Query Alarm and Power Configuration
20416_Tangguk Bongkar_3G
1. Overview from M2000 no indicated 3G down but from
power database battery back up time is 1.8 hours. And
required to add 1 rectifier module
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2 hours.
3. No diesel generator.
HUAWEI TECHNOLOGIES CO., LTD. Page 3华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
20633_MerdekaPekan_TjPura_3G
1. Overview from M2000 no indicated 3G down but from
power database battery back up time is 3 hours.
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2.5 hours.
3. Diesel generator Deactivated
4. LLVD/BLVD was configured, make sure that connection as
well.
HUAWEI TECHNOLOGIES CO., LTD. Page 4华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
30661_SITEBA2_3G
1. Overview from M2000 no indicated 3G down but from
power database battery back up time is 2 hours. And
required add 1 rectifier module
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2.5 hours.
3. Diesel generator Deactivated
4. Recommendation to activate LLVD/BLVD and do rewiring
as well.
HUAWEI TECHNOLOGIES CO., LTD. Page 5华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
50943_Lintas Timur KM 28_Sakernan_2G<> 50060_Lintas Timur_Sakernan_2G
HUAWEI TECHNOLOGIES CO., LTD. Page 6华为保密信息,未经授权禁止扩散
 In a same time GSM in far end is down. Need Checking wiring transmission cable, and make
sure that cable are connected in BLVD
Make sure that LLVD setting is working
Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission
connect to LLVD and do rewiring as well.
In Power database battery back up time ismore than 2 hours.
No Diesel Generator
HUAWEI TECHNOLOGIES CO., LTD. Page 7华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
58012_Simpang Kuamang kuning (Repeater Site)
1. Overview from M2000 that site is repeater, can’t query
alarm. Recommendation to create enva and power alarm
indication through transmission. Power database batterys
status are stolen on february 28-2016 . Required to install
new battery 2*100Ah and add 1 rectifier module
2. 2G system using Nokia equipment, can’t be monitor by
m2000. Need NOC send the query alarm. Power database
battery backup is more than 2 hours.
3. Diesel Generator not issue
4. Recommendation to activate LLVD/BLVD and do rewiring
as well.
HUAWEI TECHNOLOGIES CO., LTD. Page 8华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
60030_Burangan Seberangulu_2G <> 62211_Era Ilir Timur
HUAWEI TECHNOLOGIES CO., LTD. Page 9华为保密信息,未经授权禁止扩散
 In a same time GSM in far end is down, after we trace that problem was’nt on site 60030,
but on site 60027 that impact to another site under.
Please ensure all alarm connected to BTS are function, because the critical alarm like Main
input not detect in M2000.
Recommendation to adjust LLVD Configuration lower than 48Vdc , if actually transmission
connect to LLVD and do rewiring as soon.
In Power database battery back up time is more than 2 hours
No Diesel Generetor
HUAWEI TECHNOLOGIES CO., LTD. Page 10华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
161138_Bukit Pinang_2G <> 161155_ Sinbaya Sebulu Modern
HUAWEI TECHNOLOGIES CO., LTD. Page 11华为保密信息,未经授权禁止扩散
While the non priority load like BTS and NodeB are switch OFF, but actually in a same time
the transmission are switch off also and caused far end site down.
Need Checking wiring transmission cable, and make sure that cable are connected in BLVD
Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission
connect to LLVD and do rewiring as well.
In Power database Battery back up time is more than 2 hours
No Diesel Generator
HUAWEI TECHNOLOGIES CO., LTD. Page 12华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
280106_Sanghiang_2G
HUAWEI TECHNOLOGIES CO., LTD. Page 13华为保密信息,未经授权禁止扩散
In Power database battery backup time is more than 2 hours.
Need check wiring connection as well
No Diesel Generator.
HUAWEI TECHNOLOGIES CO., LTD. Page 14华为保密信息,未经授权禁止扩散
Query Alarm and Power Configuration
280020_Kp.Karya Mukti-Sindang laya Pagelaran
HUAWEI TECHNOLOGIES CO., LTD. Page 15华为保密信息,未经授权禁止扩散
Mostly each time the site was down, but there was not alarm power or main input detected in
M2000 before.
Need check alarm connection on BTS and make sure all alarm are function.
In Power database battery back up time is 2 hours.
No Diesel Generator
Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved.
The information in this document may contain predictive statements including, without limitation, statements
regarding the future financial and operating results, future product portfolio, new technology, etc. There are a
number of factors that could cause actual results and developments to differ materially from those expressed or
implied in the predictive statements. Therefore, such information is provided for reference purpose only and
constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice.
Thank you
www.huawei.com

