Drilling Engineering 1 Course 
3rd Ed. , 3rd Experience
1. 
Introduction 
2. 
Types of rigs 
3. 
Personnel at Rig Site 
4. 
How to drill a well
Rotary Drilling System:Introduction
2 drilling goals 
 
to build the well according to its purpose and in a safe manner 
 
(i.e, avoiding personal injuries 
 
and avoiding technical problems) 
 
to complete it with minimum cost 
 
Thereto the overall costs of the well during its lifetime in conjunction with the field development aspects shall be minimized. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 4
Parameters 
 
The overall cost minimization, or optimization, may influence 
 
the location from where the well is drilled, 
 
(e.g., an extended reach onshore or above reservoir offshore), 
 
the drilling technology applied, 
 
(e.g., conventional or slim–hole drilling, overbalanced or underbalanced, vertical or horizontal, etc), 
 
and which evaluation procedures are run to gather subsurface information to optimize future wells. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 5
drilling technologies 
 
To build a hole, different drilling technologies have been invented: 
 
Percussion drilling 
 
Cable drilling “Pennsylvanian drilling” 
 
Drillstring 
• 
With mud Quick percussion drilling 
• 
Without mud “Canadian drilling” 
 
Rotating drilling (Will be discussed exclusively) 
 
Full cross-section drilling 
• 
Surface driven 
o 
Rotary bit 
o 
Rotary nozzle 
• 
Subsurface driven 
o 
Turbine drilling 
o 
Positive displacement motor drilling 
o 
Electro motor drilling 
 
Annular drilling 
• 
Diamond coring 
• 
Shot drilling 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 6
drilling technologies (Cont.) 
 
Special techniques 
 
Abrasive jet drilling 
 
Cavitating jet drilling 
 
Electric arc and plasma drilling 
 
Electric beam drilling 
 
Electric disintegration drilling 
 
Explosive drilling 
 
Flame jet drilling 
 
Implosion drilling 
 
Laser drilling 
 
REAM drilling 
 
Replaceable cutterhead drilling 
 
Rocket exhaust drilling 
 
Spark drilling 
 
Subterrene drilling 
 
Terra drilling 
 
Thermal-mechanical drilling 
 
Thermocorer drilling 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 7
Rotary Drilling System:Introduction
drilling rig 
 
A drilling rig is a device used to drill, case and cement oil and gas wells. 
 
The correct procedure for selecting and sizing a drilling rig is as follows: 
 
Design the well 
 
Establish the various loads to be expected during drilling and testing operations and use the highest loads. This point establishes the DEPTH RATING OF THE RIG. 
 
Compare the rating of existing rigs with the design loads 
 
Select the appropriate rig and its components. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 9
Rig Classification 
Rotary Drilling Rigs 
Land 
Mobile 
Jackknife 
Portable Mast 
Conventional 
Marine 
Bottom Supported 
Platform 
Self Contained 
Tendered 
Barge 
Jack-Up 
Submersible 
Floating 
Drill Ship 
Semi Submersible 
Caisson Vessel 
Tension Leg 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 10
Land: Mobile Rigs 
Jackknife rig 
Portable mast 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 11
Marine: Bottom Supported Platform rigs 
Self Contained 
Tendered 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 12
Marine: Other Bottom Supported rigs 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 13 
A Jack–Up rig A submersible platform 
A cantilever rig on a barge
Marine: Floating rigs 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 14 
Caisson vessel 
(also called 
sparbuoy) and 
Diagram of a 
spar–buoy 
A tension– 
leg platform 
A drill–ship 
Semi– submersible vessel
comparison of drilling rigs 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 15
Well Classifications 
 
According to a wells final depth, it can be classified into: 
 
Shallow well: < 2000m 
 
Conventional well: 2 000m –3500m 
 
Deep well: 3500m –5000m 
 
Ultra deep well: > 5 000m 
 
With the help of advanced technologies in MWD/LWD and extended reach drilling techniques, horizontal departures of more than10000m are possible today. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 16
Rotary Drilling System:Introduction
Personnel 
 
People directly involved in drilling a well are employed either by 
 
the operating company, 
 
the drilling contractor, 
 
or one of the service and supply companies 
 
The operating company is the owner of the lease/block and principal user of the services provided by the drilling contractor and the different service companies. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 18
Tasks 
 
Since drilling contractors are companies that perform the actual drilling of the well, their main job is to drill a hole to the depth/location and specifications set by the operator. 
 
