SlideShare a Scribd company logo
Chapter 9:
Project Human Resource
Management
1
303KM Project Management
2
303KM Project Management
Learning Objectives
1. Explain the importance of good human resource
management on projects.
2. Define project human resource management and
understand its processes.
3. Summarize key concepts for managing people by
understanding the theories of Abraham Maslow,
Frederick Herzberg, David McClelland, and Douglas
McGregor on motivation.
3
303KM Project Management
Learning Objectives
4. Discuss human resource planning and be able to create a
project organizational chart, responsibility assignment
matrix, and resource histogram.
5. Understand important issues involved in project staff
acquisition and explain the concepts of resource
assignments, resource loading, and resource leveling.
6. Assist in team development with training, team-building
activities, and reward systems.
7. Explain and apply several tools and techniques to help
manage a project team and summarize general advice on
managing teams.
4
303KM Project Management
1 Importance of good human resource management
on projects
 U.S. productivity is No. 1 in the world when productivity is
measured as gross domestic product per worker, but our lead
vanishes when productivity is measured as GDP per hour
worked…Europeans take an average of six to seven weeks of
paid annual leave, compared with just 12 days in the United
States. Twice as many American as European workers put in
more than 48 hours per week.”*
 Sociologists have shown that many Americans, especially men,
would like to have more family or leisure time. Recent surveys
show that many Americans are willing to sacrifice up to a
quarter of their salaries in return for more time off!
*Williams, Joan and Ariane Hegewisch, “Confusing productivity with long work
week,” Minneapolis Star Tribune (September 6, 2004) (www.startribune.com).
5
303KM Project Management
2. What is Project Human Resource
Management?
 Making the most effective use of the people involved with a
project.
 Processes include:
 Human resource planning: Identifying and documenting project
roles, responsibilities, and reporting relationships.
 Acquiring the project team: Getting the needed personnel
assigned to and working on the project.
 Developing the project team: Building individual and group
skills to enhance project performance.
 Managing the project team: Tracking team member
performance, motivating team members, providing timely
feedback, resolving issues and conflicts, and coordinating changes
to help enhance project performance.
6
303KM Project Management
3. Keys to Managing People
 Psychologists and management theorists have devoted
much research and thought to the field of managing
people at work.
 Important areas related to project management include:
 Motivation theories
 Influence and power
 Effectiveness
7
303KM Project Management
Intrinsic and Extrinsic Motivation
 Intrinsic motivation causes people to participate in an
activity for their own enjoyment.
 Extrinsic motivation causes people to do something
for a reward or to avoid a penalty.
 For example, some children take piano lessons for
intrinsic motivation (they enjoy it) while others take
them for extrinsic motivation (to get a reward or avoid
punishment).
8
303KM Project Management
Maslow’s Hierarchy of Needs
 Abraham Maslow argued that human beings possess
unique qualities that enable them to make independent
choices, thus giving them control of their destiny.
 Maslow developed a hierarchy of needs, which states
that people’s behaviors are guided or motivated by a
sequence of needs.
9
303KM Project Management
Figure 9-1. Maslow’s Hierarchy
of Needs
10
303KM Project Management
Herzberg’s Motivational and Hygiene
Factors
 Frederick Herzberg wrote several famous books and
articles about worker motivation. He distinguished
between:
 Motivational factors: Achievement, recognition, the
work itself, responsibility, advancement, and growth.
These factors produce job satisfaction.
 Hygiene factors: Larger salaries, more supervision, and
a more attractive work environment. These factors cause
dissatisfaction if not present, but do not motivate
workers to do more.
11
303KM Project Management
McClelland’s Acquired-Needs Theory
 Specific needs are acquired or learned over time and are shaped
by life experiences. The following are the main categories of
acquired needs:
 Achievement (nAch): People with a high need for achievement
like challenging projects with attainable goals and lots of feedback.
