1. Page 1 of 8
FAHADUZAIRMALIKRIAZAHMAD
QA MANAGER
K.S.A Mob: (+966) 0559206509, 0539525805
I.R.P Mob: (+92) 03327784177, 03338583840
fahaddgk@gmail.com
BP & CTU QA MANAGER 1694
BP & CTU QC MANAGER 1346
SAUDI STANDARS (SASO) 2502756114488
SAUDI COUNCIL OF ENGINEERS (SCE) 382111
PAKISTAN ENGINEERING COUNCIL (PEC) CHEM/09861
AMERICAN SOCIETY FOR QUALITY (ASQ) 59641
AMERICAN CONCRETE INSTITUTE (ACI) 1349590
PROFESSIONAL OBJECTIVE:
To build a strong career in Quality Control Engineering by applying my specialized skills that
I possess and to work under a challenging environment with my skills and knowledge and
betterment of organization.
PROFILE SUMMARY:
Construction knowledge and experience in Middle East & Pakistan practicing as Quality
Control Engineer with highly reputed construction companies engaged in Power,
Petrochemical, and Oil & Gas Projects. Now looking to make a continued significant
contribution for a company that offers an opportunity for me to pursue a change in career
direction towards achievement.
QUALIFICATION:
➢ Bachelor of Science in Chemical Engineering
COMSATS University of Science & Technology, Lahore, Pakistan
➢ Diploma of Associate Engineer in Chemical Technology
Punjab Board of Technical Education, Lahore, Pakistan
MEMBERSHIP:
➢ ACI (American Concrete Institute)
➢ SCE (Saudi Council of Engineering)
➢ PEC (Pakistan Engineering Council)
➢ ASQ (American Society for Quality)
➢ SASO (Saudi Standards and Quality Organization)
2. Page 2 of 8
CERTIFICATION:
SASO (Saudi Standards and Quality Organization)
➢ National & International Challenging March-2025
➢ Application of ISO 27001:2022 March-2025
➢ Application of ISO 21502:2020 March-2025
➢ Membership February-2025
ASQ (American Society of Quality):
➢ Certified Manager of Quality/ Organizational Excellence Novmber-2024
ISO (International Organization for Standardization):
➢ IMS (Integrated Management System) April-2025
➢ ISO 22301:2019 QMS for Business Continuity July-2024
➢ ISO 17025:2017 QMS for Laboratories April-2020
➢ ISO 9001:2015 QMS Lead Auditor Dec-2017
SIX SIGMA (6σ):
➢ Lean Six Sigma Green Belt July-2024
➢ Lean Six Sigma Black Belt July-2024
➢ CCLP (Complimentary Certified Lean Practitioner) July-2024
ACI (American Concrete Institute):
➢ Changes to the Concrete Design Standard August-2021
➢ Mass Concrete-How Big is Big? Nov-2020
➢ Concrete Durability June-2020
➢ Concrete cracking June-2020
➢ Field Technician Grade-I Dec-2015
➢ ACI Membership Nov-2015
SCE (Saudi Council of Engineering):
➢ Renewable energy and water desalination April-2025
➢ IE Climate Change Policy & Carbon Trading March-2022
➢ LVP Coordination March-2022
➢ Visualization Feb-2022
➢ Project Management Professional (PMP) Jan-2022
➢ ELS & CBS Oct-2021
➢ Total Quality Management (TQM) July-2021
➢ SCE Membership Sept-2017
PEC (Pakistan Engineering Council):
➢ 5G Networks Architecture and features high level perspective June-2021
➢ Massive Connectivity in 5G+ Networks for Smart Cities June-2021
3. Page 3 of 8
➢ Leadership and Engineering: A Dichotomy or Misunderstanding June-2021
➢ Awareness of PEC Initiative on Innovation & Entrepreneurship June-2021
➢ Indigenous Entrepreneurship: Characteristics, Cases & Stories June-2021
➢ Blockchain for Integrity of Supply Chain June-2021
➢ PEC Membership April-2012
Organizational Courses:
➢ Project Planning and Control March-2022
➢ Implementation of Inspection Management System April-2020
➢ Internal Awareness Training Nov- 2019
➢ Business Ethics Policy Training March-2019
➢ 6S & Kaizen Management Nov-2012
PROFESSIONAL EXPERIENCE AS QA/QC MANAGER:
CLIENT :
Contractor : AL-SHALAWI Holding Company
Employee Type : Full Time
Project : Offices & Supporting Facilities
BI No : 25-00053-0008/0009/0014
Position : QA Manager
BP&CTU ID : 1694
Duration : April 1st .2023 to Till Date
Contractor : SHADE Corporation Limited
Employee Type : Full Time
Project : GCP Temporary Construction Facilities
BI No : 10-01996-0011 & 10-02029-0007
Position : QC Manager
BP&CTU ID : 1533
Duration : Jan 3rd .2021 to March 30th .2023
Contractor : Abdul Ali Al-Ajmi Company
Employee Type : Freelancer
Project : Jizan City for primary and Downstream Industries Roads
Cont. No : 6600038365
Position : QC Manager
BP&CTU ID : 1346
Duration : March 27th .2020 to Jan 2nd .2021
4. Page 4 of 8
JOB DESCRIPTION & RESPONSIBILITIES:
• Ensuring that the process needed for the QMS, is established, implemented and
maintained.