More Related Content

PDF
Llvd and blvd trial report 90574 manggarai utara
DOC
Wi max rru3702 troubleshooting guide v1.0-20100609-a
PDF
2.omd101010 bsc6000 hardware structure issue1.0
PPT
5. ene040613040006 huawei bsc6000 software commissioning 20061231-a-1.0
PDF
Emua quick installation manual for bts3900 l
PPT
Mobilink Project On Site Swap SOP V2_4
PPT
Handling Common Faults and Alarms for Huawei RTN Microwaves
PDF
Chichi chacha
Llvd and blvd trial report 90574 manggarai utara
Wi max rru3702 troubleshooting guide v1.0-20100609-a
2.omd101010 bsc6000 hardware structure issue1.0
5. ene040613040006 huawei bsc6000 software commissioning 20061231-a-1.0
Emua quick installation manual for bts3900 l
Mobilink Project On Site Swap SOP V2_4
Handling Common Faults and Alarms for Huawei RTN Microwaves
Chichi chacha

What's hot (16)

PPTX
ALU 7360 5520_gpon_basic_configuration
PDF
Sorrento Networks OCM10GF
PPT
Bts installation & commisioning.ppt
PPT
Basics Of Minilink Microwave Networks
PDF
Cma5000a uta
PDF
Madge Collage 743/744/763/764 4 port 155 Mbps Modules
PPT
Ome201101 gsm bts312 hardware structure issue4.0
PPTX
Accident avoidanve using controller area network protocol
PPTX
Alu xgpon solution for pt telkom akses 20130830+
PDF
CNSS_07_1345_P_CNS_FASS_Advanced
PDF
SELTA Access Network Portfolio
PDF
American Fibertek ECR-16-POE Data Sheet
PPTX
Alcatel lucent bts
PPTX
Fairchild solving design problems in motion control
PDF
"The Great Train Cyber Robbery" SCADAStrangeLove
PDF
ALU 7360 5520_gpon_basic_configuration
Sorrento Networks OCM10GF
Bts installation & commisioning.ppt
Basics Of Minilink Microwave Networks
Cma5000a uta
Madge Collage 743/744/763/764 4 port 155 Mbps Modules
Ome201101 gsm bts312 hardware structure issue4.0
Accident avoidanve using controller area network protocol
Alu xgpon solution for pt telkom akses 20130830+
CNSS_07_1345_P_CNS_FASS_Advanced
SELTA Access Network Portfolio
American Fibertek ECR-16-POE Data Sheet
Alcatel lucent bts
Fairchild solving design problems in motion control
"The Great Train Cyber Robbery" SCADAStrangeLove
Ad

Viewers also liked (20)

PDF
Bsc6900 gsm-site-maintenance-guide
PPT
Ome200301 gsm bts trouble shooting issue3.0
PPT
Sharing session oss m2000 r009 system overview & troubleshooting
PDF
Huawei RET alarms Troubleshooting Guide Flow Chart
PDF
Transmission resource management
DOC
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
PDF
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
PDF
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
PDF
Bts3900 Site Maintenance Guide(V200 01)
DOCX
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
DOC
OptiX OSN 8800 Slot Description
PDF
Opti x rtn 910950980 hardware description wind
PDF
140556299 huawei-node b-data-configuration
PPT
Mw training slide
PPT
01 Bts3900 System Structure
PPT
Huawei wcdma ran10.0 overview
PDF
Huawei - Access failures troubleshooting work shop
PDF
240243228 huawei-bts-3900-training
Bsc6900 gsm-site-maintenance-guide
Ome200301 gsm bts trouble shooting issue3.0
Sharing session oss m2000 r009 system overview & troubleshooting
Huawei RET alarms Troubleshooting Guide Flow Chart
Transmission resource management
Guide for Huwaei Telecom Equipments Of SDH, DWDM, Also Softawe U2000, T2000.....
E nodeb commissioning guide(v100r005c00 04)(pdf)-en
Mobilink 2G3G Swap Guide V1.8 20150406 (1)
Bts3900 Site Maintenance Guide(V200 01)
I manager u2000 v200r014 optional feature description (elte2.3) 01(20140314)
OptiX OSN 8800 Slot Description
Opti x rtn 910950980 hardware description wind
140556299 huawei-node b-data-configuration
Mw training slide
01 Bts3900 System Structure
Huawei wcdma ran10.0 overview
Huawei - Access failures troubleshooting work shop
240243228 huawei-bts-3900-training
Ad

