Drilling Engineering 1 Course 
3rd Ed. , 3rd Experience
1. 
Well Control System 
2. 
Well Monitoring System
Well Control and Well Monitoring Systems
well control & kick 
 
The functions of the well control system are 
 
to detect, stop, and remove any undesired entrance of formation fluids into the borehole. 
 
An undesired entrance of formation fluid into the borehole is called kick and 
 
may occur due to several reasons 
 
(high pressure formations, 
 
insufficient drilling fluid density, 
 
drillstring swab, 
 
loss of circulation, 
 
formation fracture, 
 
etc). Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 4
blowout 
 
If the undesired entrance of fluid feedbacks and the fluid continuously enters the borehole reaching the surface, it is called blowout. 
 
Blowouts (in particular gas blowouts) are extremely dangerous and put the crew, the rig, the drilling operation, and the reservoir at risk. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 5
well control system constituent 
 
The well control system must detect, control, and remove the undesired entrance of fluids into the borehole. 
 
The system is composed of 
 
sensors (flow rate, surface volume, annular and drillstring pressure, and etc,) capable to detect an increase of flow or volume in the fluid system, 
 
the blowout preventer (BOP), 
 
the circulating pressure control manifold (choke manifold), 
 
and the kill and choke lines. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 6
the blowout preventer (BOP) 
 
The BOP is a set of pack–offs capable of shutting the annular space between the surface casing and the drillstring. 
 
Because of the diversity in shape of the annular, several different device types exist and they are normally assembled together (and in various configurations) called BOP stack. 
 
The BOP stack is located 
 
under the rotary table in land and fixed marine rigs, 
 
and on the bottom of the sea in mobile and floating rigs. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 7
PRESSURE CONTROL EQUIPMENT 
 
BOPs equipment are selected based on the maximum expected wellbore pressures. 
 
The pressure rating, size and number of BOP components must be determined by the Drilling Engineer prior to drilling the well. 
 
BOPs are rated by API as 
 
3M (3000 psi), 5M, 10 M and 15 M. 
 
For HPHT, BOPS are either 
 
15 M or 20 M. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 8
BOP stacks 
A fixed rig BOP 
A floating rig BOP 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 9
Sample of a land rig BOP Stack 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 10
the BOP stack In subsea operations 
 
In subsea operations, the BOP stack is installed at seabed. 
 
The stack has several back up units in case of failure, 
 
for example two annulars are used so that if one failed the other can be used. 
 
This back-up system principle is applied to all the BOP components. 
 
The subsea stack for HPHT operation 
 
may not be part of the rig contract and 
 
may have to be rented out separately, e.g. a 20K stack. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 11
Annular BOP’s 
 
The various types of BOP devices are: 
 
Annular BOP, Blind ram, Pipe rams, and Shear rams 
 
Annular BOP: 
 
The purpose of the annular BOP is to shut the annular in front of any kind of drillstring equipment (except stabilizers) or even without drillstring. 
 
The active element is an elastomeric ribbed donut that is squeezed around the drillstring by an hydraulic ram. 
 
It is located at the top of the BOP stack. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 12
an inside BOP 
 
Controlling the pressure applied to the ram, it is possible to strip the drillstring in and out while keeping the annular closed (requires the use of an inside-BOP, which should be connected immediately to the drillstring when a kick is identified). 
 
The inside BOP acts as a check valve, allowing fluid be pumped down the drillstring, but blocking back flow. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 13
Blind & Pipe rams 
 
Blind ram: 
 
The blind rams (normally one at the top of all other rams) allows shutting the borehole with no drillstring element in front of it. (the upper ram in the figure) 
 
If the blind ram is applied to a drillpipe, the pipewill be flatten but no seal is obtained. 
 
Pipe rams: 
 
The pipe rams allows shutting the annular in front a compatible drill pipe (not in front of tool joints.) 
 
Normally two rams are used a special spool between the two is used where the kill and choke line is connected. (the lower ram in the figure) 
 
The use of two pipe rams also permit to snub the drillstring during the well control operation. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 14
shear rams 
 
Shear rams: 
 
The shear ram (normally one below the blind ram or below all other rams) can shear a drill pipe and provide seal. 
 
This is a last resource when all other rams and annular had failed. 
 
Circulation through the drillstring is lost and, if the shear ram is the lower one, the drillstring falls into the borehole. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 15
BOP control panels 
 
All these safety devices 
 
are hydraulically actuated 
 
by a pneumatic–hydraulic system (actuators and accumulators), 
 
which can operate completely independent of the power system of the rig. 
 