 Affiliation (nAff): People with high need for affiliation desire
harmonious relationships and need to feel accepted by others, so
managers should try to create a cooperative work environment for
them.
 Power (nPow): People with a need for power desire either
personal power (not good) or institutional power (good for the
organization). Provide institutional power seekers with
management opportunities.
12
303KM Project Management
McGregor’s Theory X and Y
 Douglas McGregor popularized the human relations approach to
management in the 1960s.
 Theory X: Assumes workers dislike and avoid work, so
managers must use coercion, threats, and various control
schemes to get workers to meet objectives.
 Theory Y: Assumes individuals consider work as natural as play
or rest and enjoy the satisfaction of esteem and self-actualization
needs.
 Theory Z: Introduced in 1981 by William Ouchi and is based on
the Japanese approach to motivating workers, which emphasizes
trust, quality, collective decision making, and cultural values.
13
303KM Project Management
4. Organizational Planning
 Involves identifying and documenting project
roles, responsibilities, and reporting
relationships.
 Outputs include:
 Project organizational charts
 Staffing management plans
 Responsibility assignment matrixes
 Resource histograms
14
303KM Project Management
Responsibility Assignment Matrixes
 A responsibility assignment matrix (RAM) is a
matrix that maps the work of the project, as described
in the WBS, to the people responsible for performing
the work, as described in the OBS.
 Can be created in different ways to meet unique project
needs.
15
303KM Project Management
Figure 9-4. Sample Responsibility
Assignment Matrix (RAM)
16
303KM Project Management
Figure 9-5. RAM Showing
Stakeholder Roles
17
303KM Project Management
Table 9-1. Sample RACI Chart
R = Responsibility, only one R per task
A = Accountability
C = Consultation
I = Informed
18
303KM Project Management
Staffing Management Plans and Resource
Histograms
 A staffing management plan describes when and how
people will be added to and taken off the project team.
 A resource histogram is a column chart that shows the
number of resources assigned to a project over time.
19
303KM Project Management
Figure 9-6. Sample Resource Histogram
20
303KM Project Management
5. Acquiring the Project Team
 Acquiring qualified people for teams is crucial.
 The project manager who is the smartest person on the
team has done a poor job of recruiting!
 Staffing plans and good hiring procedures are
important, as are incentives for recruiting and retention.
 Some companies give their employees one dollar for
every hour that a new person who they helped hire
works.
 Some organizations allow people to work from home as
an incentive.
21
303KM Project Management
Resource Loading
 Resource loading refers to the amount of individual
resources an existing schedule requires during specific
time periods.
 Helps project managers develop a general
understanding of the demands a project will make on
the organization’s resources and individual people’s
schedules.
 Overallocation means more resources than are
available are assigned to perform work at a given time.
22
303KM Project Management
Figure 9-7. Sample Histogram Showing an
Overallocated Individual
What’s wrong with this picture? Assume 100 percent means Joe is
working eight hours per day.
23
303KM Project Management
Resource Leveling
 Resource leveling is a technique for resolving resource
conflicts by delaying tasks.
 The main purpose of resource leveling is to create a
smoother distribution of resource use and reduce
overallocation.
24
303KM Project Management
Figure 9-8. Resource Leveling Example
25
303KM Project Management
Benefits of Resource Leveling
 When resources are used on a more constant basis, they
require less management.
 It may enable project managers to use a just-in-time
inventory type of policy for using subcontractors or
other expensive resources.
 It results in fewer problems for project personnel and
the accounting department.
 It often improves morale.
26
303KM Project Management
6. Developing the Project Team
 The main goal of team development is to help people
work together more effectively to improve project
performance.
 It takes teamwork to successfully complete most
projects.
27
303KM Project Management
Training
 Training can help people understand themselves and
each other, and understand how to work better in
teams.
 Team building activities include:
 Physical challenges
 Psychological preference indicator tools
28
303KM Project Management
Myers-Briggs Type Indicator (MBTI)
 MBTI is a popular tool for determining personality
preferences and helping teammates understand each
other.
