“ Reshoring” BSCI 2300 Final Project Spring 2009 Mrs. Linda Ruth
Air Barrier paper Air barrier paper is a continuous polyolefin membrane under the siding that controls air and water penetration. It is permeable to water vapor, but not to liquid water or air.
Attic Ventilation Promotes air movement  that evaporates any moisture that condenses in the roof space and prevents heat during the summer.
Soffit Vent
Ridge Vent
Gable Vent
Roof Turbine
Backhoe A piece of excavating equipment that consists of a digging bucket on the end of an extending arm. The bucket can vary in size depending on the job needed. This bucket measures 4’ across and is being used to dig a ditch.
Batter Boards Made of wood (typically) these boards are nailed together in correlation with plumb bobs to show a building’s outline. Establish the building’s outline, staying 4’ away from estimated dimension to allow for excavation.
Roman Arch
Jack Arch
Roman Arch with a keystone
Centering Temporary formwork for a brick arch.
Brick Bonds Running Bond – the courses are offset stretchers Flemish Bond - the courses alternate between headers and stretchers
Rowlocks Headers
Soldiers Stretcher rowlocks “Shiners”
Brick Sizes  Modular 3 ½” x 7 ½” x 2 ¼‘” Utility 3 ½ x 11 ½ x 3 ½
Bulldozer a powerful tractor fitted with caterpillar tracks and a blade at the front, used for moving dirt or debris. Not used to lift dirt.
Cladding Brick Stone
EIFS (stucco)
Wood Shingle Wood shingle -  small unit of wood nailed in overlapping fashion to render a wall  water tight. Wood shake – Shingle split from a block of wood
Code requirements 24 inches from finished floor Passes code
Code requirements Stairs Sorry for the crappy picture, used my phone Riser: 7 ¾” Tread: 11” Nosing: ¾” Survey says:    This staircase checks out
Concrete joints LOL FAIL Control joints  – an intentional discontinuity used to control cracks caused by shrinkage of concrete during curation.  Isolation Joint Completely isolate the slab from another piece  or object, normally a column
Concrete Masonry Unit (CMU) Three courses = One course 4” CMU 12” CMU A  block  of hardened concrete designed to be laid in the same way as brick. CMU’s are normally hollow to allow further reinforcing through holes in the middle. They come in varying sizes from 4” Iin depth, to 12” in depth.
Decorative CMU Blocks Split Block Ribbed Block
Doors Flush Door
Doors 6 Panel Door Sidelight  Transom
Electrical Components Transformer – steps down electricity to 110/220V AC from the generator to the house.
Electrical Elements Service Head – Sends the two hot wires and one neutral wire through the meter to the service panel.
Electrical Components Meter – measures power usage of the building
Electrical Components Service Panel – contains a main disconnect and circuit breakers
Electrical Components Duplex Receptacle – allows appliances to be plugged into the power source.
Framing Elements 1. Anchor Bolt 2. Sill Plate  -  Sits on top of foundation
3. Floor joists
4. Subflooring
5. Sole plate
6. Stud
7. Top plate
8. Stringer
9. Ceiling joists
10. Rafters
11. Sheathing
12. Roof decking
Front End Loader An earthmoving machine with a hydraulic scoop in front for lifting and loading earth or rubble with the ability to travel across site.
Gypsum Board An interior facing panel consisting of a gypsum core sandwiched between paper faces. Gypsum is very resistant to fire.
Heat Pump Compressor – pulls air in from outdoors and pumps into the air handling unit Air Handling Unit – Sends air through vents to heat/cool house An advantage is it’s ability to rapidly heat or cool house. A disadvantage is that it is noisy.