Along with hiring a drilling contractor, the operator usually employs various service and supply companies to perform 
 
logging, 
 
cementing, 
 
or any other special operations, including maintaining the drilling fluid in its planed condition. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 19
drilling crews 
 
Most drilling crews consist of 
 
a tool pusher, 
 
a driller, 
 
a derrickman, 
 
a mud logger, 
 
and two or three rotary helpers 
 
(also called floormen or roughnecks). 
 
Along with this basic crew configuration the operator sends usually a representative, called 
 
company man to the rig. 
 
For offshore operations the crews usually consist of many more employees. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 20
crew requirements 
 
Tool Pusher: 
 
supervises all drilling operations and is the leading man of the drilling contractor on location. 
 
Company Man: 
 
The company man is in direct charge of all company’s activities on the rig site. 
 
He is responsible for the drilling strategy as well as the supplies and services in need. His decisions directly effect the progress of the well. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 21
crew requirements (Cont.) 
 
Driller: 
 
The driller operates the drilling machinery on the rig floor and is the overall supervisor of all floormen. 
 
He reports directly to the tool pusher and is the person who is most closely involved in the drilling process. 
 
He operates, from his position at the control console, the rig floor brakes, switches, levers, and all other related controls that influence the drilling parameters. 
 
In case of a kick he is the first person to take action by moving the bit off bottom and closing the BOP. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 22
Inside a control console 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 23
crew requirements (Cont.) 
 
Derrick Man: 
 
The derrickman works on the so– called monkeyboard, a small platform up in the derrick, usually about 90 ft above the rotary table. 
 
When a connection is made or during tripping operations he is handling and guiding the upper end of the pipe. 
 
During drilling operations the derrickman is responsible for maintaining and repairing the pumps and other equipment as well as keeping tabs on the drilling fluid. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 24
crew requirements (Cont.) 
 
Floormen: 
 
During tripping, the rotary helpers are responsible for handling the lower end of the drill pipe as well as operating tongs and wrenches to make or break up a connection. 
 
During other times, they also maintain equipment, keep it clean, do painting and in general help where ever help is needed. 
 
Mud Engineer, Mud Logger: 
 
The service company who provides the mud almost always sends a mud engineer and a mud logger to the rig site. They are constantly responsible for logging what is happening in the hole as well as maintaining the proper mud conditions. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 25
Rotary Drilling System:Introduction
drilling process 
 
In rotary drilling, the rock is destroyed by the action of rotation and axial force applied to a drilling bit. 
 
The drilling bit is located at the end of a drill string which is composed of drill pipes (also called joints or singles), drill collars, and other specialized drilling tools. 
 
Drill collars are thick walled tubes responsible for applying the axial force at the bit. 
 
Rotation at the bit is usually obtained by rotating the whole drill string from the surface. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 27
A simplified drillstring 
 
The components of the drillstring are: 
 
Drillpipe 
 
Drillcollars 
 
Other Accessories called bottom hole assembly (BHA) including: 
 
Heavy-walled drillpipe (HWDP) 
 
Stabilisers 
 
Reamers 
 
Directional control equipment 
 
Etc. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 28
Functions of the drillstring 
 
The drill string is the mechanical linkage connecting the drillbit at the bottom of the hole to the rotary drive system on the surface. 
 
The drillstring serves the following functions: 
 
transmits rotation to the drillbit 
 
exerts weight on the bit; 
 
the compressive force necessary to break the rock 
 
guides and controls the trajectory of the bit; and 
 
allows fluid circulation 
 
which is required for cooling the bit and for cleaning the hole. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 29
drilling process (Cont.) 
 
A large variety of bit models and designs are available in industry. 
 
The choice of the right bit, based on the characteristics of the formations to be drilled, and the right parameters (weight on bit and rotary speed) 
 
are the two most basic problems the drilling engineer faces during drilling planning and drilling operation. 
 
The cuttings are lifted to the surface by the drilling fluid. 
 
At the surface, the cuttings are separated from the drilling fluid by several solid removal equipment. 
 
Drilling mud is picked up by the system of pumps and pumped again down the hole. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 30
connection 
 
As drilling progresses, new joints are added to the top of the drill string increasing its length, in an operation called connection. 
 
