REDESIGN AND MANUFACTURING BY USING DMADV METHOD
Devendra G. Pendokhare1
, Taqui Quazi2
, Prasad S. Kulkarni3
1
PG Student, Mechanical Engineering Department, SCOE, Kharghar, Mumbai University, Maharashtra, India
2
HOD, Automobile Engineering Department, Saraswati college of engineering, kharghar, New Mumbai,
Maharashtra, India
3
Lecturer, Mechanical Engineering Department, Government Polytechnic, Vikramgad, MSBTE, Maharashtra, India
Abstract
The cost of poor Quality would help in analyzing the operating costs for effective and profitable business management. . In the era
of cut throat competition, especially in automobile sector, success of an organisation resides in its ability to respond quickly to the
needs of its customers. These customer needs must be attended with minimum manufacturing costs, minimum lead time to launch
the product in market and delivering better performance than the existing competitors in the market.success achieved by market
leaders is credited to their improvement initiatives. The customer needs must be attended with minimum manufacturing costs, and
delivering better performance than the existing competitors in the market. Therefore, Indian companies in order to compete with
global companies, it is very much essential to be at par, in all spheres of business aspects. Cost and Quality are two very
important aspects to be globally competitive, to capture market share, to retain customers to be in business and to achieve
business excellence. In the present times Six Sigma Methodology and QC Story are very famous and powerful tools and are widely
used in the global industries. The increase in demand of the growing customer looking for a better quality of product has
compelled corporations to adopt Six Sigma in order to improve the quality for enhanced competitive advantage. Therefore, it is
very much essential to understand relation between six sigma and cost of quality and its application in automobile industry.
Keywords: Six Sigma, DMADV, DMAIC, Quality improvement
--------------------------------------------------------------------***------------------------------------------------------------------
1. INTRODUCTION
Six sigma defines as a statistical concept that measures
process in terms of defects. He goes further to argue that
when used in business, it indicates defects in the outputs of a
process and helps one to understand how far the processes
deviate from perfection. it as a business strategy that seeks
to identify and eliminate causes of errors or defects or
failures in business processes by focusing on outputs that are
critical to customers. On the other hand defines it as a data
driven structured problem solving methodology for solving
chronic issues facing a business, and a breakthrough
business management process that is used to improve a
company’s performance by variation reduction.
Indian Automobile Industry has already started using Six
Sigma Methodology for vehicle design and process
improvement to survive in the global competition. It is very
important to study and investigate how Six Sigma
Methodology is employed in Indian Automobile Industry for
designing the product or for Process Improvement and
importance of Six Sigma Methodology to reduce Cost of
Quality. This motivates to take up research on this topic. In
the era of cut throat competition, success achieved by market
leaders is credited to their improvement initiatives. A
common element within many of these successful
companies is the use of powerful cost of poor quality
concepts in connecting improvement priorities to strategic
objectives, assessing the financial impact of poor quality,
understanding the root causes of poor quality, selecting high
payback improvement projects and managing the
Improvement initiative to simultaneously deliver improved
financial performance and greater customer satisfaction.
The customer needs must be attended with minimum
manufacturing costs, minimum lead time to launch the
product in market and delivering better performance than the
existing competitors in the market. Therefore Indian
companies in order to compete with global companies, it is
very much essential to be at par, in all spheres of business
aspects. Cost and Quality are two very important aspects to
be globally competitive, to capture market share, to retain
customers to be in business and to achieve business
excellence. Six Sigma is the powerful methodology to drive
improvement initiatives and reduce cost of quality.
Organizations choose to implement Six Sigma for numerous
reasons. Reasons for implementing Six Sigma can vary from
one organization to another, however, the list below present
the most common reasons for organizations to implement
Six Sigma to resolve issues facing the organization:
• Cost reduction
• Cycle time reduction
• Error and waste reduction
• Increase competitive advantage
• Improve customer satisfaction
• Increase shareholder value
• Change company culture
2. OBJECTIVES
 To study Six Sigma methodology extensively for both
improvement of existing process and design for Six
Sigma.
 To Study how Six Sigma methodology helps in
reduction of cost of poor quality.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 145
 To understand how Six Sigma methodology supports
Knowledge Management.
 To understand the synergic effect of the combination
of two powerful methods Lean and Six Sigma and its
positive impact in increasing speed and effectiveness
of any process within the organization.
 To study various applications and benefits of
implementing Six Sigma.
3. METHODOLOGY
Six Sigma is a management strategy that maximizes
customer satisfaction and minimizes the defects that create
customer dissatisfaction. Six sigma methodologies can be
used for improvement of process (called DMAIC) and also
is a powerful tool for new product design or improvement in
the existing product design (called DMADV). The five step
DMAIC approach of Six Sigma reduces the defects in
process, product or service. Flow charts, Pareto analysis,
Cause & Effect diagrams are the most frequently used basic
analysis and measurement tools by Six Sigma
implementation teams. Investigation as regards application
of Six Sigma methodology for process improvement in
Indian automobile industry is done and complete framework
is prepared and illustrated.
Fig-1: Six Sigma Methodology
 The Six Sigma DMAIC (Define, Measure, Analyze,
Improve, and Control) is an improvement system for
existing processes for incremental improvement.
 The Six Sigma DMADV (Define, Measure,
Analyze, Design, and Verify) is an improvement
system used to develop new processes or products.
4. DMADV
Fig-2: Road map for DMADV
 Define the project goals and customer (internal and
external) deliverables
 Measure and determine customer needs and
specifications
 Analyze the process options to meet the customer
needs
 Design (detailed) the process to meet the customer
needs
 Verify the design performance and ability to meet
customer needs
4.1 Define Problem or Opportunity
Problem is identified from voice of customer or from voice
of process. Voice of customer could be customer complaint
for performance / defect, field failure, critical customer
issues, etc. Voice of business could be internal defects, re-
work, internal rejections, internal quality issues, other
business issues etc. Define the goals of the new process.
