SlideShare a Scribd company logo
I n t r o d u c t i o n t o w e l l d r i l l i n g
Rig ComponentsW e l l D r i l l i n g
Light rigs, down to 2,000 m
Medium rigs, to 4,000 m
Heavy rigs, to 6,000 m
1
2
3
Ultra-heavy rigs for greater depths4
Landrigclassification
onshore drilling rigs fall into four groups:
Increasing capacity is matched by increasing both maximum hook load
capacity and derrick strength.
Eng. Elsayed Amer
Light rigs, up to 650 HP
medium rigs, up to 1,300 HP
heavy rigs, up to 2,000 HP
1
2
3
ultra-heavy rigs, 3,000 HP and more.4
Landrigclassification
Another criterion for classification is the power installed on the rig, which for
oil well drilling is in the range of at least 10 HP every 100 feet in depth
Eng. Elsayed Amer
Main Rig systems components
1
2
Hoisting System
3
4
5
6
Rotary System
Mud Circulating
System
Blowout Prevention
System
Power System
Drill string handling
equipment
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
1. Hoisting System
R i g c o m p o n e n t s
Eng. Elsayed AmerEng. Elsayed Amer
1. Hoisting System
The hoisting system is the set of equipment necessary to lower or raise drill strings,
casing string and other subsurface equipment into or out of hole.
Function
Principal Components:
I. Derrick and substructure
II. Crown block
III. Travelling block
IV. Draw works
V. Drilling line
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
Hoisting
System
1
2
5
Crown Block
Deadline
Traveling Block
Drum
Deadline Anchor
Storage Reel
Fast Line
Drawworks
6
7
10
9
7
3
8
4
6
Wireline
Pipe elevators
9
11
Drum Brake
1. Hoisting System
 The substructure is the supporting base
for the derrick, the draw works and the
rotary table, and constitutes the
working floor for operations, or drilling
floor, being elevated with respect to
ground level. The substructure is a
reticular structure of steel beams, that
can easily be dismantled, and rests on
concrete foundations or on a base of
wooden planks around the cellar.
 Its height varies from a few meters up to
10 m in the largest rigs
1. Substructure
Eng. Elsayed Amer
Eng. Elsayed Amer
1. Hoisting System
 The derrick is an open-framework structure of steel beams, whose function is to
hold the ensemble of sheaves at its top, known as the crown block, on which all of
the items of equipment operated in the well or on the drilling floor are suspended.
 the height of the derrick must be such as to permit the vertical movement of the
travelling block for a distance greater than the equivalent of one stand. For
example, to handle a stand of 3 drill pipes (about 27 m long) the derrick has to be
about 40 m high. The derrick is designed to resist the loads tripped in and out of
the well in the operating phases, which induce both static and dynamic stresses.
 Every derrick has a rated load capacity, defined by API (American Petroleum
Institute) standards, which establish the maximum hook load
2. Derrick
Eng. Elsayed Amer
1. Hoisting System
Derrick
1 2Conventional derrick Mast
Eng. Elsayed Amer
Eng. Elsayed Amer
1. Hoisting System
 An assembly of sheaves mounted on
beams at the top of the derrick/mast
and over which the drilling line is
reeved.
 The crown block bears the load applied
at the hook and its function is to reduce
the wire rope tension required to pull
the tubular material used to drill the
well. It at the top of the rig consists of a
set of sheaves (usually from 3 to 7)
supported by a framework of steel
beams.
3. Crown block
Eng. Elsayed Amer
Eng. Elsayed Amer
1. Hoisting System
 consists of another set of sheaves (one
fewer than for the crown block),
mounted on an axis connected to the
hook.
 The number of sheaves in the crown
and travelling block is chosen on the
basis of the rated capacity of the tower
and the rate of pulling, which is
inversely proportional to the number
of lines of wire rope connecting the
travelling block and the crown block
4. travelling block
Eng. Elsayed Amer
Eng. Elsayed Amer
1. Hoisting System
 The high-capacity J-shaped equipment
used to hang various other equipment,
particularly the swivel and Kelly, the
elevator bails or top drive units. The
hook is attached to the bottom of the
traveling block and provides a way to
pick up heavy loads with the traveling
block. The hook is either locked (the
normal condition) or free to rotate, so
that it may be mated or decoupled
with items positioned around the rig
floor, not limited to a single direction.
5. Hook
Eng. Elsayed Amer
1. Hoisting System
 The drawworks is the machine that transmits the power to operate the equipment
in the well. The basic components of the drawworks are an engine, one or more
drums containing a steel cable, and the brakes
 The main brake is a strongly-built, band brake, used to stop the drill string as it is
being lowered, or to release it slowly during drilling.
 Normally a hydraulic brake and an electromagnetic brake are used, although these
cannot stop the hoisting drum completely and they cannot be used alone.
6. Draw works
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
DRAWORKS RATED POWER
HP (kW)
HOOK LOAD CAPACITY (tons)
CONVENTIONAL RIGS MOBILE RIGS
150 (110) 60
200 (147) 75
250 (184) 80
300 (220) 90-100
500 (368) 125
700 (515) 180 180
1000 (735) 220 220
1500 (1100) 360
2000 (1470) 500
3000 (2200) 750
4000 (2940) 1000
5000 (3728) 1500
Eng. Elsayed Amer
1. Hoisting System
 The drilling line contained in the hoist drums consists of helically-wound steel-wire
strands around a plastic, vegetable fiber or steel core.
 The first end of the drilling line (fast line) is wound around the hoist drum, after
which it passes alternately over the sheaves of the travelling block and of the crown
block, while the other end (dead line) is anchored to an element of the
substructure.
 The tension of the line is measured on this anchorage, and this makes it possible to
calculate the weight of the equipment suspended from the hook (e.g. drill string,
casing, etc.). Through being wound around the drum and over the block sheaves,
the line is subject to wear and tear, to weakening of the wires (due to local
overheating) and to fatigue due to cyclical variations of tension in the winding over
the sheaves and the drum.
7. Drilling Line
Eng. Elsayed Amer
1. Hoisting System
 One method of assessing the state of
wear and tear of the drilling line is
visual inspection, but this is uncommon
because of the uncertainty involved,
the practical difficulties and the time
required.
 slipping and cutoff, is performed when
a given value of the work
carried out by the line has been
reached.
7. Drilling Line
Eng. Elsayed Amer
1. Hoisting System
7. Drilling Line
Right Lang Lay
Left Lang Lay
Right Regular Lay
Left Regular Lay
Types of Wire Rope Lay
Eng. Elsayed Amer
1. Hoisting System
7. Drilling Line
Type of Wire Rope Construction
Shallow:
Deep:
1” to 1-1/8” diameter
1-1/4” to 2” diameter
Contruction: 6 x 19 S or 6 x 21 S or 6 x 25 FW, RRL, IPS or EIP, IWRC
Eng. Elsayed Amer
Eng. Elsayed Amer
6 X 7 with
fiber core
6 X 19W with
fiber core
6 X 19S with
fiber core
6 X 19 with
IWR core
6 X 21
Filler Wire
with fiber
core
6 X 25
Filler Wire
with fiber
core
6 X 25
Filler Wire
with IWR
core
6 X 25
Seal with
IWR core
6 X 27
Seal with
IWR core
6 X 31
Seal with
IWR core
IWR = Independent Wire Rope
Eng. Elsayed Amer
1. Hoisting System
 The cathead is used to lift heavy
objects and to pull on the tongs
when making up the drill pipe
8. cathead
Eng. Elsayed Amer
1. Hoisting System
 An air hoist or tugger is a safer
way to lift heavy objects
9. air hoist
Eng. Elsayed Amer
1. Hoisting System
The drilling line is stored on a spool
Periodically, some of the drilling line
is cut off at the drawworks and
additional line is pulled off the spool
to replace the cut line
10. Drill line spool
Eng. Elsayed Amer
1. Hoisting System
The “dead line” is anchored in the
substructure
The anchor is on the spool side
10. Deal line anchor
Eng. Elsayed Amer
2. Rotating System
R i g c o m p o n e n t s
Eng. Elsayed AmerEng. Elsayed Amer
2. Rotary System
The system of rotation is intended to cause the drill string to rotate.