A pipe slips is used to transfer the weight of the drillstring from the hook to the master bushing. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 31
round trip 
 
As the bit gets dull, a round trip is performed to bring the dull bit to the surface and replace it by a new one. 
 
A round trip is performed also to change the BHA. 
 
The drillstring is also removed to run a casing string. The operation is done by removing stands of two (“doubles”), three (“thribbles”) or even four (“fourbles”) joints connected, and stacking them upright in the rig. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 32
Removing one stand of drillstring 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 33
wiper trip 
 
Sometimes the drillstring is not completely run out of the hole. 
 
It is just lifted up to the top of the open-hole section and then lowered back again while continuously circulating with drilling mud. 
 
Such a trip, called wiper trip, 
 
is carried out to clean the hole from remaining cuttings that may have settled along the open–hole section. 
Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 34
1.(CDF) Jorge H.B. Sampaio Jr. “Drilling Engineering Fundamentals.” Master of Petroleum Engineering. Curtin University of Technology, 2007. 
Chapter 1 and 2 
2.(WEC) Rabia, Hussain. Well Engineering & Construction. Entrac Consulting Limited, 2002. 
Chapter 16
Rotary Drilling System:Introduction

More Related Content

PDF
Presentation 2 drilling rig systems
PPTX
Rotary drilling rig (onshore)
ODP
drilling operation
PDF
Power System
PDF
Functions of drilling rig components Presentation
PDF
Rotary System
PPT
RIG COMPONENTS - Definitions
PPS
16176745 drilling-rig-operations-a-to-z-rotary-drilling-rig-components
Presentation 2 drilling rig systems
Rotary drilling rig (onshore)
drilling operation
Power System
Functions of drilling rig components Presentation
Rotary System
RIG COMPONENTS - Definitions
16176745 drilling-rig-operations-a-to-z-rotary-drilling-rig-components

What's hot (20)

PDF
Basics of drilling 1
PDF
Hoisting System
PDF
Rig components
PPTX
Presentation 1 drilling rigs
PDF
2.2 rig components
PPT
Drilling operation and components
PPTX
Drill bits
PPTX
Rig types and components
PPT
Drill Bits
PDF
Types of Drilling
PPT
Rig Operations & Equipment
PPTX
Introduction to drilling
PPTX
Horizontal drilling
PDF
Q921 de1 lec 5 v1
PPT
Directional Drilling
PDF
Drilling Engineering - Casing Design
PDF
Drilling Operations
PPTX
Drilling problems and optimization
PPTX
Drilling equipments
PPTX
Rig types.
Basics of drilling 1
Hoisting System
Rig components
Presentation 1 drilling rigs
2.2 rig components
Drilling operation and components
Drill bits
Rig types and components
Drill Bits
Types of Drilling
Rig Operations & Equipment
Introduction to drilling
Horizontal drilling
Q921 de1 lec 5 v1
Directional Drilling
Drilling Engineering - Casing Design
Drilling Operations
Drilling problems and optimization
Drilling equipments
Rig types.
Ad

Similar to Rotary Drilling System: Introduction (20)

PDF
Q921 de1 lec 2 v1
PDF
Q922+de1+l02 v1
PDF
Q921 de1 lec 4 v1
PDF
CV KEREN INDONESIA DLWANDLKAWNDLKAWNDLADMSNDSO
PDF
Q922+de1+l04 v1
PPTX
overview of DRILLING OPERATION.pptx
PPTX
Operation and Well Setting GTI SEG-SUSC 08-10-2016
PDF
Life Cycle of Oil & Gas Wells
PPTX
Fundamentals of Petroleum Engineering Module 4
PDF
Drilling Fluid Circulation Systems
PPTX
Drilling - Qazma English
PDF
Introduction-to-Petroleum-Eng-Part-2.pdf
PDF
Intduction-to-Petroleum-Engineering-Part-2.pdf
PDF
Drilling engineering zaidi
PPTX
DE Module 2.pptx
PDF
Drilling - Qazma English
PPT
1 hoisting system
PPT
176589.pptx.ppt
PDF
Drilling technology oil and gas
PPTX
Chapter 1.pptx ghghghghghghghghghghghhgh
Q921 de1 lec 2 v1
Q922+de1+l02 v1
Q921 de1 lec 4 v1
CV KEREN INDONESIA DLWANDLKAWNDLKAWNDLADMSNDSO
Q922+de1+l04 v1
overview of DRILLING OPERATION.pptx
Operation and Well Setting GTI SEG-SUSC 08-10-2016
Life Cycle of Oil & Gas Wells
Fundamentals of Petroleum Engineering Module 4
Drilling Fluid Circulation Systems
Drilling - Qazma English
Introduction-to-Petroleum-Eng-Part-2.pdf
Intduction-to-Petroleum-Engineering-Part-2.pdf
Drilling engineering zaidi
DE Module 2.pptx
Drilling - Qazma English
1 hoisting system
176589.pptx.ppt
Drilling technology oil and gas
Chapter 1.pptx ghghghghghghghghghghghhgh
Ad