Identify exactly what is being designed or changed. Why is
the change being made? Using the Quality Function
Deployment (QFD) or Analytic Hierarchical Process tools to
insure that the goals are compatible with consumer demand
and the company’s overall strategy.
Organizations may use right from 7 QC tools, Quality
Circles, Kizens, Small Group Activities to the modest tools
like Six Sigma Methodology or QC Story Approach for
problem solving depending upon the nature and complexity
of the problem. Where problem is chronic in nature and
problem is known, however, reasons are not known,
everything seems to be right, however, defects are getting
generated, and such complex problems are solved using Six
Sigma Methodology.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 146
Table-1: six sigma methodology for product design (DMADV)
Define Opportunity Measure
Performance
Analyze Opportunity Design New Product Verify Product Design
 Road map
define phase
 Sources of
capturing
voice of
customer
 Rules of
visiting
customers
 KJ / Affinity
diagram
 Road map
measure
phase
 Quality
function
deployment
(QFD)
 Advantages
of QFD
 Road map for
analyze phase
 Methods for critical
to Quality (CTQ)
 Methods for
concept selection
 TRIZ- theory of
inventive problem
solving
 Pugh matrix for
concept selection
 Road map for design
phase
 Failure mode and
effect analysis
 Robust design
 Taguchi quality loss
function
 Signal to noise
ration.
 Tolerance analysis
 Road map for verify
phase
 Reliability
 Design evaluation
 Design verification
tools
 Design review inputs
 Transfer to production
 Pilot production plan
 Design Validation
Summary of Define Phase is as follows
 Identify the projects which are linked to big Y.
 Select the team which is ready to contribute.
 Prepare team charter and get it approved.
 Train team members.
 Map the process
 Carry out value analysis.
 Walkthrough process.
 Analyze the past data from various view points.
 Identify quick wins and implement.
 Record results of quick wins.
4.2 Measurement Phase
In this phase data is gathered and analyzed that describes
with precision and accuracy. What is happening? What is
current or baseline, level of performance of the process that
creates the problem? It also produces some preliminary
ideas of possible causes for problem. Identify the
measurement standards that are important to stakeholders.
Convert customer needs into project objectives.
The goals of the measure phase are as follow
 Identify customers and their needs
 Derive specific requirements to the system
 Determine the corresponding output measures and
their target values and tolerances.
The significant improvement could be accomplished by:
 Reduction of cycle time,
 Reduction of control time,
 Reduction of tool costs, and
 Minimizing or eliminating scrap.
4.3 Analyze Phase
The analysis phase deals with identifying the critical factors
embedded in the current operation that could be improved to
minimize waste. Prior to starting this phase, the project
champion reviewed the collected data to filter out any type
of noise and disturbance. Data mining is then used to
identify main types of wastes for each machine to perform
the corrective actions. Develop design alternatives, identify
the best combination of requirements to provide value
within constraints, develop conceptual designs, evaluate,
select the best components and develop the best available
design. Analyse the alternatives available for meeting
project aims. Identify the behaviour of comparable best-in-
class designs.At this stage it is important not to miss out any
possible cause. If an important X is missed out, it will never
be analyzed for validation.
The tools used for listing Xs are:
 Brainstorming
 Process map
 Cause effect diagram
 Why-Why analysis
Prioritize Xs - After the Xs have been listed using process
map or cause effect diagram, these need to be prioritized.
The tools used to prioritize Xs are as follow
 Cause- Effect Matrix
 Pareto analysis
 Pugh Matrix
Validate Xs - There are three steps to validate Xs. They are
as follow.
 Scatter Plot
 Tolerance stack up analysis
 Design failure made & effects analysis
4.4 Design New Product
This stage of DMADV includes both a detailed and high
level design for the selected alternative. The elements of the
design are prioritized and from there a high level design is
developed. Once this step is complete, a more detailed
model will be prototyped in order to identify where errors
may occur and to make necessary modifications. Develop a
high level design, Develop exact specifications, Develop
detailed component designs, Develop related processes,
Optimize design. Design the new product, service, or
process. Utilize prognostic modelling, simulation,
prototypes, pilot trials, and other techniques in order to
confirm the design’s ability to meet the established aims of
the project.
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 147
Fig-3: Key Steps Involved in Design Phase
4.4.1 Signal to Noise Ratio
The signals to noise ratio combines, in a single measure, information on both the average level and the spread of a variable. The
goal is to always maximize S/N ratio. The types of signal to noise ratios are
Lower is better ratio- applies to variables where lower value is preferable.
Higher is better ratio- applies to variables where a higher value is preferable.
Nominal is best ratio- applies to variables where deviations from a target value are undesirable
4.4.2 Tolerance Analysis
Tolerance analysis (TA) is the process of taking known tolerances and analyzing the combination of these tolerances at an
assembly level.
Fig-4: Tolerance Analysis
4.5 Verify Product Design
In the final phase, the team validates that the design is acceptable to all stakeholders. Will the design be effective in the real
world? Several pilot and production runs will be necessary to ensure that the quality is the highest possible. Here, expectations
will be confirmed, deployment will be expanded and all lessons learned will be documented. The Verify step also includes a plan
to transition the product or service to a routine operation and to ensure that this change is sustainable. Verify the efficiency of the
new product or process in a real world situation.
Fig-5: Steps involved in verify phase
4.5.1 Design Verification
It involves checking inputs/outputs at each stage as per
Design Verification Plan. It includes-
 Calculation Checks
 Peer review
 Proto test
 Lab trials
 Simulations
 Benchmarking with existing designs available in the
market
4.5.2 Design Reviews
Cross functional review to conform if design team has not
missed out on any key items such as
 Customer needs
 Manufacturability or assembly issues
 Serviceability issues
 Inspectability issues
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 148
4.5.3 Transfer to Production
The implementation and the handover to the process owner
occur after the successful piloting.
