SlideShare a Scribd company logo
Quality Assurance /
Software Testing Training
Quality Standard
Page 2Classification: Restricted
Agenda
• Quality Standard
• SEI-CMMI
• The CMM is organized into five maturity level
• IEEE
• Assignment 3
Page 3Classification: Restricted
Quality Standard
ISO (International Organization for Standardization)
ISO is an independent, non-governmental membership organization and
the world's largest developer of voluntary International Standards.
ISO International Standards ensure that products and services are safe, reliable and
of good quality. For business, they are strategic tools that reduce costs by
minimizing waste and errors and increasing productivity.
Popular standards
ISO 9000 Quality management
ISO 14000 Environmental management
ISO 3166 Country codes
ISO 26000 Social responsibility
ISO 50001 Energy management
ISO 31000 Risk management
ISO 22000 Food safety management
ISO 27001 Information security management
ISO 20121 Sustainable events
Page 4Classification: Restricted
SEI-CMMI
Software Engineering Institute (SEI) developed Capability Maturity Model
(CMM)
CMM describes the prime elements - planning, engineering, managing
software development and maintenance
CMM can be used for
Software process improvement
Software process assessment
Software capability evaluations
Page 5Classification: Restricted
The CMM is organized into five maturity level
Initial
Level 1
Repeatable
Level 2
Defined
Level 3
Managed
Level 4
Optimizing
Level 5
Disciplined Process
Standard
Consistence Process
Predictable Process
Continuous
Improvement Process
Page 6Classification: Restricted
CMM – Level 1 – Initial Level
Does not have an environment for developing and maintaining software.
At the time of crises, projects usually stop using all planned procedures and
revert to coding and testing.
CMM – Level 2 – Repeatable level
Effective management process having established which can be
• Practiced
• Documented
• Enforced
• Trained
• Measured
• Improvised
Page 7Classification: Restricted
CMM – Level 3 – Defined level
Standard defined software engineering and management process for
developing and maintaining software. These processes are put together to
make a coherent whole.
CMM – Level 4 – Managed level
Quantitative goals set for both software products and processes. The
organizational measurement plan involves determining the productivity and
quality for all important software process activities across all projects.
CMM – Level 5 – Optimizing level
•Process improvement
•Tools to identify weaknesses existing in their processes
•Make timely corrections
Page 8Classification: Restricted
IEEE
Institute of Electrical and Electronics Engineers designed an entire set of
standards for software and to be followed by the testers.
IEEE 488 Standard Digital Interface for Programmable Instrumentation, IEEE-
488-1978 (now 488.1).
IEEE 802.1 Standards for LAN/MAN bridging and management and remote
media access control (MAC) bridging.
IEEE 802.7 Standards for broadband LAN cabling.
IEEE 802.11 Wireless Networking – "WiFi".
IEEE 802.15.1 Bluetooth
Page 9Classification: Restricted
Requirements, CM, Strategy & DLC
• Requirement Management
• Configuration Management
• Project Management
• Risk Management
• Test Strategy and Planning
• Overview of Test Strategy
• Test Planning (Pre->Test->Post Activities)
• Risk Analysis
• Estimations
• Typical Test issues
Page 10Classification: Restricted
Requirement Management
Testing Cycle starts with the study of client’s requirements.
Understanding of the requirements is very essential for testing the product.
Requirements management is the process of documenting, analyzing,
tracing, prioritizing and agreeing on requirements and then controlling
change and communicating to relevant stakeholders. It is a continuous
process throughout a project. A requirement is a capability to which a project
outcome (product or service) should conform
Page 11Classification: Restricted
Configuration Management
PC version
Initial system DEC
version
VMS
version
Unix
version
Mainfram
e version
Workstatio
n version
Sun
version
CM should be based on a set of standards, which are applied within
an organization.
Page 12Classification: Restricted
CM Planning
• Documents, required for future system maintenance, should be identified and
included as managed documents.
• It defines the types of documents to be managed and a document naming scheme.
Change Management
• Keeping and managing the changes and ensuring that they are implemented in the
most cost-effective way.
Change Request form
A part of the CM planning process
 Records change required
 Change suggested by
 Reason why change was suggested
 Urgency of change
 Records change evaluation
 Impact analysis
 Change cost
 Recommendations(system maintenance staff)
Page 13Classification: Restricted
VERSION AND RELEASE MANAGEMENT
Invent identification scheme for system versions and plan when new system
version is to be produced.
Ensure that version management procedures and tools are properly applied
and to plan and distribute new system releases.
Versions/Releases
Versions - An instance of a system, which is functionally distinct in some way from
other system instances.
Release -An instance of a system, which is distributed to users outside of the
development team.
Page 14Classification: Restricted
Project Management
Project Staffing
Project budget may not allow to utilize highly – paid staff.
Staff with the appropriate experience may not be available.
Project Scheduling
Bar charts and Activity Networks
Scheduling problems
Page 15Classification: Restricted
Project Planning
Plan Description
Quality plan Describes the quality procedures and
standards used in a project.
Validation plan Describes the approach, resources and
schedule used for system validation.
Configuration
management
plan
Describes the configuration management
procedures and structures to be used.
Maintenance
plan
Predicts the maintenance requirements of
the system/ maintenance costs and
efforts required.
Staff
development
plan
Describes how the skills and experience
of the project team members will be
developed.
Page 16Classification: Restricted
Risk Management
• Risk identification
• Risk Analysis
• Risk Planning
• Risk Monitoring
Page 17Classification: Restricted
Risk Risk
type
Description
Staff
turnover
Project Experienced staff will leave the
project before it is finished.
Management
change
Project There will be a change of
organizational management with
different priorities.
Hardware
unavailability
Project Hardware which is essential for the project
will not be delivered on schedule.
Requiremens
change
Project &
Product
There will be a larger number of
changes to the requirements than
anticipated.
Page 18Classification: Restricted
Risk Risk type Description
Specification delays Project &
Product
Specifications of essential interfaces are
not available on schedule.
Size under estimate Project &
Product
The size of the system has been under
estimated.
CASE tool under
performance
Product CASE tools which support the project do
not perform as anticipated.
Technology change Business The underlying technology on which the
system is built is superseded by new
technology.
Product
competition
Business A competitive product is marketed
before the system is completed.
Page 19Classification: Restricted
Thank You