I nsulation  a material of low thermal conductivity placed to slow heat loss or gain from outside. Also helps with sound control. Fiberglass Batts Cellulose Loose-fill
Rigid board
Foamed insulation
Lintel A piece of metal or concrete that transfers the load above windows or doors to the surrounding walls.
Mortar Concave Type S mortar for parking deck, 3/8” tooled joint
Mortar Flush Type N mortar for a retaining wall, 3/8” tooled joint
OSB Home Depot was on the lookout, so I had to be sneaky. OSB is a non veneered wood product that is manufactured by orienting strands in perpendicular layers followed by random end layers, glued together, and put under immense pressure which give OSB it’s strength.
Plumbing Lavatory – uses ½” piping Water closet – uses 3” piping
Plumbing Rough-in shower Vent – vents noxious sewer gases safely into the air
Plumbing Drop-in sink
Plywood Plywood is manufactured by literally unrolling a tree by it’s layers. The tree is then sliced into different size pieces, cured, and sold.
Radiant Barrier NO PICTURE! WHERE THE ****? I KNOW I PUT IT IN HERE! No, wait a minute, I couldn’t find this one…
Rebar This is ½” rebar and would therefore be referred to as #4 rebar. The purpose for the deformations in the surface of the rebar is so that it adheres to the concrete surrounding it.
Steep Roof Drainage Gutter - A trough fixed under or along the eaves for draining rainwater from a roof.  Down spout -  a vertical pipe used to drain rainwater from a roof
Steep Roof Drainage Splash block -  A pad placed under the lower end of a downspout to divert the water from the downspout away from the building and to avoid erosion directly below downspout.
Steep Roof Materials Shingle underlayment – creates a waterproof barrier  between sheathing and shingles that protects against  backed up or wind driven rain under shingles and into the house.
Steep Roof Materials Clay shingles
Steep Roof Materials Shingle -  A thin oblong  piece of material, such as wood or slate, that is laid in  overlapping rows  to cover the roof or sides of a house or other building. It protects  against water  penetration. Copper shingles were used in the construction of this steeple.
Steep Roof Materials Metal decking for roofs normally consist of Aluminum and Tin.
Steep Roof Shapes Gable Hip
Steep Roof Shapes Gambrel Mansard
Steep Roof Terms Ridge -  the point where the rafters meet.   Valley - The place of meeting of two slopes of a roof, which have their plates running in different directions.
Steep Roof Terms Eave – projecting overhang Rake -  The inclined edge of a sloped roof over a wall.
Steep Roof Terms Fascia -  A  flat, horizontal board enclosing the overhang under the eave
Soffit Cover the eave of a roofing system.
Steep Roof Terms Roof without Fascia
Stone Random Rubble Coursed Ashlars
Stone Random Ashlars
Vapor Retarder A layer of moisture resistant material usually which controls moisture diffusion to prevent moisture build up in the walls. Normally put on the cold in winter side of the wall.
WaterProofing NO! Not again!!!!!!! Why? Why? WHY??? WHY???? WHY????? I hate this part.  -1 point
Weep Hole
Welded Wire Fabric (WWF) Welded Wire Fabric  reinforce the concrete  to prevent  cracking. This particular piece is roughly  16’ by 8’.
Windows This is an inward swinging hopper window because it has its hinges on the bottom and swings in but doesn’t allow water in. This is a double hung window, because both panes (top and bottom) are free to slide up and down.
Windows This is an out swinging awning window  because the hinges are on top of the window to allow it to swing outward over an awning.
Thanks, hopefully this will get enough bonus points to avoid an embarrassing B…

