2. Group 1 Group 2 Group 3 Group 4 Group 5
YASHMIT ANAND
VISHAV CHAWLA
TARANPREET KAUR
Shubham Shelly
SARPREET KAMRA
RISHABH BAJPAI
RISHABH ARORA
Raja Thalapathy.R
PARIKSHIT KHURANA
Pardeshi Ajay
Deepaksingh
PARAS GROVER
PANKAJ SAINI
Nishant
NISHAM HUSSAIN
nischay malik
Meghna Manoharan
MEERA V RAJAN
KUNWAR
KHARBANDA
Keshav Makhija
kartik srivastava
KANDARP BAJAJ
KALPIT HISSARIA
IKHWAK SINGH
HARSH SHARMA
HARPREET SINGH
Divyansh Bajaj
Arjun Sethi
AJAY GUPTA
ABHI CHANDELA
3. Category A
Category B
Each Question Carries 10 Marks. 45 Secs for each question
There is no negative marking and no passing of questions
Each Question Carries 20 Marks. 5 Minutes for each question
There is no negative marking and no passing of questions
17. Questio
n
A quantity takeoff is
a. a process of measuring the work of the project in
the form of a series of quantified work items.
b. A process of measuring materials required in the
project
c. A process of measuring the work of the project in
gross wise
d. All the above
18. Answe
r
a. a process of measuring the work of the project in
the form of a series of quantified work items.
19. Questio
n
GIA
a. is the area of a building measured to the internal face
of the perimeter walls at each floor level
b. is defined as the area of a building measured
externally at each floor level as follows;
c. is the usable area within a building measured to the
internal face of the perimeter walls at each floor level
d. None of the above
20. Answe
r
a. is the area of a building measured to the internal
face of the perimeter walls at each floor level
21. Questio
n
Area of irregular figures is determined by
a. Trapezoidal rule
b. Mid ordinate rule
c. Simpson rule
d. All the above
23. Questio
n
Long wall length
a. Is a length out-to-out
b. Center to center length + half breadth on one
Side + half breadth on other side
c. Center to center length + one breadth
d. All the above
25. Questio
n
Centre line length is
a. Inner length + half breadth +half breadth
b. Outer length –half breadth –half breadth
c. Length of center line plotted in the figure
d. All the above
27. Questio
n
Which of the following statement is false?
a. By centerline method, estimate for earthwork, concrete
work or brick work for all walls of the building can be done
at a time.
b. By long wall and short wall method, each wall is estimated
separately
c. In Centerline method, estimate can be physically
measured at site where as it can be done for Long wall
short wall method
d. Centerline method is preferred for preparing estimates
and long wall short wall method is preferred for entering
measurements in measurement book.
28. Answe
r
c. In Centerline method, estimate can be physically
measured at site where as it can be done for Long
wall short wall method
39. Answe
r
7
Category 1
1. column 1 - the time sing column;
2. column 2 - the dimension column;
3. column 3 - the squaring column;
4. column 4 - the description column;
47. Answe
r
9
Category 1
CENTRE LINE METHOD
Lengths 4.9
Lengths 4.6
Lengths 3.9
Lengths 3.9
Lengths 3.9
Lengths 4.9
Lengths 4.6
Lengths 4
Lengths 4
Lengths 4.9
43.6
No of
Junctions 4
Deduction
s 0.8
Centre
Line 42.8