Function
Principal Components:
1. The rotary table
2. Kelly or Top Drive
3. Kelly Bushing
4. Master Bushing
Eng. Elsayed Amer
Eng. Elsayed Amer
Drill Pipe
Drill Collars
Bit
Swivel
Kelly
Kelly Bushing
K.B. Elevation
Rotary Table
2. Rotary System
1. Top drive
 The top drive is a relatively recent piece of
equipment, introduced towards the mid-1980s,
grouping together in a single unit the equipment
for connecting the drill pipes, rotation of the drill
string and circulation of the fluid
 The top drive unit is suspended from the hook
and is guided by two vertical rails fixed to the
derrick, which provide the reactive torque
necessary to prevent the rotation of the whole
complex and to allow free vertical movement.
Eng. Elsayed Amer
2. Rotary System
1. Top drive
the use of the top drive instead of the rotary table offers numerous advantages, including:
possibility of ‘drilling by stands’ (adding the pipes by stands, and not individually), allowing
greater control of drilling.
1
2
3
4
the reduction of the time required to connect the pipes, with less risk of accidents for drilling
operators
the possibility of performing the trip-out operation while circulating mud and rotating the
string (back reaming), impossible with the rotary table and useful for preventing the drill
string from becoming stuck
the possibility of obtaining longer cores, as intermediate connections are eliminated.
Eng. Elsayed Amer
Top
drive
Rig floor Drill pipe
‘A’ frame
Guide
rails
Eng. Elsayed Amer
2. Rotary System
 The rotary tool that is hung from
the hook of the traveling block
to suspend the drillstring and
permit it to rotate freely.
 It also provide connection for
the rotary hose and provide
passageway for the flow of
drilling fluid into the drill stem.
2. swivel
Eng. Elsayed Amer
2. Rotary System
 The Kelly is a pipe of square or
hexagonal section that transmits
the motion of the rotary table to
the drill string.
 It receives this motion from the
Kelly bushing, to which it is
joined through a sliding
coupling, so that it can move
vertically.
3. Kelly
Eng. Elsayed Amer
Eng. Elsayed Amer
2. Rotary System
4. Kelly Bushing
A device that when fitted to master bushing transmits torque to the Kelly
and simultaneously permits vertical movement of the Kelly to make hole.
Type HDP Type HDS Type MDS
Heavy Duty fits 23” through 49-1/2” Rotary
Table
Heavy Duty for Square Drive Rotary
Tables
Medium Duty for Square Rotary Table
Eng. Elsayed Amer
Eng. Elsayed Amer
2. Rotary System
5. Master Bushing
A device that fits into the rotary table to accommodate the slips and drive the kelly bushing so that the
rotating motion of the rotary table can be transmitted to the Kelly.
Type MSPC Type MSPC Type MBSSType MPCH
Fits 20-1/2” to 27-1/2” Rotary
Tables
Fits 37-1/2” to 49-1/2” Rotary
Tables
Fits 17-1/2” to 27-1/2” Rotary
Tables
Fits 17-1/2” to 27-1/2” Rotary
Tables
Eng. Elsayed Amer
2. Rotary System
 The rotary table makes the drill
string rotate and supports its
weight during operations or
during the connection of a new
drill pipe, when it cannot be
borne by the hook
6. Rotary table
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
3.TubularandTubular
HandlingEquipment
R i g c o m p o n e n t
Eng. Elsayed Amer
 Drill string
The drill string is an assemblage of hollow pipes of circular
section, extending from the surface to the bottom of the hole.
It has three functions:
 it takes the drilling bit to the bottom of the hole,
while transmitting its rotation and its vertical load
to it.
 It permits the circulation of the drilling fluid to the
bottom of the hole.
 it guides and controls the trajectory of the hole.
Eng. Elsayed Amer
 Drillstring
 The drill pipes are hollow steel
pipes of various types, with two
tool joints welded at their ends.
 They are standardized according
to API standards and classified on
the basis of their length (usually
about 9 m), their outside diameter,
their linear weight and their steel
grade.
 The most common drill pipes are
the following: 3.50'' (13.30 lb/ft),
4.50'‘ (16.60 lb/ft) and 5'' (19.50
lb/ft),
a) Drill Pipe
Eng. Elsayed Amer
 Drillstring
a) Drill Pipe
Eng. Elsayed Amer
 Drillstring
a) Drill Pipe
TENSILE REQUIREMENTS
RANGE LENGHTS
TOLERANCES
Eng. Elsayed Amer
 Drillstring
a) Drill Pipe
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
 Drillstring
 To avoid the danger of breaks in the drill string,
a short stretch of intermediate heavy-wall or
heavy-weight drill pipes is inserted.
b) Heavy Weight Drill pipe
Eng. Elsayed Amer
 Drillstring
 Similar in appearance to a drill pipe, HWDP has the
following different dimensional characteristics; the tube
wall is heavier about 1”thick in most sizes, the tool joints
are longer, and the tube section has a larger diameter at
mid length to protect the pipe from wear.
b) Heavy Weight Drill pipe
Eng. Elsayed Amer
Eng. Elsayed Amer
 Drillstring
 The heavy, thick-walled tube steel, used
between the drill pipe and the bit in the drill
stem to provide pendulum effect to the drill
stem and to provide weight on bit.
C) Drill Collar
Eng. Elsayed Amer
Drill collar
Drillpipe
An 8” OD drill collar weighs
150 lbs/ft or 4500 lbs each
 Drillstring
The drill collars have a thick wall, are made out of solid steel bars, rounded
externally, bored on the inside and with threaded ends directly on the body,
with threading analogous to that used for ordinary pipes.
The drill collars are 9 to 13 m in length and their outside diameter is between
3.125'' and 14''.
They are also standardized (API), with the most common diameters being
9.50'', 8'' and 6.50''.
Drill collars made of nonmagnetic steel also exist, and are used in directional
drilling so as not to influence the sensors that measure
the earth’s magnetic field.
They are manufactured with stainless steels (alloys of K-Monel type) or with
chrome-manganese steel alloys.
C) Drill Collar
Eng. Elsayed Amer
 Drillstring
 A short, threaded piece of pipe used to adapt parts of the
drilling string that cannot otherwise be screwed together
because of difference in thread size or design.