 Four dimensions include:
 Extrovert/Introvert (E/I)
 Sensation/Intuition (S/N)
 Thinking/Feeling (T/F)
 Judgment/Perception (J/P)
 NTs, or rationals, are attracted to technology fields.
 IT people vary most from the general population in
their tendency to not be extroverted or sensing.
29
303KM Project Management
Wideman and Shenhar’s Views on MBTI
and Project Management*
 Most suited for project leadership:
 100 percent: INTJ, ENTJ, ISTJ, ESTJ
 50 percent: INTP, ENTP, ENFP, ENFJ
 Best suited as followers:
 100 percent: INFJ, ISFJ
 50 percent: INTP, ENTP, ENFP, ENFJ, ESFJ
 Not suited for project work:
 100 percent: INFP, ISFP, ESFP, ISTP
 50 percent: ENFP, ESTP
*Wideman, R. Max and Aaron J. Shenhar, “Professional and Personal Development: A Practical
Approach to Education and Training,” Project Management for Business Professionals, edited by Joan
Knutson, 2001, p. 375.
30
303KM Project Management
MBTI and Suitability to Project Work*
*Wideman, R. Max. “Project Teamwork, Personality Profiles and the Population at Large: Do we
have enough of the right kind of people?” (http://www.maxwideman.com/papers/profiles/profiles.pdf ).
What do
you think
about
these
views?
31
303KM Project Management
Social Styles Profile
 People are perceived as behaving primarily in one of
four zones, based on their assertiveness and
responsiveness:
 Drivers
 Expressives
 Analyticals
 Amiables
 People on opposite corners (drivers and amiables,
analyticals and expressives) may have difficulty getting
along.
32
303KM Project Management
Figure 9-9. Social Styles
33
303KM Project Management
Reward and Recognition Systems
 Team-based reward and recognition systems can
promote teamwork.
 Focus on rewarding teams for achieving specific goals.
 Allow time for team members to mentor and help each
other to meet project goals and develop human
resources.
34
303KM Project Management
7. Managing the Project Team
 Project managers must lead their teams in performing
various project activities.
 After assessing team performance and related
information, the project manager must decide:
 If changes should be requested to the project.
 If corrective or preventive actions should be
recommended.
 If updates are needed to the project management plan or
organizational process assets.
35
303KM Project Management
Tools and Techniques for Managing
Project Teams
 Observation and conversation
 Project performance appraisals
 Conflict management
 Issue logs

More Related Content

PDF
Project quality management
PPT
Project Time Management
PPTX
5 - Project Scope Management.pptx
PPTX
Project Human Resource Management.pptx
PPT
Project Scheduling, Planning and Risk Management
PDF
Project Resource Management
PPTX
Triple constraint
PPTX
Project management process and Project Management Knowledge areas
Project quality management
Project Time Management
5 - Project Scope Management.pptx
Project Human Resource Management.pptx
Project Scheduling, Planning and Risk Management
Project Resource Management
Triple constraint
Project management process and Project Management Knowledge areas

What's hot (20)

PDF
Project Management Best Practices: Brock Boddie/General Assembly
PDF
Introduction to project management( framework and processes )
PPTX
Project scope management 1
PPTX
project management
PDF
PMP PMBOK 6th
PPT
Project Management Tools and Techniques
PPT
Project Management
PDF
Project scope management
PDF
Planning fundamentals - Project Management
PPT
Project Scope Management -
PPT
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
PPT
Project management planning
PPTX
Introduction to Software Project Management
PPTX
Project management
PDF
Project Management Concepts
PPTX
PMP Training - 08 project quality management
PPTX
Project Management Principles and Process
PPTX
Time Management within IT Project Management
PPT
Ch 9 project monitoring & control updated
PDF
Fundamentals of project management
Project Management Best Practices: Brock Boddie/General Assembly
Introduction to project management( framework and processes )
Project scope management 1
project management
PMP PMBOK 6th
Project Management Tools and Techniques
Project Management
Project scope management
Planning fundamentals - Project Management
Project Scope Management -
Organizational Influences and Project Life Cycle,PMP Chapter 2,PMBOK,PMP Exam...
