Tutorial (Traversing
1. Calculate the angular error of closure, and balance the traverse angles. Angles shown
are unadjusted.
(Traversing)
Calculate the angular error of closure, and balance the traverse angles. Angles shown
Figure 1
Answer:
Calculate the angular error of closure, and balance the traverse angles. Angles shown
2. Calculate Adjusted bearings from field angles:
Figure 2
Answer:
3. Calculate the latitudes and departures for each course in this traverse. Bearings shown
are from balanced angles and distances are in ft.
Figure 3
i. Perform a compass rule adjustment on the latitudes and departures and list the
balanced latitude and departure for each course.
ii. Calculate adjusted bearings, distances, and coordinates for the traverse.
Answer:
s2 5 tutorial traversing - compass rule and transit rule
4. The included angles given in Table Q4 below are recorded at stations forming a closed
traverse survey around the perimeter of a field.
Determine the amount of angular error in the survey and adjust the values of the included
angles.
If the whole circle bearing of the line BC is 45° calculate the whole circle bearings of the
traverse lines.
5. A survey was carried out on a closed loop traverse with six sides. With the traverse
labeled anti-clockwise as shown in Figure below the data in Table Q5 were obtained.
The co-ordinates of point A are 1000 mE, 1000 mN and the whole circle bearing of line A – F
is 166°45’52’’.
After adjustment by Bowditch’s method what are the co-ordinates of the other five traverse
stations?
6. Measurements of the traverse ABCDE, as shown in Figure below, are given in Table Q6.
WCB of XA = 123° 16’ 06’’
WCB of EY = 282° 03’ 00’’
Station Included angle
A 122°42’20’’
B 87°16’40’’
C 133°08’20’’
D 125°55’20’’
E 92°47’40’’
F 158°06’40’’
Station Included angle Length
A 130°18’45’’ AB 14.248
B 110°18’23’’ BC 85.771
C 99°32’35’’ CD 77.318
D 116°18’2’’ DE 28.222
E 119°46’7’’ EF 53.099
F 143°46’20’’ FA 65.914
Station Clockwise angle Length (m)
A 260°31’18’’
129.352
B 123°50’42’’
81.700
C 233°00’06’’
101.112
D 158°22’48’’
94.273
E 283°00’18’’
The measured angles are as shown in the figure. Keeping the bearings XA and EY and also
the co-ordinates of A and E fixed, obtain the adjusted co-ordinates for B, C and D using an
equal shifts angular adjustment and Bowditch linear adjustment.
7. A closed traverse survey ABCDEA in which lines CD and AE cross was carried out in a
confined area. Various obstructions prevented distances BC and CD from being measured
although their whole circle bearings were able to be recorded. Determine the lengths of BC
and CD from the values given in Table below:
Assume that A has co-ordinates 500.00 N, 500.00E.
Side Length (m) Clockwise angle
AB 141.2 325° 40’ 00’’
BC ? 69° 10’ 00’’
CD ? 41° 00’ 00’’
DE 58.6 305° 55’ 00’’
EA 347.0 194° 50’ 00’’

More Related Content

PDF
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
PDF
Surveying problem solving
PDF
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
PPT
GEODETIC Least Square with fx 991-es plus
PDF
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
PPT
Basics Of Surveying
PPTX
Computation of area
Ge 105 lecture 1 (LEAST SQUARES ADJUSTMENT) by: Broddett B. Abatayo
Surveying problem solving
Ge 105 lecture 2 (TAPING CORRECTION) by: Broddett B. Abatayo
GEODETIC Least Square with fx 991-es plus
Ge 105 lecture 4 (TRIANGULATION ADJUSTMENT) by: Broddett B. Abatayo
Basics Of Surveying
Computation of area

What's hot (20)

