DAILY QUALITY ASSURANCE
PROCEDURE
LINEAR ACCELERATOR
MUHAMMAD SOHAIL
PREPARED BY :
Quality Assurance of LINAC Machines :
• To ensure the consistency of quality of
machine.
• Patient safety important.
• To ensure that it deliver right dose to the
patients.
• To check if there is any mechanical or
software errors.
CONTENTS
 TURN ON PROCEDURE
 MACHANICAL CHECKS
 WARMUP PROCEDURE
 DOSIMETRY
 DOCUMENTATION
TURN ON PROCEDURE
• First step turn on power keys
• Second step turn on the control cabinet
key (Make it horizontal).
• Third step turn on IRM (In-Room
Monitor)
• Fourth step turn on 4D Console
MACHANICAL CHECKS
• Rotate gantry & Collimator at 0 degree.
• Then turn on HyperTerminal MLC.
• Check Couch movement(LAT,LNG,VRT) and Breaks
manually and motorized.
• Check all safety measures.
• Check ODI (optical density indicator) with the
help of front pointer array set on 100 cm
• ODI exact set on 100 cm SSD on couch and both
lateral laser should be touch the edges of couch.
• Field size should be set on 20x20 at 100 cm SSD
on Field Card.
• Check water temperature , system pressure,
SF 6(Sulfur Hexafluoride) gas pressure and
water level . These value enter online in Morning
checkout .
• Insert accessory mount at gantry then insert
applicator size 15x15 with cutout tray.
warm-up machine .We have five electron
energies 6MeV,9MeV,12MeV,15MeV,
18MeV all electron energies run during
Morning QA.
WARMUP PROCEDURE
• We have two photon energies 6MV and
18MV photon run during Morning QA
for Warm-Up machine.
• We are check beam interlocks, and beam indicator
lights on daily Morning QA. we have some checks
of beam interlock's .
 Key turn on and turn off
 Beam off button
 Backup counter
 LPO button
 Door interlock
• We have some parameters apply during
Morning QA on checkmate 2 phantom.
 Checkmate2 set on central axis.
 Field size should be set on 15x15 Gant.0
coll.0 SSD set on 122cm.
 We get some references value during
dosimetry 6MV 18MV photon and
6MeV electron on daily basis.
 Checkmate 2 phantom have 8 channels
(A2,A3,A4,A5,A6,A7,A7) each channel
calibrate to
each energy
Exp: A2 calibrate for 6MV, A3 calibrate
for 18MV. One is calibrate for electron
day by day.
PARAMETERS & PROTOCOL
NOTE:
Deliver 100 MUs, the electrometer reading should be within 98%≤ CPD ≤ 102%,
tolerance level is ±2% . If there are unusual observation or reading are beyond the
tolerance then consult Physicist before treating the patients.
DOCUMENTATION
• We have a QA sheet after QA we taken values
documented in QA sheet. With two RTT Signature
Quality assurance of linear accelerator DHX

More Related Content

PPTX
Quality Assurance Programme in Computed Tomography
PPTX
linac QA.pptx
PDF
Overview of occupational radiation safety in hospital, Dr. Avinash u. Sonaware
PPTX
Beam modification devices
PDF
Cbahi hospital accreditation guide october 2016
PPTX
BASIC RADIATION SAFETY AWARENESS
PPTX
IMMOBILIZATION DEVICES IN RADIOTHERAPY.pptx
Quality Assurance Programme in Computed Tomography
linac QA.pptx
Overview of occupational radiation safety in hospital, Dr. Avinash u. Sonaware
Beam modification devices
Cbahi hospital accreditation guide october 2016
BASIC RADIATION SAFETY AWARENESS
IMMOBILIZATION DEVICES IN RADIOTHERAPY.pptx

What's hot (20)

PPTX
Treatment verification and set up errors
PPTX
Three dimensional conformal radiotherapy - 3D-CRT and IMRT - Intensity modula...
PPTX
QUALITY ASSURANCE IN LINAC AND CYBERKNIFE.pptx
PPTX
Srs and srt
PPTX
Intensity modulated radiation therapy and Image guided radiation therapy
PPTX
beam modifying devises
PDF
planning systems in radiotherapy
PDF
Tomotherapy
PPT
Seminar 2 .beam modification devices
PPTX
GAMMA KNIFE , X-KNIFE AND CYBERKNIFE
PPTX
importance of ct-simulator in radiotherapy
PPTX
Immobilisation in Radiotherapy
PPTX
Beam modification in radiotherapy
PPTX
CT Simulation Procedure
PPTX
ELECTRON BEAM THERAPY
PPTX
Three dimensional conformal radiation therapy
PDF
Dosimetry
PPT
Tomotherapy
PPTX
image guided brachytherapy carcinoma cervix
PPTX
Radiation emergencies and preparedness in radiotherapy
Treatment verification and set up errors
Three dimensional conformal radiotherapy - 3D-CRT and IMRT - Intensity modula...
QUALITY ASSURANCE IN LINAC AND CYBERKNIFE.pptx
Srs and srt
Intensity modulated radiation therapy and Image guided radiation therapy
beam modifying devises
planning systems in radiotherapy
Tomotherapy
Seminar 2 .beam modification devices
GAMMA KNIFE , X-KNIFE AND CYBERKNIFE
importance of ct-simulator in radiotherapy
Immobilisation in Radiotherapy
Beam modification in radiotherapy
CT Simulation Procedure
ELECTRON BEAM THERAPY
Three dimensional conformal radiation therapy
Dosimetry
Tomotherapy
image guided brachytherapy carcinoma cervix
Radiation emergencies and preparedness in radiotherapy
Ad

Similar to Quality assurance of linear accelerator DHX (20)

