SlideShare a Scribd company logo
3
Most read
5
Most read
9
Most read
Presentation on bullet train
THE BULLET TRAIN
Introduction
Bullet train track
Bullet vs. Conventional train
How it is better for the environment
Bullet train in India
Presentation on bullet train
 The first bullet train named Shinkansen
was invented in1964 by Hideo Shima
from Tokyo, Japan.
Its launch occurred in October and
coincided with the Tokyo Olympics.
Bullet trains travel up to three times
the normal speed of a train.
 This train uses superconducting electric magnets in the
vehicle to levitate and propel the train.
 This means that once electrified these magnets do not require
additional energy.
 The train levitate b/w 0.39 and 3.93 inches above the track.
 These magnets are cooled by liquid helium or liquid nitrogen.
SEATING CAPACITY AND CLASSES:
 The train has three separate classes namely business class , green class ,
ordinary class.
 First bullet train i.e. Shinkansen train configured with ten cars and has a
capacity to carry 731 passenger.
 658 seats of ordinary class ,55 seats are of green class and 18 seats are in
business class.
BETTER FOR THE ENVIRONMENT:
 Less energy consumption because of no rail-track friction.
 Requires no fossil fuels which can harm environment.
 Less noise pollution since the train never hits the track.
BULLET TRAIN vs. CONVENTIONAL TRAIN
BULLET TRAINS CONVENTIONAL TRAINS
• No friction=Less maintenance
• No engine=No fuel required
• Speeds in excess of 300 km/h
• Routine maintenance is needed
• Engines require fossil fuels
• Speed up to 110 km/h
BULLET TRAIN IN INDIA
• The Mumbai–Ahmedabad high-speed rail corridor is an
approved high-speed rail corridor project to connect the cities
of Mumbai, Maharashtra and Ahmedabad, Gujarat in India. If
built, it will be India's first high speed rail line.
CONSTRUCTION:
 Work on the high-speed rail corridor will start by late 2017 or early 2018
and is estimated to be completed by 2024-25. A 21 km undersea tunnel has
been planned between Thane and Virar . It is estimated that land
acquisition be completed by 2017.
Presentation on bullet train
 The project is estimated to
cost ₹97636 crore (US$15 billion).
 Japan has agreed to fund 81% of the total project cost (INR
79,165 Crore ) , through a 50-year loan at an interest rate of
0.1% and a moratorium on repayments up to 15 years.
 Indian Railways will invest Rs 9,800 crore in the high speed
rail project, and the remaining cost will be borne by the state
governments of Maharashtra and Gujarat.
 20% of the components used on the corridor will be supplied
by Japan, and manufactured in India.
Presentation on bullet train

More Related Content

PPTX
Bullet train in india
PPTX
Corrosion control
PDF
R1 robotics book groover pdf book pr.pdf
PPT
Heavy metal and heavy metal antagonists
PDF
Airport Planning & Terminal Building Design
PPTX
Roller compaction machines
PPTX
Over the Counter drugs vs Prescription Drugs
PPTX
Metro Rail in India ppt
Bullet train in india
Corrosion control
R1 robotics book groover pdf book pr.pdf
Heavy metal and heavy metal antagonists
Airport Planning & Terminal Building Design
Roller compaction machines
Over the Counter drugs vs Prescription Drugs
Metro Rail in India ppt

What's hot (20)

PPTX
Bullet train in India
PPTX
Bullet train In India
PPSX
PPT On High Speed Railways
PDF
THE INDIAN RAILWAYS
PPTX
Bullet train project in india
PPTX
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
PPTX
ppt on bullet trains
PPTX
Bullet train in india
PPTX
Bullet train study
PPTX
Metro rail in india
PPT
Indian Railways ppt.
PPT
Bullet train
PPTX
Bullet Train in India
PPT
Delhi metro
PPTX
Delhi metro presentation(SCHOOL/COLLEGE)
PPTX
RAILWAYS
PPTX
Railway project
PPTX
History of great indian railways
PPTX
Chenab Bridge, Jammu and Kashmir - Railway Technology
PPTX
Chenab bridge ppt
Bullet train in India
Bullet train In India
PPT On High Speed Railways
THE INDIAN RAILWAYS
Bullet train project in india
BULLET TRAIN - A Preview on India's FIRST fastest High-Speed Railway Corriodor
ppt on bullet trains
Bullet train in india
Bullet train study
Metro rail in india
Indian Railways ppt.
Bullet train
Bullet Train in India
Delhi metro
Delhi metro presentation(SCHOOL/COLLEGE)
RAILWAYS
Railway project
History of great indian railways
Chenab Bridge, Jammu and Kashmir - Railway Technology
Chenab bridge ppt
Ad

Similar to Presentation on bullet train (20)

