Prioritization 301
   Advanced Roadmapping Class


         Bruce McCarthy
   Chief Product Person, Reqqs
         bruce@reqqs.com
          www.reqqs.com
           @d8a_driven
Why roadmaps matter
R
“Did [Previous PM] send you his
 spreadsheet of [5 trillion un-
 prioritized] feature requests?”
          - VP Product Management
“We need this to close
[big deal] this quarter!”
             - Key Sales Person
“37% of our Support calls are about
 [oldest, hairiest part of the code].
           Can’t we fix it?”
                   - Support Manager
“[Shiny tech thing] will make
[your top priority] much easier!”
                       - Tech Lead
“[Previously irrelevant competitor]
just shipped [shiny feature]. How are
     we going to leapfrog them?”
                        - VP Marketing
“We gotta drop everything and work
  on [meaningless buzzword]. It’s
         gonna be huge!”
                         - VP Sales
“If you don’t support [obscure
platform] I can’t buy your stuff.”
               - Key Customer CTO
“Why would anybody schedule [easy
feature] before [hard feature]? Who
  approved that [expletive] idea?”
                               - CEO
“What’s your business case for [CEO’s
  pet project]? When do we make
              money?”
                               - CFO
“You can’t add work without
subtracting something? What, is your
         whole team lazy?”
                               - CEO
Roadmap Process
1.   Set Goals
2.   Collect Ideas
3.   Set Priorities
4.   Get Buy-in
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Roadmap Process
1.   Set Goals
2.   Collect Ideas Today’s
3.   Set Priorities focus
4.   Get Buy-in
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Prioritization
Prioritization
Important
 Basis of your roadmap

 Can determine success

 Inspires confidence

 Grooms your backlog

 Key PM skill
Prioritization
Important                Hard
 Basis of your roadmap    Big backlogs

 Can determine success    Competing goals

 Inspires confidence       Multiple stakeholders

 Grooms your backlog      Vocal customers

 Key PM skill             Dependencies

                          Risks
Methods I Don’t
 Recommend
Methods I Don’t
 Recommend
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)


  PM       How long can you tread water?
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)


  PM       How long can you tread water?


Customer   How to stop growing
Methods I Don’t
    Recommend
Engineer   How to build the perfect solution no one will buy


  CEO      How to build a buzzword


 Sales     How to never finish anything (and lose your devs)


  PM       How long can you tread water?


Customer   How to stop growing


Analyst    How to miss the market window
Math makes (almost)
 everything better
Prioritization 301: An Advanced Roadmapping Class for Product People
Value / Effort = Priority
High




Value




  Low

         High            Low
                Effort
High




Value




  Low

         High            Low
                Effort
Value / Effort = Priority


     Value = Expected
  Contribution to Defined
           Goals
Typical Goals
Typical Goals
Grow the user base
Typical Goals
Grow the user base
Increase customer satisfaction
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Increase revenue this year
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Increase revenue this year
Transformation (revenue in future years)
Typical Goals
Grow the user base
Increase customer satisfaction
Improve performance
Increase referrals
Validated learning
Increase revenue this year
Transformation (revenue in future years)
Generate buzz
Value / Effort = Priority
Value / Effort = Priority



   Value = V1+V2+V3...
Value / Effort = Priority
Value / Effort = Priority


 (V1+V2+V3) / (E1+E2) x
      Certainty = P
Contribution
Contribution
Exact numbers
Contribution
Exact numbers
Contribution
Exact numbers

1-10
Contribution
Exact numbers

1-10

1-100
Contribution
Exact numbers

1-10

1-100

Fibonacci
Contribution
Exact numbers

1-10

1-100

Fibonacci

1 to 5 stars
Contribution
Exact numbers

1-10

1-100

Fibonacci

1 to 5 stars

0,1,2
Contribution
Exact numbers

1-10

1-100

Fibonacci

1 to 5 stars

0,1,2
Feature   V1   V2   E   Raw    C    Score


  A       1    1    2    1    75%   0.75


  B       1    0    2   0.5   90%   0.45


  C       2    -1   1    1    40%    0.4
(V1+V2)/E = Raw


Feature   V1   V2   E   Raw       C    Score


  A       1    1    2    1       75%   0.75


  B       1    0    2   0.5      90%   0.45


  C       2    -1   1    1       40%    0.4
Feature   V1   V2   E   Raw    C    Score