More Related Content

PPT
Capability Maturity Model
PPT
Capability maturity model cmm lecture 8
PPT
Capability Maturity Model (CMM)
PPT
Cmm
PPTX
Beit 381 se lec 14 - 35 - 12 mar21 - sqa - iso and cmm
PPT
Capability Maturity Model (CMM) in Software Engineering
Capability Maturity Model
Capability maturity model cmm lecture 8
Capability Maturity Model (CMM)
Cmm
Beit 381 se lec 14 - 35 - 12 mar21 - sqa - iso and cmm
Capability Maturity Model (CMM) in Software Engineering

What's hot (20)

PDF
C M M Tutorial
PPTX
Cmm ashish ppt
PDF
Software quality infrastructure
PPTX
Topic 5 capability maturity model
PDF
Capability maturity model
PPT
10 software maintenance
PDF
PPTX
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
PDF
Sqa 2 marks
PPTX
Cost of software quality ( software quality assurance )
PPTX
Sqa plan
PPT
Software Quality Assurance class 1
PPTX
Ch 10 cost of software quality
PPT
Introduction To Cmm1
PPTX
Ch 12(spi)cm mi scampi
PDF
Capibility Maturity Model for Finance - OpenView Venture Partners
PPTX
Software maintenance Unit5
PDF
SQA Components
C M M Tutorial
Cmm ashish ppt
Software quality infrastructure
Topic 5 capability maturity model
Capability maturity model
10 software maintenance
Unit4 Software Engineering Institute (SEI)’s Capability Maturity Model (CMM) ...
Sqa 2 marks
Cost of software quality ( software quality assurance )
Sqa plan
Software Quality Assurance class 1
Ch 10 cost of software quality
Introduction To Cmm1
Ch 12(spi)cm mi scampi
Capibility Maturity Model for Finance - OpenView Venture Partners
Software maintenance Unit5
SQA Components
Ad