Similar to Query alarm and power configuration 2 (20)

PPTX
SMA Residential Inverters.
PDF
Manual router technicolor
PDF
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
PDF
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System
PPTX
Fast return to 3 g
PDF
Optimized operation of current fed dual active bridge dc-dc converter for pv ...
PDF
Topological Advancement in DVR; A review
PDF
Juliet Joseph
PDF
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
PDF
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
PDF
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
PDF
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
DOCX
Data acquisition system to monitor electricity supply
DOCX
Ramesh up dated CV
PDF
How to use the good obd tuning Honda GNA600?
PPTX
New Mexico Statewide Standards for Solar PV and Solar Thermal
PDF
Goldwind - Microgrid Case Study
PDF
SAT COMPANY_INTRODUCTION_PRESENTATION
PPT
L3-Indian power system.pptaaaaaaaaaaaaaaaaaaaaaaaaaa
PPT
L3-Indian power system.pptssmsmmsjjsdmdmsk
SMA Residential Inverters.
Manual router technicolor
REVIEW ON: ENERGY STORAGE MANAGEMENT IN MICROGRID BY USING VEHICLE TO GRID TE...
Introduction of LVAC Auto Change Over Scheme in DEWA Transmission System
Fast return to 3 g
Optimized operation of current fed dual active bridge dc-dc converter for pv ...
Topological Advancement in DVR; A review
Juliet Joseph
Cataloge ge 3.control and_automation_dienhathe.com-4_speed_drive_units_vat200...
Cataloge ge 3.control and_automation-4_speed_drive_units_vat200_manual_english
Cataloge ge 3.control and_automation-4_speed_drive_units_avat200_manual_english
DESIGN & IMPLEMENT OF PERFORMANCE OF MONITORING OF E- BATTERY USING NODEMCU E...
Data acquisition system to monitor electricity supply
Ramesh up dated CV
How to use the good obd tuning Honda GNA600?
New Mexico Statewide Standards for Solar PV and Solar Thermal
Goldwind - Microgrid Case Study
SAT COMPANY_INTRODUCTION_PRESENTATION
L3-Indian power system.pptaaaaaaaaaaaaaaaaaaaaaaaaaa
L3-Indian power system.pptssmsmmsjjsdmdmsk

Recently uploaded (20)

PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
PDF
Abrasive, erosive and cavitation wear.pdf
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPT
Total quality management ppt for engineering students
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
introduction to high performance computing
PPTX
Amdahl’s law is explained in the above power point presentations
Exploratory_Data_Analysis_Fundamentals.pdf
ChapteR012372321DFGDSFGDFGDFSGDFGDFGDFGSDFGDFGFD
Abrasive, erosive and cavitation wear.pdf
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Management Information system : MIS-e-Business Systems.pptx
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Fundamentals of safety and accident prevention -final (1).pptx
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Visual Aids for Exploratory Data Analysis.pdf
Total quality management ppt for engineering students
Fundamentals of Mechanical Engineering.pptx
Improvement effect of pyrolyzed agro-food biochar on the properties of.pdf
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
CyberSecurity Mobile and Wireless Devices
introduction to high performance computing
Amdahl’s law is explained in the above power point presentations