Two control panels are normally used, 
 
one at the rig floor, 
 
and a remote one away from the risky area. 
BOP accumulators and control panels 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 16
The accumulators 
 
The accumulators are steel bottles lined with a elastomeric bladers forming two separated compartments. 
 
One compartment is filled with oil, which powers the BOP. 
 
The other compartment is filled with air or nitrogen at high pressure. 
 
The pressure of the gas pressurizes the oil across the elastomeric liner. 
 
Rig power, during ordinary operation, keeps the gas in the accumulators under pressure. 
 
The accumulators should be able to provide hydraulic power to close and open all elements of the BOP stack a number of times without external power. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 17
Sample of BOP control panel & the accumulator 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 18
Choke Manifold 
 
During a kick control operation, some of the BOP stack devices are actuated to close the annulus and divert the returning fluid to the choke line. 
 
The choke line directs the returning fluid to a manifold of valves and chokes called choke manifold, 
 
which allows to control the flow pressure at the top of the annular adjusting the flow area open to flow. 
 
The choke manifold also direct the flow 
• 
to a flare (in case of a gas kick), or 
• 
to the pits (if mud) or 
• 
to special tanks (if oil) 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 19
Choke manifold 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 20
Sample of a choke manifold 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 21
Well Control and Well Monitoring Systems
data required to control of operations under way in the rig 
 
Several sensors, gauges, meters, indicators, alarms, and recorders exist in the rig to provide all data required to control (safely, efficiently, and reliably) of all operations under way in the rig. 
 
Among the most important parameters are: 
 
weight on bit (WOB) and hook load, 
 
rate of penetration (ROP), 
 
rotary speed, 
 
torque, 
 
circulating (pump) pressure, 
 
flow rate (in and out), 
 
drilling fluid gain/loss, 
 
mud temperature, 
 
mud density, 
 
total hydrocarbon gas in the drilling fluid. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 23
indication of hook load and weight on bit 
 
Accurate and reliable indication of hook load and weight on bit are essential for 
 
the efficient control of rate of penetration, bit life, borehole cleaning, and borehole direction. 
 
The weight indicator works 
 
in conjunction with the deadline anchor 
 
using either tension or compression hydraulic load cells. 
 
The deadline anchor senses the tension in the deadline and hydraulically actuates the weight indicator. 
 
Most weight indicators have two hands and two scales. 
 
The inner scale shows the hook load and the outer one shows the weight-on–bit. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 24
Weight indicator and a deadline anchor 
Weight indicator 
a deadline anchor 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 25
weight–on–bit 
 
To obtain the weight–on–bit, the driller perform the following steps: 
 
with the bit out of the bottom, the drillstring is put to rotate and the weight of the drillstring is observed in the central scale; 
 
using the knob at the rim of the weight indicator, the outer scale is adjusted so that the zero of the outer scale aligns with the longer hand. 
 
The driller lowers the drillstring slowly observing the long hand. 
 
When the bit touches the bottom, part of the weight of the drillstring is transferred from the hook to the bit (the weight–on–bit.) 
 
The amount of weight transferred corresponds to the decrease of hook load, indicated by the long pointer (turning counterclockwise). 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 26
control consoles 
 
All modern rigs have control consoles that 
 
shows all pertinent parameters in analog and or digital displays. 
 
All parameters and operations may be 
 
recorded in physical (paper) or 
 
magnetic media for post analysis. 
 
Some automated operations like 
 
constant weight–on–bit and 
 
constant torque are possible in most rigs. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 27
Drilling control console 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 28
1.(CDF) Jorge H.B. SampaioJr. “Drilling Engineering Fundamentals.” Master of Petroleum Engineering. Curtin University of Technology, 2007. 
Chapter 2 
2.(WEC) Rabia, Hussain. Well Engineering & Construction. EntracConsulting Limited, 2002. 
Chapter 16
Well Control and Well Monitoring Systems

More Related Content

PPTX
Asset Integrity Management
PPT
Drilling operation and components
PDF
Hoisting System
PPTX
Rig types and components
PDF
Rotary System
PDF
Drilling Fluid Circulation Systems
PPTX
Well Control
PDF
Installation procedures of wellhead
Asset Integrity Management
Drilling operation and components
Hoisting System
Rig types and components
Rotary System
Drilling Fluid Circulation Systems
Well Control
Installation procedures of wellhead

What's hot (20)