4.5.4 Pilot Production Plan
Steps involved in pilot production are as follow
 Prepare pilot production plan
 Carry out the pilot production.
 Analyze the results
 Carry out optimization.
Most important tools used are as follow
 PDCA cycle
 Project Management tools (Gantt chart, Network
plan)
 Change management tools (Communication plan,
stake holder analysis)
 Documentation
 SOP s
 KPI systems
 Control Charts
 Process flow diagrams.
4.5.5 Design Validation
The objectives of design validation are
 To validate the design actually works in the real
operating environment
 May be part of initial design verification plan
document or may be developed separately
 If multiple applications are foreseen for new
product, plan to cover all possible
applications/environments in which the product is
likely to be used.
6. FUTURE SCOPE OF WORK
Investigation as regards application of six sigma
methodology to Indian automobile industry for reducing
cost of quality is done for manufacturing processes.
However as stated above, Six Sigma Methodology is
industry independent and it is applicable to all business
process. Viz. Purchasing, marketing, financial marketing,
finance etc. Future work may be taken up as follows.
 Application of six sigma for non manufacturing
processes in Indian automobile industry.
 Application of six sigma to Indian engineering
industry viz. non automobile companies.
 Application of six sigma in hospitality industry,
Application of six sigma in small scale industry.
7. CONCLUSION
In order for DMADV to be successful, the company will
need to understand the customer's needs and decide which
needs are being met and which needs should be improved
upon. Complete evaluations of the existing processes need
to be made in order to determine how you can satisfy your
customers while saving money.Six sigma is methodology
and a powerful quality improvement and design
improvement tool. Organizations that have adopted Six
Sigma indicate they have chosen it for several reasons.
Organizations indicated that they generally adopted the Six
Sigma technology in order to lower costs, increase time to
market, and improve both process and product and service
quality. In addition, they intended to institutionalize Six
Sigma as a company culture or state of mind. Organizations
implementing Six Sigma reveal product and service quality
improvement, cost reduction, and significant savings due to
Six Sigma projects focus on bottom line results. The success
of Six Sigma projects is also due to its results orientation,
data driven and ability to align the goals with objectives
across the organizations. It is used by Indian automobile
industry for supplier quality improvement. It helps in defect
reduction, process improvement, inventory reduction,
productivity improvement, reduction in customer
complaints, reduction in field returns, reduction in field
failures, reduction in warranty costs, and etc leading
reduction in Cost of Poor Quality. Lean is supportive to Six
sigma methodology & during the process walk through
value stream mapping is done to reduce waste (MUDA)
from the system.
ACKNOWLEDGMENTS
First of all, I would like to show my thanks and gratitude to
my project guide Prof. T. Z. Quazi for their time, effort and
guidance for the accomplishment of this project. To the
HOD, Prof. S. N. Teli, following my progress and correcting
my path the monitoring guidance and the advisor who was
always there. I also would like to express my thanks to the
Principal Dr. Manjush Deshmukh, for their contribution in
the paper work.
REFERENCES
[1] Garima Chaudhary, (2014), Six Sigma Concepts: a
Complete Revolution, International Journal of
Emerging Research in Management &Technology,
Volume-3, Issue-2, PP 82 – 86.
[2] peter mutua mutia, stephen morangi nyambegera,
(2014), six sigma approach for quality improvement
and its future in kenyan organizations: a research
agenda, International journal of science commerce
and humanities, Volume no 2 no 1, 125- 136.
[3] Vipin s. Patil, Sunil r. Andhale, izhak d. Paul, (2013),
A review of DFSS: methodology, implementation
and future research, International journal of
innovations in engineering and technology (ijiet),
Vol. 2, 369 to 375.
[4] Nurul fadly habidin, sha?ri mohd yusof, (2013),
Critical success factors of lean Six sigma for the
Malaysian Automotive industry, International journal
of lean six sigma, Vol. 4 no. 1, 60- 82.
[5] Nurul Fadly Habidin, Sha’ri Mohd Yusof, Che Mohd
Zulkifli Che Omar, Syed Ismail Syed Mohamad,
Sharul Effendy Janudin, Baharudin Omar, (2012),
Lean Six Sigma Initiative: Business Engineering
Practices and Performance in Malaysian Automotive
Industry, IOSR Journal of Engineering (IOSRJEN)
IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308
_______________________________________________________________________________________
Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 149
ISSN: 2250-3021 Volume 2, Issue 7(July 2012), PP
13-18
[6] Nabeel Mandahawi, Rami H. Fouad, Suleiman
Obeidat, (2012), An Application of Customized Lean
Six Sigma to Enhance Productivity at a Paper
Manufacturing Company, Volume 6, Number 1, Feb.
2012 ISSN 1995-6665 Pages 103 – 109
[7] Lou Magritzer, PE, Jichao Xu, (2012), Six Sigma and
the Cost of (Poor) Quality, Vol. 3 Iss: 2 pp. 159 – 182
[8] Subhash s. Tirumalai, (2012), Role of design for six
sigma (dfss) in designing and Building test rigs for
Commercial aircraft, Quest global services.
[9] Yang, Ching-chow, (2010),Six sigma and total
quality management, Intech.
[10] Sameer Kumar, Kenneth F. Bauer, (2010), Exploring
the Use of Lean Thinking and Six Sigma in Public
Housing Authorities, University of St. Thomas
[11] B. Tjahjono, P. Ball, V.I. Vitanov, C. Scorzafave, J.
Nogueira, J. Calleja, M. Minguet, L. Narasimha, A.
Rivas, A. Srivastava, S. Srivastava, Yadav, (2010),
Six Sigma: a literature review, Vol. 1 Iss: 3 pp. 216 –
233
[12] Mohamed Gamal Aboelmaged, (2009), Six Sigma
quality: a structured review and implications for
future research.
[13] Raymond vella, sekhar chattopadhyay john p.t. Mo,
(2009),Six sigma driven enterprise model
transformation, International journal of engineering
business management, Vol. 1, no. 1, 1 – 8.