More from AFATous (20)

PDF
جزوه درس نمودارگیری از چاه، ویرایش ششم
PDF
جزوه درس مهندسی حفاری دو، ویرایش ششم
PDF
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
PDF
جزوه درس مهندسی حفاری یک،ویرایش ششم
PDF
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
PDF
Q933+log reference fa lec
PDF
Q933+log reference fa lec 4x1
PDF
Q933+po2 reference fa lec
PDF
Q933+po2 reference fa lec 4x1
PDF
Q933+de2 reference fa lec 4x1
PDF
Q933+de2 reference fa lec
PDF
Q933+de1 reference fa lec 4x1
PDF
Q933+de1 reference fa lec
PDF
Q932+log reference fa lec 4 x1
PDF
Q932+stm reference fa lec 4x1
PDF
Q932+rrl reference fa lec
PDF
Q932+stm reference fa lec
PDF
Q932+rrl reference fa lec 4x1
PDF
Q932+sgo reference fa lec 4x1
PDF
Q932+sgo reference fa lec
جزوه درس نمودارگیری از چاه، ویرایش ششم
جزوه درس مهندسی حفاری دو، ویرایش ششم
جزوه درس مهندسی بهره برداری دو، ویرایش دوم
جزوه درس مهندسی حفاری یک،ویرایش ششم
جزوه درس انگیزش چاه (اسیدکاری)، ویرایش دوم
Q933+log reference fa lec
Q933+log reference fa lec 4x1
Q933+po2 reference fa lec
Q933+po2 reference fa lec 4x1
Q933+de2 reference fa lec 4x1
Q933+de2 reference fa lec
Q933+de1 reference fa lec 4x1
Q933+de1 reference fa lec
Q932+log reference fa lec 4 x1
Q932+stm reference fa lec 4x1
Q932+rrl reference fa lec
Q932+stm reference fa lec
Q932+rrl reference fa lec 4x1
Q932+sgo reference fa lec 4x1
Q932+sgo reference fa lec

Recently uploaded (20)

PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPT
Total quality management ppt for engineering students
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
PDF
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
PDF
737-MAX_SRG.pdf student reference guides
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
Feature types and data preprocessing steps
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
Current and future trends in Computer Vision.pptx
PDF
Design Guidelines and solutions for Plastics parts
PPTX
communication and presentation skills 01
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PDF
Abrasive, erosive and cavitation wear.pdf
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Categorization of Factors Affecting Classification Algorithms Selection
Total quality management ppt for engineering students
Visual Aids for Exploratory Data Analysis.pdf
tack Data Structure with Array and Linked List Implementation, Push and Pop O...
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
737-MAX_SRG.pdf student reference guides
Fundamentals of safety and accident prevention -final (1).pptx
Feature types and data preprocessing steps
August 2025 - Top 10 Read Articles in Network Security & Its Applications
Information Storage and Retrieval Techniques Unit III
distributed database system" (DDBS) is often used to refer to both the distri...
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Current and future trends in Computer Vision.pptx
Design Guidelines and solutions for Plastics parts
communication and presentation skills 01
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
Abrasive, erosive and cavitation wear.pdf

