Chapter 17
Attaining Just and Lasting
Peace
A Economic growth cannot be sufficiently buoyant, sustained, nor inclusive with-
out durable and enduring peace. Communities that experience armed conflict are
frequently among the poorest in the country. Families that belong to these com-
munities always need to be prepared for evacuation at a moment’s notice when-
ever fighting erupts. As a result, families are unable to build up assets, particu-
larly immovable ones. Moreover, very few put up businesses not only because
they fear for their safety but also because they cannot secure property rights. At
the same time, schoolchildren in these areas are either forced to suspend or quit
schooling, which leaves their learning stunted and options for the future limited.
In response, the government has been relentless in its pursuit of peace, through
intensified development and other peace-building initiatives in conflict-affected
and vulnerable communities. While much has been achieved, so much more re-
mains to be done.
The peace strategy adopted in the
SOCCSKSARGEN Region was anchored
on the PAMANA (Payapa at Masaganang
Pamayanan) Program which was
spearheaded by the Office of the Presidential
Adviser on the Peace Process (OPAPP). The
implementation of the PAMANA on the
ground was executed in partnership with
different national/regional line agencies
(DA, DILG, DSWD, DAR, DENR, DepED,
DOH), local government units, Philippine
Health Insurance Corporation (PHIC) and
the Armed Forces of the Philippines (AFP).
For the period 2011-2016, a total of 2,762
projects with an aggregate amount of
PhP2.97 billion were implemented in
different areas of Region XII. About 54.27
percent of these projects were farm-to-
market roads or road concreting projects.
Other projects with DENR XII as
implementing partner are: a) the Riverbank
Stabilization of Buluan Creek (6.5
kilometers) located in Barangay Buluan,
Pigcawayan, Cotabato Province; and b)
Tree Farm Development and Watershed
Management at Kabalantian-Binoongan-
Kulaman Valley Forest Reserve Strips in
Barangay Binoongan, Arakan, Cotabato
Province.
Through the DILG XII, the barangays of
Salvacion and Kibudoc in the Municipality
of Matalam, Cotabato benefitted PAMANA
road project. The Salvacion and Kibudoc
project was identified as a main road to
ensure that residents of five (5) other
adjacent barangays, namely: Kibia,
Marbel, Lampayan, Kabulacan and New
Abra. Farmers in Barangay Del Carmen,
Municipality of President Roxas could
also use the newly paved road in bringing
agriculture products to the market.
A 1.2 kilometer FMR was constructed in
Barangays Bual-Galidan-Damawatu in
the Municipality of Tulunan. The Bual-
Assessment
130 | SOCCSKSARGEN Regional Development Plan 2017-2022
Table 47: Total Number and Cost of PAMANA Projects, 2011-2016
Source of data: OPAPP
Galidan-Damawatu road concreting serves
as the main route for the residents of these
areas. Most of the farmers in three adjoining
barangays farming and growing various
crops where the condition of the road plays
an important part in the transport of farm
products. Another PAMANA intervention
in Tulunan is a water/spring system
development project in Barangay Batang
which will be used by about 100 families.
Also in Cotabato Province, an elevated
steel tank water system was constructed in
Barangay Dugong, Municipality of M’lang,
as well as multi-purpose covered court in
Barangay Tawan-Tawan.
DA XII turned over around P481 million
worth of grants for projects for the entire
Region XII under the PAMANA. OPAPP
closely coordinated with the Provincial
Governments of Cotabato, South Cotabato,
Sultan Kudarat, Sarangani and the City
Governments of Cotabato and General
Santos to implement various livelihood,
agriculture, forestry and infrastructure
projects. The table that follow show
the summary of PAMANA projects
implemented for 2011-2016
Year Agency/Partner Total Projects Total Cost
2011 DAR, DSWD, OPAPP 117 216,443,000
2012 DA, DAR, DILG, DSWD 240 142,600,000
2013 DA, DAR, DENR, DILG, DSWD, NEA
784 386,590,000
2014 DA, DAR, DILG, DSWD, NCIP 909 999,045,000
2015 DA, DILG, DOE, DSWD, NEA 668 888,597,955
2016 DA, DILG, DPWH 44 333,791,000
Total 2,762 2,971,066,955
Undertaken by Peace and Development
Teams (PDTs) of the Philippine Army
(PA), AFP, PDOP is a strategy of winning
peace through development means. PDOP
recognizes convergence of services and
actions among peace and development
stakeholders and institutionalizes
civilian and military partnership in the
implementation of programs, project and
activities.