[14] Jim franklin, (2009),A case study for DFSS, Six
sigma experts.
[15] Rafat a. Samman, ian graham, (2007),The six sigma
project management Strategy, Belfast, uk, association
of researchers In construction management, 587-596.
[16] M. Soković, D. Pavletić, E. Krulčić, (2006), Six
Sigma process improvements in automotive parts
production, Journal of Achievements in Materials and
Manufacturing Engineering, VOLUME 19, ISSUE 1,
November 2006.
[17] Role of design for six sigma in total product
development, (2006), Six sigma academy
international , llc, new York.
[18] frank t. Anbari, young hoon kwak, (2004), success
factors in managing six sigma projects, Project
management institute research conference, london,
uk, 1 to 14.
[19] Charles huber, glenn h. Mazur, (2003),QFD and
design for six sigma, 14th symposium on QFD.
[20] Gregory H. Watson, (2003), The Elements of Design
for Six Sigma, GOAL/QPC Press, 01 to 16.
BIOGRAPHIES
Devendra Gajanan Pendokhare
currently pursuing Masters Degree
Program in Manufacturing System
from Saraswati college of engineering,
Kharghar, New Mumbai, Maharashtra,
India, also working as Lecturer in
Government Polytechnic, Vikramgad in Mechanical
Engineering Department. BE in Mechanical Engineering
from Nagpur University.
T. Z. Quazi currently working as
Associate Professor and Head of
Department at Saraswati College of
Engineering, Kharghar, Navi Mumbai. He
has over 16 years of experience in
teaching field. He has published various
research papers in national and international journals
P. S. Kulkarni currently working as
Lecturer at Government Polytechnic,
Vikramgad. He has 20 years of
experience in teaching field. Completed
ME in Manufacturing Technology from
thapar university Patiyala.

More Related Content

PDF
IRJET- Quality Improvement for LED Lights using Six Sigma
PDF
Need of Lean & Six Sigma to Achieve Business Excellence in SMEs
PDF
Case study of LMD & HD trucks using Quality Function Deployment
PDF
quality engineering(ME522) part 2
PPT
Ch04 evans mcq_aise[1]
PDF
Dl4301663673
PDF
Enhancement of the performance of an industry by the application of tqm concepts
PDF
Enhancement of the performance of an industry by the
IRJET- Quality Improvement for LED Lights using Six Sigma
Need of Lean & Six Sigma to Achieve Business Excellence in SMEs
Case study of LMD & HD trucks using Quality Function Deployment
quality engineering(ME522) part 2
Ch04 evans mcq_aise[1]
Dl4301663673
Enhancement of the performance of an industry by the application of tqm concepts
Enhancement of the performance of an industry by the

What's hot (20)

PDF
IRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
PPTX
VTU MBA-TQM 12MBA42 Module 3
PPTX
Six Sigma and Construction Industry
PDF
IRJET- Application of Quality Function Deployment (QFD) in Aluminium Pot Manu...
PPTX
Lean Six Sigma in various Industries
PPTX
World class management
DOCX
A project report on TQM
PPTX
VTU Syllabus, MBA TQM, Module 8
PDF
Benefits derived by sm es through implementation of tqm
DOCX
Assignment ii
PDF
The International Journal of Engineering and Science (The IJES)
PDF
Case study gamification approach to analytics deployment
PPTX
TQM, VTU, Unit 5
PDF
Analysis of ship to use program stu a case study to investigate the effective
PDF
Six Sigma Deployement Plan: A Case Study
PPTX
6sigma
PPT
Six sigma in customer satisfaction
PDF
SSCG Insight: Agile Automotive Quality Governance and Oversight
PDF
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
PDF
Is 09 six-sigma
IRJET- Quality Audit of Public Building Project by using Six Sigma Techniques
VTU MBA-TQM 12MBA42 Module 3
Six Sigma and Construction Industry
IRJET- Application of Quality Function Deployment (QFD) in Aluminium Pot Manu...
Lean Six Sigma in various Industries
World class management
A project report on TQM
VTU Syllabus, MBA TQM, Module 8
Benefits derived by sm es through implementation of tqm
Assignment ii
The International Journal of Engineering and Science (The IJES)
Case study gamification approach to analytics deployment
TQM, VTU, Unit 5
Analysis of ship to use program stu a case study to investigate the effective
Six Sigma Deployement Plan: A Case Study
6sigma
Six sigma in customer satisfaction
SSCG Insight: Agile Automotive Quality Governance and Oversight
IRJET- A Study on Quality Management System and Customer Satisfaction in Cons...