 These consist of:
D) Sub
1. Bit Sub
2. Crossover Sub
3. Kelly Saver Sub
4. Lifting Sub
5. Bent Sub
Eng. Elsayed Amer
 Drillstring
D) Sub
Eng. Elsayed Amer
 Drillstring
D) Sub
Eng. Elsayed Amer
Eng. Elsayed Amer
1. Elevator Links
2. Elevator
3. Lifting Subs
4. Lifting Plug
5. Tugger/Winch
6. Slips
7. Safety Clamp
8. Tongs
9. Kelly Spinner
10. Drillpipe Spinner
11. Iron Roughneck
12. Bit Breaker
Equipment used to move, make and break connection, suspend tubular on the
rig. These include the following:
 Drillstring
Tubular Handling Equipment
Eng. Elsayed Amer
1. Elevator Links
Equipment attached onto the Traveling Block
in order to suspend the Elevators.
Eng. Elsayed Amer
2. Elevator
Clamps that grip a stand of casing, tubing,
drillpipe or drill collars so that the stand or joint
can be raised from or lowered into the hole
opening of the rotary table.
Eng. Elsayed Amer
Eng. Elsayed Amer
2. Elevator
Clamps that grip a stand of casing, tubing, drill
pipe or drill collars so that the stand or joint can
be raised from or lowered into the hole opening
of the rotary table.
Eng. Elsayed Amer
Eng. Elsayed Amer
Slips for hanging the string on rotary table:
A, drill pipe suspended inside the rotary table; B, close-up of pipe-slips
Eng. Elsayed Amer
2. Slips
Eng. Elsayed Amer
Drill Pipe SlipsDrill collar Slips
2. Slips
Eng. Elsayed Amer
Casing slips
2. Slips
The are used on tubular above the slips to prevent dropping the string should
the slips fail to hold.
Eng. Elsayed Amer
3. Safety clamp
The are used on tubular above the slips to prevent dropping the string should
the slips fail to hold.
Eng. Elsayed Amer
3. Safety clamp
Used to make up and brake down drill string.
Eng. Elsayed Amer
Make up Tong Breakout Tong
4. Rig tong
Used to make up and brake down drill string.
Eng. Elsayed Amer
4. Rig tong
Eng. Elsayed Amer
5. Drillpipe Spinner
A pneumatically operated device usually suspended
on the rig floor used to make fast connections and spin
off of drill pipes.
Eng. Elsayed Amer
5. Drillpipe Spinner
A pneumatically operated device usually suspended
on the rig floor used to make fast connections and spin
off of drill pipes.
Eng. Elsayed Amer
6. Bit breaker
A device that is placed on top of the rotary table to
enable the bit to be made up to drill string.
4. Mud Circulation
System
R i g c o m p o n e n t s
Eng. Elsayed Amer
3. Mud Circulation System
A major function of the fluid circulating system is to remove the rock cuttings from the
hole as the drilling progresses
Function
Principal Components:
1. Mud Pump
2. Pump Manifold
3. Standpipe
4. Swivel
5. Drillstring
6. Annulus
7. Return Line
8. Shale Shaker
9. Desander
10. Desilter
11. Degasser
12. Mud Pit
Eng. Elsayed Amer
Eng. Elsayed Amer
4. Mud Circulation System
1. Mud pumps
 A large, high-pressure reciprocating
pump used to circulated the mud on
a drilling rig.
 with 2 or 3 pistons (duplex or triplex
pumps), may be single – or dual
acting, and receive their power from
an electric motor independent from
other uses.
Eng. Elsayed Amer
4. Mud Circulation System
1. Mud pumps
Eng. Elsayed Amer
4. Mud Circulation System
1. Mud pumps
Eng. Elsayed Amer
Eng. Elsayed Amer
4. Mud Circulation System
2. Stand pipe manifold
 Divert Mud flow to kill
lines in case of kill or
lost circulation
Eng. Elsayed Amer
4. Mud Circulation System
3. Stand Pipe
The vertical pipe rising along the side of the
Derrick or Mast, which joins mud pump manifold
to the rotary hose.
Eng. Elsayed Amer
Eng. Elsayed Amer
4. Mud Circulation System
6. Rotary hose
 A large-diameter (3- to 5-in.
inside diameter), high-pressure
flexible line used to connect the
standpipe to the swivel. This
flexible piping arrangement
permits the kelly (and, in turn,
the drillstring and bit) to be
raised or lowered while drilling
fluid is pumped through the
drillstring. The simultaneous
lowering of the drillstring while
pumping fluid is critical to the
drilling operation.
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
4. Mud Circulation System
7. Mud return
The passageway of the drilling
fluid as it comes out of the well.
Eng. Elsayed Amer
4. Mud Circulation System
8. Shale Shaker
An equipment the uses a
vibrating screen to
remove cuttings from the
circulating fluid in rotary
drilling operations.
POSSUM
BELLY
From mud
return line
Vibrator motor
Screens
Shale shaker
Eng. Elsayed Amer
Eng. Elsayed Amer
4. Mud Circulation System
9. Desander
A centrifugal device for
removing sand from the
drilling fluid to prevent
abrasion of the pumps.
Eng. Elsayed Amer
4. Mud Circulation System
10. Desilter
Also a centrifugal device for
removing free particles of silt
from the drilling fluid to keep
the amount of solids in the
fluid at the lowest possible
point.
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
4. Mud Circulation System
10. Degasser
Eng. Elsayed Amer
4. Mud Circulation System
11. Mud Gas Separator
Eng. Elsayed Amer
4. Mud Circulation System
12.Reserve Pit
A waste pit, usually an excavated
earthen-walled pit.
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
Eng. Elsayed Amer
7
6
3
5
4
8
12
11
1
2
9 10
14
13
15
1617
Hose
Kelly
Stand pipe
BOP
Annulus
Drillpipes
Drill collars
Drill bit
Seprator
Shale shaker
Return line
Mud pumps
Mud-mixing Shake
Mud tanks
Mud mixer
Desilter
Discharge line
Mud Circulating System:
Eng. Elsayed Amer
Circulation
System
Drill Collar
Mud
House
Borehole
Shaleslide
Mud pit
Shale
shaker
Chemical tank
Mud return
line
Discharge
Mud
pump
Swivel
Kelly
Drill pipe
Annulus
Reserve
pit Bit
Standpipe
Rotary hose
Eng. Elsayed Amer
Eng. Elsayed Amer
5. Power systemR i g c o m p o n e n t s
Eng. Elsayed Amer
Rig component
5.Powersystem
 Internal combustion engine or a turbine that is
the source of power for driving equipment on
the Rig.
 In a drilling site power is needed to run the
machines driving the main components of the
rig, such as the drawworks, the pumps, the
rotary table and the engines of the various
auxiliary facilities (compressed air, safety
systems, centrifugal pumps, lighting, services,
etc.)
Eng. Elsayed Amer
Eng. Elsayed Amer
Rig component
5.Powersystem
 Power and electrical control room
SCR
Eng. Elsayed Amer
Rig component
5.Powersystem
 Fuel tank for generator
Diesel Tank
Eng. Elsayed Amer
Eng. Elsayed Amer
6.Blowout Prevention
System
R i g c o m p o n e n t s
Eng. Elsayed Amer
6. 6.Blowout Prevention System
The function of the well control system is to prevent the uncontrolled flow of formation
fluids from the wellbore .