RDC XII passed a number of resolutions
recognizing the efforts of the 39th IB, as
well as the provincial and municipal LGUs
of Cotabato Province for supporting the
PDOP activities, to wit:
•	 RDC XII Resolution No. 80, Series
of 2015: Commending the Provincial
GovernmentofCotabatoandMunicipal
Government of Tulunan for Supporting
the PDOP of the 39th IB, PA, AFP; and
•	 RDC Resolution No. 81, Series of 2015:
Enjoining All Local Government Units
(LGUs) of Region XII to Support the
PDOP Conducted by the Philippine
Army in their Localities.
As a support to RDC XII Resolution No. 81,
Series of 2015, the Municipal Government
of Magpet, Cotabato Province informed the
Council that it fully supports the conduct
of PDOP in their area. LGU-Magpet stated
that the 57th Infantry Battalion, PA, AFP
which has jurisdiction over its area has
implemented PDOP in 32 barangays. The
completion of the 57th IB PDOP operations
has resulted to the neutralization of at
least 11 barangays under its jurisdiction
which were formerly influenced by the
Chapter 17 Attaining Just and Lasting Peace 131
leftist Communist Party of the Philippines/
New People’s Army/National Democratic
Front (CPP/NPA/NDF). LGU-Magpet has
extended its full support to the 57th IB
PDOP operations in the municipality.
The 6th Infantry (Kampilan) Division and
its operating units has been involved in the
implementation of a total of thirty-eight
(38) projects in far-flung communities of
Cotabato Province as its support to the
inclusive growth and poverty alleviation
program of the government. As a strategy,
the 6th ID provided training on livelihood
skill for the people in the target barangays
and the LGUs, RLAs and NGOs supplied
the necessary construction materials and
other requirements for the said activity.
The approach used by the Army encouraged
the sense of responsibility from among the
beneficiaries to sustain the projects given to
them.
In promoting IPSP Bayanihan, the 6th
ID likewise initiated several civic action
activities and medical and dental outreach
campaigns. These activities were either
done solely by the 6th ID and its operating
units (e.g. infantry brigades, infantry
battalion, task forces) or were conducted in
partnership with LGUs, NGOs, the private
sector and civic organizations. The activities
were held in various areas of Region XII
wherein a total of 4,478 people availed of
medical services; 2,578 people for dental
services; and, 629 boys were circumcised by
military doctors and nurses.
To complement the peace and development
initiatives in the southern part of the region,
the 512th Engineer Construction Battalion
(ECB), 52nd Engineer Brigade based in
Barangay Bawing, General Santos City
implemented various program/project/
activities in its Area of Responsibility
(AOR). The project funds estimated at a cost
of P1,981,645.08 was sourced from various
sources such as Internal Peace and Security
Plan (IPSP) “Bayanihan”, Congressman
Emmanuel Pacquiao, DENR XII, DepED
XII and the private sector, namely: RD
Foundation, ABS-CBN and Brigada News.
Table 9.2 show the interventions of the AFP
to promote peace and development in the
region.
In promoting the Culture of Peace (COP)
advocacy, a total of 44 Culture of Peace
(COP) trainings conducted initiated by
the 1002ndBagwis Brigade for the military
units under its control namely: 27th,
73rd, 57th Infantry Battalions and Joint
Task Force Gensan. For its part, the 6th
Infantry (Kampilan) Division have strongly
advocated for the primacy of the peace
process between the Government of the
Philippines (GPH) and the Moro Islamic
Liberation Front (MILF) by displaying
tarpaulin/streamers along the national
highway throughout the region. Kampilan
Division has likewise sustained its project
of distributing of Pins for Peace among the
different stakeholders in its AOR.
Cotabato Province is continuing its
advocacy to institutionalize the Culture
of Peace (COP) in accordance with the
principles of active non-violence, respect,
unity and understanding for the rights of all
people. Governor Emmylou “Lala” J. Taliño-
Mendoza issued Executive Order 29 which
created the Task Force on Land Conflicts to
help in resolving land conflict which result
to “rido.” This pro-active measure is part of
the peacebuilding initiatives of the province.
InOctober2012,abreakthroughinthepeace
process was achieved with the signing of
the Framework Agreement on Bangsamoro
(FAB) between the GPH and MILF. The
Annex on Transitional Arrangements and
Modalities was signed on 28 February
2013; the Annex on Revenue Generation
and Wealth Sharing was signed on 13 July
2013; the Annex on Power Sharing was
signed on 8 December 2013; and Annex on
Normalization was signed on 25 January
2014. The Comprehensive Agreement on
132 | SOCCSKSARGEN Regional Development Plan 2017-2022
Non-integration of Conflict
Sensitivity Peace Planning
(CSPP) in the development
planning process
•	 Non-passage of the Bangsamoro Basic
Law (BBL) during the 16th Congress.