  A       1    1    2    1    75%   0.75


  B       1    0    2   0.5   90%   0.45


  C       2    -1   1    1    40%    0.4
(V1+V2)/E x C = Score


Feature   V1   V2   E    Raw     C    Score


  A       1    1    2      1    75%   0.75


  B       1    0    2    0.5    90%    0.45


  C       2    -1   1      1    40%    0.4
Feature   V1   V2   E   Raw    C    Score


  A       1    1    2    1    75%   0.75


  B       1    0    2   0.5   90%   0.45


  C       2    -1   1    1    40%    0.4
Are We There Yet?
Roadmap Process
1.   Set Goals
2.   Collect Ideas
3.   Set Priorities
4.   Get Buy-in
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Roadmap Process
1.   Set Goals
2.   Collect Ideas
3.   Set Priorities    w/o this, you
4.   Get Buy-in          are f***ed
5.   Define Releases
6.   Communicate Roadmap
7.   Build Product
8.   Launch Product
9.   Repeat
Prioritization 301: An Advanced Roadmapping Class for Product People
Shuttle Diplomacy

 “I’ve got a draft set of
priorities. Would you help
       me refine it?”
Prioritization 301: An Advanced Roadmapping Class for Product People
Collaboration

“I’ll present our priorities
to the executive team on
           Friday”
Feature   V1   V2   E   Raw    C    Score



         1    1    2    1    75%   0.75



  ?       1    0    2   0.5   90%   0.45



         2    -1   1    1    40%    0.4
Use Tools
(Don’t let them use you.)
Discussion
For Slides & Excel
     Template

         Bruce McCarthy
   Chief Product Person, Reqqs
         bruce@reqqs.com
    www.reqqs.com/resources
           @d8a_driven

More Related Content

PDF
The power of creative collaboration
PDF
10 Insightful Quotes On Designing A Better Customer Experience
PDF
Roadmaps Relaunched Bruce McCarthy Workshop BoS Boston 2018 Tesla
PDF
25 Need-to-Know Marketing Stats
PDF
PDF
Work Hacks : Body Language
PDF
The Productivity Secret Of The Best Leaders
PDF
10 Things your Audience Hates About your Presentation
The power of creative collaboration
10 Insightful Quotes On Designing A Better Customer Experience
Roadmaps Relaunched Bruce McCarthy Workshop BoS Boston 2018 Tesla
25 Need-to-Know Marketing Stats
Work Hacks : Body Language
The Productivity Secret Of The Best Leaders
10 Things your Audience Hates About your Presentation

What's hot (20)

PPTX
24 Design Tips from Real Designers
PPTX
Digital Marketing Plan Template
PDF
Mobile Is Eating the World (2016)
PDF
24 Time Management Hacks to Develop for Increased Productivity
PDF
The Future of Everything
PPTX
The battle for attention
PDF
Digital Strategy 101
PDF
What is strategy?
PDF
The Great State of Design with CSS Grid Layout and Friends
PPTX
15 Quotes To Nurture Your Creative Soul!
PDF
Sales Strategy and Plan Template in Powerpoint | By ex-McKinsey Consultants
PPTX
The science of memorable presentations
PPSX
Baldrige Criteria Overview
PDF
The Future of Trade: Special Gaming Edition
PDF
signmesh snapshot - the best of sustainability
PPTX
Go-to-Market Strategies
PDF
Pixar's 22 Rules to Phenomenal Storytelling
PDF
How NOT to Run Your Company – Lessons Learned
PDF
17 Ways to Design a Presentation People Want to View
PPTX
Agile Product Manager/Product Owner Dilemma (PMEC)
24 Design Tips from Real Designers
Digital Marketing Plan Template
Mobile Is Eating the World (2016)
24 Time Management Hacks to Develop for Increased Productivity
The Future of Everything
The battle for attention
Digital Strategy 101
What is strategy?
The Great State of Design with CSS Grid Layout and Friends
15 Quotes To Nurture Your Creative Soul!
Sales Strategy and Plan Template in Powerpoint | By ex-McKinsey Consultants
The science of memorable presentations
Baldrige Criteria Overview
The Future of Trade: Special Gaming Edition
signmesh snapshot - the best of sustainability
Go-to-Market Strategies
Pixar's 22 Rules to Phenomenal Storytelling
How NOT to Run Your Company – Lessons Learned
17 Ways to Design a Presentation People Want to View
Agile Product Manager/Product Owner Dilemma (PMEC)
Ad