Function
Principal Components:
1. Annular Blowout Preventer
2. Ram Blowout Preventer
3. Diverter
4. Drilling Spools
5. Manifold, Valves and Sensors
6. Accumulator
7. Inside BOP
Eng. Elsayed Amer
BOP
Bell nipple
Flow line
Fill line
Annular
preventer
Pipe ram
Shear/blind ram
Kill line Choke
Pipe ram
Emergency kill line Emergency choke
BOP riser
Drilling spool
Casing headEng. Elsayed Amer
Rig component
6.BOP
 Blow Out Preventers (BOPs), are large
valves located on the wellhead during
drilling operations ,able to fully shut-in
the well in just a few tens of seconds,
whatever the working conditions.
 BOP stack consists, starting from below,
of:
1. one or more spools for connection
to the wellhead
2. a dual function ram preventer
3. a single-function ram preventer
4. an annular blowout preventer
5. a lateral tube which conveys the
outgoing mud from the well to the
shaker.
BOP
Eng. Elsayed Amer
Rig component
6.BOP
BOP
Single
Double
Terrible
As per ram numbers As per ram shape
Blind
Pipe
Shearing
Variable
Eng. Elsayed Amer
Rig component
6.BOP
 The arrangement of piping and special
valves, called chokes, through which
drilling mud is circulated when the
blowout preventers are closed to control
the pressures encountered during a kick.
2- Choke manifold
Eng. Elsayed Amer
Rig component
6.BOP
 The storage device for nitrogen pressurized
hydraulic fluid, which is used in operating
the blowout preventers.
3- accumulator
Eng. Elsayed Amer
Rig component
6.BOP
 The diverter is a large, low pressure,
annular preventer equipped with large
bore discharge flowlines. This type of BOP
is generally used when drilling at shallow
depths below the conductor.
4. Diverter System
Eng. Elsayed Amer
BOP
Single
Double
Terrible
As per ram numbers As per ram shape
Blind
Pipe
Shearing
Variable
Eng. Elsayed Amer
ST 4
2000 hp drilling rig
Sino Tharwa Drilling Company
Rated Drilling Depth
Mud Pumps
Mud Tanks
Power Supply
Well Control Equipment
Rotary Table
Hook load
Draw Works
Derrick
Safety Equipment
Camp
20,000 ft. with 5” drill pipe.
Static load capacity 1,000,000 lb
Height 149 ft
2000 hp
drilling line 1 1/2”
Rated capacity 1,000,000 lb
Max. Opening 37-1/2”
Height 29.5 ft
Two Triplex
1600 hp Rated input power
5000 psi working pressure
Total number 6 tanks
Total capacity 2250 bbl
3 ea. Engine Cat 3512 B
• 21 ¼” x 2000 psi diverter system
• 13 5/8” annular preventer 5000 psi.
• 13 5/8” double ram preventer 10000 psi.
• 13 5/8” single ram preventer 10000 psi
• Accumulator unit 3000 psi working
pressure with 210 gallon capacity & 20
bottle installed
To accommodate 80 person
As required by regulations
Eng. Elsayed Amer
Drilling Time & Cost Impact
Section
Lengths
Time Savings
(Days)
Dayrate Cost
($70k / day) Casing Cost Cement Cost Total Cost
26" Hole 1500 Base Case -$ 81,000.00$ 41,000.00$ 122,000.00$
16" Hole 6445 Base Case -$ 278,075.00$ 118,000.00$ 396,075.00$
14" Hole 4740 Base Case -$ 378,000.00$ 110,000.00$ 488,000.00$
12 1/4" Hole 2315 Base Case -$ 465,000.00$ 106,000.00$ 571,000.00$
8 1/2" Hole 3430 Base Case -$ -$ -$ -$
Total Depth 18430 Base Case -$ 1,202,075.00$ 375,000.00$ $1,577,075.00
Section
Lengths
Time Savings
(Days)
Dayrate Cost
($70k / day) Casing Cost Cement Cost Total Cost
26" Hole 1500 0.00 $0.00 81,000.00$ 41,000.00$ 122,000.00$
16" Hole 6855 0.57 $39,861.11 292,425.00$ 125,506.59$ 457,792.71$
14" Hole 4081 (1.83) ($128,138.89) 328,575.00$ 94,706.75$ 295,142.86$
12 1/4" Hole 2303 (0.03) ($2,333.33) 456,909.00$ 105,450.54$ 560,026.21$
8 1/2" Hole 3393 (0.10) ($7,194.44) -$ -$ (7,194.44)$
Total Depth 18132 (1.40) ($97,805.56) 1,158,909.00$ 366,663.89$ $1,427,767.33
$149,307.67
Original Design Cost Benefit
Revised Design Cost Benefit
Estimated Total Savings =
Eng. Elsayed Amer

More Related Content

PDF
Rig components
PDF
Presentation 2 drilling rig systems
PPT
RIG COMPONENTS - Definitions
PDF
Drilling Operations
PPS
16176745 drilling-rig-operations-a-to-z-rotary-drilling-rig-components
PDF
2.1 rig types
PDF
Rig components
PDF
Drilling Rig Components ( Illustrated Glossary )
Rig components
Presentation 2 drilling rig systems
RIG COMPONENTS - Definitions
Drilling Operations
16176745 drilling-rig-operations-a-to-z-rotary-drilling-rig-components
2.1 rig types
Rig components
Drilling Rig Components ( Illustrated Glossary )

What's hot (20)

PDF
Hoisting System
PDF
3. sequances of drilling operations
PPTX
Drill string
PPTX
Rig types.
PPTX
Rig types and components
PDF
Tubing string
PDF
Rotary System
PPTX
Fundamentals of Petroleum Engineering Module 4
PPT
rig types and its components
PDF
Well completion equipment 2. landing nipples
PPT
Basic Well Control
PPTX
Well control equipment
PDF
Functions of drilling rig components Presentation
PPT
Well completion fundamentals
PPTX
Wellhead and christmas tree components, functions and more
PDF
7'' liner running and cementing
PDF
Side sliding door ssd
PDF
Drilling engineering zaidi
PPSX
BHA components and performances
 
PDF
introduction to directional drilling
Hoisting System
3. sequances of drilling operations
Drill string
Rig types.