Is 09 six-sigma
Ad

Viewers also liked (12)

PDF
Fleet Management System
PDF
Training Project Cerfiticate - Wheelchair
PDF
Navrh programu rada_rtvs_130130[1]
PDF
102 c assignment 1
PPTX
Calidad para certificación
DOCX
Minimanual
PPTX
5068 Raymond Stotzer Parkway Rezoning
PDF
PDF
Hockey Town - Chicago
PPT
Six Sigma Tools Project Templates
PPTX
Sosiaalinen media Eläkeliiton yhdistyskehittäjille_mp
Fleet Management System
Training Project Cerfiticate - Wheelchair
Navrh programu rada_rtvs_130130[1]
102 c assignment 1
Calidad para certificación
Minimanual
5068 Raymond Stotzer Parkway Rezoning
Hockey Town - Chicago
Six Sigma Tools Project Templates
Sosiaalinen media Eläkeliiton yhdistyskehittäjille_mp
Ad

Similar to Redesign and manufacturing by using dmadv method (20)

PDF
Six Sigma Methodologies to Improve Processes in Industries
PDF
Six Sigma Methodologies and its Application in Manufacturing Firms
PDF
6 sigma basic best ppt
PPTX
Six sigma
PDF
sixsigma-
PPTX
Six sigma QMS
DOCX
6 sigma assignment
PDF
Why sixsigma
PPT
Basics Six Sigma Fresher Guide
PPT
Introduction to Six sigma
PDF
A Review: Six Sigma Implementation Practice in Manufacturing Industries
PDF
Six Sigma as a Quality and Continuous Improvement Strategy
PDF
The advancement & effect of six sigma approach in a modern
PPTX
Six sigma
PPT
Adi Six sigma basics
PDF
6 sigma
PPTX
Six sigma
PDF
‘Six Sigma Technique’ A Journey Through its Implementation
PDF
IRJET- Application of Lean Six Sigma Principles
PDF
Six Sigma and Educational Quality Management
Six Sigma Methodologies to Improve Processes in Industries
Six Sigma Methodologies and its Application in Manufacturing Firms
6 sigma basic best ppt
Six sigma
sixsigma-
Six sigma QMS
6 sigma assignment
Why sixsigma
Basics Six Sigma Fresher Guide
Introduction to Six sigma
A Review: Six Sigma Implementation Practice in Manufacturing Industries
Six Sigma as a Quality and Continuous Improvement Strategy
The advancement & effect of six sigma approach in a modern
Six sigma
Adi Six sigma basics
6 sigma
Six sigma
‘Six Sigma Technique’ A Journey Through its Implementation
IRJET- Application of Lean Six Sigma Principles
Six Sigma and Educational Quality Management

More from eSAT Journals (20)

PDF
Mechanical properties of hybrid fiber reinforced concrete for pavements
PDF
Material management in construction – a case study
PDF
Managing drought short term strategies in semi arid regions a case study
PDF
Life cycle cost analysis of overlay for an urban road in bangalore
PDF
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
PDF
Laboratory investigation of expansive soil stabilized with natural inorganic ...
PDF
Influence of reinforcement on the behavior of hollow concrete block masonry p...
PDF
Influence of compaction energy on soil stabilized with chemical stabilizer
PDF
Geographical information system (gis) for water resources management
PDF
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
PDF
Factors influencing compressive strength of geopolymer concrete
PDF
Experimental investigation on circular hollow steel columns in filled with li...
PDF
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
PDF
Evaluation of punching shear in flat slabs
PDF
Evaluation of performance of intake tower dam for recent earthquake in india
PDF
Evaluation of operational efficiency of urban road network using travel time ...
PDF
Estimation of surface runoff in nallur amanikere watershed using scs cn method
PDF
Estimation of morphometric parameters and runoff using rs & gis techniques
PDF
Effect of variation of plastic hinge length on the results of non linear anal...
PDF
Effect of use of recycled materials on indirect tensile strength of asphalt c...
Mechanical properties of hybrid fiber reinforced concrete for pavements
Material management in construction – a case study
Managing drought short term strategies in semi arid regions a case study
Life cycle cost analysis of overlay for an urban road in bangalore
Laboratory studies of dense bituminous mixes ii with reclaimed asphalt materials
Laboratory investigation of expansive soil stabilized with natural inorganic ...
Influence of reinforcement on the behavior of hollow concrete block masonry p...
Influence of compaction energy on soil stabilized with chemical stabilizer
Geographical information system (gis) for water resources management
Forest type mapping of bidar forest division, karnataka using geoinformatics ...
Factors influencing compressive strength of geopolymer concrete
Experimental investigation on circular hollow steel columns in filled with li...
Experimental behavior of circular hsscfrc filled steel tubular columns under ...
Evaluation of punching shear in flat slabs
Evaluation of performance of intake tower dam for recent earthquake in india
Evaluation of operational efficiency of urban road network using travel time ...
Estimation of surface runoff in nallur amanikere watershed using scs cn method
Estimation of morphometric parameters and runoff using rs & gis techniques
Effect of variation of plastic hinge length on the results of non linear anal...
Effect of use of recycled materials on indirect tensile strength of asphalt c...

Recently uploaded (20)

PPTX
communication and presentation skills 01
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPTX
Safety Seminar civil to be ensured for safe working.
PDF
III.4.1.2_The_Space_Environment.p pdffdf
PPTX
Artificial Intelligence
PPT
introduction to datamining and warehousing
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PPTX
introduction to high performance computing
PDF
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPTX
UNIT - 3 Total quality Management .pptx
PPTX
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
communication and presentation skills 01
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
Categorization of Factors Affecting Classification Algorithms Selection
Safety Seminar civil to be ensured for safe working.
III.4.1.2_The_Space_Environment.p pdffdf
Artificial Intelligence
introduction to datamining and warehousing
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
introduction to high performance computing
Analyzing Impact of Pakistan Economic Corridor on Import and Export in Pakist...
