Arseniy Ignatyev
Contributor: Veronika Olenik
2
3
 What is Project Management?
 Necessary skills
 Software development project management
and related techniques
 Failure and Success
 Q&A
4
 “Go ahead and do it” approach
 Run the business / operations approach
 Project approach
5
 Project - Planned set of interrelated tasks
to be executed over a fixed period and
within certain cost and other limitations.
◦ New Airplane
◦ New Cell Phone
◦ New Software
6
 Process planning and control
 Timely risk identification and mitigation
 Grater assurance in the positive result
7
 Project Management is the application of
knowledge, skills and techniques to execute
projects effectively and efficiently.
◦ project management brings a unique focus shaped by
the goals, resources and schedule of each project.
8
 Until 1900 projects were managed as "go ahead
and do it" by the chief engineers
 1900 – 1950 – a transition period. Henry Gantt
and Frederick Winslow Taylor developed the
structured processes and tools: WBS standing for
“Work breakdown structure” and Gantt chart
 At 1950 project management became structured.
Fields that could be considered as starting point:
civil engineering and military
 IMPA – 1967 in Europe and PMI – 1969 in US
9
 Integration
 Cost
 Human Resources
 Scope
 Quality
 Communications
 Time
 Procurement
 Risk Management
10
 Leadership
 Negotiation
 Planning and controlling
 Domain knowledge
 Critical thinking
 Psychology
 Expectations management
11
•Define Result
•Define
Business case
and
Justification
•Define high
level
milestones
•Identify
constraints
and costs
•Identify
Sponsor and
stakeholders
•Define
Success &
Failure
•Identify
Deliverables
and WBS
•Scope
management
•Cost
management
•Resource
management
•Risk and
response
planning
•Estimating
time and cost
for activities
•Direct and
Manage
Project
execution
•Manage
expectations
•Distribute
Information
•Manage team
•Quality
Assurance of
deliverables
•Measuring
the ongoing
project
activities
•Monitoring
the project
Scope, cost
and other
variables
•Identify and
Address Risks
•Lessons
learned
•Project
transition
12
Initiating Planning Executing
Monitoring
& Control
Closing
 Software Development Life Cycle - Software development life
cycle models describe phases of the software cycle and
the order in which those phases are executed:
 Waterfall model
 V-Shaped model
 Spiral model
 Incremental model
 Set of general project stages:
13
Requireme
nts
Design TransitionImplementation Testing
Initiating Planning Executing
Monitoring
& Control
Closing
14
Advantages Disadvantages
Simple and easy to use.
Easy to manage due to the rigidity of the
model – each phase has specific
deliverables and a review process.
Phases are processed and completed one
at a time.
Works well for smaller projects where
requirements are very well understood.
- Adjusting scope during the life cycle can kill a
project
- No working software is produced until late during
the life cycle.
- High amounts of risk and uncertainty.
- Poor model for complex and object-oriented
projects.
- Poor model for long and ongoing projects.
- Poor model where requirements are at a
moderate to high risk of changing.
15
Advantages
Simple and easy to use
Each phase has specific deliverables
Higher chance of success over the waterfall model
due to the development of test plans early on during
the life cycle
Works well for small projects where requirements are
easily understood
Disadvantages
- Very rigid, like the waterfall model
- Little flexibility and adjusting scope is difficult and
expensive
- Software is developed during the implementation
phase, so no early prototypes of the software are
produced
- Model doesn’t provide a clear path for problems
found during testing phases
16
Advantages Disadvantages
Generates working software quickly and early
during the software life cycle
More flexible – less costly to change scope and
requirements
Easier to test and debug during a smaller
iteration
Easier to manage risk because risky pieces are
identified and handled during its iteration
Each iteration is an easily managed milestone
- Each phase of an iteration is rigid and do not
overlap each other
- Problems may arise pertaining to system
architecture because not
all requirements are gathered up front for the
entire software life
cycle.
17
Advantages
High amount of risk analysis
Good for large and mission-critical projects
Software is produced early in the software life
cycle
Disadvantages
- Can be a costly model to use
- Risk analysis requires highly specific expertise
- Project’s success is highly dependent on the risk
analysis phase
- Doesn’t work well for smaller projects
18
19
Project Manager = Scrum Master / Coach
 SW Projects typically fail
when:
◦ People begin programming
before they understand the
problem
◦ The team has an unrealistic
idea about how much work is
involved
◦ Defects are injected early but
discovered late
◦ Programmers have poor habits
– and they don’t feel
accountable for their work
◦ Define Failure!!!
20
 How can we make sure a project
to succeed:
◦ Make sure all decisions are based on
openly and timely shared
information
◦ Don’t second-guess your team
members’ expertise
◦ Introduce software quality from
the very beginning of the project
◦ Don’t impose an artificial hierarchy
on the project team
◦ Remember that the fastest way
through the project is to use good
engineering practices
◦ Define sucess !!!
21
 Software Development Life Cycle Models, Raymond
Lewallen, 2005, http://codebetter.com/raymondlewallen/2005/07/13/software-
development-life-cycle-models/
 Applied Software Project Management, Andrew Stellman & Jennifer
Greene, 2005, http://www.stellman-greene.com/aspm/content/view/28/33/
22
 Questions?
 Comments?
23