Viewers also liked (20)

PDF
FMCG / CPG Consumer Trends 2015 - Product Innovations of the Year
PDF
Diabetes in Pregnancy
PDF
Internet of Things (IOT) - Technology and Applications
PPTX
AUTISM ppt
PPTX
Key Passages in Jane Eyre
PDF
The Future of Work
PPTX
BUSINESS QUIZ -Round 1
PPTX
Introduction To Software Engineering
PPTX
Roadmaps That Inspire
PDF
Biofertilizer
PDF
What Do Real Women Look Like? 100 Stock Photos of Real Women
PDF
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
PDF
Web Trends to Watch in 2014
DOCX
BCG Matrix of Engro foods
PPTX
4. heredity and evolution
PDF
The Power of Color in Branding
PDF
Deep Learning through Examples
PPTX
Political Development of the Philippine Government
PPT
Plate tectonics slides re
FMCG / CPG Consumer Trends 2015 - Product Innovations of the Year
Diabetes in Pregnancy
Internet of Things (IOT) - Technology and Applications
AUTISM ppt
Key Passages in Jane Eyre
The Future of Work
BUSINESS QUIZ -Round 1
Introduction To Software Engineering
Roadmaps That Inspire
Biofertilizer
What Do Real Women Look Like? 100 Stock Photos of Real Women
Environmental Impact Assessment (EIA) report on Rampal 1320MW coal-based powe...
Web Trends to Watch in 2014
BCG Matrix of Engro foods
4. heredity and evolution
The Power of Color in Branding
Deep Learning through Examples
Political Development of the Philippine Government
Plate tectonics slides re
Ad

Similar to Prioritization 301: An Advanced Roadmapping Class for Product People (20)

PPT
Prioritizing for Profit from AgilePalooza
PDF
How to Build Roadmaps that Stick - Roadmapping 301 (Bruce McCarthy) ProductCa...
PDF
Product Management - Quality teams collaboration
PPTX
Getting it Built
PDF
Creating a Product Roadmap - Product Strategy Series
PPTX
Prioritization in Product Management
PPTX
PM TEMPLATE_ PRODUCT ROADMAP.pptx
PPTX
Software Project Health Check: Best Practices and Techniques for Your Product...
PPTX
Product Roadmap
PDF
Roadmapping workshop - Bruce McCarthy
PPTX
Making Cornwall Agile
PPT
Collaborative Roadmapping
PDF
How to be a successful agile product manager
PPTX
Curing Shiny object syndrome
PDF
Quantitative, Qualitative, and Intuitive Feature Prioritization
PDF
Guiding a Product Roadmap in a Chaotic World
PDF
Priorities and roadmaps product camp
PPTX
Georgia State Presentation
PPTX
Building Faster Horses: Taking Over An Existing Software Product
PDF
SPM 5 - Release Planning
Prioritizing for Profit from AgilePalooza
How to Build Roadmaps that Stick - Roadmapping 301 (Bruce McCarthy) ProductCa...
Product Management - Quality teams collaboration
Getting it Built
Creating a Product Roadmap - Product Strategy Series
Prioritization in Product Management
PM TEMPLATE_ PRODUCT ROADMAP.pptx
Software Project Health Check: Best Practices and Techniques for Your Product...
Product Roadmap
Roadmapping workshop - Bruce McCarthy
Making Cornwall Agile
Collaborative Roadmapping
How to be a successful agile product manager
Curing Shiny object syndrome
Quantitative, Qualitative, and Intuitive Feature Prioritization
Guiding a Product Roadmap in a Chaotic World
Priorities and roadmaps product camp
Georgia State Presentation
Building Faster Horses: Taking Over An Existing Software Product
SPM 5 - Release Planning