•	 Weak support on the CAB/BBL in the
adjacent non-Bangsamoro regions due
to ineffective communication/advocacy.
•	 Factionalism of stakeholders of the
Bangsamoro peace processes
•	 Growing Sultanate enthronements,
divisions and assertions of position in
the Bangsamoro political governance.
•	 Growing youth radicalism by Daesh-
inspired groups using sentiments on the
failure of the draft BBL.
•	 Presence of spoilers to peace.
Inadequate compliance
to EO 570 (Integration of
peace education in public
school curriculum)
Unstable peace and
order condition due to
LGU boundary disputes
which resulted to delayed
implementation of projects
Challenges
GPH-NDFP Peace Process
•	 Stalled peace process arising from the
breakdown of peace talks between GRP
and NDFP
•	 Exploitation of the Indigenous People’s
as source of combatants of the New
People’s Army (NPA).
•	 Abductions, ambuscades and extortion
activities committed by the NPA
Bangsamoro Peace
Process
•	 Non-passage of the Bangsamoro Basic
Law (BBL) during the 16th Congress.
•	 Weak support on the CAB/BBL in the
adjacent non-Bangsamoro regions due
to ineffective communication/advocacy.
•	 Factionalism of stakeholders of the
Bangsamoro peace processes
•	 Growing Sultanate enthronements,
divisions and assertions of position in
the Bangsamoro political governance.
•	 Growing youth radicalism by Daesh-
inspired groups using sentiments on the
failure of the draft BBL.
•	 Presence of spoilers to peace.
Inadequatedocumentation
on the PAMANA Program
outcomes
•	 Absence of baseline data relative
to peace and development prior to
implementation of PAMANA.
the Bangsamoro (CAB) was signed on 27
March 2014.
The Philippine Army through the 6th ID
and 1002nd Brigade sustained the conduct
peace and human rights training/education
for its personnel in its AOR.
Chapter 17 Attaining Just and Lasting Peace 133
Priority Strategy
1.	 GPH-NDFP Peace
Process
•	 Full support for the success of the GPH-
NDFP negotiations.
•	 Intensify government presence in
far-flung especially IP communities/
areas through implementation of
convergence programs
•	 Demand that NDFP implement
ceasefire and for NPA to stop activities
in violation of the Comprehensive
Agreement on Human Rights and
International Humanitarian Law
(CAHRIHL)
2.	 Bangsamoro Peace
Process
•	 Implementation of the CAB through an
enabling law passed by Congress and
signed by the President.
•	 Intensify peacebuilding conversations
and youth de-radicalization programs
at the grassroots
3.	 Mainstreaming of
peace paradigm and
approaches in planning,
programming, budgeting,
monitoring and evaluation
processes especially for
the PAMANA Program
•	 I•	 Conduct of comprehensive baseline
and evaluation study for peace and
development initiatives in the conflict-
affected and fragile communities.
•	 •	 Strengthen the coordination and
convergence mechanism on peace and
development initiatives including the
PAMANA Program.
4.	 Institutionalization
of the CSPP in the
development planning,
programming, budgeting,
monitoring and evaluation
processes
•	 Encourage the RLAs, LGUs and CSOs/
NGOs to utilize PCIA in project
development, implementation and
monitoring.
•	 Capacity building on CSPP and conflict
analysis tools for RLAs, LGUs and other
donors of peacebuilding projects
5.	 C o n t i n u i n g
institutionalization of the
Culture of Peace (COP)
•	 Full compliance by public education
institutions to EO 570.
•	 Support to the operationalization of the
TWG under EO 570 activities geared
towards Peace Education (PeaceEd)
and capacity development program for
teachers, peace educators, local leaders
including formulation of community-
based peace education program.
•	 Conduct of regular COP awareness
and capability building activities
particularly to be initiated by LGUs.
134 | SOCCSKSARGEN Regional Development Plan 2017-2022
Priority Legislative Agenda
•	 Law to implement the Comprehensive
Agreement on the Bangsamoro
(CAB) as a replacement to the draft
Bangsamoro Basic Law (BBL).
•	 Law to harmonize the existence of
overlapping land tenurial instruments
that may lead to peace and security
issues.

More Related Content

PDF
SOCCSKSARGEN RDP 2017-2022 Messages
PDF
Philippine Development Plan oral report (madayag, laarni grace f.)