Query alarm and power configuration 2

  • 1. www.huawei.com Security Level: HUAWEI TECHNOLOGIES CO., LTD. Query Alarm and Power Configuration Hub Site Down Until_CW 9 Alwan Ramadan WX289116, March 16, 2016
  • 2. HUAWEI TECHNOLOGIES CO., LTD. Page 2华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 20416_Tangguk Bongkar_3G 1. Overview from M2000 no indicated 3G down but from power database battery back up time is 1.8 hours. And required to add 1 rectifier module 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2 hours. 3. No diesel generator.
  • 3. HUAWEI TECHNOLOGIES CO., LTD. Page 3华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 20633_MerdekaPekan_TjPura_3G 1. Overview from M2000 no indicated 3G down but from power database battery back up time is 3 hours. 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2.5 hours. 3. Diesel generator Deactivated 4. LLVD/BLVD was configured, make sure that connection as well.
  • 4. HUAWEI TECHNOLOGIES CO., LTD. Page 4华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 30661_SITEBA2_3G 1. Overview from M2000 no indicated 3G down but from power database battery back up time is 2 hours. And required add 1 rectifier module 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2.5 hours. 3. Diesel generator Deactivated 4. Recommendation to activate LLVD/BLVD and do rewiring as well.
  • 5. HUAWEI TECHNOLOGIES CO., LTD. Page 5华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 50943_Lintas Timur KM 28_Sakernan_2G<> 50060_Lintas Timur_Sakernan_2G
  • 6. HUAWEI TECHNOLOGIES CO., LTD. Page 6华为保密信息,未经授权禁止扩散  In a same time GSM in far end is down. Need Checking wiring transmission cable, and make sure that cable are connected in BLVD Make sure that LLVD setting is working Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission connect to LLVD and do rewiring as well. In Power database battery back up time ismore than 2 hours. No Diesel Generator
  • 7. HUAWEI TECHNOLOGIES CO., LTD. Page 7华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 58012_Simpang Kuamang kuning (Repeater Site) 1. Overview from M2000 that site is repeater, can’t query alarm. Recommendation to create enva and power alarm indication through transmission. Power database batterys status are stolen on february 28-2016 . Required to install new battery 2*100Ah and add 1 rectifier module 2. 2G system using Nokia equipment, can’t be monitor by m2000. Need NOC send the query alarm. Power database battery backup is more than 2 hours. 3. Diesel Generator not issue 4. Recommendation to activate LLVD/BLVD and do rewiring as well.
  • 8. HUAWEI TECHNOLOGIES CO., LTD. Page 8华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 60030_Burangan Seberangulu_2G <> 62211_Era Ilir Timur
  • 9. HUAWEI TECHNOLOGIES CO., LTD. Page 9华为保密信息,未经授权禁止扩散  In a same time GSM in far end is down, after we trace that problem was’nt on site 60030, but on site 60027 that impact to another site under. Please ensure all alarm connected to BTS are function, because the critical alarm like Main input not detect in M2000. Recommendation to adjust LLVD Configuration lower than 48Vdc , if actually transmission connect to LLVD and do rewiring as soon. In Power database battery back up time is more than 2 hours No Diesel Generetor
  • 10. HUAWEI TECHNOLOGIES CO., LTD. Page 10华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 161138_Bukit Pinang_2G <> 161155_ Sinbaya Sebulu Modern
  • 11. HUAWEI TECHNOLOGIES CO., LTD. Page 11华为保密信息,未经授权禁止扩散 While the non priority load like BTS and NodeB are switch OFF, but actually in a same time the transmission are switch off also and caused far end site down. Need Checking wiring transmission cable, and make sure that cable are connected in BLVD Recommendation to adjust LLVD Configuration lower than 47Vdc , if actually transmission connect to LLVD and do rewiring as well. In Power database Battery back up time is more than 2 hours No Diesel Generator
  • 12. HUAWEI TECHNOLOGIES CO., LTD. Page 12华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 280106_Sanghiang_2G
  • 13. HUAWEI TECHNOLOGIES CO., LTD. Page 13华为保密信息,未经授权禁止扩散 In Power database battery backup time is more than 2 hours. Need check wiring connection as well No Diesel Generator.
  • 14. HUAWEI TECHNOLOGIES CO., LTD. Page 14华为保密信息,未经授权禁止扩散 Query Alarm and Power Configuration 280020_Kp.Karya Mukti-Sindang laya Pagelaran
  • 15. HUAWEI TECHNOLOGIES CO., LTD. Page 15华为保密信息,未经授权禁止扩散 Mostly each time the site was down, but there was not alarm power or main input detected in M2000 before. Need check alarm connection on BTS and make sure all alarm are function. In Power database battery back up time is 2 hours. No Diesel Generator
  • 16. Copyright©2011 Huawei Technologies Co., Ltd. All Rights Reserved. The information in this document may contain predictive statements including, without limitation, statements regarding the future financial and operating results, future product portfolio, new technology, etc. There are a number of factors that could cause actual results and developments to differ materially from those expressed or implied in the predictive statements. Therefore, such information is provided for reference purpose only and constitutes neither an offer nor an acceptance. Huawei may change the information at any time without notice. Thank you www.huawei.com