Project management planning
Introduction to Software Project Management
Project management
Project Management Concepts
PMP Training - 08 project quality management
Project Management Principles and Process
Time Management within IT Project Management
Ch 9 project monitoring & control updated
Fundamentals of project management
Ad

Similar to Project Human Resources Management.ppt (20)

PPTX
It project Human resources management.pptx
PPTX
HRM in PM (1).pptx
PPTX
Project Management Institute Human Resource Management - PMBOK Chap 9
PPTX
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
PPT
human_resource_planning_staff_acquisition_and_team_development.ppt
PPT
Hr Management
PPTX
Introduction to PMP
PPTX
OverView to PMP
PDF
PPTX
8- PMP Training - Human Resource Management
PDF
Topic 13 - Project Resource Management.pdf
PPT
01puneetpatel0010_01puneetpatel0010_01puneetpatel0010.ppt
PPTX
9- PMP Training - Communication Management
PPTX
2.09 hr management 1
PPT
Ed4 P9 Project Human Resources Management
PPTX
Session 15 4th edition PMP
PPTX
human resource management for construction projects
PPTX
Human resource mangagement process
PPTX
PMP Training - 09 project human resource management
It project Human resources management.pptx
HRM in PM (1).pptx
Project Management Institute Human Resource Management - PMBOK Chap 9
Online PMP Training Material for PMP Exam - Human Resources Management Knowle...
human_resource_planning_staff_acquisition_and_team_development.ppt
Hr Management
Introduction to PMP
OverView to PMP
8- PMP Training - Human Resource Management
Topic 13 - Project Resource Management.pdf
01puneetpatel0010_01puneetpatel0010_01puneetpatel0010.ppt
9- PMP Training - Communication Management
2.09 hr management 1
Ed4 P9 Project Human Resources Management
Session 15 4th edition PMP
human resource management for construction projects
Human resource mangagement process
PMP Training - 09 project human resource management
Ad

More from MUST (20)

PPT
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
PDF
NYQUIST_PLOTS.pdf
PDF
ME451_L10_RouthHurwitz.pdf
PDF
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
PDF
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
PPTX
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
PPTX
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
PPT
2 Robot Actuators and drive systems.ppt
PPT
ON-OFF CONTROL (2).ppt
PDF
L7_PROJECT PROCUREMENT Management.pdf
PPT
L4_Cost Management.ppt
PPT
L8_PROJECT CONTRACT Management.ppt
PPT
Project procurement Management.ppt
PDF
PROJECT RISK MANAGEMENT.pdf
PDF
pmp11-risk-180412035349-2.pdf
PDF
2nd_order.pdf
PPT
History of Robotics.ppt
PPTX
Machine Vision Systems.pptx
PPTX
Robot actuation and feedback components.pptx
PPT
Contract management.ppt
Lecture 4-ELECTRIC MOTORS-ACTUATION SYSTEMS2.ppt
NYQUIST_PLOTS.pdf
ME451_L10_RouthHurwitz.pdf
LECTURE 1. Control Systems Engineering_MEB 4101.pdf
Stability criteria and Analysis_Control Systems Engineering_MEB 4101.pdf
LECTURE 3_On-off_Control Systems Engineering_MEB 4101.pptx
LECTURE 4. Stability criteria and Analysis_Control Systems Engineering_MEB 41...