PDF
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
PDF
Levelling report-1
PDF
Horizontal curves pdf
PDF
Traverse Survey Part 2/2
PPTX
Tacheometric survey
PPT
Balancing of traverse
PPTX
Slope deflection method
PPTX
Lecture 11 traverse computations
PPTX
Error in Levelling with its Preventive Measures
PPTX
12.1. Horizontal and vertical control (1).pptx
DOC
Area and Volume Survey Engineering (RZ)
PDF
Triangulation and trilateration pdf...
PDF
Location horizontal and vertical curves Theory
PPT
Simple circular curve
PPT
TRAVERSE in land surveying and technique
PPTX
Transition curve and Superelevation
PDF
Triangulation survey
PPTX
Tacheometry ppt
PPT
Vertical Alignment
Ge 105 lecture 3 (LEVELING ADJUSTMENT) by: Broddett B. Abatayo
Levelling report-1
Horizontal curves pdf
Traverse Survey Part 2/2
Tacheometric survey
Balancing of traverse
Slope deflection method
Lecture 11 traverse computations
Error in Levelling with its Preventive Measures
12.1. Horizontal and vertical control (1).pptx
Area and Volume Survey Engineering (RZ)
Triangulation and trilateration pdf...
Location horizontal and vertical curves Theory
Simple circular curve
TRAVERSE in land surveying and technique
Transition curve and Superelevation
Triangulation survey
Tacheometry ppt
Vertical Alignment
Ad

Viewers also liked (13)

PDF
Traversing final-report
DOC
C -users-mmusa-desktop-exams-final exam (1)
PDF
Y1 s2 ws1_levels_brief
PDF
Traverse Survey Part 1/2
PPT
Chap.6 traverse surveys
PPTX
Traverse surveiying
PPTX
Unit hydrograph by anwar
PPT
Types of level
PPTX
Plane Table Surveying PPt
PDF
Engineering surveying-ii
PPTX
PPTX
Theodolite Traversing
Traversing final-report
C -users-mmusa-desktop-exams-final exam (1)
Y1 s2 ws1_levels_brief
Traverse Survey Part 1/2
Chap.6 traverse surveys
Traverse surveiying
Unit hydrograph by anwar
Types of level
Plane Table Surveying PPt
Engineering surveying-ii
Theodolite Traversing
Ad

Similar to s2 5 tutorial traversing - compass rule and transit rule (20)

PPTX
Chapter No. 04 - Angles and Directions.pptx
PPTX
4_6041824606606592995.pptx
PDF
travesing.pdf
PDF
Site Surveying Traversing
PDF
Surveying traverse
PDF
216 surveying traverse explained
PPTX
Angles Measurement using theodolites in geomatics engineering
PDF
Traverse Computations
DOCX
Site surveying report 2
PDF
Surveying - Module II - compass surveying
DOCX
Site survey report 2
PDF
Survey handsout question for sub er and asst
DOCX
Ss report 2 report
DOCX
Project 2- traversing
DOCX
Project 2- traversing
PPT
Compass surveying uses a compass to determine directions (bearings)
DOCX
Site survey Fieldwork 2 traversing
PDF
Theory of machines by rs. khurmi_ solution manual _ chapter 7
PDF
Theory of machines solution of exercise
PPTX
Module 4 numerical problems on cams - cycloidal motion
Chapter No. 04 - Angles and Directions.pptx
4_6041824606606592995.pptx
travesing.pdf
Site Surveying Traversing
Surveying traverse
216 surveying traverse explained
Angles Measurement using theodolites in geomatics engineering
Traverse Computations
Site surveying report 2
Surveying - Module II - compass surveying
Site survey report 2
Survey handsout question for sub er and asst
Ss report 2 report
Project 2- traversing
Project 2- traversing
Compass surveying uses a compass to determine directions (bearings)
Site survey Fieldwork 2 traversing
Theory of machines by rs. khurmi_ solution manual _ chapter 7
Theory of machines solution of exercise
Module 4 numerical problems on cams - cycloidal motion

More from Est (20)