More Related Content

PPT
Visual Dictionary- Zoning
PPTX
Visual dictionary 4
PPT
Joist Visual Dictionary 3
PPTX
fiber board
PPTX
Visual Dictionary Final
PPTX
Visual dictionary - Sp10knothole
PPTX
Visual dictionary
PPTX
Visual dictionary GRADE THIS
Visual Dictionary- Zoning
Visual dictionary 4
Joist Visual Dictionary 3
fiber board
Visual Dictionary Final
Visual dictionary - Sp10knothole
Visual dictionary
Visual dictionary GRADE THIS

What's hot (19)

PPT
Visual dictionary
PPT
Visual dictionary Sp10stain
PPTX
Visual dictionary
PPTX
Visual dictionary
PPTX
Visual dictionary 2
PPT
Visual Dictionary Presentation (New)
PPT
Visual Dictionary - LVL
 
PPT
Visual Dictionary (Updated) 4/23
PPT
Visual Dictionary
PPTX
Visual Dictionary Day 3
PPTX
Visual Dictionary- Travertine
PPTX
Visual dictionary day 2
PPT
Visual Dictionary - Loadbearing
PPT
Bsci2300 Visual Dictionary New
PPTX
Visual Dictionary - Porosity
PPT
Bolster
PPT
Visual Dictionary- Gauge
PPT
Visual Dictionary - Anchorbolts
PPT
Visual Dictionary - Chamfer
Visual dictionary
Visual dictionary Sp10stain
Visual dictionary
Visual dictionary
Visual dictionary 2
Visual Dictionary Presentation (New)
Visual Dictionary - LVL
 
Visual Dictionary (Updated) 4/23
Visual Dictionary
Visual Dictionary Day 3
Visual Dictionary- Travertine
Visual dictionary day 2
Visual Dictionary - Loadbearing
Bsci2300 Visual Dictionary New
Visual Dictionary - Porosity
Bolster
Visual Dictionary- Gauge
Visual Dictionary - Anchorbolts
Visual Dictionary - Chamfer
Ad

Similar to Reshoring - use this one if it's up (20)

PPT
Final bsci ppt
PPT
Sp10Lumber
PPT
Materials And Methods I Visual Dictionary
PPT
Codename Astm1
PPT
Visual Dictionary-Blocking
PPT
sp10underlayment
PPT
Visual Dictionary-Anchorbolts
PPT
Visual Dictionary Shores
PPT
Visual Dictionary Shores
PPT
Visual Dictionary- Admixture
PPT
mon 4/27 last half visual dictionary
PPT
Bolster last half of visual dictionary
PPTX
Visual Dictionary - Plywood
PPT
Visual Dictionary - Backsplash
PPT
Visual Dictionary Monday update
PPT
Visual Dictionary- Lighttransmitting
PPTX
Visual Dictionary (2)
PPT
Visual Dictionary - Damper
PPT
Visual Dictionary Terrazzo
PPT
Visual Dictionary-workability
Final bsci ppt
Sp10Lumber
Materials And Methods I Visual Dictionary
Codename Astm1
Visual Dictionary-Blocking
sp10underlayment
Visual Dictionary-Anchorbolts
Visual Dictionary Shores
Visual Dictionary Shores
Visual Dictionary- Admixture
mon 4/27 last half visual dictionary
Bolster last half of visual dictionary
Visual Dictionary - Plywood
Visual Dictionary - Backsplash
Visual Dictionary Monday update
Visual Dictionary- Lighttransmitting
Visual Dictionary (2)
Visual Dictionary - Damper
Visual Dictionary Terrazzo
Visual Dictionary-workability
Ad

Recently uploaded (20)

PDF
Business model innovation report 2022.pdf
PPTX
Amazon (Business Studies) management studies
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
How to Get Business Funding for Small Business Fast
PDF
Reconciliation AND MEMORANDUM RECONCILATION
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
IFRS Notes in your pocket for study all the time
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
DOCX
Business Management - unit 1 and 2
PPTX
Lecture (1)-Introduction.pptx business communication
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPT
Data mining for business intelligence ch04 sharda
Business model innovation report 2022.pdf
Amazon (Business Studies) management studies
Chapter 5_Foreign Exchange Market in .pdf
How to Get Business Funding for Small Business Fast
Reconciliation AND MEMORANDUM RECONCILATION
unit 1 COST ACCOUNTING AND COST SHEET
Roadmap Map-digital Banking feature MB,IB,AB
Ôn tập tiếng anh trong kinh doanh nâng cao
COST SHEET- Tender and Quotation unit 2.pdf
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
IFRS Notes in your pocket for study all the time
WRN_Investor_Presentation_August 2025.pdf
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Business Management - unit 1 and 2
Lecture (1)-Introduction.pptx business communication
ICG2025_ICG 6th steering committee 30-8-24.pptx
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
HR Introduction Slide (1).pptx on hr intro
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Data mining for business intelligence ch04 sharda