More Related Content

PPTX
Software project management
PPTX
Lect3 conventional vs modern spm
PPTX
Lect2 conventional software management
PPTX
PPTX
The Waterfall Model
PPTX
SDLC
PPTX
Methodologies of Software Engineering
PPTX
Software development lifecycle part2
Software project management
Lect3 conventional vs modern spm
Lect2 conventional software management
The Waterfall Model
SDLC
Methodologies of Software Engineering
Software development lifecycle part2

What's hot (20)

DOCX
Sdlc overview
PPTX
Software Engineering Methodologies
PPT
The Software Development Process
PDF
Agile Model & Methodology
PPT
An overview of software development methodologies.
PPTX
system level requirements gathering and analysis
PPT
IT Software Development Life Cycle
PPTX
Software project management Software economics
PPTX
Software Engineering Methodologies
PPTX
Slides môn Công nghệ phần mềm Software Engineering
PPTX
Introduction of sdlc
PPTX
List of Software Development Model and Methods
PPTX
Phased life cycle model
PPTX
SDLC MODEL
PDF
Software engineering note
PPTX
software development life cycle(SDLC)
PPTX
software project management Assumption about conventional model
PPTX
Advantages & disadvantages of system life cycles
PPT
SDLC - Software Development Life Cycle
Sdlc overview
Software Engineering Methodologies
The Software Development Process
Agile Model & Methodology
An overview of software development methodologies.
system level requirements gathering and analysis
IT Software Development Life Cycle
Software project management Software economics
Software Engineering Methodologies
Slides môn Công nghệ phần mềm Software Engineering
Introduction of sdlc
List of Software Development Model and Methods
Phased life cycle model
SDLC MODEL
Software engineering note
software development life cycle(SDLC)
software project management Assumption about conventional model
Advantages & disadvantages of system life cycles
SDLC - Software Development Life Cycle
Ad

Similar to Project Management in Information Technologies (20)

PPTX
lect3-Life-Cycle-models-I.pptx
PPTX
SAD07 - Project Management
PDF
SPM software project management nptel fife cycle model
PPT
Chapter 1- Introduction to software engineering for CS.ppt
PPT
Chapter 1- Introduction for software.ppt
PDF
SOFTWARE ENGINEERING
PPT
Software Project Management (lecture 3)
PPTX
Mg6088 spm unit-1
PPTX
PPTX
Unit 1 spm
PPTX
Unit 1 spm
PDF
SE_Lecture02[4232347 software desogn].PDF
PPT
PPT
Software engg. pressman_ch-3
PPTX
Software developement life cycle ppt
PPT
L02 pm & it context
PPTX
Sessionnnnnnnnnnnnndewfcecsdddnnnnn 1.pptx
PPTX
1.1.pptx software project management and
PPTX
Lecture 2 Software Development Process and SDCL models.pptx
PPT
2. Software process
lect3-Life-Cycle-models-I.pptx
SAD07 - Project Management
SPM software project management nptel fife cycle model
Chapter 1- Introduction to software engineering for CS.ppt
Chapter 1- Introduction for software.ppt
SOFTWARE ENGINEERING
Software Project Management (lecture 3)
Mg6088 spm unit-1
Unit 1 spm
Unit 1 spm
SE_Lecture02[4232347 software desogn].PDF
Software engg. pressman_ch-3
Software developement life cycle ppt
L02 pm & it context
Sessionnnnnnnnnnnnndewfcecsdddnnnnn 1.pptx
1.1.pptx software project management and
Lecture 2 Software Development Process and SDCL models.pptx
2. Software process
Ad