Rotary Drilling System: Introduction

  • 1. Drilling Engineering 1 Course 3rd Ed. , 3rd Experience
  • 2. 1. Introduction 2. Types of rigs 3. Personnel at Rig Site 4. How to drill a well
  • 4. 2 drilling goals  to build the well according to its purpose and in a safe manner  (i.e, avoiding personal injuries  and avoiding technical problems)  to complete it with minimum cost  Thereto the overall costs of the well during its lifetime in conjunction with the field development aspects shall be minimized. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 4
  • 5. Parameters  The overall cost minimization, or optimization, may influence  the location from where the well is drilled,  (e.g., an extended reach onshore or above reservoir offshore),  the drilling technology applied,  (e.g., conventional or slim–hole drilling, overbalanced or underbalanced, vertical or horizontal, etc),  and which evaluation procedures are run to gather subsurface information to optimize future wells. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 5
  • 6. drilling technologies  To build a hole, different drilling technologies have been invented:  Percussion drilling  Cable drilling “Pennsylvanian drilling”  Drillstring • With mud Quick percussion drilling • Without mud “Canadian drilling”  Rotating drilling (Will be discussed exclusively)  Full cross-section drilling • Surface driven o Rotary bit o Rotary nozzle • Subsurface driven o Turbine drilling o Positive displacement motor drilling o Electro motor drilling  Annular drilling • Diamond coring • Shot drilling Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 6
  • 7. drilling technologies (Cont.)  Special techniques  Abrasive jet drilling  Cavitating jet drilling  Electric arc and plasma drilling  Electric beam drilling  Electric disintegration drilling  Explosive drilling  Flame jet drilling  Implosion drilling  Laser drilling  REAM drilling  Replaceable cutterhead drilling  Rocket exhaust drilling  Spark drilling  Subterrene drilling  Terra drilling  Thermal-mechanical drilling  Thermocorer drilling Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 7
  • 9. drilling rig  A drilling rig is a device used to drill, case and cement oil and gas wells.  The correct procedure for selecting and sizing a drilling rig is as follows:  Design the well  Establish the various loads to be expected during drilling and testing operations and use the highest loads. This point establishes the DEPTH RATING OF THE RIG.  Compare the rating of existing rigs with the design loads  Select the appropriate rig and its components. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 9
  • 10. Rig Classification Rotary Drilling Rigs Land Mobile Jackknife Portable Mast Conventional Marine Bottom Supported Platform Self Contained Tendered Barge Jack-Up Submersible Floating Drill Ship Semi Submersible Caisson Vessel Tension Leg Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 10
  • 11. Land: Mobile Rigs Jackknife rig Portable mast Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 11
  • 12. Marine: Bottom Supported Platform rigs Self Contained Tendered Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 12
  • 13. Marine: Other Bottom Supported rigs Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 13 A Jack–Up rig A submersible platform A cantilever rig on a barge
  • 14. Marine: Floating rigs Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 14 Caisson vessel (also called sparbuoy) and Diagram of a spar–buoy A tension– leg platform A drill–ship Semi– submersible vessel
  • 15. comparison of drilling rigs Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 15
  • 16. Well Classifications  According to a wells final depth, it can be classified into:  Shallow well: < 2000m  Conventional well: 2 000m –3500m  Deep well: 3500m –5000m  Ultra deep well: > 5 000m  With the help of advanced technologies in MWD/LWD and extended reach drilling techniques, horizontal departures of more than10000m are possible today. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 16
  • 18. Personnel  People directly involved in drilling a well are employed either by  the operating company,  the drilling contractor,  or one of the service and supply companies  The operating company is the owner of the lease/block and principal user of the services provided by the drilling contractor and the different service companies. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 18
  • 19. Tasks  Since drilling contractors are companies that perform the actual drilling of the well, their main job is to drill a hole to the depth/location and specifications set by the operator.  Along with hiring a drilling contractor, the operator usually employs various service and supply companies to perform  logging,  cementing,  or any other special operations, including maintaining the drilling fluid in its planed condition. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 19
  • 20. drilling crews  Most drilling crews consist of  a tool pusher,  a driller,  a derrickman,  a mud logger,  and two or three rotary helpers  (also called floormen or roughnecks).  Along with this basic crew configuration the operator sends usually a representative, called  company man to the rig.  For offshore operations the crews usually consist of many more employees. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 20
  • 21. crew requirements  Tool Pusher:  supervises all drilling operations and is the leading man of the drilling contractor on location.  Company Man:  The company man is in direct charge of all company’s activities on the rig site.  He is responsible for the drilling strategy as well as the supplies and services in need. His decisions directly effect the progress of the well. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 21