Rig types and components
Tubing string
Rotary System
Fundamentals of Petroleum Engineering Module 4
rig types and its components
Well completion equipment 2. landing nipples
Basic Well Control
Well control equipment
Functions of drilling rig components Presentation
Well completion fundamentals
Wellhead and christmas tree components, functions and more
7'' liner running and cementing
Side sliding door ssd
Drilling engineering zaidi
BHA components and performances
 
introduction to directional drilling
Ad

Similar to 2.2 rig components (20)

PPT
Rig Operations & Equipment
PPTX
DRILLING PRESENTATION and their major types
PDF
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
PPTX
Rotary Drilling Rigs and its Components and the functions of these parts
PPTX
DE Module 2.pptx
PPT
Basic drilling engineering
PPT
(2) drilling rig operations & a to z rotary drilling rig components
PPS
Drilling rig operations a to z rotary drilling rig components
PPT
176589.pptx.ppt
PDF
Drilling Rig Operating System and Components.pdf
PPT
1 hoisting system
PDF
REVIEW OF RIG COMPONENTS DRILLING SYSTEM.pdf
PPTX
6 day.pptx
PPT
2000 Drilling Rig Operations & A to Z Rotary Drilling Rig Components.ppt
PPTX
Drilling - Qazma English
PPTX
RIGS-Systems-and-Components drilling.pptx
PDF
Drilling - Qazma English
PPT
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
PPTX
Rotary drilling rig (onshore)
PDF
Q921 de1 lec 3 v1
Rig Operations & Equipment
DRILLING PRESENTATION and their major types
PE 305 Drilling Engineering 1 Ch-3= 1-2.pdf
Rotary Drilling Rigs and its Components and the functions of these parts
DE Module 2.pptx
Basic drilling engineering
(2) drilling rig operations & a to z rotary drilling rig components
Drilling rig operations a to z rotary drilling rig components
176589.pptx.ppt
Drilling Rig Operating System and Components.pdf
1 hoisting system
REVIEW OF RIG COMPONENTS DRILLING SYSTEM.pdf
6 day.pptx
2000 Drilling Rig Operations & A to Z Rotary Drilling Rig Components.ppt
Drilling - Qazma English
RIGS-Systems-and-Components drilling.pptx
Drilling - Qazma English
DRILLING ROTARY RIGS ENGINEERING ANALYSIS .ppt
Rotary drilling rig (onshore)
Q921 de1 lec 3 v1
Ad

More from Elsayed Amer (20)

PDF
1. completion sequance
PDF
Production packer
PDF
perforated joint, flow coupling and blast joint
PDF
Well completion 1 wleg
PDF
complete guide to process valves
PDF
Valves operation and functions complete guide
PDF
Installation procedures of wellhead
PDF
Wellhead function, rating and selection
PDF
Landing nipples X & XN
PDF
Production Packer setting and types
PDF
Ssd spm
PDF
Scsssv surface control subsurface safety valve
PDF
Sequence of well drilling part 1
PDF
Sequence of well completion part 1
PDF
Sequence of well completion part 1
PDF
1. sequance of well drilling and completion part 1
PDF
Completion equipment part 1
PDF
Completion equipment packer part #2
PDF
Completion equipment packer part #1
PDF
3. natural gas composition
1. completion sequance
Production packer
perforated joint, flow coupling and blast joint
Well completion 1 wleg
complete guide to process valves
Valves operation and functions complete guide
Installation procedures of wellhead
Wellhead function, rating and selection
Landing nipples X & XN
Production Packer setting and types
Ssd spm
Scsssv surface control subsurface safety valve
Sequence of well drilling part 1
Sequence of well completion part 1
Sequence of well completion part 1
1. sequance of well drilling and completion part 1
Completion equipment part 1
Completion equipment packer part #2
Completion equipment packer part #1
3. natural gas composition

Recently uploaded (20)

PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
Software Engineering and software moduleing
PPTX
Feature types and data preprocessing steps
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
Visual Aids for Exploratory Data Analysis.pdf
PDF
Soil Improvement Techniques Note - Rabbi
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Module 8- Technological and Communication Skills.pptx
Management Information system : MIS-e-Business Systems.pptx
Software Engineering and software moduleing
Feature types and data preprocessing steps
Abrasive, erosive and cavitation wear.pdf
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
Visual Aids for Exploratory Data Analysis.pdf
Soil Improvement Techniques Note - Rabbi
Exploratory_Data_Analysis_Fundamentals.pdf
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Fundamentals of safety and accident prevention -final (1).pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Safety Seminar civil to be ensured for safe working.
R24 SURVEYING LAB MANUAL for civil enggi
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
III.4.1.2_The_Space_Environment.p pdffdf
"Array and Linked List in Data Structures with Types, Operations, Implementat...
CURRICULAM DESIGN engineering FOR CSE 2025.pptx

2.2 rig components

  • 1. I n t r o d u c t i o n t o w e l l d r i l l i n g Rig ComponentsW e l l D r i l l i n g
  • 2. Light rigs, down to 2,000 m Medium rigs, to 4,000 m Heavy rigs, to 6,000 m 1 2 3 Ultra-heavy rigs for greater depths4 Landrigclassification onshore drilling rigs fall into four groups: Increasing capacity is matched by increasing both maximum hook load capacity and derrick strength. Eng. Elsayed Amer
  • 3. Light rigs, up to 650 HP medium rigs, up to 1,300 HP heavy rigs, up to 2,000 HP 1 2 3 ultra-heavy rigs, 3,000 HP and more.4 Landrigclassification Another criterion for classification is the power installed on the rig, which for oil well drilling is in the range of at least 10 HP every 100 feet in depth Eng. Elsayed Amer
  • 4. Main Rig systems components 1 2 Hoisting System 3 4 5 6 Rotary System Mud Circulating System Blowout Prevention System Power System Drill string handling equipment Eng. Elsayed Amer
  • 7. 1. Hoisting System R i g c o m p o n e n t s Eng. Elsayed AmerEng. Elsayed Amer
  • 8. 1. Hoisting System The hoisting system is the set of equipment necessary to lower or raise drill strings, casing string and other subsurface equipment into or out of hole. Function Principal Components: I. Derrick and substructure II. Crown block III. Travelling block IV. Draw works V. Drilling line Eng. Elsayed Amer
  • 11. Eng. Elsayed Amer Hoisting System 1 2 5 Crown Block Deadline Traveling Block Drum Deadline Anchor Storage Reel Fast Line Drawworks 6 7 10 9 7 3 8 4 6 Wireline Pipe elevators 9 11 Drum Brake
  • 12. 1. Hoisting System  The substructure is the supporting base for the derrick, the draw works and the rotary table, and constitutes the working floor for operations, or drilling floor, being elevated with respect to ground level. The substructure is a reticular structure of steel beams, that can easily be dismantled, and rests on concrete foundations or on a base of wooden planks around the cellar.  Its height varies from a few meters up to 10 m in the largest rigs 1. Substructure Eng. Elsayed Amer