PDF
Sustainable development goals (5, 6 & 7)
SOCCSKSARGEN RDP 2017-2022 Messages
Philippine Development Plan oral report (madayag, laarni grace f.)
Sustainable development goals (5, 6 & 7)

What's hot (20)

PPTX
Status of the Sustainable Development Goals (SDGs) in the Niger Delta
PPTX
National Development Planning of Bhutan
PPTX
Digital artifact: MDG to SDG - A Bangladesh success story and financing chall...
PPTX
Ogun State SDGs Household Survey 2019
PPTX
Sustainable Development and Environmental Policy in Bangladesh
PDF
Philippine Development Plan 2011-2016
PPTX
Inclusive growth
PPT
Mainstreaming gad budget presentation
PDF
World Bank Sustainable Development Goals (17 SDG's)
PPTX
Localizing SDGs for a Dispersed Population
PPTX
Achieving SDGs Through Technology-Driven Solutions
PDF
Budgeting and mainstreaming the SDGs in local budgets
PPTX
POVERTY ALLEVIATION PROGRAMME11
PPT
Inclusive growth in india 30 32_48
PPTX
Integrating the 2030 Agenda into National Strategies – Lessons Learnt and Ne...
DOCX
Kenya vision 2030
PPTX
INDIA REQURIES INCLUSIVE GROWTH AND SUSTAINABLE DEVELOPMENT
PDF
Bayelsa State Seeds
PDF
Civil Society Statement
Status of the Sustainable Development Goals (SDGs) in the Niger Delta
National Development Planning of Bhutan
Digital artifact: MDG to SDG - A Bangladesh success story and financing chall...
Ogun State SDGs Household Survey 2019
Sustainable Development and Environmental Policy in Bangladesh
Philippine Development Plan 2011-2016
Inclusive growth
Mainstreaming gad budget presentation
World Bank Sustainable Development Goals (17 SDG's)
Localizing SDGs for a Dispersed Population
Achieving SDGs Through Technology-Driven Solutions
Budgeting and mainstreaming the SDGs in local budgets
POVERTY ALLEVIATION PROGRAMME11
Inclusive growth in india 30 32_48
Integrating the 2030 Agenda into National Strategies – Lessons Learnt and Ne...
Kenya vision 2030
INDIA REQURIES INCLUSIVE GROWTH AND SUSTAINABLE DEVELOPMENT
Bayelsa State Seeds
Civil Society Statement
Ad

Viewers also liked (14)

Ad

Similar to RDP Chapter 17 (20)

PPTX
Davao localizing poverty reduction.final pres 2015
PDF
Strategic Planning Models
PDF
5 - Social Inclusion - Terry Hyland.pdf
PDF
EDUC613_Term_Paper.Emergency & Disaster Management.pdf
PPTX
Bukluran Para sa Pag-unlad ng Pamilya
PDF
Anubha Raina
PDF
PDF
Twenty point policy
DOCX
17 rural support projects role in rural development
DOCX
17 rural support projects role in rural development
PPT
Exposure-to-Sustainable-Development brief
PPT
2710-04Exposure-to-Sustainable-Development-20211106143421.ppt
PPT
2710-04Exposure-to-Sustainable-Development-20211106143421.ppt
PPTX
Agrikulturang pantawid pamilya pilipino tor ppt
PPT
Sustainable development in BD
PPTX
Comprehensive-Development-Plan (2.).pptx
PDF
VILLAGE POVERTY REDUCTION PLAN PRESENTATION PPT.pdf
RTF
Significance of SRSP
Davao localizing poverty reduction.final pres 2015
Strategic Planning Models
5 - Social Inclusion - Terry Hyland.pdf
EDUC613_Term_Paper.Emergency & Disaster Management.pdf
Bukluran Para sa Pag-unlad ng Pamilya
Anubha Raina
Twenty point policy
17 rural support projects role in rural development
17 rural support projects role in rural development
Exposure-to-Sustainable-Development brief
2710-04Exposure-to-Sustainable-Development-20211106143421.ppt
2710-04Exposure-to-Sustainable-Development-20211106143421.ppt
Agrikulturang pantawid pamilya pilipino tor ppt
Sustainable development in BD
Comprehensive-Development-Plan (2.).pptx
VILLAGE POVERTY REDUCTION PLAN PRESENTATION PPT.pdf
Significance of SRSP

More from National Economic and Development Authority XII (20)