Recently uploaded (20)

PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
DOCX
The AUB Centre for AI in Media Proposal.docx
PPTX
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
PPTX
Cloud computing and distributed systems.
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
Approach and Philosophy of On baking technology
PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PPTX
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Empathic Computing: Creating Shared Understanding
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PPTX
Big Data Technologies - Introduction.pptx
PDF
Unlocking AI with Model Context Protocol (MCP)
PDF
CIFDAQ's Market Insight: SEC Turns Pro Crypto
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
Bridging biosciences and deep learning for revolutionary discoveries: a compr...
Diabetes mellitus diagnosis method based random forest with bat algorithm
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
The AUB Centre for AI in Media Proposal.docx
KOM of Painting work and Equipment Insulation REV00 update 25-dec.pptx
Cloud computing and distributed systems.
Chapter 3 Spatial Domain Image Processing.pdf
Digital-Transformation-Roadmap-for-Companies.pptx
Approach and Philosophy of On baking technology
Dropbox Q2 2025 Financial Results & Investor Presentation
PA Analog/Digital System: The Backbone of Modern Surveillance and Communication
“AI and Expert System Decision Support & Business Intelligence Systems”
Empathic Computing: Creating Shared Understanding
20250228 LYD VKU AI Blended-Learning.pptx
The Rise and Fall of 3GPP – Time for a Sabbatical?
Big Data Technologies - Introduction.pptx
Unlocking AI with Model Context Protocol (MCP)
CIFDAQ's Market Insight: SEC Turns Pro Crypto
Review of recent advances in non-invasive hemoglobin estimation
Bridging biosciences and deep learning for revolutionary discoveries: a compr...