PDF
PDF
Drilling Engineering - Casing Design
PDF
2.1 rig types
DOCX
Open Hole Completion Design
PPT
Introduction to Drilling Engineering
PPTX
Well control equipment
PDF
Drilling fluid
PDF
3. sequances of drilling operations
PPT
Well completion fundamentals
PPT
Drilling Engineering - Directional Drilling
PPTX
Rig types.
PPTX
Drilling fluids
PDF
Rotary Drilling System: Introduction
PPTX
Wireline Operations
PDF
1. completion sequance
PPT
Stuck pipe
PDF
Presentation 5 drilling mud
PPTX
Casing design
PPTX
Drill bit types advantages and disadvantages
Drilling Engineering - Casing Design
2.1 rig types
Open Hole Completion Design
Introduction to Drilling Engineering
Well control equipment
Drilling fluid
3. sequances of drilling operations
Well completion fundamentals
Drilling Engineering - Directional Drilling
Rig types.
Drilling fluids
Rotary Drilling System: Introduction
Wireline Operations
1. completion sequance
Stuck pipe
Presentation 5 drilling mud
Casing design
Drill bit types advantages and disadvantages
Ad

Viewers also liked (6)

PDF
Power System
PDF
WELL COSTING
PDF
Q931+de1 reference en lec 4x1
PDF
Q931+de1 reference en lecs
PPTX
Introduction to drilling
PPTX
Oil well drilling video course
Power System
WELL COSTING
Q931+de1 reference en lec 4x1
Q931+de1 reference en lecs
Introduction to drilling
Oil well drilling video course
Ad

Similar to Well Control and Well Monitoring Systems (20)

PDF
Q921 de1 lec 6 v1
PDF
Q921 de1 lec 6 v1
PDF
Q922+de1+l06 v1
PPTX
Well control system
DOCX
PDF
Q922+de1+l08 v1
DOCX
Blowout preventer
PDF
Q921 de1 lec 5 v1
PDF
Q921 de1 lec 2 v1
PDF
Q922+de1+l05 v1
PDF
Surge Pressure Prediction for Running Liners
PDF
05 drilling methods
DOCX
Underbalance drilling equipment
PDF
Well control manual_bharat_petro_resource (1)
PDF
Well control manual_bharat_petro_resource (1)
PDF
2 delugevalve a
PPTX
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
PPTX
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
PPTX
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
PPTX
Aircraft Propulsion-Intakes.pptx
Q921 de1 lec 6 v1
Q921 de1 lec 6 v1
Q922+de1+l06 v1
Well control system
Q922+de1+l08 v1
Blowout preventer
Q921 de1 lec 5 v1
Q921 de1 lec 2 v1
Q922+de1+l05 v1
Surge Pressure Prediction for Running Liners
05 drilling methods
Underbalance drilling equipment
Well control manual_bharat_petro_resource (1)
Well control manual_bharat_petro_resource (1)
2 delugevalve a
رضا مصطفوی طباطبایی, hydraulic workover and snubbing solutions
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Hydraulic workover and snubbing solutions, رضا مصطفوی طباطبایی
Aircraft Propulsion-Intakes.pptx

More from AFATous (20)

PDF
جزوه درس نمودارگیری از چاه، ویرایش ششم
PDF
جزوه درس مهندسی حفاری دو، ویرایش ششم
PDF
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
PDF
جزوه درس مهندسی حفاری یک،ویرایش ششم
PDF
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
PDF
Q933+log reference fa lec
PDF
Q933+log reference fa lec 4x1
PDF
Q933+po2 reference fa lec
PDF
Q933+po2 reference fa lec 4x1
PDF
Q933+de2 reference fa lec 4x1
PDF
Q933+de2 reference fa lec
PDF
Q933+de1 reference fa lec 4x1
PDF
Q933+de1 reference fa lec
PDF
Q932+log reference fa lec 4 x1
PDF
Q932+stm reference fa lec 4x1
PDF
Q932+rrl reference fa lec
PDF
Q932+stm reference fa lec
PDF
Q932+rrl reference fa lec 4x1
PDF
Q932+sgo reference fa lec 4x1
PDF
Q932+sgo reference fa lec
جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
Q933+log reference fa lec
Q933+log reference fa lec 4x1
Q933+po2 reference fa lec
Q933+po2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec
Q932+log reference fa lec 4 x1
Q932+stm reference fa lec 4x1
Q932+rrl reference fa lec
Q932+stm reference fa lec
Q932+rrl reference fa lec 4x1
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec

Recently uploaded (20)

PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
Module 8- Technological and Communication Skills.pptx
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
August -2025_Top10 Read_Articles_ijait.pdf
PDF
Java Basics-Introduction and program control
PDF
Soil Improvement Techniques Note - Rabbi
PPTX
ai_satellite_crop_management_20250815030350.pptx
PDF
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
PPTX
Principal presentation for NAAC (1).pptx
PDF
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
PPTX
Feature types and data preprocessing steps
PDF
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
Building constraction Conveyance of water.pptx
PDF
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
PPTX
Measurement Uncertainty and Measurement System analysis
PDF
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
PPTX
Software Engineering and software moduleing
PPTX
mechattonicsand iotwith sensor and actuator
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Module 8- Technological and Communication Skills.pptx
distributed database system" (DDBS) is often used to refer to both the distri...
August -2025_Top10 Read_Articles_ijait.pdf
Java Basics-Introduction and program control
Soil Improvement Techniques Note - Rabbi
ai_satellite_crop_management_20250815030350.pptx
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
Principal presentation for NAAC (1).pptx
Prof. Dr. KAYIHURA A. SILAS MUNYANEZA, PhD..pdf
Feature types and data preprocessing steps
LOW POWER CLASS AB SI POWER AMPLIFIER FOR WIRELESS MEDICAL SENSOR NETWORK
Exploratory_Data_Analysis_Fundamentals.pdf
Building constraction Conveyance of water.pptx
UEFA_Embodied_Carbon_Emissions_Football_Infrastructure.pdf
Measurement Uncertainty and Measurement System analysis
Influence of Green Infrastructure on Residents’ Endorsement of the New Ecolog...
Software Engineering and software moduleing
mechattonicsand iotwith sensor and actuator