PDF
2018 SOCCSKSARGEN Regional Development Report
PDF
2018 Regional Development Report
PDF
PDF
Regional Development Updates | Vol 17 Issue 3 | November - December 2019
PDF
SOCCSKSARGEN RDP 2017 2022 Midterm Update
PDF
SOCCSKSARGEN 2020 Regional Development Outlook
PDF
2019 SOCCSKSARGEN Annual Regional Economic Situationer
PDF
Regional Development Updates | Vol 17 Issue 3 | October - December 2019
PDF
Regional Development Updates | Vol 17 Issue 2 | January - September 2019
PDF
Regional Development Updates | Vol 17 Issue 1 | January - March 2019
PDF
Updated 2018 Socioeconomic Report of Region XII
PDF
CY 2018 SOCIOECONOMIC REPORT SOCCSKSARGEN REGION
PDF
Regional Development Updates | Vol 16 Issue 4 | October - December 2018
PDF
Regional Development Updates | Vol 16 Issue 3 | July - September 2018
PDF
Regional Development Updates | Vol 16 Issue 2 | April - June 2018
PDF
Regional Development Plan 2017-2022
PDF
2017 SOCCSKSARGEN Regional Development Report
PDF
Regional Development Updates | Vol 16 Issue 1 | January - March 2018
PDF
Regional Development Updates | Vol 15 Issue 4 | October - December 2017
2018 SOCCSKSARGEN Regional Development Report
2018 Regional Development Report
Regional Development Updates | Vol 17 Issue 3 | November - December 2019
SOCCSKSARGEN RDP 2017 2022 Midterm Update
SOCCSKSARGEN 2020 Regional Development Outlook
2019 SOCCSKSARGEN Annual Regional Economic Situationer
Regional Development Updates | Vol 17 Issue 3 | October - December 2019
Regional Development Updates | Vol 17 Issue 2 | January - September 2019
Regional Development Updates | Vol 17 Issue 1 | January - March 2019
Updated 2018 Socioeconomic Report of Region XII
CY 2018 SOCIOECONOMIC REPORT SOCCSKSARGEN REGION
Regional Development Updates | Vol 16 Issue 4 | October - December 2018
Regional Development Updates | Vol 16 Issue 3 | July - September 2018
Regional Development Updates | Vol 16 Issue 2 | April - June 2018
Regional Development Plan 2017-2022
2017 SOCCSKSARGEN Regional Development Report
Regional Development Updates | Vol 16 Issue 1 | January - March 2018
Regional Development Updates | Vol 15 Issue 4 | October - December 2017

Recently uploaded (20)

PPTX
GOVERNMENT-ACCOUNTING1. bsa 4 government accounting
PDF
PPT Item #s 2&3 - 934 Patterson SUP & Final Review
PPTX
Nur Shakila Assesmentlwemkf;m;mwee f.pptx
PDF
CXPA Finland Webinar: Rated 5 Stars - Delivering Service That Customers Truly...
PDF
It Helpdesk Solutions - ArcLight Group
PPTX
Introduction_to_the_Study_of_Globalization.pptx
PDF
About Karen Miner-Romanoff - Academic & nonprofit consultant
PDF
PPT Item # 4 - 328 Albany St compt. review
PPTX
26.1.2025 venugopal K Awarded with commendation certificate.pptx
PPTX
Weekly Report 17-10-2024_cybersecutity.pptx
PDF
Item # 4 -- 328 Albany St. compt. review
PDF
PPT Items # 6&7 - 900 Cambridge Oval Right-of-Way
PPTX
Omnibus rules on leave administration.pptx
PPTX
Quiz - Saturday.pptxaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
PPTX
The DFARS - Part 251 - Use of Government Sources By Contractors
PDF
PPT - Primary Rules of Interpretation (1).pdf
PDF
The Detrimental Impacts of Hydraulic Fracturing for Oil and Gas_ A Researched...
PDF
ESG Alignment in Action - The Abhay Bhutada Foundation
PPTX
PCCR-ROTC-UNIT-ORGANIZATIONAL-STRUCTURE-pptx-Copy (1).pptx
DOCX
EAPP.docxdffgythjyuikuuiluikluikiukuuuuuu
GOVERNMENT-ACCOUNTING1. bsa 4 government accounting
PPT Item #s 2&3 - 934 Patterson SUP & Final Review
Nur Shakila Assesmentlwemkf;m;mwee f.pptx
CXPA Finland Webinar: Rated 5 Stars - Delivering Service That Customers Truly...