  • 22. crew requirements (Cont.)  Driller:  The driller operates the drilling machinery on the rig floor and is the overall supervisor of all floormen.  He reports directly to the tool pusher and is the person who is most closely involved in the drilling process.  He operates, from his position at the control console, the rig floor brakes, switches, levers, and all other related controls that influence the drilling parameters.  In case of a kick he is the first person to take action by moving the bit off bottom and closing the BOP. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 22
  • 23. Inside a control console Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 23
  • 24. crew requirements (Cont.)  Derrick Man:  The derrickman works on the so– called monkeyboard, a small platform up in the derrick, usually about 90 ft above the rotary table.  When a connection is made or during tripping operations he is handling and guiding the upper end of the pipe.  During drilling operations the derrickman is responsible for maintaining and repairing the pumps and other equipment as well as keeping tabs on the drilling fluid. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 24
  • 25. crew requirements (Cont.)  Floormen:  During tripping, the rotary helpers are responsible for handling the lower end of the drill pipe as well as operating tongs and wrenches to make or break up a connection.  During other times, they also maintain equipment, keep it clean, do painting and in general help where ever help is needed.  Mud Engineer, Mud Logger:  The service company who provides the mud almost always sends a mud engineer and a mud logger to the rig site. They are constantly responsible for logging what is happening in the hole as well as maintaining the proper mud conditions. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 25
  • 27. drilling process  In rotary drilling, the rock is destroyed by the action of rotation and axial force applied to a drilling bit.  The drilling bit is located at the end of a drill string which is composed of drill pipes (also called joints or singles), drill collars, and other specialized drilling tools.  Drill collars are thick walled tubes responsible for applying the axial force at the bit.  Rotation at the bit is usually obtained by rotating the whole drill string from the surface. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 27
  • 28. A simplified drillstring  The components of the drillstring are:  Drillpipe  Drillcollars  Other Accessories called bottom hole assembly (BHA) including:  Heavy-walled drillpipe (HWDP)  Stabilisers  Reamers  Directional control equipment  Etc. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 28
  • 29. Functions of the drillstring  The drill string is the mechanical linkage connecting the drillbit at the bottom of the hole to the rotary drive system on the surface.  The drillstring serves the following functions:  transmits rotation to the drillbit  exerts weight on the bit;  the compressive force necessary to break the rock  guides and controls the trajectory of the bit; and  allows fluid circulation  which is required for cooling the bit and for cleaning the hole. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 29
  • 30. drilling process (Cont.)  A large variety of bit models and designs are available in industry.  The choice of the right bit, based on the characteristics of the formations to be drilled, and the right parameters (weight on bit and rotary speed)  are the two most basic problems the drilling engineer faces during drilling planning and drilling operation.  The cuttings are lifted to the surface by the drilling fluid.  At the surface, the cuttings are separated from the drilling fluid by several solid removal equipment.  Drilling mud is picked up by the system of pumps and pumped again down the hole. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 30
  • 31. connection  As drilling progresses, new joints are added to the top of the drill string increasing its length, in an operation called connection.  A pipe slips is used to transfer the weight of the drillstring from the hook to the master bushing. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 31
  • 32. round trip  As the bit gets dull, a round trip is performed to bring the dull bit to the surface and replace it by a new one.  A round trip is performed also to change the BHA.  The drillstring is also removed to run a casing string. The operation is done by removing stands of two (“doubles”), three (“thribbles”) or even four (“fourbles”) joints connected, and stacking them upright in the rig. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 32
  • 33. Removing one stand of drillstring Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 33
  • 34. wiper trip  Sometimes the drillstring is not completely run out of the hole.  It is just lifted up to the top of the open-hole section and then lowered back again while continuously circulating with drilling mud.  Such a trip, called wiper trip,  is carried out to clean the hole from remaining cuttings that may have settled along the open–hole section. Fall 14 H. AlamiNia Drilling Engineering 1 Course (3rd Ed.) 34
  • 35. 1.(CDF) Jorge H.B. Sampaio Jr. “Drilling Engineering Fundamentals.” Master of Petroleum Engineering. Curtin University of Technology, 2007. Chapter 1 and 2 2.(WEC) Rabia, Hussain. Well Engineering & Construction. Entrac Consulting Limited, 2002. Chapter 16