More from C.T.Co (10)

PDF
Things They Didn't Teach Me In Academy
PDF
Mobile vs Desktop
PPTX
Business Analysis in IT by Ilze Buksha, Latvian
PDF
Overview of Android Infrastructure
PPT
Stratoplan 2013 Brief by C.T.Co
PPTX
Scrum methodology
PPT
Introduction to Performance Testing Part 1
PPT
Project management in Agile Way
PPTX
Data Access using Entity Framework
PPTX
Windows phone 7
Things They Didn't Teach Me In Academy
Mobile vs Desktop
Business Analysis in IT by Ilze Buksha, Latvian
Overview of Android Infrastructure
Stratoplan 2013 Brief by C.T.Co
Scrum methodology
Introduction to Performance Testing Part 1
Project management in Agile Way
Data Access using Entity Framework
Windows phone 7

Recently uploaded (20)

PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PPTX
Big Data Technologies - Introduction.pptx
DOCX
The AUB Centre for AI in Media Proposal.docx
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
PPTX
Programs and apps: productivity, graphics, security and other tools
PPT
Teaching material agriculture food technology
PPTX
sap open course for s4hana steps from ECC to s4
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PDF
Machine learning based COVID-19 study performance prediction
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Unlocking AI with Model Context Protocol (MCP)
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Dropbox Q2 2025 Financial Results & Investor Presentation
Spectral efficient network and resource selection model in 5G networks
Architecting across the Boundaries of two Complex Domains - Healthcare & Tech...
Reach Out and Touch Someone: Haptics and Empathic Computing
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
Per capita expenditure prediction using model stacking based on satellite ima...
Big Data Technologies - Introduction.pptx
The AUB Centre for AI in Media Proposal.docx
Mobile App Security Testing_ A Comprehensive Guide.pdf
Review of recent advances in non-invasive hemoglobin estimation
How UI/UX Design Impacts User Retention in Mobile Apps.pdf
Programs and apps: productivity, graphics, security and other tools
Teaching material agriculture food technology
sap open course for s4hana steps from ECC to s4
Understanding_Digital_Forensics_Presentation.pptx
Machine learning based COVID-19 study performance prediction
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Unlocking AI with Model Context Protocol (MCP)
Digital-Transformation-Roadmap-for-Companies.pptx
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...