2 Robot Actuators and drive systems.ppt
ON-OFF CONTROL (2).ppt
L7_PROJECT PROCUREMENT Management.pdf
L4_Cost Management.ppt
L8_PROJECT CONTRACT Management.ppt
Project procurement Management.ppt
PROJECT RISK MANAGEMENT.pdf
pmp11-risk-180412035349-2.pdf
2nd_order.pdf
History of Robotics.ppt
Machine Vision Systems.pptx
Robot actuation and feedback components.pptx
Contract management.ppt

Recently uploaded (20)

PPTX
HR Introduction Slide (1).pptx on hr intro
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
PDF
MSPs in 10 Words - Created by US MSP Network
PPTX
Amazon (Business Studies) management studies
PDF
Training And Development of Employee .pdf
PDF
How to Get Funding for Your Trucking Business
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
How to Get Business Funding for Small Business Fast
PDF
IFRS Notes in your pocket for study all the time
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
WRN_Investor_Presentation_August 2025.pdf
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PDF
Business model innovation report 2022.pdf
HR Introduction Slide (1).pptx on hr intro
unit 1 COST ACCOUNTING AND COST SHEET
Dragon_Fruit_Cultivation_in Nepal ppt.pptx
MSPs in 10 Words - Created by US MSP Network
Amazon (Business Studies) management studies
Training And Development of Employee .pdf
How to Get Funding for Your Trucking Business
ICG2025_ICG 6th steering committee 30-8-24.pptx
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
How to Get Business Funding for Small Business Fast
IFRS Notes in your pocket for study all the time
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
WRN_Investor_Presentation_August 2025.pdf
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Euro SEO Services 1st 3 General Updates.docx
Reconciliation AND MEMORANDUM RECONCILATION
Chapter 5_Foreign Exchange Market in .pdf
COST SHEET- Tender and Quotation unit 2.pdf
Probability Distribution, binomial distribution, poisson distribution
Business model innovation report 2022.pdf

Project Human Resources Management.ppt

  • 1. Chapter 9: Project Human Resource Management 1 303KM Project Management
  • 2. 2 303KM Project Management Learning Objectives 1. Explain the importance of good human resource management on projects. 2. Define project human resource management and understand its processes. 3. Summarize key concepts for managing people by understanding the theories of Abraham Maslow, Frederick Herzberg, David McClelland, and Douglas McGregor on motivation.
  • 3. 3 303KM Project Management Learning Objectives 4. Discuss human resource planning and be able to create a project organizational chart, responsibility assignment matrix, and resource histogram. 5. Understand important issues involved in project staff acquisition and explain the concepts of resource assignments, resource loading, and resource leveling. 6. Assist in team development with training, team-building activities, and reward systems. 7. Explain and apply several tools and techniques to help manage a project team and summarize general advice on managing teams.
  • 4. 4 303KM Project Management 1 Importance of good human resource management on projects  U.S. productivity is No. 1 in the world when productivity is measured as gross domestic product per worker, but our lead vanishes when productivity is measured as GDP per hour worked…Europeans take an average of six to seven weeks of paid annual leave, compared with just 12 days in the United States. Twice as many American as European workers put in more than 48 hours per week.”*  Sociologists have shown that many Americans, especially men, would like to have more family or leisure time. Recent surveys show that many Americans are willing to sacrifice up to a quarter of their salaries in return for more time off! *Williams, Joan and Ariane Hegewisch, “Confusing productivity with long work week,” Minneapolis Star Tribune (September 6, 2004) (www.startribune.com).
  • 5. 5 303KM Project Management 2. What is Project Human Resource Management?  Making the most effective use of the people involved with a project.  Processes include:  Human resource planning: Identifying and documenting project roles, responsibilities, and reporting relationships.  Acquiring the project team: Getting the needed personnel assigned to and working on the project.  Developing the project team: Building individual and group skills to enhance project performance.  Managing the project team: Tracking team member performance, motivating team members, providing timely feedback, resolving issues and conflicts, and coordinating changes to help enhance project performance.