PDF
Task group report 135 cyberknie
PDF
PPT
temperature controller
PPTX
PDF
ZIPPTORK Torque control series products
PDF
ZIPPTORK Torque control system introduction - 2020 Update
PDF
ZIPPTORK Torque controller and monitoring system
PPTX
Nuclear Medicine Instrumentation and quality control presentation
DOCX
15 el83 automatic washing machine using microchip pic18f series microcontro...
PDF
ZIPPTORK Torque control system catalog - July 2021
PDF
Panasonic grid eye IR Sensor by Allchips.
PDF
ZIPPTORK Torque control system catalog - 2020 July edition
PPTX
U III embedded system MOTION CONTROL QEI.pptx
PDF
ZIPPTORK Torque control system catalog 2021 Edition
PPT
21 Ex Qa
DOCX
classic control and PLC training report
PPT
Machine monitoring system
PPTX
Zagazig digital control introduction.pptx
PPTX
Fingerprint EVM
Task group report 135 cyberknie
temperature controller
ZIPPTORK Torque control series products
ZIPPTORK Torque control system introduction - 2020 Update
ZIPPTORK Torque controller and monitoring system
Nuclear Medicine Instrumentation and quality control presentation
15 el83 automatic washing machine using microchip pic18f series microcontro...
ZIPPTORK Torque control system catalog - July 2021
Panasonic grid eye IR Sensor by Allchips.
ZIPPTORK Torque control system catalog - 2020 July edition
U III embedded system MOTION CONTROL QEI.pptx
ZIPPTORK Torque control system catalog 2021 Edition
21 Ex Qa
classic control and PLC training report
Machine monitoring system
Zagazig digital control introduction.pptx
Fingerprint EVM
Ad

Recently uploaded (20)

PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
Cell Types and Its function , kingdom of life
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
Updated Idioms and Phrasal Verbs in English subject
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Trump Administration's workforce development strategy
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
RMMM.pdf make it easy to upload and study
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PDF
Yogi Goddess Pres Conference Studio Updates
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PPTX
master seminar digital applications in india
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Complications of Minimal Access Surgery at WLH
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
Microbial disease of the cardiovascular and lymphatic systems
Cell Types and Its function , kingdom of life
Final Presentation General Medicine 03-08-2024.pptx
Practical Manual AGRO-233 Principles and Practices of Natural Farming
Updated Idioms and Phrasal Verbs in English subject
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Weekly quiz Compilation Jan -July 25.pdf
Trump Administration's workforce development strategy
Anesthesia in Laparoscopic Surgery in India
STATICS OF THE RIGID BODIES Hibbelers.pdf
RMMM.pdf make it easy to upload and study
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
Yogi Goddess Pres Conference Studio Updates
Paper A Mock Exam 9_ Attempt review.pdf.
master seminar digital applications in india
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Chinmaya Tiranga quiz Grand Finale.pdf
Complications of Minimal Access Surgery at WLH

Quality assurance of linear accelerator DHX

  • 1. DAILY QUALITY ASSURANCE PROCEDURE LINEAR ACCELERATOR MUHAMMAD SOHAIL PREPARED BY :
  • 2. Quality Assurance of LINAC Machines : • To ensure the consistency of quality of machine. • Patient safety important. • To ensure that it deliver right dose to the patients. • To check if there is any mechanical or software errors.
  • 3. CONTENTS  TURN ON PROCEDURE  MACHANICAL CHECKS  WARMUP PROCEDURE  DOSIMETRY  DOCUMENTATION
  • 4. TURN ON PROCEDURE • First step turn on power keys • Second step turn on the control cabinet key (Make it horizontal). • Third step turn on IRM (In-Room Monitor) • Fourth step turn on 4D Console
  • 5. MACHANICAL CHECKS • Rotate gantry & Collimator at 0 degree. • Then turn on HyperTerminal MLC. • Check Couch movement(LAT,LNG,VRT) and Breaks manually and motorized. • Check all safety measures.
  • 6. • Check ODI (optical density indicator) with the help of front pointer array set on 100 cm • ODI exact set on 100 cm SSD on couch and both lateral laser should be touch the edges of couch. • Field size should be set on 20x20 at 100 cm SSD on Field Card.
  • 7. • Check water temperature , system pressure, SF 6(Sulfur Hexafluoride) gas pressure and water level . These value enter online in Morning checkout . • Insert accessory mount at gantry then insert applicator size 15x15 with cutout tray. warm-up machine .We have five electron energies 6MeV,9MeV,12MeV,15MeV, 18MeV all electron energies run during Morning QA. WARMUP PROCEDURE
  • 8. • We have two photon energies 6MV and 18MV photon run during Morning QA for Warm-Up machine. • We are check beam interlocks, and beam indicator lights on daily Morning QA. we have some checks of beam interlock's .  Key turn on and turn off  Beam off button  Backup counter  LPO button  Door interlock
  • 9. • We have some parameters apply during Morning QA on checkmate 2 phantom.  Checkmate2 set on central axis.  Field size should be set on 15x15 Gant.0 coll.0 SSD set on 122cm.  We get some references value during dosimetry 6MV 18MV photon and 6MeV electron on daily basis.  Checkmate 2 phantom have 8 channels (A2,A3,A4,A5,A6,A7,A7) each channel calibrate to each energy Exp: A2 calibrate for 6MV, A3 calibrate for 18MV. One is calibrate for electron day by day. PARAMETERS & PROTOCOL NOTE: Deliver 100 MUs, the electrometer reading should be within 98%≤ CPD ≤ 102%, tolerance level is ±2% . If there are unusual observation or reading are beyond the tolerance then consult Physicist before treating the patients.
  • 10. DOCUMENTATION • We have a QA sheet after QA we taken values documented in QA sheet. With two RTT Signature