PDF
SABD PROGRAMME GUIDE 2017
PDF
Sabd undergraduate pg draft v3
PPT
BS 2 Fire protection 4
PPT
CSCM Chapter 11 relationship management cscm
PDF
CSCM Partnering
PDF
CSCM Communication in construction
PDF
CSCM Material delivery problems cscm
DOC
BS 2 Escalators arrangement
DOCX
BS 2 Escalators 1of 2
DOC
BS 2 Group assignment brief question august 2016
DOC
BS 2 Variable air volume systems
PDF
CSCM Supply chain management 312 cscm
DOCX
CSCM Bim group assignment.docx
DOCX
CSCM individual assignment
PDF
Management science group assignment MS
PPTX
MS Tutorial 12 hrm
PDF
MS Case study development for entrepreneur mark zuckerberg
PPTX
MS Lecture 7 leadership and motivation
PPTX
MS Lecture 8 communication
DOCX
MS Qsb 2413 group project 2016
SABD PROGRAMME GUIDE 2017
Sabd undergraduate pg draft v3
BS 2 Fire protection 4
CSCM Chapter 11 relationship management cscm
CSCM Partnering
CSCM Communication in construction
CSCM Material delivery problems cscm
BS 2 Escalators arrangement
BS 2 Escalators 1of 2
BS 2 Group assignment brief question august 2016
BS 2 Variable air volume systems
CSCM Supply chain management 312 cscm
CSCM Bim group assignment.docx
CSCM individual assignment
Management science group assignment MS
MS Tutorial 12 hrm
MS Case study development for entrepreneur mark zuckerberg
MS Lecture 7 leadership and motivation
MS Lecture 8 communication
MS Qsb 2413 group project 2016

Recently uploaded (20)

PPTX
philippine contemporary artscot ppt.pptx
PDF
Landscape Architecture: Shaping the World Between Buildings
PPTX
Copy of liver-cancer-case-study.pptx.pptx
PPTX
QA PROCESS FLOW CHART (1).pptxbbbbbbbbbnnnn
PPTX
Structuralism and functionalism dhshjdjejdj
PPTX
Lc 10hhjkhhjjkkkkjhhuiooopojjjoookjji.pptx
PPSX
opcua_121710.ppsxthsrtuhrbxdtnhtdtndtyty
PPTX
Review1_Bollywood_Project analysis of bolywood trends from 1950s to 2025
PPTX
Lung Cancer - Bimbingan.pptxmnbmbnmnmn mn mn
PPTX
CPAR_QR1_WEEK1_INTRODUCTION TO CPAR.pptx
PDF
Celebrate Krishna Janmashtami 2025 | Cottage9
PPTX
Presentation on tradtional textiles of kutch
PPTX
Cloud Computing ppt.ppt1QU4FFIWEKWEIFRRGx
PPTX
Understanding Postmodernism Powerpoint.pptx
PPTX
GREEN BUILDINGS are eco friendly for environment
PDF
630895715-Romanesque-Architecture-ppt.pdf
PPTX
CMU-WEEK-2_TOPIC_Photography_Its_Definition_Historical_Background_and_Princi ...
PPTX
CPAR7 ARTS GRADE 112 LITERARY ARTS OR LI
PPTX
Understanding-Philippine-Popular-Culture (1).pptx
PPTX
WATER RESOURCE-1.pptx ssssdsedsddsssssss
philippine contemporary artscot ppt.pptx
Landscape Architecture: Shaping the World Between Buildings
Copy of liver-cancer-case-study.pptx.pptx
QA PROCESS FLOW CHART (1).pptxbbbbbbbbbnnnn
Structuralism and functionalism dhshjdjejdj
Lc 10hhjkhhjjkkkkjhhuiooopojjjoookjji.pptx
opcua_121710.ppsxthsrtuhrbxdtnhtdtndtyty
Review1_Bollywood_Project analysis of bolywood trends from 1950s to 2025
Lung Cancer - Bimbingan.pptxmnbmbnmnmn mn mn
CPAR_QR1_WEEK1_INTRODUCTION TO CPAR.pptx
Celebrate Krishna Janmashtami 2025 | Cottage9
Presentation on tradtional textiles of kutch
Cloud Computing ppt.ppt1QU4FFIWEKWEIFRRGx
Understanding Postmodernism Powerpoint.pptx
GREEN BUILDINGS are eco friendly for environment
630895715-Romanesque-Architecture-ppt.pdf
CMU-WEEK-2_TOPIC_Photography_Its_Definition_Historical_Background_and_Princi ...
CPAR7 ARTS GRADE 112 LITERARY ARTS OR LI
Understanding-Philippine-Popular-Culture (1).pptx
WATER RESOURCE-1.pptx ssssdsedsddsssssss