Prioritization 301: An Advanced Roadmapping Class for Product People

Editor's Notes

  • #2: I’m Bruce McCarthy, CPP of Reqqs - the smart roadmap tool for product people. I’ve been in product management for 16 years at companies like iMarket (bought by Dun & Bradstreet) and ATG (bought by Oracle). My day job currently is VP of Product at NetProspex in Waltham. \n\nI’m here to talk about how to do prioritization in an objective and collaborative way so that you can get the buy-in you need to put together a roadmap that will stick. This is the advanced class because you guys are well beyond the basics of H-M-L.\n\nI developed this methodology over time in various jobs. I’ve seen it work over and over again where gut instinct or endless meetings fail. In talking with other product people, I’ve found the good ones usually develop something similar. I’ve really just tried to standardize it and genericize it a bit so everyone can benefit.\n
  • #3: In today’s agile world, do roadmaps still matter? Aren’t we allowed to change direction after each sprint? Actually, I think roadmaps are needed even more in an agile world. Yes, you can correct course after each sprint, but you should be correcting course toward something - toward a vision of where you want your product or your company to be in a year or 2 or 3. You need to stake out that vision and then you need to work out what you think is the best path to get there. That’s your roadmap.\n
  • #4: Your roadmap is also a shield against the constant onslaught of potentially diverting requests from all quarters.\n
  • #5: \n
  • #6: \n
  • #7: \n
  • #8: \n
  • #9: \n
  • #10: \n
  • #11: \n
  • #12: \n
  • #13: \n
  • #14: This is my favorite - actually heard - CEO quote.\n
  • #15: Your roadmap isn’t much of a shield unless you have buy-in from your stakeholders on it. Before you can get that, though, you need priorities. To set priorities you need ideas, and you need goals to test those ideas against. I want to talk about priorities first because your roadmap is really a reflection - a timeline view - of your priorities.\n
  • #16: Your roadmap isn’t much of a shield unless you have buy-in from your stakeholders on it. Before you can get that, though, you need priorities. To set priorities you need ideas, and you need goals to test those ideas against. I want to talk about priorities first because your roadmap is really a reflection - a timeline view - of your priorities.\n
  • #17: \n
  • #18: \n
  • #19: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #20: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #21: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #22: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #23: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #24: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #25: The PM’s gut is near and dear to my heart, of course, but it can only take you so far. Sooner or later you need data. Even more, though, you need consensus from all of these stakeholders.\n
  • #26: There is a better way.\n
  • #27: A simple equation. It’s really the familiar ROI calculation. Effort is the investment you make to generate value in return. The items in your backlog that have the highest ROI are the ones you should do first, right?\n
  • #28: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #29: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #30: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #31: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #32: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #33: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #34: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #35: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #36: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #37: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #38: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #39: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #40: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #41: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #42: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #43: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #44: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #45: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #46: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #47: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #48: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #49: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #50: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #51: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #52: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #53: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #54: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #55: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #56: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #57: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #58: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #59: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #60: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #61: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #62: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #63: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #64: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #65: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #66: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #67: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #68: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #69: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #70: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #71: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #72: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #73: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #74: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #75: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #76: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #77: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #78: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #79: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #80: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #81: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #82: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #83: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #84: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #85: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #86: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #87: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #88: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #89: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #90: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #91: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #92: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #93: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #94: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #95: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #96: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #97: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #98: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #99: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #100: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #101: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #102: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #103: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #104: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #105: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #106: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #107: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #108: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #109: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #110: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #111: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #112: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #113: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #114: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #115: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #116: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #117: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #118: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #119: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #120: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #121: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #122: Analysts and some requirements tools like to plot value vs. effort on the classic 2x2 grid. You do the things that fall in the upper right quadrant, right? That works fine when you have 5 or 10 things to prioritize, but most of us are dealing with hundreds. How do you figure out which is closest to the corner here? And don’t most of us have several projects running in parallel?\n
  • #123: \n
  • #124: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #125: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #126: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #127: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #128: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #129: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #130: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #131: Your goals usually come down from your CEO or your executive team. Strategic goals help you prioritize projects. More tactical goals are what gets your project approved. Revenue is nearly always on the list. \n\nA tip for when your CEO asks what you are doing that’s “transformative” or “paradigm-shifting” is to think of it as things that won’t generate significant revenue this year but have a chance to grow it a lot in future years by entering new markets or serving new needs.\n\nI’ve never been able to get away without including some kind of “coolness” or “buzz factor” goal for anything but internal projects. If you skip that, someone always complains that we’re not taking into account that we need to generate excitement in the market to be successful.\n
  • #132: \n
  • #133: \n
  • #134: \n
  • #135: \n
  • #136: \n
  • #137: \n
  • #138: \n
  • #139: \n
  • #140: \n
  • #141: \n
  • #142: Removing the QA step to ship early means negative numbers for quality (V2)\n
  • #143: Removing the QA step to ship early means negative numbers for quality (V2)\n
  • #144: Removing the QA step to ship early means negative numbers for quality (V2)\n
  • #145: Removing the QA step to ship early means negative numbers for quality (V2)\n
  • #146: No. Maybe halfway.\n
  • #147: \n
  • #148: \n
  • #149: \n
  • #150: Henry Kissinger was Nixon’s Secretary of State and famously settled things down in the Middle East after the 1967 war using shuttle diplomacy.\n
  • #151: \n
  • #152: \n
  • #153: \n
  • #154: A long-time PM of a company I had just joined saw the way this methodology drove consensus among his executive team as “magical.”\n
  • #155: A PM I met recently told me he had a friend who developed a spreadsheet like this but could not get buy-in on it. Turns out he made two critical mistakes. First, he had about 20 different goals he scored everything against and so couldn’t get anyone to review it with him. Second, he insisted the team adopt the spreadsheet’s recommendations exactly without further discussion.\n
  • #156: \n
  • #157: \n