  • 14. 1. Hoisting System  The derrick is an open-framework structure of steel beams, whose function is to hold the ensemble of sheaves at its top, known as the crown block, on which all of the items of equipment operated in the well or on the drilling floor are suspended.  the height of the derrick must be such as to permit the vertical movement of the travelling block for a distance greater than the equivalent of one stand. For example, to handle a stand of 3 drill pipes (about 27 m long) the derrick has to be about 40 m high. The derrick is designed to resist the loads tripped in and out of the well in the operating phases, which induce both static and dynamic stresses.  Every derrick has a rated load capacity, defined by API (American Petroleum Institute) standards, which establish the maximum hook load 2. Derrick Eng. Elsayed Amer
  • 15. 1. Hoisting System Derrick 1 2Conventional derrick Mast Eng. Elsayed Amer
  • 17. 1. Hoisting System  An assembly of sheaves mounted on beams at the top of the derrick/mast and over which the drilling line is reeved.  The crown block bears the load applied at the hook and its function is to reduce the wire rope tension required to pull the tubular material used to drill the well. It at the top of the rig consists of a set of sheaves (usually from 3 to 7) supported by a framework of steel beams. 3. Crown block Eng. Elsayed Amer
  • 19. 1. Hoisting System  consists of another set of sheaves (one fewer than for the crown block), mounted on an axis connected to the hook.  The number of sheaves in the crown and travelling block is chosen on the basis of the rated capacity of the tower and the rate of pulling, which is inversely proportional to the number of lines of wire rope connecting the travelling block and the crown block 4. travelling block Eng. Elsayed Amer
  • 21. 1. Hoisting System  The high-capacity J-shaped equipment used to hang various other equipment, particularly the swivel and Kelly, the elevator bails or top drive units. The hook is attached to the bottom of the traveling block and provides a way to pick up heavy loads with the traveling block. The hook is either locked (the normal condition) or free to rotate, so that it may be mated or decoupled with items positioned around the rig floor, not limited to a single direction. 5. Hook Eng. Elsayed Amer
  • 22. 1. Hoisting System  The drawworks is the machine that transmits the power to operate the equipment in the well. The basic components of the drawworks are an engine, one or more drums containing a steel cable, and the brakes  The main brake is a strongly-built, band brake, used to stop the drill string as it is being lowered, or to release it slowly during drilling.  Normally a hydraulic brake and an electromagnetic brake are used, although these cannot stop the hoisting drum completely and they cannot be used alone. 6. Draw works Eng. Elsayed Amer
  • 27. DRAWORKS RATED POWER HP (kW) HOOK LOAD CAPACITY (tons) CONVENTIONAL RIGS MOBILE RIGS 150 (110) 60 200 (147) 75 250 (184) 80 300 (220) 90-100 500 (368) 125 700 (515) 180 180 1000 (735) 220 220 1500 (1100) 360 2000 (1470) 500 3000 (2200) 750 4000 (2940) 1000 5000 (3728) 1500 Eng. Elsayed Amer
  • 28. 1. Hoisting System  The drilling line contained in the hoist drums consists of helically-wound steel-wire strands around a plastic, vegetable fiber or steel core.  The first end of the drilling line (fast line) is wound around the hoist drum, after which it passes alternately over the sheaves of the travelling block and of the crown block, while the other end (dead line) is anchored to an element of the substructure.  The tension of the line is measured on this anchorage, and this makes it possible to calculate the weight of the equipment suspended from the hook (e.g. drill string, casing, etc.). Through being wound around the drum and over the block sheaves, the line is subject to wear and tear, to weakening of the wires (due to local overheating) and to fatigue due to cyclical variations of tension in the winding over the sheaves and the drum. 7. Drilling Line Eng. Elsayed Amer
  • 29. 1. Hoisting System  One method of assessing the state of wear and tear of the drilling line is visual inspection, but this is uncommon because of the uncertainty involved, the practical difficulties and the time required.  slipping and cutoff, is performed when a given value of the work carried out by the line has been reached. 7. Drilling Line Eng. Elsayed Amer
  • 30. 1. Hoisting System 7. Drilling Line Right Lang Lay Left Lang Lay Right Regular Lay Left Regular Lay Types of Wire Rope Lay Eng. Elsayed Amer
  • 31. 1. Hoisting System 7. Drilling Line Type of Wire Rope Construction Shallow: Deep: 1” to 1-1/8” diameter 1-1/4” to 2” diameter Contruction: 6 x 19 S or 6 x 21 S or 6 x 25 FW, RRL, IPS or EIP, IWRC Eng. Elsayed Amer
  • 32. Eng. Elsayed Amer 6 X 7 with fiber core 6 X 19W with fiber core 6 X 19S with fiber core 6 X 19 with IWR core 6 X 21 Filler Wire with fiber core 6 X 25 Filler Wire with fiber core 6 X 25 Filler Wire with IWR core 6 X 25 Seal with IWR core 6 X 27 Seal with IWR core 6 X 31 Seal with IWR core IWR = Independent Wire Rope
  • 34. 1. Hoisting System  The cathead is used to lift heavy objects and to pull on the tongs when making up the drill pipe 8. cathead Eng. Elsayed Amer
  • 35. 1. Hoisting System  An air hoist or tugger is a safer way to lift heavy objects 9. air hoist Eng. Elsayed Amer
  • 36. 1. Hoisting System The drilling line is stored on a spool Periodically, some of the drilling line is cut off at the drawworks and additional line is pulled off the spool to replace the cut line 10. Drill line spool Eng. Elsayed Amer
  • 37. 1. Hoisting System The “dead line” is anchored in the substructure The anchor is on the spool side 10. Deal line anchor Eng. Elsayed Amer
  • 38. 2. Rotating System R i g c o m p o n e n t s Eng. Elsayed AmerEng. Elsayed Amer
  • 39. 2. Rotary System The system of rotation is intended to cause the drill string to rotate. Function Principal Components: 1. The rotary table 2. Kelly or Top Drive 3. Kelly Bushing 4. Master Bushing Eng. Elsayed Amer
  • 40. Eng. Elsayed Amer Drill Pipe Drill Collars Bit Swivel Kelly Kelly Bushing K.B. Elevation Rotary Table
  • 41. 2. Rotary System 1. Top drive  The top drive is a relatively recent piece of equipment, introduced towards the mid-1980s, grouping together in a single unit the equipment for connecting the drill pipes, rotation of the drill string and circulation of the fluid  The top drive unit is suspended from the hook and is guided by two vertical rails fixed to the derrick, which provide the reactive torque necessary to prevent the rotation of the whole complex and to allow free vertical movement. Eng. Elsayed Amer
  • 42. 2. Rotary System 1. Top drive the use of the top drive instead of the rotary table offers numerous advantages, including: possibility of ‘drilling by stands’ (adding the pipes by stands, and not individually), allowing greater control of drilling. 1 2 3 4 the reduction of the time required to connect the pipes, with less risk of accidents for drilling operators the possibility of performing the trip-out operation while circulating mud and rotating the string (back reaming), impossible with the rotary table and useful for preventing the drill string from becoming stuck the possibility of obtaining longer cores, as intermediate connections are eliminated. Eng. Elsayed Amer