Well Control and Well Monitoring Systems

  • 1. Drilling Engineering 1 Course 3rd Ed. , 3rd Experience
  • 2. 1. Well Control System 2. Well Monitoring System
  • 4. well control & kick  The functions of the well control system are  to detect, stop, and remove any undesired entrance of formation fluids into the borehole.  An undesired entrance of formation fluid into the borehole is called kick and  may occur due to several reasons  (high pressure formations,  insufficient drilling fluid density,  drillstring swab,  loss of circulation,  formation fracture,  etc). Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 4
  • 5. blowout  If the undesired entrance of fluid feedbacks and the fluid continuously enters the borehole reaching the surface, it is called blowout.  Blowouts (in particular gas blowouts) are extremely dangerous and put the crew, the rig, the drilling operation, and the reservoir at risk. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 5
  • 6. well control system constituent  The well control system must detect, control, and remove the undesired entrance of fluids into the borehole.  The system is composed of  sensors (flow rate, surface volume, annular and drillstring pressure, and etc,) capable to detect an increase of flow or volume in the fluid system,  the blowout preventer (BOP),  the circulating pressure control manifold (choke manifold),  and the kill and choke lines. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 6
  • 7. the blowout preventer (BOP)  The BOP is a set of pack–offs capable of shutting the annular space between the surface casing and the drillstring.  Because of the diversity in shape of the annular, several different device types exist and they are normally assembled together (and in various configurations) called BOP stack.  The BOP stack is located  under the rotary table in land and fixed marine rigs,  and on the bottom of the sea in mobile and floating rigs. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 7
  • 8. PRESSURE CONTROL EQUIPMENT  BOPs equipment are selected based on the maximum expected wellbore pressures.  The pressure rating, size and number of BOP components must be determined by the Drilling Engineer prior to drilling the well.  BOPs are rated by API as  3M (3000 psi), 5M, 10 M and 15 M.  For HPHT, BOPS are either  15 M or 20 M. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 8
  • 9. BOP stacks A fixed rig BOP A floating rig BOP Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 9
  • 10. Sample of a land rig BOP Stack Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 10
  • 11. the BOP stack In subsea operations  In subsea operations, the BOP stack is installed at seabed.  The stack has several back up units in case of failure,  for example two annulars are used so that if one failed the other can be used.  This back-up system principle is applied to all the BOP components.  The subsea stack for HPHT operation  may not be part of the rig contract and  may have to be rented out separately, e.g. a 20K stack. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 11
  • 12. Annular BOP’s  The various types of BOP devices are:  Annular BOP, Blind ram, Pipe rams, and Shear rams  Annular BOP:  The purpose of the annular BOP is to shut the annular in front of any kind of drillstring equipment (except stabilizers) or even without drillstring.  The active element is an elastomeric ribbed donut that is squeezed around the drillstring by an hydraulic ram.  It is located at the top of the BOP stack. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 12
  • 13. an inside BOP  Controlling the pressure applied to the ram, it is possible to strip the drillstring in and out while keeping the annular closed (requires the use of an inside-BOP, which should be connected immediately to the drillstring when a kick is identified).  The inside BOP acts as a check valve, allowing fluid be pumped down the drillstring, but blocking back flow. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 13
  • 14. Blind & Pipe rams  Blind ram:  The blind rams (normally one at the top of all other rams) allows shutting the borehole with no drillstring element in front of it. (the upper ram in the figure)  If the blind ram is applied to a drillpipe, the pipewill be flatten but no seal is obtained.  Pipe rams:  The pipe rams allows shutting the annular in front a compatible drill pipe (not in front of tool joints.)  Normally two rams are used a special spool between the two is used where the kill and choke line is connected. (the lower ram in the figure)  The use of two pipe rams also permit to snub the drillstring during the well control operation. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 14
  • 15. shear rams  Shear rams:  The shear ram (normally one below the blind ram or below all other rams) can shear a drill pipe and provide seal.  This is a last resource when all other rams and annular had failed.  Circulation through the drillstring is lost and, if the shear ram is the lower one, the drillstring falls into the borehole. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 15
  • 16. BOP control panels  All these safety devices  are hydraulically actuated  by a pneumatic–hydraulic system (actuators and accumulators),  which can operate completely independent of the power system of the rig.  Two control panels are normally used,  one at the rig floor,  and a remote one away from the risky area. BOP accumulators and control panels Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 16
  • 17. The accumulators  The accumulators are steel bottles lined with a elastomeric bladers forming two separated compartments.  One compartment is filled with oil, which powers the BOP.  The other compartment is filled with air or nitrogen at high pressure.  The pressure of the gas pressurizes the oil across the elastomeric liner.  Rig power, during ordinary operation, keeps the gas in the accumulators under pressure.  The accumulators should be able to provide hydraulic power to close and open all elements of the BOP stack a number of times without external power. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 17
  • 18. Sample of BOP control panel & the accumulator Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 18
  • 19. Choke Manifold  During a kick control operation, some of the BOP stack devices are actuated to close the annulus and divert the returning fluid to the choke line.  The choke line directs the returning fluid to a manifold of valves and chokes called choke manifold,  which allows to control the flow pressure at the top of the annular adjusting the flow area open to flow.  The choke manifold also direct the flow • to a flare (in case of a gas kick), or • to the pits (if mud) or • to special tanks (if oil) Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 19
  • 20. Choke manifold Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 20
  • 21. Sample of a choke manifold Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 21
  • 23. data required to control of operations under way in the rig  Several sensors, gauges, meters, indicators, alarms, and recorders exist in the rig to provide all data required to control (safely, efficiently, and reliably) of all operations under way in the rig.  Among the most important parameters are:  weight on bit (WOB) and hook load,  rate of penetration (ROP),  rotary speed,  torque,  circulating (pump) pressure,  flow rate (in and out),  drilling fluid gain/loss,  mud temperature,  mud density,  total hydrocarbon gas in the drilling fluid. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 23
  • 24. indication of hook load and weight on bit  Accurate and reliable indication of hook load and weight on bit are essential for  the efficient control of rate of penetration, bit life, borehole cleaning, and borehole direction.  The weight indicator works  in conjunction with the deadline anchor  using either tension or compression hydraulic load cells.  The deadline anchor senses the tension in the deadline and hydraulically actuates the weight indicator.  Most weight indicators have two hands and two scales.  The inner scale shows the hook load and the outer one shows the weight-on–bit. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 24
  • 25. Weight indicator and a deadline anchor Weight indicator a deadline anchor Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 25
  • 26. weight–on–bit  To obtain the weight–on–bit, the driller perform the following steps:  with the bit out of the bottom, the drillstring is put to rotate and the weight of the drillstring is observed in the central scale;  using the knob at the rim of the weight indicator, the outer scale is adjusted so that the zero of the outer scale aligns with the longer hand.  The driller lowers the drillstring slowly observing the long hand.  When the bit touches the bottom, part of the weight of the drillstring is transferred from the hook to the bit (the weight–on–bit.)  The amount of weight transferred corresponds to the decrease of hook load, indicated by the long pointer (turning counterclockwise). Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 26
  • 27. control consoles  All modern rigs have control consoles that  shows all pertinent parameters in analog and or digital displays.  All parameters and operations may be  recorded in physical (paper) or  magnetic media for post analysis.  Some automated operations like  constant weight–on–bit and  constant torque are possible in most rigs. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 27
  • 28. Drilling control console Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 28
  • 29. 1.(CDF) Jorge H.B. SampaioJr. “Drilling Engineering Fundamentals.” Master of Petroleum Engineering. Curtin University of Technology, 2007. Chapter 2 2.(WEC) Rabia, Hussain. Well Engineering & Construction. EntracConsulting Limited, 2002. Chapter 16