Project Management in Information Technologies

  • 2. 2
  • 3. 3
  • 4.  What is Project Management?  Necessary skills  Software development project management and related techniques  Failure and Success  Q&A 4
  • 5.  “Go ahead and do it” approach  Run the business / operations approach  Project approach 5
  • 6.  Project - Planned set of interrelated tasks to be executed over a fixed period and within certain cost and other limitations. ◦ New Airplane ◦ New Cell Phone ◦ New Software 6
  • 7.  Process planning and control  Timely risk identification and mitigation  Grater assurance in the positive result 7
  • 8.  Project Management is the application of knowledge, skills and techniques to execute projects effectively and efficiently. ◦ project management brings a unique focus shaped by the goals, resources and schedule of each project. 8
  • 9.  Until 1900 projects were managed as "go ahead and do it" by the chief engineers  1900 – 1950 – a transition period. Henry Gantt and Frederick Winslow Taylor developed the structured processes and tools: WBS standing for “Work breakdown structure” and Gantt chart  At 1950 project management became structured. Fields that could be considered as starting point: civil engineering and military  IMPA – 1967 in Europe and PMI – 1969 in US 9
  • 10.  Integration  Cost  Human Resources  Scope  Quality  Communications  Time  Procurement  Risk Management 10
  • 11.  Leadership  Negotiation  Planning and controlling  Domain knowledge  Critical thinking  Psychology  Expectations management 11
  • 12. •Define Result •Define Business case and Justification •Define high level milestones •Identify constraints and costs •Identify Sponsor and stakeholders •Define Success & Failure •Identify Deliverables and WBS •Scope management •Cost management •Resource management •Risk and response planning •Estimating time and cost for activities •Direct and Manage Project execution •Manage expectations •Distribute Information •Manage team •Quality Assurance of deliverables •Measuring the ongoing project activities •Monitoring the project Scope, cost and other variables •Identify and Address Risks •Lessons learned •Project transition 12 Initiating Planning Executing Monitoring & Control Closing
  • 13.  Software Development Life Cycle - Software development life cycle models describe phases of the software cycle and the order in which those phases are executed:  Waterfall model  V-Shaped model  Spiral model  Incremental model  Set of general project stages: 13 Requireme nts Design TransitionImplementation Testing Initiating Planning Executing Monitoring & Control Closing
  • 14. 14
  • 15. Advantages Disadvantages Simple and easy to use. Easy to manage due to the rigidity of the model – each phase has specific deliverables and a review process. Phases are processed and completed one at a time. Works well for smaller projects where requirements are very well understood. - Adjusting scope during the life cycle can kill a project - No working software is produced until late during the life cycle. - High amounts of risk and uncertainty. - Poor model for complex and object-oriented projects. - Poor model for long and ongoing projects. - Poor model where requirements are at a moderate to high risk of changing. 15
  • 16. Advantages Simple and easy to use Each phase has specific deliverables Higher chance of success over the waterfall model due to the development of test plans early on during the life cycle Works well for small projects where requirements are easily understood Disadvantages - Very rigid, like the waterfall model - Little flexibility and adjusting scope is difficult and expensive - Software is developed during the implementation phase, so no early prototypes of the software are produced - Model doesn’t provide a clear path for problems found during testing phases 16
  • 17. Advantages Disadvantages Generates working software quickly and early during the software life cycle More flexible – less costly to change scope and requirements Easier to test and debug during a smaller iteration Easier to manage risk because risky pieces are identified and handled during its iteration Each iteration is an easily managed milestone - Each phase of an iteration is rigid and do not overlap each other - Problems may arise pertaining to system architecture because not all requirements are gathered up front for the entire software life cycle. 17
  • 18. Advantages High amount of risk analysis Good for large and mission-critical projects Software is produced early in the software life cycle Disadvantages - Can be a costly model to use - Risk analysis requires highly specific expertise - Project’s success is highly dependent on the risk analysis phase - Doesn’t work well for smaller projects 18
  • 19. 19 Project Manager = Scrum Master / Coach
  • 20.  SW Projects typically fail when: ◦ People begin programming before they understand the problem ◦ The team has an unrealistic idea about how much work is involved ◦ Defects are injected early but discovered late ◦ Programmers have poor habits – and they don’t feel accountable for their work ◦ Define Failure!!! 20
  • 21.  How can we make sure a project to succeed: ◦ Make sure all decisions are based on openly and timely shared information ◦ Don’t second-guess your team members’ expertise ◦ Introduce software quality from the very beginning of the project ◦ Don’t impose an artificial hierarchy on the project team ◦ Remember that the fastest way through the project is to use good engineering practices ◦ Define sucess !!! 21
  • 22.  Software Development Life Cycle Models, Raymond Lewallen, 2005, http://codebetter.com/raymondlewallen/2005/07/13/software- development-life-cycle-models/  Applied Software Project Management, Andrew Stellman & Jennifer Greene, 2005, http://www.stellman-greene.com/aspm/content/view/28/33/ 22