  • 43. Top drive Rig floor Drill pipe ‘A’ frame Guide rails Eng. Elsayed Amer
  • 44. 2. Rotary System  The rotary tool that is hung from the hook of the traveling block to suspend the drillstring and permit it to rotate freely.  It also provide connection for the rotary hose and provide passageway for the flow of drilling fluid into the drill stem. 2. swivel Eng. Elsayed Amer
  • 45. 2. Rotary System  The Kelly is a pipe of square or hexagonal section that transmits the motion of the rotary table to the drill string.  It receives this motion from the Kelly bushing, to which it is joined through a sliding coupling, so that it can move vertically. 3. Kelly Eng. Elsayed Amer
  • 47. 2. Rotary System 4. Kelly Bushing A device that when fitted to master bushing transmits torque to the Kelly and simultaneously permits vertical movement of the Kelly to make hole. Type HDP Type HDS Type MDS Heavy Duty fits 23” through 49-1/2” Rotary Table Heavy Duty for Square Drive Rotary Tables Medium Duty for Square Rotary Table Eng. Elsayed Amer
  • 49. 2. Rotary System 5. Master Bushing A device that fits into the rotary table to accommodate the slips and drive the kelly bushing so that the rotating motion of the rotary table can be transmitted to the Kelly. Type MSPC Type MSPC Type MBSSType MPCH Fits 20-1/2” to 27-1/2” Rotary Tables Fits 37-1/2” to 49-1/2” Rotary Tables Fits 17-1/2” to 27-1/2” Rotary Tables Fits 17-1/2” to 27-1/2” Rotary Tables Eng. Elsayed Amer
  • 50. 2. Rotary System  The rotary table makes the drill string rotate and supports its weight during operations or during the connection of a new drill pipe, when it cannot be borne by the hook 6. Rotary table Eng. Elsayed Amer Eng. Elsayed Amer
  • 53. 3.TubularandTubular HandlingEquipment R i g c o m p o n e n t Eng. Elsayed Amer
  • 54.  Drill string The drill string is an assemblage of hollow pipes of circular section, extending from the surface to the bottom of the hole. It has three functions:  it takes the drilling bit to the bottom of the hole, while transmitting its rotation and its vertical load to it.  It permits the circulation of the drilling fluid to the bottom of the hole.  it guides and controls the trajectory of the hole. Eng. Elsayed Amer
  • 55.  Drillstring  The drill pipes are hollow steel pipes of various types, with two tool joints welded at their ends.  They are standardized according to API standards and classified on the basis of their length (usually about 9 m), their outside diameter, their linear weight and their steel grade.  The most common drill pipes are the following: 3.50'' (13.30 lb/ft), 4.50'‘ (16.60 lb/ft) and 5'' (19.50 lb/ft), a) Drill Pipe Eng. Elsayed Amer
  • 56.  Drillstring a) Drill Pipe Eng. Elsayed Amer
  • 57.  Drillstring a) Drill Pipe TENSILE REQUIREMENTS RANGE LENGHTS TOLERANCES Eng. Elsayed Amer
  • 58.  Drillstring a) Drill Pipe Eng. Elsayed Amer
  • 59. Eng. Elsayed Amer Eng. Elsayed Amer
  • 60.  Drillstring  To avoid the danger of breaks in the drill string, a short stretch of intermediate heavy-wall or heavy-weight drill pipes is inserted. b) Heavy Weight Drill pipe Eng. Elsayed Amer
  • 61.  Drillstring  Similar in appearance to a drill pipe, HWDP has the following different dimensional characteristics; the tube wall is heavier about 1”thick in most sizes, the tool joints are longer, and the tube section has a larger diameter at mid length to protect the pipe from wear. b) Heavy Weight Drill pipe Eng. Elsayed Amer
  • 63.  Drillstring  The heavy, thick-walled tube steel, used between the drill pipe and the bit in the drill stem to provide pendulum effect to the drill stem and to provide weight on bit. C) Drill Collar Eng. Elsayed Amer Drill collar Drillpipe An 8” OD drill collar weighs 150 lbs/ft or 4500 lbs each
  • 64.  Drillstring The drill collars have a thick wall, are made out of solid steel bars, rounded externally, bored on the inside and with threaded ends directly on the body, with threading analogous to that used for ordinary pipes. The drill collars are 9 to 13 m in length and their outside diameter is between 3.125'' and 14''. They are also standardized (API), with the most common diameters being 9.50'', 8'' and 6.50''. Drill collars made of nonmagnetic steel also exist, and are used in directional drilling so as not to influence the sensors that measure the earth’s magnetic field. They are manufactured with stainless steels (alloys of K-Monel type) or with chrome-manganese steel alloys. C) Drill Collar Eng. Elsayed Amer
  • 65.  Drillstring  A short, threaded piece of pipe used to adapt parts of the drilling string that cannot otherwise be screwed together because of difference in thread size or design.  These consist of: D) Sub 1. Bit Sub 2. Crossover Sub 3. Kelly Saver Sub 4. Lifting Sub 5. Bent Sub Eng. Elsayed Amer
  • 68. Eng. Elsayed Amer 1. Elevator Links 2. Elevator 3. Lifting Subs 4. Lifting Plug 5. Tugger/Winch 6. Slips 7. Safety Clamp 8. Tongs 9. Kelly Spinner 10. Drillpipe Spinner 11. Iron Roughneck 12. Bit Breaker Equipment used to move, make and break connection, suspend tubular on the rig. These include the following:  Drillstring Tubular Handling Equipment
  • 69. Eng. Elsayed Amer 1. Elevator Links Equipment attached onto the Traveling Block in order to suspend the Elevators.
  • 70. Eng. Elsayed Amer 2. Elevator Clamps that grip a stand of casing, tubing, drillpipe or drill collars so that the stand or joint can be raised from or lowered into the hole opening of the rotary table. Eng. Elsayed Amer
  • 71. Eng. Elsayed Amer 2. Elevator Clamps that grip a stand of casing, tubing, drill pipe or drill collars so that the stand or joint can be raised from or lowered into the hole opening of the rotary table.
  • 74. Slips for hanging the string on rotary table: A, drill pipe suspended inside the rotary table; B, close-up of pipe-slips Eng. Elsayed Amer 2. Slips
  • 75. Eng. Elsayed Amer Drill Pipe SlipsDrill collar Slips 2. Slips
  • 76. Eng. Elsayed Amer Casing slips 2. Slips
  • 77. The are used on tubular above the slips to prevent dropping the string should the slips fail to hold. Eng. Elsayed Amer 3. Safety clamp
  • 78. The are used on tubular above the slips to prevent dropping the string should the slips fail to hold. Eng. Elsayed Amer 3. Safety clamp
  • 79. Used to make up and brake down drill string. Eng. Elsayed Amer Make up Tong Breakout Tong 4. Rig tong
  • 80. Used to make up and brake down drill string. Eng. Elsayed Amer 4. Rig tong
  • 81. Eng. Elsayed Amer 5. Drillpipe Spinner A pneumatically operated device usually suspended on the rig floor used to make fast connections and spin off of drill pipes.
  • 82. Eng. Elsayed Amer 5. Drillpipe Spinner A pneumatically operated device usually suspended on the rig floor used to make fast connections and spin off of drill pipes.
  • 83. Eng. Elsayed Amer 6. Bit breaker A device that is placed on top of the rotary table to enable the bit to be made up to drill string.