s2 5 tutorial traversing - compass rule and transit rule

  • 1. Tutorial (Traversing 1. Calculate the angular error of closure, and balance the traverse angles. Angles shown are unadjusted. (Traversing) Calculate the angular error of closure, and balance the traverse angles. Angles shown Figure 1 Answer: Calculate the angular error of closure, and balance the traverse angles. Angles shown
  • 2. 2. Calculate Adjusted bearings from field angles: Figure 2 Answer:
  • 3. 3. Calculate the latitudes and departures for each course in this traverse. Bearings shown are from balanced angles and distances are in ft. Figure 3 i. Perform a compass rule adjustment on the latitudes and departures and list the balanced latitude and departure for each course. ii. Calculate adjusted bearings, distances, and coordinates for the traverse. Answer:
  • 5. 4. The included angles given in Table Q4 below are recorded at stations forming a closed traverse survey around the perimeter of a field. Determine the amount of angular error in the survey and adjust the values of the included angles. If the whole circle bearing of the line BC is 45° calculate the whole circle bearings of the traverse lines. 5. A survey was carried out on a closed loop traverse with six sides. With the traverse labeled anti-clockwise as shown in Figure below the data in Table Q5 were obtained. The co-ordinates of point A are 1000 mE, 1000 mN and the whole circle bearing of line A – F is 166°45’52’’. After adjustment by Bowditch’s method what are the co-ordinates of the other five traverse stations? 6. Measurements of the traverse ABCDE, as shown in Figure below, are given in Table Q6. WCB of XA = 123° 16’ 06’’ WCB of EY = 282° 03’ 00’’ Station Included angle A 122°42’20’’ B 87°16’40’’ C 133°08’20’’ D 125°55’20’’ E 92°47’40’’ F 158°06’40’’ Station Included angle Length A 130°18’45’’ AB 14.248 B 110°18’23’’ BC 85.771 C 99°32’35’’ CD 77.318 D 116°18’2’’ DE 28.222 E 119°46’7’’ EF 53.099 F 143°46’20’’ FA 65.914 Station Clockwise angle Length (m) A 260°31’18’’ 129.352 B 123°50’42’’ 81.700 C 233°00’06’’ 101.112 D 158°22’48’’ 94.273 E 283°00’18’’
  • 6. The measured angles are as shown in the figure. Keeping the bearings XA and EY and also the co-ordinates of A and E fixed, obtain the adjusted co-ordinates for B, C and D using an equal shifts angular adjustment and Bowditch linear adjustment. 7. A closed traverse survey ABCDEA in which lines CD and AE cross was carried out in a confined area. Various obstructions prevented distances BC and CD from being measured although their whole circle bearings were able to be recorded. Determine the lengths of BC and CD from the values given in Table below: Assume that A has co-ordinates 500.00 N, 500.00E. Side Length (m) Clockwise angle AB 141.2 325° 40’ 00’’ BC ? 69° 10’ 00’’ CD ? 41° 00’ 00’’ DE 58.6 305° 55’ 00’’ EA 347.0 194° 50’ 00’’