Visual Aids for Exploratory Data Analysis.pdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
UNIT - 3 Total quality Management .pptx
MET 305 2019 SCHEME MODULE 2 COMPLETE.pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Fundamentals of safety and accident prevention -final (1).pptx
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
UNIT no 1 INTRODUCTION TO DBMS NOTES.pdf
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems

Redesign and manufacturing by using dmadv method

  • 1. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 144 REDESIGN AND MANUFACTURING BY USING DMADV METHOD Devendra G. Pendokhare1 , Taqui Quazi2 , Prasad S. Kulkarni3 1 PG Student, Mechanical Engineering Department, SCOE, Kharghar, Mumbai University, Maharashtra, India 2 HOD, Automobile Engineering Department, Saraswati college of engineering, kharghar, New Mumbai, Maharashtra, India 3 Lecturer, Mechanical Engineering Department, Government Polytechnic, Vikramgad, MSBTE, Maharashtra, India Abstract The cost of poor Quality would help in analyzing the operating costs for effective and profitable business management. . In the era of cut throat competition, especially in automobile sector, success of an organisation resides in its ability to respond quickly to the needs of its customers. These customer needs must be attended with minimum manufacturing costs, minimum lead time to launch the product in market and delivering better performance than the existing competitors in the market.success achieved by market leaders is credited to their improvement initiatives. The customer needs must be attended with minimum manufacturing costs, and delivering better performance than the existing competitors in the market. Therefore, Indian companies in order to compete with global companies, it is very much essential to be at par, in all spheres of business aspects. Cost and Quality are two very important aspects to be globally competitive, to capture market share, to retain customers to be in business and to achieve business excellence. In the present times Six Sigma Methodology and QC Story are very famous and powerful tools and are widely used in the global industries. The increase in demand of the growing customer looking for a better quality of product has compelled corporations to adopt Six Sigma in order to improve the quality for enhanced competitive advantage. Therefore, it is very much essential to understand relation between six sigma and cost of quality and its application in automobile industry. Keywords: Six Sigma, DMADV, DMAIC, Quality improvement --------------------------------------------------------------------***------------------------------------------------------------------ 1. INTRODUCTION Six sigma defines as a statistical concept that measures process in terms of defects. He goes further to argue that when used in business, it indicates defects in the outputs of a process and helps one to understand how far the processes deviate from perfection. it as a business strategy that seeks to identify and eliminate causes of errors or defects or failures in business processes by focusing on outputs that are critical to customers. On the other hand defines it as a data driven structured problem solving methodology for solving chronic issues facing a business, and a breakthrough business management process that is used to improve a company’s performance by variation reduction. Indian Automobile Industry has already started using Six Sigma Methodology for vehicle design and process improvement to survive in the global competition. It is very important to study and investigate how Six Sigma Methodology is employed in Indian Automobile Industry for designing the product or for Process Improvement and importance of Six Sigma Methodology to reduce Cost of Quality. This motivates to take up research on this topic. In the era of cut throat competition, success achieved by market leaders is credited to their improvement initiatives. A common element within many of these successful companies is the use of powerful cost of poor quality concepts in connecting improvement priorities to strategic objectives, assessing the financial impact of poor quality, understanding the root causes of poor quality, selecting high payback improvement projects and managing the Improvement initiative to simultaneously deliver improved financial performance and greater customer satisfaction. The customer needs must be attended with minimum manufacturing costs, minimum lead time to launch the product in market and delivering better performance than the existing competitors in the market. Therefore Indian companies in order to compete with global companies, it is very much essential to be at par, in all spheres of business aspects. Cost and Quality are two very important aspects to be globally competitive, to capture market share, to retain customers to be in business and to achieve business excellence. Six Sigma is the powerful methodology to drive improvement initiatives and reduce cost of quality. Organizations choose to implement Six Sigma for numerous reasons. Reasons for implementing Six Sigma can vary from one organization to another, however, the list below present the most common reasons for organizations to implement Six Sigma to resolve issues facing the organization: • Cost reduction • Cycle time reduction • Error and waste reduction • Increase competitive advantage • Improve customer satisfaction • Increase shareholder value • Change company culture 2. OBJECTIVES  To study Six Sigma methodology extensively for both improvement of existing process and design for Six Sigma.  To Study how Six Sigma methodology helps in reduction of cost of poor quality.
  • 2. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 145  To understand how Six Sigma methodology supports Knowledge Management.  To understand the synergic effect of the combination of two powerful methods Lean and Six Sigma and its positive impact in increasing speed and effectiveness of any process within the organization.  To study various applications and benefits of implementing Six Sigma. 3. METHODOLOGY Six Sigma is a management strategy that maximizes customer satisfaction and minimizes the defects that create customer dissatisfaction. Six sigma methodologies can be used for improvement of process (called DMAIC) and also is a powerful tool for new product design or improvement in the existing product design (called DMADV). The five step DMAIC approach of Six Sigma reduces the defects in process, product or service. Flow charts, Pareto analysis, Cause & Effect diagrams are the most frequently used basic analysis and measurement tools by Six Sigma implementation teams. Investigation as regards application of Six Sigma methodology for process improvement in Indian automobile industry is done and complete framework is prepared and illustrated. Fig-1: Six Sigma Methodology  The Six Sigma DMAIC (Define, Measure, Analyze, Improve, and Control) is an improvement system for existing processes for incremental improvement.  The Six Sigma DMADV (Define, Measure, Analyze, Design, and Verify) is an improvement system used to develop new processes or products. 4. DMADV Fig-2: Road map for DMADV  Define the project goals and customer (internal and external) deliverables  Measure and determine customer needs and specifications  Analyze the process options to meet the customer needs  Design (detailed) the process to meet the customer needs  Verify the design performance and ability to meet customer needs 4.1 Define Problem or Opportunity Problem is identified from voice of customer or from voice of process. Voice of customer could be customer complaint for performance / defect, field failure, critical customer issues, etc. Voice of business could be internal defects, re- work, internal rejections, internal quality issues, other business issues etc. Define the goals of the new process. Identify exactly what is being designed or changed. Why is the change being made? Using the Quality Function Deployment (QFD) or Analytic Hierarchical Process tools to insure that the goals are compatible with consumer demand and the company’s overall strategy. Organizations may use right from 7 QC tools, Quality Circles, Kizens, Small Group Activities to the modest tools like Six Sigma Methodology or QC Story Approach for problem solving depending upon the nature and complexity of the problem. Where problem is chronic in nature and problem is known, however, reasons are not known, everything seems to be right, however, defects are getting generated, and such complex problems are solved using Six Sigma Methodology.