Similar to Quality Management and Quality Standard (20)

PPTX
Quality Standard
PPTX
Software Testing Management
PPTX
Software Testing Management
PPTX
Testing Management
PPSX
Test Management
PPSX
Project Management
PPTX
UNIT-1-INTRO.pptxsqa assurance testing sqa
PPT
Using Doors® And Taug2® To Support A Simplified
PDF
chapter2-softwareprocessmodels-190805164811.pdf
PPTX
Chapter 2 software process models
PPTX
SQA-Lecture-4.pptx
PPSX
Software Development Life Cycle - SDLC
PPTX
Software Engineering-Process Models.pptx
PPT
CISQ and Software Quality Measurement - Software Assurance Forum (March 2010)
PPT
7.quality management chapter 7
PPT
Six sigma ajal
PPT
Softwaretesting
PPT
chap06.ppthistory of conputers in positioning pointing and drawing
PPTX
vnd.openxmlformats-officedocument.presentationml.presentation&rendition=1.pptx
ODP
IEEE 12207
Quality Standard
Software Testing Management
Software Testing Management
Testing Management
Test Management
Project Management
UNIT-1-INTRO.pptxsqa assurance testing sqa
Using Doors® And Taug2® To Support A Simplified
chapter2-softwareprocessmodels-190805164811.pdf
Chapter 2 software process models
SQA-Lecture-4.pptx
Software Development Life Cycle - SDLC
Software Engineering-Process Models.pptx
CISQ and Software Quality Measurement - Software Assurance Forum (March 2010)
7.quality management chapter 7
Six sigma ajal
Softwaretesting
chap06.ppthistory of conputers in positioning pointing and drawing
vnd.openxmlformats-officedocument.presentationml.presentation&rendition=1.pptx
IEEE 12207
Ad

More from Murageppa-QA (20)

PPTX
Selenium RC, Selenium WebDriver and HP LoadRunner
PPTX
Selenium Introduction and IDE
PPTX
QTP/UFT Overview and Installation
PPTX
Automation Tools Overview
PPTX
SQL - Basic Commands and Queries
PPTX
Introduction DBMS, RDBMS and SQL
PPTX
Test Management Tool - JIRA
PPTX
Test Management Tool HP ALM- Quality Center Part 2
PPTX
Test Management Tool HP ALM- Quality Center Part 1
PPTX
Defect Life Cycle
PPTX
Test Case Design Techniques
PPTX
Test Case Design and Design Techniques
PPTX
Test Planning and Test Estimation Techniques
PPTX
Types of Testing
PPTX
Testing Concepts and Manual Testing
PPTX
Software Development Life Cycle – Agile Methodology
PPTX
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
PPTX
Software Development Life Cycle – SDLC – Waterfall Model
PPTX
Introduction to Software Testing Part 2
PPTX
Introduction to Software Testing - Part 1
Selenium RC, Selenium WebDriver and HP LoadRunner
Selenium Introduction and IDE
QTP/UFT Overview and Installation
Automation Tools Overview
SQL - Basic Commands and Queries
Introduction DBMS, RDBMS and SQL
Test Management Tool - JIRA
Test Management Tool HP ALM- Quality Center Part 2
Test Management Tool HP ALM- Quality Center Part 1
Defect Life Cycle
Test Case Design Techniques
Test Case Design and Design Techniques
Test Planning and Test Estimation Techniques
Types of Testing
Testing Concepts and Manual Testing
Software Development Life Cycle – Agile Methodology
Software Development Life Cycle – SDLC – Waterfall, Iterative, V, Spiral, and...
Software Development Life Cycle – SDLC – Waterfall Model
Introduction to Software Testing Part 2
Introduction to Software Testing - Part 1

Recently uploaded (20)