Editor's Notes

  • #14: There are tons of models, and many companies adopt their own, but all have very similarpatterns.Each phase produces deliverables required by the next phase in thelife cycle.  Requirements are translated into design.  Codeis producedduring implementation that is driven by the design. Testing verifies the deliverable of the implementation phase againstrequirements.RequirementsBusiness requirements are gathered in this phase.  This phaseis the main focus of the project managers and stake holders. Meetings with managers, stake holders and users are held in order todetermine the requirements.  Who is going to use the system? How will they use thesystem?  What data should be input into thesystem?  What data should be output by the system?  These aregeneral questions that getanswered during a requirements gatheringphase.  This produces a nice big list of functionality that thesystem should provide, which describes functions the system shouldperform, business logic that processes data, what data is stored andused by the system, and how theuser interface should work.  Theoverall result is the system as a whole and how it performs, not how itis actually going to do it.DesignThe software system design is produced from the results of therequirements phase.  Architects have the ball in their courtduring this phaseand this is the phase in which their focuslies.  This is where the details on how the system will work isproduced.  Architecture, includinghardware and software,communication, software design (UML is produced here) are all part ofthe deliverables of a design phase.ImplementationCode is produced from the deliverables of the design phase duringimplementation, and this is the longest phase of the softwaredevelopment life cycle.  For a developer, this is the main focusof the life cycle because this is where the code is produced. Implementationmy overlap with both the design and testingphases.  Many tools exists (CASE tools) to actually automate theproduction of code usinginformation gathered and produced during thedesign phase.TestingDuring testing, the implementation is tested against therequirements to make sure that the product is actually solving theneeds addressedand gathered during the requirements phase.  Unittests and system/acceptance tests are done during this phase. Unit tests act on a specificcomponent of the system, while systemtests act on the system as a whole.So in a nutshell, that is a very basic overview of the generalsoftware development life cycle model.
  • #16: Waterfall ModelThis is the most common and classic of life cycle models, alsoreferred to as a linear-sequential life cycle model.  It is verysimple tounderstand and use.  In a waterfall model, each phasemust be completed in its entirety before the next phase canbegin.  At the end of each phase, a review takes place todetermine if the project is on the right path and whether or not tocontinue or discard the project.  Unlikewhat I mentioned in thegeneral model, phases do not overlap in a waterfall model.
  • #17: V-Shaped ModelJust like the waterfall model, the V-Shaped life cycle is asequential path of execution of processes.  Each phase must becompleted beforethe next phase begins.  Testing is emphasized inthis model more so than the waterfall model though.  The testingprocedures are developedearly in the life cycle before any coding isdone, during each of the phases preceding implementation.Requirements begin the life cyclemodel just like the waterfallmodel.  Before development is started, a system test plan iscreated.  The test plan focuses on meeting thefunctionalityspecified in the requirements gathering.The high-level design phase focuses on system architecture anddesign.  An integration test plan is created in this phase as wellin order to test the pieces of the software systems ability to worktogether.The low-level design phase is where the actual software componentsare designed, and unit tests are created in this phase as well.The implementation phase is, again, where all coding takesplace.  Once coding is complete, the path of execution continuesup the right sideof the V where the test plans developed earlier arenow put to use.
  • #18: Incremental ModelThe incremental model is an intuitive approach to the waterfallmodel.  Multiple development cycles take place here, making thelife cycle a“multi-waterfall” cycle.  Cycles are divided up intosmaller, more easily managed iterations.  Each iteration passesthrough the requirements,design, implementation and testing phases.A working version of software is produced during the firstiteration, so you have working softwareearly on during the softwarelife cycle.  Subsequent iterations build on the initial softwareproduced during the first iteration.Spiral ModelThe spiral model is similar to the incremental model, with moreemphases placed on risk analysis.  The spiral model has fourphases: Planning, Risk Analysis, Engineering and Evaluation.  Asoftware project repeatedly passes through these phases in iterations(called Spirals in this model).  The baseline spiral, starting inthe planning phase, requirements are gathered and risk isassessed.  Each subsequent spiralsbuilds on the baseline spiral.Requirements are gathered during the planning phase.  In therisk analysis phase, a process is undertaken toidentify risk andalternate solutions.  A prototype is produced at the end of therisk analysis phase.Software is produced in the engineering phase, along with testing atthe end of the phase.  The evaluation phase allows the customer toevaluate the output of the project to date before the project continuesto the next spiral.In the spiral model, the angular component represents progress, and the radius of the spiral represents cost.
  • #19: Spiral ModelThe spiral model is similar to the incremental model, with moreemphases placed on risk analysis.  The spiral model has fourphases: Planning, Risk Analysis, Engineering and Evaluation.  Asoftware project repeatedly passes through these phases in iterations(called Spirals in this model).  The baseline spiral, starting inthe planning phase, requirements are gathered and risk isassessed.  Each subsequent spiralsbuilds on the baseline spiral.Requirements are gathered during the planning phase.  In therisk analysis phase, a process is undertaken toidentify risk andalternate solutions.  A prototype is produced at the end of therisk analysis phase.Software is produced in the engineering phase, along with testing atthe end of the phase.  The evaluation phase allows the customer toevaluate the output of the project to date before the project continuesto the next spiral.In the spiral model, the angular component represents progress, and the radius of the spiral represents cost.