  • 3. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 146 Table-1: six sigma methodology for product design (DMADV) Define Opportunity Measure Performance Analyze Opportunity Design New Product Verify Product Design  Road map define phase  Sources of capturing voice of customer  Rules of visiting customers  KJ / Affinity diagram  Road map measure phase  Quality function deployment (QFD)  Advantages of QFD  Road map for analyze phase  Methods for critical to Quality (CTQ)  Methods for concept selection  TRIZ- theory of inventive problem solving  Pugh matrix for concept selection  Road map for design phase  Failure mode and effect analysis  Robust design  Taguchi quality loss function  Signal to noise ration.  Tolerance analysis  Road map for verify phase  Reliability  Design evaluation  Design verification tools  Design review inputs  Transfer to production  Pilot production plan  Design Validation Summary of Define Phase is as follows  Identify the projects which are linked to big Y.  Select the team which is ready to contribute.  Prepare team charter and get it approved.  Train team members.  Map the process  Carry out value analysis.  Walkthrough process.  Analyze the past data from various view points.  Identify quick wins and implement.  Record results of quick wins. 4.2 Measurement Phase In this phase data is gathered and analyzed that describes with precision and accuracy. What is happening? What is current or baseline, level of performance of the process that creates the problem? It also produces some preliminary ideas of possible causes for problem. Identify the measurement standards that are important to stakeholders. Convert customer needs into project objectives. The goals of the measure phase are as follow  Identify customers and their needs  Derive specific requirements to the system  Determine the corresponding output measures and their target values and tolerances. The significant improvement could be accomplished by:  Reduction of cycle time,  Reduction of control time,  Reduction of tool costs, and  Minimizing or eliminating scrap. 4.3 Analyze Phase The analysis phase deals with identifying the critical factors embedded in the current operation that could be improved to minimize waste. Prior to starting this phase, the project champion reviewed the collected data to filter out any type of noise and disturbance. Data mining is then used to identify main types of wastes for each machine to perform the corrective actions. Develop design alternatives, identify the best combination of requirements to provide value within constraints, develop conceptual designs, evaluate, select the best components and develop the best available design. Analyse the alternatives available for meeting project aims. Identify the behaviour of comparable best-in- class designs.At this stage it is important not to miss out any possible cause. If an important X is missed out, it will never be analyzed for validation. The tools used for listing Xs are:  Brainstorming  Process map  Cause effect diagram  Why-Why analysis Prioritize Xs - After the Xs have been listed using process map or cause effect diagram, these need to be prioritized. The tools used to prioritize Xs are as follow  Cause- Effect Matrix  Pareto analysis  Pugh Matrix Validate Xs - There are three steps to validate Xs. They are as follow.  Scatter Plot  Tolerance stack up analysis  Design failure made & effects analysis 4.4 Design New Product This stage of DMADV includes both a detailed and high level design for the selected alternative. The elements of the design are prioritized and from there a high level design is developed. Once this step is complete, a more detailed model will be prototyped in order to identify where errors may occur and to make necessary modifications. Develop a high level design, Develop exact specifications, Develop detailed component designs, Develop related processes, Optimize design. Design the new product, service, or process. Utilize prognostic modelling, simulation, prototypes, pilot trials, and other techniques in order to confirm the design’s ability to meet the established aims of the project.
  • 4. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 147 Fig-3: Key Steps Involved in Design Phase 4.4.1 Signal to Noise Ratio The signals to noise ratio combines, in a single measure, information on both the average level and the spread of a variable. The goal is to always maximize S/N ratio. The types of signal to noise ratios are Lower is better ratio- applies to variables where lower value is preferable. Higher is better ratio- applies to variables where a higher value is preferable. Nominal is best ratio- applies to variables where deviations from a target value are undesirable 4.4.2 Tolerance Analysis Tolerance analysis (TA) is the process of taking known tolerances and analyzing the combination of these tolerances at an assembly level. Fig-4: Tolerance Analysis 4.5 Verify Product Design In the final phase, the team validates that the design is acceptable to all stakeholders. Will the design be effective in the real world? Several pilot and production runs will be necessary to ensure that the quality is the highest possible. Here, expectations will be confirmed, deployment will be expanded and all lessons learned will be documented. The Verify step also includes a plan to transition the product or service to a routine operation and to ensure that this change is sustainable. Verify the efficiency of the new product or process in a real world situation. Fig-5: Steps involved in verify phase 4.5.1 Design Verification It involves checking inputs/outputs at each stage as per Design Verification Plan. It includes-  Calculation Checks  Peer review  Proto test  Lab trials  Simulations  Benchmarking with existing designs available in the market 4.5.2 Design Reviews Cross functional review to conform if design team has not missed out on any key items such as  Customer needs  Manufacturability or assembly issues  Serviceability issues  Inspectability issues
  • 5. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 148 4.5.3 Transfer to Production The implementation and the handover to the process owner occur after the successful piloting. 4.5.4 Pilot Production Plan Steps involved in pilot production are as follow  Prepare pilot production plan  Carry out the pilot production.  Analyze the results  Carry out optimization. Most important tools used are as follow  PDCA cycle  Project Management tools (Gantt chart, Network plan)  Change management tools (Communication plan, stake holder analysis)  Documentation  SOP s  KPI systems  Control Charts  Process flow diagrams. 4.5.5 Design Validation The objectives of design validation are  To validate the design actually works in the real operating environment  May be part of initial design verification plan document or may be developed separately  If multiple applications are foreseen for new product, plan to cover all possible applications/environments in which the product is likely to be used. 6. FUTURE SCOPE OF WORK Investigation as regards application of six sigma methodology to Indian automobile industry for reducing cost of quality is done for manufacturing processes. However as stated above, Six Sigma Methodology is industry independent and it is applicable to all business process. Viz. Purchasing, marketing, financial marketing, finance etc. Future work may be taken up as follows.  