It Helpdesk Solutions - ArcLight Group
Introduction_to_the_Study_of_Globalization.pptx
About Karen Miner-Romanoff - Academic & nonprofit consultant
PPT Item # 4 - 328 Albany St compt. review
26.1.2025 venugopal K Awarded with commendation certificate.pptx
Weekly Report 17-10-2024_cybersecutity.pptx
Item # 4 -- 328 Albany St. compt. review
PPT Items # 6&7 - 900 Cambridge Oval Right-of-Way
Omnibus rules on leave administration.pptx
Quiz - Saturday.pptxaaaaaaaaaaaaaaaaaaaaaaaaaaaaaa
The DFARS - Part 251 - Use of Government Sources By Contractors
PPT - Primary Rules of Interpretation (1).pdf
The Detrimental Impacts of Hydraulic Fracturing for Oil and Gas_ A Researched...
ESG Alignment in Action - The Abhay Bhutada Foundation
PCCR-ROTC-UNIT-ORGANIZATIONAL-STRUCTURE-pptx-Copy (1).pptx
EAPP.docxdffgythjyuikuuiluikluikiukuuuuuu

RDP Chapter 17

  • 2. 126 | SOCCSKSARGEN Regional Development Plan 2017-2022
  • 3. Chapter 17 Attaining Just and Lasting Peace 127
  • 4. 128 | SOCCSKSARGEN Regional Development Plan 2017-2022
  • 5. Chapter 17 Attaining Just and Lasting Peace 129 Chapter 17 Attaining Just and Lasting Peace A Economic growth cannot be sufficiently buoyant, sustained, nor inclusive with- out durable and enduring peace. Communities that experience armed conflict are frequently among the poorest in the country. Families that belong to these com- munities always need to be prepared for evacuation at a moment’s notice when- ever fighting erupts. As a result, families are unable to build up assets, particu- larly immovable ones. Moreover, very few put up businesses not only because they fear for their safety but also because they cannot secure property rights. At the same time, schoolchildren in these areas are either forced to suspend or quit schooling, which leaves their learning stunted and options for the future limited. In response, the government has been relentless in its pursuit of peace, through intensified development and other peace-building initiatives in conflict-affected and vulnerable communities. While much has been achieved, so much more re- mains to be done. The peace strategy adopted in the SOCCSKSARGEN Region was anchored on the PAMANA (Payapa at Masaganang Pamayanan) Program which was spearheaded by the Office of the Presidential Adviser on the Peace Process (OPAPP). The implementation of the PAMANA on the ground was executed in partnership with different national/regional line agencies (DA, DILG, DSWD, DAR, DENR, DepED, DOH), local government units, Philippine Health Insurance Corporation (PHIC) and the Armed Forces of the Philippines (AFP). For the period 2011-2016, a total of 2,762 projects with an aggregate amount of PhP2.97 billion were implemented in different areas of Region XII. About 54.27 percent of these projects were farm-to- market roads or road concreting projects. Other projects with DENR XII as implementing partner are: a) the Riverbank Stabilization of Buluan Creek (6.5 kilometers) located in Barangay Buluan, Pigcawayan, Cotabato Province; and b) Tree Farm Development and Watershed Management at Kabalantian-Binoongan- Kulaman Valley Forest Reserve Strips in Barangay Binoongan, Arakan, Cotabato Province. Through the DILG XII, the barangays of Salvacion and Kibudoc in the Municipality of Matalam, Cotabato benefitted PAMANA road project. The Salvacion and Kibudoc project was identified as a main road to ensure that residents of five (5) other adjacent barangays, namely: Kibia, Marbel, Lampayan, Kabulacan and New Abra. Farmers in Barangay Del Carmen, Municipality of President Roxas could also use the newly paved road in bringing agriculture products to the market. A 1.2 kilometer FMR was constructed in Barangays Bual-Galidan-Damawatu in the Municipality of Tulunan. The Bual- Assessment
  • 6. 130 | SOCCSKSARGEN Regional Development Plan 2017-2022 Table 47: Total Number and Cost of PAMANA Projects, 2011-2016 Source of data: OPAPP Galidan-Damawatu road concreting serves as the main route for the residents of these areas. Most of the farmers in three adjoining barangays farming and growing various crops where the condition of the road plays an important part in the transport of farm products. Another PAMANA intervention in Tulunan is a water/spring system development project in Barangay Batang which will be used by about 100 families. Also in Cotabato Province, an elevated steel tank water system was constructed in Barangay Dugong, Municipality of M’lang, as well as multi-purpose covered court in Barangay Tawan-Tawan. DA XII turned over around P481 million worth of grants for projects for the entire Region XII under the PAMANA. OPAPP closely coordinated with the Provincial Governments of Cotabato, South Cotabato, Sultan Kudarat, Sarangani and the City Governments of Cotabato and General Santos to implement various livelihood, agriculture, forestry and infrastructure projects. The table that follow show the