• Reporting to top management on the performance of the QMS and any needs for
improvement
• Authorize to issue the direction related to the work
• Taking full responsibility for hold-point releases once all QMS functions have been
completed and the equipment is ready to go to the next work stage.
• Authorize to manage and coordinate the work
• Managing plant integrity through a failure analysis reporting system and following
up on the recommendations and;
• Identify and develop solutions to correct inspection function deficiencies.
• Liaison with external parties, on the matter related to the QMS.
• Ensure the performance of awareness of customer requirements throughout
organization.
• Monitoring the implementation of QC plan.
• To report regularly about quality performance and deficiency trends.
• To report monthly observation statistics.
• Quality: Follow-up quality alerts & contingency plans.
• Manage the day-to-day responsibilities of the QC team in accordance with the
company’s policies and procedures and meeting the approved budget
• Manage the responsibility for all QC activities at all facilities and work sites
• Support the QHSE Director in advising the Executive Management at the level of
tendering, business development in relation to QC
• Mange the implementation of the organization's QC strategy to ensure delivery of
quality projects to the clients
• Analyze and monitor performance of project QC teams against schedule and reflect in
monthly and quarterly project review meetings
• Ensure maintaining the company’s quality certifications
• Ensure periodic reviews and updates of the processes & procedures related to QC
• Support in managing the preparation of periodic QC management information
systems (reports & other communications)
• Ensure Legal and Regulatory compliance in QC matters
• Identify and track KPIs for the QC function, and devises plans and initiatives for
business and operational improvements
• Manage the development of the company’s expertise, know-how, and capabilities in
QC
• Ensure the QC policy and standards are maintained and updated at all times
• Manage the development and execution of QC strategy to comply with international
standards
• Ensure QC policy is put in place to minimize hazards
5. Page 5 of 8
• Ensure the QC coordination takes place with all parties for the execution of periodic
audits
• Report the function’s performance regularly to the QHSE Director
• Develop and implement Quality Management System for planning, fabrication,
inspection, documentation, and operations activities
• Plan duties for Corporate QC staff
• Identify and develop QC personnel certification requirement
• Lead, mentor and manage QC personnel at project level
• Develop and maintain business Quality policy and standards
• Develop and maintain integrated business management system
• Develop corrective preventive action report
• Ensure projects have developed and followed the inspection and test plan
• Manage inspection and verification of construction & installation works & permanent
material verification
• Monitor and ensure timely closure of Non-conformance report – External, Internal
NCR & Observation notes
• Adapt company procedures to be followed for the proper control of documents in
conformance with ISO 9001:2015
• Conduct periodic Management Reviews
• Ensure proper Document Control process for receiving, distributing and archiving
documents & records in the document management system Accountable for ensuring
the document distribution matrix is followed and implemented
• Ensure an appropriate security for information systems
• Ensure effective internal and external communication
PPROFESSIONAL EXPEREINCE AS QA/QC INSPECTOR:
CLIENT :
Main Contractor : Enppi
Sub-Contractor : Petrojet
Employee Type : Freelancer
Project : Downstream Pipeline Haradh Increment (HUG-2)
BI No : 10-02142-0002
Position : Batch Plant QC Inspector.
Duration : Sept 18th .2019 to Jan 25th .2020
Contractor : Tecnicas Reunidas (TR)
Employee Type : Full Time
Project : PKG-1, 2&3, Haradh & Hawiyah Field Gas Compression Project
BI No : 10-001996 & 10-02029
Position : Batch Plant QC Inspector.