Reshoring - use this one if it's up

  • 1. “ Reshoring” BSCI 2300 Final Project Spring 2009 Mrs. Linda Ruth
  • 2. Air Barrier paper Air barrier paper is a continuous polyolefin membrane under the siding that controls air and water penetration. It is permeable to water vapor, but not to liquid water or air.
  • 3. Attic Ventilation Promotes air movement that evaporates any moisture that condenses in the roof space and prevents heat during the summer.
  • 8. Backhoe A piece of excavating equipment that consists of a digging bucket on the end of an extending arm. The bucket can vary in size depending on the job needed. This bucket measures 4’ across and is being used to dig a ditch.
  • 9. Batter Boards Made of wood (typically) these boards are nailed together in correlation with plumb bobs to show a building’s outline. Establish the building’s outline, staying 4’ away from estimated dimension to allow for excavation.
  • 12. Roman Arch with a keystone
  • 13. Centering Temporary formwork for a brick arch.
  • 14. Brick Bonds Running Bond – the courses are offset stretchers Flemish Bond - the courses alternate between headers and stretchers
  • 17. Brick Sizes Modular 3 ½” x 7 ½” x 2 ¼‘” Utility 3 ½ x 11 ½ x 3 ½
  • 18. Bulldozer a powerful tractor fitted with caterpillar tracks and a blade at the front, used for moving dirt or debris. Not used to lift dirt.
  • 21. Wood Shingle Wood shingle - small unit of wood nailed in overlapping fashion to render a wall water tight. Wood shake – Shingle split from a block of wood
  • 22. Code requirements 24 inches from finished floor Passes code
  • 23. Code requirements Stairs Sorry for the crappy picture, used my phone Riser: 7 ¾” Tread: 11” Nosing: ¾” Survey says:  This staircase checks out
  • 24. Concrete joints LOL FAIL Control joints – an intentional discontinuity used to control cracks caused by shrinkage of concrete during curation. Isolation Joint Completely isolate the slab from another piece or object, normally a column
  • 25. Concrete Masonry Unit (CMU) Three courses = One course 4” CMU 12” CMU A block of hardened concrete designed to be laid in the same way as brick. CMU’s are normally hollow to allow further reinforcing through holes in the middle. They come in varying sizes from 4” Iin depth, to 12” in depth.
  • 26. Decorative CMU Blocks Split Block Ribbed Block
  • 28. Doors 6 Panel Door Sidelight Transom
  • 29. Electrical Components Transformer – steps down electricity to 110/220V AC from the generator to the house.
  • 30. Electrical Elements Service Head – Sends the two hot wires and one neutral wire through the meter to the service panel.
  • 31. Electrical Components Meter – measures power usage of the building
  • 32. Electrical Components Service Panel – contains a main disconnect and circuit breakers
  • 33. Electrical Components Duplex Receptacle – allows appliances to be plugged into the power source.
  • 34. Framing Elements 1. Anchor Bolt 2. Sill Plate - Sits on top of foundation
  • 45. Front End Loader An earthmoving machine with a hydraulic scoop in front for lifting and loading earth or rubble with the ability to travel across site.
  • 46. Gypsum Board An interior facing panel consisting of a gypsum core sandwiched between paper faces. Gypsum is very resistant to fire.
  • 47. Heat Pump Compressor – pulls air in from outdoors and pumps into the air handling unit Air Handling Unit – Sends air through vents to heat/cool house An advantage is it’s ability to rapidly heat or cool house. A disadvantage is that it is noisy.
  • 48. I nsulation a material of low thermal conductivity placed to slow heat loss or gain from outside. Also helps with sound control. Fiberglass Batts Cellulose Loose-fill