summary of PAMANA projects implemented for 2011-2016 Year Agency/Partner Total Projects Total Cost 2011 DAR, DSWD, OPAPP 117 216,443,000 2012 DA, DAR, DILG, DSWD 240 142,600,000 2013 DA, DAR, DENR, DILG, DSWD, NEA 784 386,590,000 2014 DA, DAR, DILG, DSWD, NCIP 909 999,045,000 2015 DA, DILG, DOE, DSWD, NEA 668 888,597,955 2016 DA, DILG, DPWH 44 333,791,000 Total 2,762 2,971,066,955 Undertaken by Peace and Development Teams (PDTs) of the Philippine Army (PA), AFP, PDOP is a strategy of winning peace through development means. PDOP recognizes convergence of services and actions among peace and development stakeholders and institutionalizes civilian and military partnership in the implementation of programs, project and activities. RDC XII passed a number of resolutions recognizing the efforts of the 39th IB, as well as the provincial and municipal LGUs of Cotabato Province for supporting the PDOP activities, to wit: • RDC XII Resolution No. 80, Series of 2015: Commending the Provincial GovernmentofCotabatoandMunicipal Government of Tulunan for Supporting the PDOP of the 39th IB, PA, AFP; and • RDC Resolution No. 81, Series of 2015: Enjoining All Local Government Units (LGUs) of Region XII to Support the PDOP Conducted by the Philippine Army in their Localities. As a support to RDC XII Resolution No. 81, Series of 2015, the Municipal Government of Magpet, Cotabato Province informed the Council that it fully supports the conduct of PDOP in their area. LGU-Magpet stated that the 57th Infantry Battalion, PA, AFP which has jurisdiction over its area has implemented PDOP in 32 barangays. The completion of the 57th IB PDOP operations has resulted to the neutralization of at least 11 barangays under its jurisdiction which were formerly influenced by the
  • 7. Chapter 17 Attaining Just and Lasting Peace 131 leftist Communist Party of the Philippines/ New People’s Army/National Democratic Front (CPP/NPA/NDF). LGU-Magpet has extended its full support to the 57th IB PDOP operations in the municipality. The 6th Infantry (Kampilan) Division and its operating units has been involved in the implementation of a total of thirty-eight (38) projects in far-flung communities of Cotabato Province as its support to the inclusive growth and poverty alleviation program of the government. As a strategy, the 6th ID provided training on livelihood skill for the people in the target barangays and the LGUs, RLAs and NGOs supplied the necessary construction materials and other requirements for the said activity. The approach used by the Army encouraged the sense of responsibility from among the beneficiaries to sustain the projects given to them. In promoting IPSP Bayanihan, the 6th ID likewise initiated several civic action activities and medical and dental outreach campaigns. These activities were either done solely by the 6th ID and its operating units (e.g. infantry brigades, infantry battalion, task forces) or were conducted in partnership with LGUs, NGOs, the private sector and civic organizations. The activities were held in various areas of Region XII wherein a total of 4,478 people availed of medical services; 2,578 people for dental services; and, 629 boys were circumcised by military doctors and nurses. To complement the peace and development initiatives in the southern part of the region, the 512th Engineer Construction Battalion (ECB), 52nd Engineer Brigade based in Barangay Bawing, General Santos City implemented various program/project/ activities in its Area of Responsibility (AOR). The project funds estimated at a cost of P1,981,645.08 was sourced from various sources such as Internal Peace and Security Plan (IPSP) “Bayanihan”, Congressman Emmanuel Pacquiao, DENR XII, DepED XII and the private sector, namely: RD Foundation, ABS-CBN and Brigada News. Table 9.2 show the interventions of the AFP to promote peace and development in the region. In promoting the Culture of Peace (COP) advocacy, a total of 44 Culture of Peace (COP) trainings conducted initiated by the 1002ndBagwis Brigade for the military units under its control namely: 27th, 73rd, 57th Infantry Battalions and Joint Task Force Gensan. For its part, the 6th Infantry (Kampilan) Division have strongly advocated for the primacy of the peace process between the Government of the Philippines (GPH) and the Moro Islamic Liberation Front (MILF) by displaying tarpaulin/streamers along the national highway throughout the region. Kampilan Division has likewise sustained its project of distributing of Pins for Peace among the different stakeholders in its AOR. Cotabato Province is continuing its advocacy to institutionalize the Culture of Peace (COP) in accordance with the principles of active non-violence, respect, unity and understanding for the rights of all people. Governor Emmylou “Lala” J. Taliño- Mendoza issued Executive Order 29 which created the Task Force on Land Conflicts to help in resolving land conflict which result to “rido.” This pro-active measure is part of the peacebuilding initiatives of the province. InOctober2012,abreakthroughinthepeace process was achieved with the signing of the Framework Agreement on Bangsamoro (FAB) between the GPH and MILF. The Annex on Transitional Arrangements and Modalities was signed on 28 February 2013; the Annex on Revenue Generation and Wealth Sharing was signed on 13 July 2013; the Annex on Power Sharing was signed on 8 December 2013; and Annex on Normalization was signed on 25 January 2014. The Comprehensive Agreement on