  • 6. 6 303KM Project Management 3. Keys to Managing People  Psychologists and management theorists have devoted much research and thought to the field of managing people at work.  Important areas related to project management include:  Motivation theories  Influence and power  Effectiveness
  • 7. 7 303KM Project Management Intrinsic and Extrinsic Motivation  Intrinsic motivation causes people to participate in an activity for their own enjoyment.  Extrinsic motivation causes people to do something for a reward or to avoid a penalty.  For example, some children take piano lessons for intrinsic motivation (they enjoy it) while others take them for extrinsic motivation (to get a reward or avoid punishment).
  • 8. 8 303KM Project Management Maslow’s Hierarchy of Needs  Abraham Maslow argued that human beings possess unique qualities that enable them to make independent choices, thus giving them control of their destiny.  Maslow developed a hierarchy of needs, which states that people’s behaviors are guided or motivated by a sequence of needs.
  • 9. 9 303KM Project Management Figure 9-1. Maslow’s Hierarchy of Needs
  • 10. 10 303KM Project Management Herzberg’s Motivational and Hygiene Factors  Frederick Herzberg wrote several famous books and articles about worker motivation. He distinguished between:  Motivational factors: Achievement, recognition, the work itself, responsibility, advancement, and growth. These factors produce job satisfaction.  Hygiene factors: Larger salaries, more supervision, and a more attractive work environment. These factors cause dissatisfaction if not present, but do not motivate workers to do more.
  • 11. 11 303KM Project Management McClelland’s Acquired-Needs Theory  Specific needs are acquired or learned over time and are shaped by life experiences. The following are the main categories of acquired needs:  Achievement (nAch): People with a high need for achievement like challenging projects with attainable goals and lots of feedback.  Affiliation (nAff): People with high need for affiliation desire harmonious relationships and need to feel accepted by others, so managers should try to create a cooperative work environment for them.  Power (nPow): People with a need for power desire either personal power (not good) or institutional power (good for the organization). Provide institutional power seekers with management opportunities.
  • 12. 12 303KM Project Management McGregor’s Theory X and Y  Douglas McGregor popularized the human relations approach to management in the 1960s.  Theory X: Assumes workers dislike and avoid work, so managers must use coercion, threats, and various control schemes to get workers to meet objectives.  Theory Y: Assumes individuals consider work as natural as play or rest and enjoy the satisfaction of esteem and self-actualization needs.  Theory Z: Introduced in 1981 by William Ouchi and is based on the Japanese approach to motivating workers, which emphasizes trust, quality, collective decision making, and cultural values.
  • 13. 13 303KM Project Management 4. Organizational Planning  Involves identifying and documenting project roles, responsibilities, and reporting relationships.  Outputs include:  Project organizational charts  Staffing management plans  Responsibility assignment matrixes  Resource histograms
  • 14. 14 303KM Project Management Responsibility Assignment Matrixes  A responsibility assignment matrix (RAM) is a matrix that maps the work of the project, as described in the WBS, to the people responsible for performing the work, as described in the OBS.  Can be created in different ways to meet unique project needs.
  • 15. 15 303KM Project Management Figure 9-4. Sample Responsibility Assignment Matrix (RAM)
  • 16. 16 303KM Project Management Figure 9-5. RAM Showing Stakeholder Roles
  • 17. 17 303KM Project Management Table 9-1. Sample RACI Chart R = Responsibility, only one R per task A = Accountability C = Consultation I = Informed
  • 18. 18 303KM Project Management Staffing Management Plans and Resource Histograms  A staffing management plan describes when and how people will be added to and taken off the project team.  A resource histogram is a column chart that shows the number of resources assigned to a project over time.
  • 19. 19 303KM Project Management Figure 9-6. Sample Resource Histogram
  • 20. 20 303KM Project Management 5. Acquiring the Project Team  Acquiring qualified people for teams is crucial.  The project manager who is the smartest person on the team has done a poor job of recruiting!  Staffing plans and good hiring procedures are important, as are incentives for recruiting and retention.  Some companies give their employees one dollar for every hour that a new person who they helped hire works.  Some organizations allow people to work from home as an incentive.