PDF
Dropbox Q2 2025 Financial Results & Investor Presentation
PDF
Machine learning based COVID-19 study performance prediction
PDF
Spectral efficient network and resource selection model in 5G networks
PDF
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
PDF
Electronic commerce courselecture one. Pdf
PDF
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
Empathic Computing: Creating Shared Understanding
PDF
Reach Out and Touch Someone: Haptics and Empathic Computing
PPTX
Digital-Transformation-Roadmap-for-Companies.pptx
PPTX
Cloud computing and distributed systems.
PDF
Diabetes mellitus diagnosis method based random forest with bat algorithm
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
Advanced methodologies resolving dimensionality complications for autism neur...
PDF
NewMind AI Monthly Chronicles - July 2025
PDF
Chapter 3 Spatial Domain Image Processing.pdf
PDF
Approach and Philosophy of On baking technology
PDF
Mobile App Security Testing_ A Comprehensive Guide.pdf
Dropbox Q2 2025 Financial Results & Investor Presentation
Machine learning based COVID-19 study performance prediction
Spectral efficient network and resource selection model in 5G networks
Peak of Data & AI Encore- AI for Metadata and Smarter Workflows
The Rise and Fall of 3GPP – Time for a Sabbatical?
Electronic commerce courselecture one. Pdf
7 ChatGPT Prompts to Help You Define Your Ideal Customer Profile.pdf
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
“AI and Expert System Decision Support & Business Intelligence Systems”
Empathic Computing: Creating Shared Understanding
Reach Out and Touch Someone: Haptics and Empathic Computing
Digital-Transformation-Roadmap-for-Companies.pptx
Cloud computing and distributed systems.
Diabetes mellitus diagnosis method based random forest with bat algorithm
Per capita expenditure prediction using model stacking based on satellite ima...
Advanced methodologies resolving dimensionality complications for autism neur...
NewMind AI Monthly Chronicles - July 2025
Chapter 3 Spatial Domain Image Processing.pdf
Approach and Philosophy of On baking technology
Mobile App Security Testing_ A Comprehensive Guide.pdf