  • 8. 132 | SOCCSKSARGEN Regional Development Plan 2017-2022 Non-integration of Conflict Sensitivity Peace Planning (CSPP) in the development planning process • Non-passage of the Bangsamoro Basic Law (BBL) during the 16th Congress. • Weak support on the CAB/BBL in the adjacent non-Bangsamoro regions due to ineffective communication/advocacy. • Factionalism of stakeholders of the Bangsamoro peace processes • Growing Sultanate enthronements, divisions and assertions of position in the Bangsamoro political governance. • Growing youth radicalism by Daesh- inspired groups using sentiments on the failure of the draft BBL. • Presence of spoilers to peace. Inadequate compliance to EO 570 (Integration of peace education in public school curriculum) Unstable peace and order condition due to LGU boundary disputes which resulted to delayed implementation of projects Challenges GPH-NDFP Peace Process • Stalled peace process arising from the breakdown of peace talks between GRP and NDFP • Exploitation of the Indigenous People’s as source of combatants of the New People’s Army (NPA). • Abductions, ambuscades and extortion activities committed by the NPA Bangsamoro Peace Process • Non-passage of the Bangsamoro Basic Law (BBL) during the 16th Congress. • Weak support on the CAB/BBL in the adjacent non-Bangsamoro regions due to ineffective communication/advocacy. • Factionalism of stakeholders of the Bangsamoro peace processes • Growing Sultanate enthronements, divisions and assertions of position in the Bangsamoro political governance. • Growing youth radicalism by Daesh- inspired groups using sentiments on the failure of the draft BBL. • Presence of spoilers to peace. Inadequatedocumentation on the PAMANA Program outcomes • Absence of baseline data relative to peace and development prior to implementation of PAMANA. the Bangsamoro (CAB) was signed on 27 March 2014. The Philippine Army through the 6th ID and 1002nd Brigade sustained the conduct peace and human rights training/education for its personnel in its AOR.
  • 9. Chapter 17 Attaining Just and Lasting Peace 133 Priority Strategy 1. GPH-NDFP Peace Process • Full support for the success of the GPH- NDFP negotiations. • Intensify government presence in far-flung especially IP communities/ areas through implementation of convergence programs • Demand that NDFP implement ceasefire and for NPA to stop activities in violation of the Comprehensive Agreement on Human Rights and International Humanitarian Law (CAHRIHL) 2. Bangsamoro Peace Process • Implementation of the CAB through an enabling law passed by Congress and signed by the President. • Intensify peacebuilding conversations and youth de-radicalization programs at the grassroots 3. Mainstreaming of peace paradigm and approaches in planning, programming, budgeting, monitoring and evaluation processes especially for the PAMANA Program • I• Conduct of comprehensive baseline and evaluation study for peace and development initiatives in the conflict- affected and fragile communities. • • Strengthen the coordination and convergence mechanism on peace and development initiatives including the PAMANA Program. 4. Institutionalization of the CSPP in the development planning, programming, budgeting, monitoring and evaluation processes • Encourage the RLAs, LGUs and CSOs/ NGOs to utilize PCIA in project development, implementation and monitoring. • Capacity building on CSPP and conflict analysis tools for RLAs, LGUs and other donors of peacebuilding projects 5. C o n t i n u i n g institutionalization of the Culture of Peace (COP) • Full compliance by public education institutions to EO 570. • Support to the operationalization of the TWG under EO 570 activities geared towards Peace Education (PeaceEd) and capacity development program for teachers, peace educators, local leaders including formulation of community- based peace education program. • Conduct of regular COP awareness and capability building activities particularly to be initiated by LGUs.
  • 10. 134 | SOCCSKSARGEN Regional Development Plan 2017-2022 Priority Legislative Agenda • Law to implement the Comprehensive Agreement on the Bangsamoro (CAB) as a replacement to the draft Bangsamoro Basic Law (BBL). • Law to harmonize the existence of overlapping land tenurial instruments that may lead to peace and security issues.