  • 51. Lintel A piece of metal or concrete that transfers the load above windows or doors to the surrounding walls.
  • 52. Mortar Concave Type S mortar for parking deck, 3/8” tooled joint
  • 53. Mortar Flush Type N mortar for a retaining wall, 3/8” tooled joint
  • 54. OSB Home Depot was on the lookout, so I had to be sneaky. OSB is a non veneered wood product that is manufactured by orienting strands in perpendicular layers followed by random end layers, glued together, and put under immense pressure which give OSB it’s strength.
  • 55. Plumbing Lavatory – uses ½” piping Water closet – uses 3” piping
  • 56. Plumbing Rough-in shower Vent – vents noxious sewer gases safely into the air
  • 58. Plywood Plywood is manufactured by literally unrolling a tree by it’s layers. The tree is then sliced into different size pieces, cured, and sold.
  • 59. Radiant Barrier NO PICTURE! WHERE THE ****? I KNOW I PUT IT IN HERE! No, wait a minute, I couldn’t find this one…
  • 60. Rebar This is ½” rebar and would therefore be referred to as #4 rebar. The purpose for the deformations in the surface of the rebar is so that it adheres to the concrete surrounding it.
  • 61. Steep Roof Drainage Gutter - A trough fixed under or along the eaves for draining rainwater from a roof. Down spout - a vertical pipe used to drain rainwater from a roof
  • 62. Steep Roof Drainage Splash block - A pad placed under the lower end of a downspout to divert the water from the downspout away from the building and to avoid erosion directly below downspout.
  • 63. Steep Roof Materials Shingle underlayment – creates a waterproof barrier between sheathing and shingles that protects against backed up or wind driven rain under shingles and into the house.
  • 64. Steep Roof Materials Clay shingles
  • 65. Steep Roof Materials Shingle - A thin oblong piece of material, such as wood or slate, that is laid in overlapping rows to cover the roof or sides of a house or other building. It protects against water penetration. Copper shingles were used in the construction of this steeple.
  • 66. Steep Roof Materials Metal decking for roofs normally consist of Aluminum and Tin.
  • 67. Steep Roof Shapes Gable Hip
  • 68. Steep Roof Shapes Gambrel Mansard
  • 69. Steep Roof Terms Ridge - the point where the rafters meet. Valley - The place of meeting of two slopes of a roof, which have their plates running in different directions.
  • 70. Steep Roof Terms Eave – projecting overhang Rake - The inclined edge of a sloped roof over a wall.
  • 71. Steep Roof Terms Fascia - A flat, horizontal board enclosing the overhang under the eave
  • 72. Soffit Cover the eave of a roofing system.
  • 73. Steep Roof Terms Roof without Fascia
  • 74. Stone Random Rubble Coursed Ashlars
  • 76. Vapor Retarder A layer of moisture resistant material usually which controls moisture diffusion to prevent moisture build up in the walls. Normally put on the cold in winter side of the wall.
  • 77. WaterProofing NO! Not again!!!!!!! Why? Why? WHY??? WHY???? WHY????? I hate this part. -1 point
  • 79. Welded Wire Fabric (WWF) Welded Wire Fabric reinforce the concrete to prevent cracking. This particular piece is roughly 16’ by 8’.
  • 80. Windows This is an inward swinging hopper window because it has its hinges on the bottom and swings in but doesn’t allow water in. This is a double hung window, because both panes (top and bottom) are free to slide up and down.
  • 81. Windows This is an out swinging awning window because the hinges are on top of the window to allow it to swing outward over an awning.
  • 82. Thanks, hopefully this will get enough bonus points to avoid an embarrassing B…