Application of six sigma for non manufacturing processes in Indian automobile industry.  Application of six sigma to Indian engineering industry viz. non automobile companies.  Application of six sigma in hospitality industry, Application of six sigma in small scale industry. 7. CONCLUSION In order for DMADV to be successful, the company will need to understand the customer's needs and decide which needs are being met and which needs should be improved upon. Complete evaluations of the existing processes need to be made in order to determine how you can satisfy your customers while saving money.Six sigma is methodology and a powerful quality improvement and design improvement tool. Organizations that have adopted Six Sigma indicate they have chosen it for several reasons. Organizations indicated that they generally adopted the Six Sigma technology in order to lower costs, increase time to market, and improve both process and product and service quality. In addition, they intended to institutionalize Six Sigma as a company culture or state of mind. Organizations implementing Six Sigma reveal product and service quality improvement, cost reduction, and significant savings due to Six Sigma projects focus on bottom line results. The success of Six Sigma projects is also due to its results orientation, data driven and ability to align the goals with objectives across the organizations. It is used by Indian automobile industry for supplier quality improvement. It helps in defect reduction, process improvement, inventory reduction, productivity improvement, reduction in customer complaints, reduction in field returns, reduction in field failures, reduction in warranty costs, and etc leading reduction in Cost of Poor Quality. Lean is supportive to Six sigma methodology & during the process walk through value stream mapping is done to reduce waste (MUDA) from the system. ACKNOWLEDGMENTS First of all, I would like to show my thanks and gratitude to my project guide Prof. T. Z. Quazi for their time, effort and guidance for the accomplishment of this project. To the HOD, Prof. S. N. Teli, following my progress and correcting my path the monitoring guidance and the advisor who was always there. I also would like to express my thanks to the Principal Dr. Manjush Deshmukh, for their contribution in the paper work. REFERENCES [1] Garima Chaudhary, (2014), Six Sigma Concepts: a Complete Revolution, International Journal of Emerging Research in Management &Technology, Volume-3, Issue-2, PP 82 – 86. [2] peter mutua mutia, stephen morangi nyambegera, (2014), six sigma approach for quality improvement and its future in kenyan organizations: a research agenda, International journal of science commerce and humanities, Volume no 2 no 1, 125- 136. [3] Vipin s. Patil, Sunil r. Andhale, izhak d. Paul, (2013), A review of DFSS: methodology, implementation and future research, International journal of innovations in engineering and technology (ijiet), Vol. 2, 369 to 375. [4] Nurul fadly habidin, sha?ri mohd yusof, (2013), Critical success factors of lean Six sigma for the Malaysian Automotive industry, International journal of lean six sigma, Vol. 4 no. 1, 60- 82. [5] Nurul Fadly Habidin, Sha’ri Mohd Yusof, Che Mohd Zulkifli Che Omar, Syed Ismail Syed Mohamad, Sharul Effendy Janudin, Baharudin Omar, (2012), Lean Six Sigma Initiative: Business Engineering Practices and Performance in Malaysian Automotive Industry, IOSR Journal of Engineering (IOSRJEN)
  • 6. IJRET: International Journal of Research in Engineering and Technology eISSN: 2319-1163 | pISSN: 2321-7308 _______________________________________________________________________________________ Volume: 04 Issue: 02 | Feb-2015, Available @ http://www.ijret.org 149 ISSN: 2250-3021 Volume 2, Issue 7(July 2012), PP 13-18 [6] Nabeel Mandahawi, Rami H. Fouad, Suleiman Obeidat, (2012), An Application of Customized Lean Six Sigma to Enhance Productivity at a Paper Manufacturing Company, Volume 6, Number 1, Feb. 2012 ISSN 1995-6665 Pages 103 – 109 [7] Lou Magritzer, PE, Jichao Xu, (2012), Six Sigma and the Cost of (Poor) Quality, Vol. 3 Iss: 2 pp. 159 – 182 [8] Subhash s. Tirumalai, (2012), Role of design for six sigma (dfss) in designing and Building test rigs for Commercial aircraft, Quest global services. [9] Yang, Ching-chow, (2010),Six sigma and total quality management, Intech. [10] Sameer Kumar, Kenneth F. Bauer, (2010), Exploring the Use of Lean Thinking and Six Sigma in Public Housing Authorities, University of St. Thomas [11] B. Tjahjono, P. Ball, V.I. Vitanov, C. Scorzafave, J. Nogueira, J. Calleja, M. Minguet, L. Narasimha, A. Rivas, A. Srivastava, S. Srivastava, Yadav, (2010), Six Sigma: a literature review, Vol. 1 Iss: 3 pp. 216 – 233 [12] Mohamed Gamal Aboelmaged, (2009), Six Sigma quality: a structured review and implications for future research. [13] Raymond vella, sekhar chattopadhyay john p.t. Mo, (2009),Six sigma driven enterprise model transformation, International journal of engineering business management, Vol. 1, no. 1, 1 – 8. [14] Jim franklin, (2009),A case study for DFSS, Six sigma experts. [15] Rafat a. Samman, ian graham, (2007),The six sigma project management Strategy, Belfast, uk, association of researchers In construction management, 587-596. [16] M. Soković, D. Pavletić, E. Krulčić, (2006), Six Sigma process improvements in automotive parts production, Journal of Achievements in Materials and Manufacturing Engineering, VOLUME 19, ISSUE 1, November 2006. [17] Role of design for six sigma in total product development, (2006), Six sigma academy international , llc, new York. [18] frank t. Anbari, young hoon kwak, (2004), success factors in managing six sigma projects, Project management institute research conference, london, uk, 1 to 14. [19] Charles huber, glenn h. Mazur, (2003),QFD and design for six sigma, 14th symposium on QFD. [20] Gregory H. Watson, (2003), The Elements of Design for Six Sigma, GOAL/QPC Press, 01 to 16. BIOGRAPHIES Devendra Gajanan Pendokhare currently pursuing Masters Degree Program in Manufacturing System from Saraswati college of engineering, Kharghar, New Mumbai, Maharashtra, India, also working as Lecturer in Government Polytechnic, Vikramgad in Mechanical Engineering Department. BE in Mechanical Engineering from Nagpur University. T. Z. Quazi currently working as Associate Professor and Head of Department at Saraswati College of Engineering, Kharghar, Navi Mumbai. He has over 16 years of experience in teaching field. He has published various research papers in national and international journals P. S. Kulkarni currently working as Lecturer at Government Polytechnic, Vikramgad. He has 20 years of experience in teaching field. Completed ME in Manufacturing Technology from thapar university Patiyala.