6. Page 6 of 8
Duration : Oct 7th .2018 to August 15th .2019
Contractor : Contracting & Construction Enterprises (CCE)
Employee Type : Full Time
Project : PKG-7, Interconnecting Infrastructure Utilities
BI No : 25-00037-0014
Position : Batch Plant QC Inspector.
Duration : June 3rd .2017 to Oct 1st .2018
Main Contractor : Petrofac
Sub-Contractor : Nesma & Partners
Employee Type : Full Time
Project : PKG-4&5, NTF Dike Wall (Jizan Refinery Project)
Cont. No : 6600029560
Position : Batching Plant QC Inspector.
Duration : Oct 1st .2016 to June 1st .2017
Contractor : Nesma & Partners
Employee Type : Full Time
Project : JBRU & New Roads within JEC Area (Jizan Refinery Project)
BI No : 25-00037-0005
Position : Batch Plant Internal QC Inspector.
BP&CTU ID : 0523
Duration : April 10th .2016 to Sept 30th .2016
Contractor : ABV Rock Group
Employee Type : Freelancer
Project : PKG-MC5, Yanbu Aramco Sinopec Refinery Project (Yasref)
Cont. No : 6600028326
Position : Civil QC Inspector.
Duration : August 3rd .2014 to March 25th. 2015
Contractor : China Communication Construction Co.
Employee Type : Freelancer
Project : PKG-11, JSDP (Jeddah Strom Water Drainage Program)
Cont. No : 05_2013
Position : Batch Plant QC Inspector.
Duration : May 11th .2014 to July 30th .2014
JOB DESCRIPTION & RESPONSIBILITIES:
• He shall monitor the work of a third-party independent qualified inspection and
testing agency for the Surveying, Concreting and Material tests.
• Asphalt laying Inspection, Prime coat, Tack coat, Core Density Test Inspection.
• Inspection & approval of cast elements for delivery.
7. Page 7 of 8
• Co-ordinate with the client consultants & engineers.
• Conducted the Trail Mix for Mix design approval.
• Slump Test, Strength Test etc.
• To report on Quality Manager – on day-to-day basis.
• To comply with Quality Assurance/Quality Control laws, norms, standards and
specifications.
• Ensure that construction and installation conform to project standards and will met
target completion dates.
• Daily surveillance checks and records ensuring that the Sub contractor will provide
safe working conditions and with necessary permits, PPE, enough supervisors &
manpower and reliable well-maintained construction equipment.
• Coordinate in the preparation of final RFI and handover documents.
• To maintain, analyze and keep track record of collected data and information
regarding frequency and severity of all the inspection reports
• To formulate suitable Objectives and programs to meet the requirements of client
with absolute efficiency.
• To formulate and select suitable remedial and corrective measure in order to contain
or minimize improper procedures or unsafe practices and hazards of various nature.
• Well versed with Saudi Aramco Process.
• Assist in Saudi Aramco, inspection of construction site.
• Meet the client regarding Quality issues and documentation of the project as and
when required,
• Keep record of all mix design using at our project.
• Monitor that batching must be sequence.
• Check slump, temperature of every truck batch.
• Check the mixer when comeback there is no water inside the mixer put by driver.
• Check temp of chiller water, ph. TDS of mixing water.
• Issue internal N.C.R then also closes it after recovers it.
• Monitor concrete/Asphalt Batching.
• Check calibration of plant.
• Make sure that each mix design is allotted uniform code.
• To verify that plant possess approved mix design copy as a part of documentation.
• Make sure that concrete/Asphalt is being batched as per approved mixing
proportions.
• Periodic checking of plant calibration.
• Ensure that all concrete raw materials are being procured by approved vendors.
• To verify also that all raw material test results reports has been submitted to client.
• Daily check the plant condition.
• Check Aggregates, Sulfur & Filler source is approved.
• Stock aggregate under shelter and identification tag must put on all types.
• Random checking of batch.
• Keep record of all mix design using at our project.
8. Page 8 of 8
PERSONNEL DETAIL:
Nationality : Pakistani
Nationality ID : 3210244903547
Passport No : AD2893542
Resident Country : Al-Dammam, Saudi Arabia
Resident (Iqama) ID : 2353514371
Resident (Iqama) Status : Transferable
Driving License : Validated (Saudi Arabia & Pak)