  • 21. 21 303KM Project Management Resource Loading  Resource loading refers to the amount of individual resources an existing schedule requires during specific time periods.  Helps project managers develop a general understanding of the demands a project will make on the organization’s resources and individual people’s schedules.  Overallocation means more resources than are available are assigned to perform work at a given time.
  • 22. 22 303KM Project Management Figure 9-7. Sample Histogram Showing an Overallocated Individual What’s wrong with this picture? Assume 100 percent means Joe is working eight hours per day.
  • 23. 23 303KM Project Management Resource Leveling  Resource leveling is a technique for resolving resource conflicts by delaying tasks.  The main purpose of resource leveling is to create a smoother distribution of resource use and reduce overallocation.
  • 24. 24 303KM Project Management Figure 9-8. Resource Leveling Example
  • 25. 25 303KM Project Management Benefits of Resource Leveling  When resources are used on a more constant basis, they require less management.  It may enable project managers to use a just-in-time inventory type of policy for using subcontractors or other expensive resources.  It results in fewer problems for project personnel and the accounting department.  It often improves morale.
  • 26. 26 303KM Project Management 6. Developing the Project Team  The main goal of team development is to help people work together more effectively to improve project performance.  It takes teamwork to successfully complete most projects.
  • 27. 27 303KM Project Management Training  Training can help people understand themselves and each other, and understand how to work better in teams.  Team building activities include:  Physical challenges  Psychological preference indicator tools
  • 28. 28 303KM Project Management Myers-Briggs Type Indicator (MBTI)  MBTI is a popular tool for determining personality preferences and helping teammates understand each other.  Four dimensions include:  Extrovert/Introvert (E/I)  Sensation/Intuition (S/N)  Thinking/Feeling (T/F)  Judgment/Perception (J/P)  NTs, or rationals, are attracted to technology fields.  IT people vary most from the general population in their tendency to not be extroverted or sensing.
  • 29. 29 303KM Project Management Wideman and Shenhar’s Views on MBTI and Project Management*  Most suited for project leadership:  100 percent: INTJ, ENTJ, ISTJ, ESTJ  50 percent: INTP, ENTP, ENFP, ENFJ  Best suited as followers:  100 percent: INFJ, ISFJ  50 percent: INTP, ENTP, ENFP, ENFJ, ESFJ  Not suited for project work:  100 percent: INFP, ISFP, ESFP, ISTP  50 percent: ENFP, ESTP *Wideman, R. Max and Aaron J. Shenhar, “Professional and Personal Development: A Practical Approach to Education and Training,” Project Management for Business Professionals, edited by Joan Knutson, 2001, p. 375.
  • 30. 30 303KM Project Management MBTI and Suitability to Project Work* *Wideman, R. Max. “Project Teamwork, Personality Profiles and the Population at Large: Do we have enough of the right kind of people?” (http://www.maxwideman.com/papers/profiles/profiles.pdf ). What do you think about these views?
  • 31. 31 303KM Project Management Social Styles Profile  People are perceived as behaving primarily in one of four zones, based on their assertiveness and responsiveness:  Drivers  Expressives  Analyticals  Amiables  People on opposite corners (drivers and amiables, analyticals and expressives) may have difficulty getting along.
  • 33. 33 303KM Project Management Reward and Recognition Systems  Team-based reward and recognition systems can promote teamwork.  Focus on rewarding teams for achieving specific goals.  Allow time for team members to mentor and help each other to meet project goals and develop human resources.
  • 34. 34 303KM Project Management 7. Managing the Project Team  Project managers must lead their teams in performing various project activities.  After assessing team performance and related information, the project manager must decide:  If changes should be requested to the project.  If corrective or preventive actions should be recommended.  If updates are needed to the project management plan or organizational process assets.
  • 35. 35 303KM Project Management Tools and Techniques for Managing Project Teams  Observation and conversation  Project performance appraisals  Conflict management  Issue logs