Quality Management and Quality Standard

  • 1. Quality Assurance / Software Testing Training Quality Standard
  • 2. Page 2Classification: Restricted Agenda • Quality Standard • SEI-CMMI • The CMM is organized into five maturity level • IEEE • Assignment 3
  • 3. Page 3Classification: Restricted Quality Standard ISO (International Organization for Standardization) ISO is an independent, non-governmental membership organization and the world's largest developer of voluntary International Standards. ISO International Standards ensure that products and services are safe, reliable and of good quality. For business, they are strategic tools that reduce costs by minimizing waste and errors and increasing productivity. Popular standards ISO 9000 Quality management ISO 14000 Environmental management ISO 3166 Country codes ISO 26000 Social responsibility ISO 50001 Energy management ISO 31000 Risk management ISO 22000 Food safety management ISO 27001 Information security management ISO 20121 Sustainable events
  • 4. Page 4Classification: Restricted SEI-CMMI Software Engineering Institute (SEI) developed Capability Maturity Model (CMM) CMM describes the prime elements - planning, engineering, managing software development and maintenance CMM can be used for Software process improvement Software process assessment Software capability evaluations
  • 5. Page 5Classification: Restricted The CMM is organized into five maturity level Initial Level 1 Repeatable Level 2 Defined Level 3 Managed Level 4 Optimizing Level 5 Disciplined Process Standard Consistence Process Predictable Process Continuous Improvement Process
  • 6. Page 6Classification: Restricted CMM – Level 1 – Initial Level Does not have an environment for developing and maintaining software. At the time of crises, projects usually stop using all planned procedures and revert to coding and testing. CMM – Level 2 – Repeatable level Effective management process having established which can be • Practiced • Documented • Enforced • Trained • Measured • Improvised
  • 7. Page 7Classification: Restricted CMM – Level 3 – Defined level Standard defined software engineering and management process for developing and maintaining software. These processes are put together to make a coherent whole. CMM – Level 4 – Managed level Quantitative goals set for both software products and processes. The organizational measurement plan involves determining the productivity and quality for all important software process activities across all projects. CMM – Level 5 – Optimizing level •Process improvement •Tools to identify weaknesses existing in their processes •Make timely corrections
  • 8. Page 8Classification: Restricted IEEE Institute of Electrical and Electronics Engineers designed an entire set of standards for software and to be followed by the testers. IEEE 488 Standard Digital Interface for Programmable Instrumentation, IEEE- 488-1978 (now 488.1). IEEE 802.1 Standards for LAN/MAN bridging and management and remote media access control (MAC) bridging. IEEE 802.7 Standards for broadband LAN cabling. IEEE 802.11 Wireless Networking – "WiFi". IEEE 802.15.1 Bluetooth
  • 9. Page 9Classification: Restricted Requirements, CM, Strategy & DLC • Requirement Management • Configuration Management • Project Management • Risk Management • Test Strategy and Planning • Overview of Test Strategy • Test Planning (Pre->Test->Post Activities) • Risk Analysis • Estimations • Typical Test issues
  • 10. Page 10Classification: Restricted Requirement Management Testing Cycle starts with the study of client’s requirements. Understanding of the requirements is very essential for testing the product. Requirements management is the process of documenting, analyzing, tracing, prioritizing and agreeing on requirements and then controlling change and communicating to relevant stakeholders. It is a continuous process throughout a project. A requirement is a capability to which a project outcome (product or service) should conform
  • 11. Page 11Classification: Restricted Configuration Management PC version Initial system DEC version VMS version Unix version Mainfram e version Workstatio n version Sun version CM should be based on a set of standards, which are applied within an organization.
  • 12. Page 12Classification: Restricted CM Planning • Documents, required for future system maintenance, should be identified and included as managed documents. • It defines the types of documents to be managed and a document naming scheme. Change Management • Keeping and managing the changes and ensuring that they are implemented in the most cost-effective way. Change Request form A part of the CM planning process  Records change required  Change suggested by  Reason why change was suggested  Urgency of change  Records change evaluation  Impact analysis  Change cost  Recommendations(system maintenance staff)
  • 13. Page 13Classification: Restricted VERSION AND RELEASE MANAGEMENT Invent identification scheme for system versions and plan when new system version is to be produced. Ensure that version management procedures and tools are properly applied and to plan and distribute new system releases. Versions/Releases Versions - An instance of a system, which is functionally distinct in some way from other system instances. Release -An instance of a system, which is distributed to users outside of the development team.
  • 14. Page 14Classification: Restricted Project Management Project Staffing Project budget may not allow to utilize highly – paid staff. Staff with the appropriate experience may not be available. Project Scheduling Bar charts and Activity Networks Scheduling problems
  • 15. Page 15Classification: Restricted Project Planning Plan Description Quality plan Describes the quality procedures and standards used in a project. Validation plan Describes the approach, resources and schedule used for system validation. Configuration management plan Describes the configuration management procedures and structures to be used. Maintenance plan Predicts the maintenance requirements of the system/ maintenance costs and efforts required. Staff development plan Describes how the skills and experience of the project team members will be developed.
  • 16. Page 16Classification: Restricted Risk Management • Risk identification • Risk Analysis • Risk Planning • Risk Monitoring
  • 17. Page 17Classification: Restricted Risk Risk type Description Staff turnover Project Experienced staff will leave the project before it is finished. Management change Project There will be a change of organizational management with different priorities. Hardware unavailability Project Hardware which is essential for the project will not be delivered on schedule. Requiremens change Project & Product There will be a larger number of changes to the requirements than anticipated.
  • 18. Page 18Classification: Restricted Risk Risk type Description Specification delays Project & Product Specifications of essential interfaces are not available on schedule. Size under estimate Project & Product The size of the system has been under estimated. CASE tool under performance Product CASE tools which support the project do not perform as anticipated. Technology change Business The underlying technology on which the system is built is superseded by new technology. Product competition Business A competitive product is marketed before the system is completed.