  • 84. 4. Mud Circulation System R i g c o m p o n e n t s Eng. Elsayed Amer
  • 85. 3. Mud Circulation System A major function of the fluid circulating system is to remove the rock cuttings from the hole as the drilling progresses Function Principal Components: 1. Mud Pump 2. Pump Manifold 3. Standpipe 4. Swivel 5. Drillstring 6. Annulus 7. Return Line 8. Shale Shaker 9. Desander 10. Desilter 11. Degasser 12. Mud Pit Eng. Elsayed Amer
  • 87. 4. Mud Circulation System 1. Mud pumps  A large, high-pressure reciprocating pump used to circulated the mud on a drilling rig.  with 2 or 3 pistons (duplex or triplex pumps), may be single – or dual acting, and receive their power from an electric motor independent from other uses. Eng. Elsayed Amer
  • 88. 4. Mud Circulation System 1. Mud pumps Eng. Elsayed Amer
  • 89. 4. Mud Circulation System 1. Mud pumps Eng. Elsayed Amer
  • 91. 4. Mud Circulation System 2. Stand pipe manifold  Divert Mud flow to kill lines in case of kill or lost circulation Eng. Elsayed Amer
  • 92. 4. Mud Circulation System 3. Stand Pipe The vertical pipe rising along the side of the Derrick or Mast, which joins mud pump manifold to the rotary hose. Eng. Elsayed Amer
  • 94. 4. Mud Circulation System 6. Rotary hose  A large-diameter (3- to 5-in. inside diameter), high-pressure flexible line used to connect the standpipe to the swivel. This flexible piping arrangement permits the kelly (and, in turn, the drillstring and bit) to be raised or lowered while drilling fluid is pumped through the drillstring. The simultaneous lowering of the drillstring while pumping fluid is critical to the drilling operation. Eng. Elsayed Amer
  • 97. 4. Mud Circulation System 7. Mud return The passageway of the drilling fluid as it comes out of the well. Eng. Elsayed Amer
  • 98. 4. Mud Circulation System 8. Shale Shaker An equipment the uses a vibrating screen to remove cuttings from the circulating fluid in rotary drilling operations. POSSUM BELLY From mud return line Vibrator motor Screens Shale shaker Eng. Elsayed Amer
  • 100. 4. Mud Circulation System 9. Desander A centrifugal device for removing sand from the drilling fluid to prevent abrasion of the pumps. Eng. Elsayed Amer
  • 101. 4. Mud Circulation System 10. Desilter Also a centrifugal device for removing free particles of silt from the drilling fluid to keep the amount of solids in the fluid at the lowest possible point. Eng. Elsayed Amer
  • 104. 4. Mud Circulation System 10. Degasser Eng. Elsayed Amer
  • 105. 4. Mud Circulation System 11. Mud Gas Separator Eng. Elsayed Amer
  • 106. 4. Mud Circulation System 12.Reserve Pit A waste pit, usually an excavated earthen-walled pit. Eng. Elsayed Amer
  • 110. 7 6 3 5 4 8 12 11 1 2 9 10 14 13 15 1617 Hose Kelly Stand pipe BOP Annulus Drillpipes Drill collars Drill bit Seprator Shale shaker Return line Mud pumps Mud-mixing Shake Mud tanks Mud mixer Desilter Discharge line Mud Circulating System: Eng. Elsayed Amer
  • 111. Circulation System Drill Collar Mud House Borehole Shaleslide Mud pit Shale shaker Chemical tank Mud return line Discharge Mud pump Swivel Kelly Drill pipe Annulus Reserve pit Bit Standpipe Rotary hose Eng. Elsayed Amer
  • 113. 5. Power systemR i g c o m p o n e n t s Eng. Elsayed Amer
  • 114. Rig component 5.Powersystem  Internal combustion engine or a turbine that is the source of power for driving equipment on the Rig.  In a drilling site power is needed to run the machines driving the main components of the rig, such as the drawworks, the pumps, the rotary table and the engines of the various auxiliary facilities (compressed air, safety systems, centrifugal pumps, lighting, services, etc.) Eng. Elsayed Amer
  • 116. Rig component 5.Powersystem  Power and electrical control room SCR Eng. Elsayed Amer
  • 117. Rig component 5.Powersystem  Fuel tank for generator Diesel Tank Eng. Elsayed Amer
  • 119. 6.Blowout Prevention System R i g c o m p o n e n t s Eng. Elsayed Amer
  • 120. 6. 6.Blowout Prevention System The function of the well control system is to prevent the uncontrolled flow of formation fluids from the wellbore . Function Principal Components: 1. Annular Blowout Preventer 2. Ram Blowout Preventer 3. Diverter 4. Drilling Spools 5. Manifold, Valves and Sensors 6. Accumulator 7. Inside BOP Eng. Elsayed Amer
  • 121. BOP Bell nipple Flow line Fill line Annular preventer Pipe ram Shear/blind ram Kill line Choke Pipe ram Emergency kill line Emergency choke BOP riser Drilling spool Casing headEng. Elsayed Amer
  • 122. Rig component 6.BOP  Blow Out Preventers (BOPs), are large valves located on the wellhead during drilling operations ,able to fully shut-in the well in just a few tens of seconds, whatever the working conditions.  BOP stack consists, starting from below, of: 1. one or more spools for connection to the wellhead 2. a dual function ram preventer 3. a single-function ram preventer 4. an annular blowout preventer 5. a lateral tube which conveys the outgoing mud from the well to the shaker. BOP Eng. Elsayed Amer
  • 123. Rig component 6.BOP BOP Single Double Terrible As per ram numbers As per ram shape Blind Pipe Shearing Variable Eng. Elsayed Amer
  • 124. Rig component 6.BOP  The arrangement of piping and special valves, called chokes, through which drilling mud is circulated when the blowout preventers are closed to control the pressures encountered during a kick. 2- Choke manifold Eng. Elsayed Amer
  • 125. Rig component 6.BOP  The storage device for nitrogen pressurized hydraulic fluid, which is used in operating the blowout preventers. 3- accumulator Eng. Elsayed Amer
  • 126. Rig component 6.BOP  The diverter is a large, low pressure, annular preventer equipped with large bore discharge flowlines. This type of BOP is generally used when drilling at shallow depths below the conductor. 4. Diverter System Eng. Elsayed Amer
  • 127. BOP Single Double Terrible As per ram numbers As per ram shape Blind Pipe Shearing Variable Eng. Elsayed Amer
  • 128. ST 4 2000 hp drilling rig Sino Tharwa Drilling Company Rated Drilling Depth Mud Pumps Mud Tanks Power Supply Well Control Equipment Rotary Table Hook load Draw Works Derrick Safety Equipment Camp 20,000 ft. with 5” drill pipe. Static load capacity 1,000,000 lb Height 149 ft 2000 hp drilling line 1 1/2” Rated capacity 1,000,000 lb Max. Opening 37-1/2” Height 29.5 ft Two Triplex 1600 hp Rated input power 5000 psi working pressure Total number 6 tanks Total capacity 2250 bbl 3 ea. Engine Cat 3512 B • 21 ¼” x 2000 psi diverter system • 13 5/8” annular preventer 5000 psi. • 13 5/8” double ram preventer 10000 psi. • 13 5/8” single ram preventer 10000 psi • Accumulator unit 3000 psi working pressure with 210 gallon capacity & 20 bottle installed To accommodate 80 person As required by regulations Eng. Elsayed Amer
  • 129. Drilling Time & Cost Impact Section Lengths Time Savings (Days) Dayrate Cost ($70k / day) Casing Cost Cement Cost Total Cost 26" Hole 1500 Base Case -$ 81,000.00$ 41,000.00$ 122,000.00$ 16" Hole 6445 Base Case -$ 278,075.00$ 118,000.00$ 396,075.00$ 14" Hole 4740 Base Case -$ 378,000.00$ 110,000.00$ 488,000.00$ 12 1/4" Hole 2315 Base Case -$ 465,000.00$ 106,000.00$ 571,000.00$ 8 1/2" Hole 3430 Base Case -$ -$ -$ -$ Total Depth 18430 Base Case -$ 1,202,075.00$ 375,000.00$ $1,577,075.00 Section Lengths Time Savings (Days) Dayrate Cost ($70k / day) Casing Cost Cement Cost Total Cost 26" Hole 1500 0.00 $0.00 81,000.00$ 41,000.00$ 122,000.00$ 16" Hole 6855 0.57 $39,861.11 292,425.00$ 125,506.59$ 457,792.71$ 14" Hole 4081 (1.83) ($128,138.89) 328,575.00$ 94,706.75$ 295,142.86$ 12 1/4" Hole 2303 (0.03) ($2,333.33) 456,909.00$ 105,450.54$ 560,026.21$ 8 1/2" Hole 3393 (0.10) ($7,194.44) -$ -$ (7,194.44)$ Total Depth 18132 (1.40) ($97,805.56) 1,158,909.00$ 366,663.89$ $1,427,767.33 $149,307.67 Original Design Cost Benefit Revised Design Cost Benefit Estimated Total Savings = Eng. Elsayed Amer