PPTX
PDF
A Review on High Speed Rail Project between Ahmedabad and Mumbai
PPTX
Bullet train .
PPTX
Train 18
PPTX
Ten remarkable infrastructure developments in india
PPTX
Does india currently need a bullet trainhigh speed train or does the governme...
PPTX
Metro project
PPTX
Sky bus technology
PDF
India (6).pdf
PDF
BMRCL In-Plant Training Report
PPTX
Sky bus
PPTX
Bullet train feasibility
PPTX
Metro project in inda
PPTX
Transport infrastructure in india
PPTX
sky bus
DOCX
Railway budget 2012
PDF
A Study on High Speed Rails in India
PPTX
railways.pptx
PPTX
Delhi metro
PPTX
Introduction to railway engineering
A Review on High Speed Rail Project between Ahmedabad and Mumbai
Bullet train .
Train 18
Ten remarkable infrastructure developments in india
Does india currently need a bullet trainhigh speed train or does the governme...
Metro project
Sky bus technology
India (6).pdf
BMRCL In-Plant Training Report
Sky bus
Bullet train feasibility
Metro project in inda
Transport infrastructure in india
sky bus
Railway budget 2012
A Study on High Speed Rails in India
railways.pptx
Delhi metro
Introduction to railway engineering
Ad

More from Krishna Mohan Mishra (20)

PDF
PDF automation
PDF
Excel automation
PDF
Database automation
PDF
Bot creator- RPA
PDF
PDF
Automation Anywhere Clients
PDF
Web Control Room-2
PDF
Web Control Room
PDF
PDF
Introduction to RPA
DOCX
IBM Study material
PDF
Data structures college notes(LPU)
PPTX
Performance issues in Cloud Computing
PDF
Teaching Assistant Evaluation
PDF
Stock Market Prediction Using ANN
PPTX
Python with data Sciences
PDF
Software requirement Analysis (SRS) for FACEBOOK
PPTX
PDF automation
Excel automation
Database automation
Bot creator- RPA
Automation Anywhere Clients
Web Control Room-2
Web Control Room
Introduction to RPA
IBM Study material
Data structures college notes(LPU)
Performance issues in Cloud Computing
Teaching Assistant Evaluation
Stock Market Prediction Using ANN
Python with data Sciences
Software requirement Analysis (SRS) for FACEBOOK

Recently uploaded (20)

PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
Classroom Observation Tools for Teachers
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
Lesson notes of climatology university.
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
Cell Structure & Organelles in detailed.
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Trump Administration's workforce development strategy
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Supply Chain Operations Speaking Notes -ICLT Program
LDMMIA Reiki Yoga Finals Review Spring Summer
Classroom Observation Tools for Teachers
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
A systematic review of self-coping strategies used by university students to ...
Lesson notes of climatology university.
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
GENETICS IN BIOLOGY IN SECONDARY LEVEL FORM 3
History, Philosophy and sociology of education (1).pptx
Microbial diseases, their pathogenesis and prophylaxis
Cell Structure & Organelles in detailed.
STATICS OF THE RIGID BODIES Hibbelers.pdf
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Module 4: Burden of Disease Tutorial Slides S2 2025
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Trump Administration's workforce development strategy
Chinmaya Tiranga quiz Grand Finale.pdf

Presentation on bullet train

  • 3. Introduction Bullet train track Bullet vs. Conventional train How it is better for the environment Bullet train in India
  • 5.  The first bullet train named Shinkansen was invented in1964 by Hideo Shima from Tokyo, Japan. Its launch occurred in October and coincided with the Tokyo Olympics. Bullet trains travel up to three times the normal speed of a train.
  • 6.  This train uses superconducting electric magnets in the vehicle to levitate and propel the train.  This means that once electrified these magnets do not require additional energy.  The train levitate b/w 0.39 and 3.93 inches above the track.  These magnets are cooled by liquid helium or liquid nitrogen.
  • 7. SEATING CAPACITY AND CLASSES:  The train has three separate classes namely business class , green class , ordinary class.  First bullet train i.e. Shinkansen train configured with ten cars and has a capacity to carry 731 passenger.  658 seats of ordinary class ,55 seats are of green class and 18 seats are in business class.
  • 8. BETTER FOR THE ENVIRONMENT:  Less energy consumption because of no rail-track friction.  Requires no fossil fuels which can harm environment.  Less noise pollution since the train never hits the track.
  • 9. BULLET TRAIN vs. CONVENTIONAL TRAIN BULLET TRAINS CONVENTIONAL TRAINS • No friction=Less maintenance • No engine=No fuel required • Speeds in excess of 300 km/h • Routine maintenance is needed • Engines require fossil fuels • Speed up to 110 km/h
  • 10. BULLET TRAIN IN INDIA • The Mumbai–Ahmedabad high-speed rail corridor is an approved high-speed rail corridor project to connect the cities of Mumbai, Maharashtra and Ahmedabad, Gujarat in India. If built, it will be India's first high speed rail line.
  • 11. CONSTRUCTION:  Work on the high-speed rail corridor will start by late 2017 or early 2018 and is estimated to be completed by 2024-25. A 21 km undersea tunnel has been planned between Thane and Virar . It is estimated that land acquisition be completed by 2017.
  • 13.  The project is estimated to cost ₹97636 crore (US$15 billion).  Japan has agreed to fund 81% of the total project cost (INR 79,165 Crore ) , through a 50-year loan at an interest rate of 0.1% and a moratorium on repayments up to 15 years.  Indian Railways will invest Rs 9,800 crore in the high speed rail project, and the remaining cost will be borne by the state governments of Maharashtra and Gujarat.  20% of the components used on the corridor will be supplied by Japan, and manufactured in India.