SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
BACHELOR OF QUANTITY SURVEYING (HONOURS)
[QSB 60203] SITE SURVEYING
FIELDWORK 2
Traversing
NAME STUDENT ID
NG SHENG ZHE 0323830
SEW YUE LING 0327032
LIEU XUE QI 0327523
PHON KIT POI 0328435
2
CONTENTS
CONTENT PAGE NUMBER
Cover page 1
Contents 2
Objectives 3
Introduction to Traversing 4-5
Apparatus Used for Traversing 6-7
Field Data 8-10
Adjusted Data 11-18
Summary 19
References 20
3
Objectives
● To allow us to have a better understanding or knowledge about the process of using the
instrument (Theodolite) rather than learning from a video in class.
● To enable us to have the experience in using theodolite such as setting up,
collaborating, calculating and recording data.
● To allow us to have the teamwork while carrying out the fieldwork.
● To apply the theories that had learnt in class.
● To learn how to analyse the data collected.
● To enable us to have a basic knowledge on how to set up the points.
● To determine the error of misclosure in order whether is it acceptable or not in the
traversing calculation.
● To enable us to know the precautions should be taken while using Theodolite.
● To allow us to experience and expose to the actual working environment in site such as
working under the hot weather.
● To allow us to understand how to distribute different types of error from the data
collected on field.
4
Introduction to Traversing
Traversing is a method of survey and establish and a method to carry out a survey plan. From
the framework, the direction and length of the survey line must have a few of connected survey
lines because it is provide help for the angle measure instrument. When the connected line
formed a loop is called closed traverse, if the connected lines that did not formed a loop called
open traverse.
Two Types of Traverse
1) Closed Traverse
2) Open Traverse
1) Closed Traverse
Closed traverses are used extensively in control, construction, property, and topographic
surveys. The loop traverse starts and ends at the same points. To check a validity and accuracy
of field measurements can use closed Traverses methods.
5
2) Open Traverse
A traverse whose end point is different from the starting point or is at an unknown position.
Normally, Open Traverse is apply on underground surveys. In addition, repeated observation is
required to minimize error.
6
Apparatus Usedfor Traversing
Theodolite
A theodolite is an instrument for measuring angles in the horizontal and vertical planes.
Theodolites are used mainly for surveying applications, and have been adapted for specialized
purposes in fields like meteorology and rocket launch technology.
Tripod
A surveyor's tripod is a gadget used to support any one of a number of surveying instruments,
such as theodolites, total stations, levels or transits. The surveyor will adjust on the legs'
7
platforms to securely anchor the legs in soil or drive the feet to a low position on uneven, pock-
marked pavement.
Plumb Bob
A plumb bob is a weight, at the bottom has a pointed tip that suspended from a string and used
as a vertical reference line.
Barcode Level Rod for Site Survey
It is made by wood or steel. It is used to determine the height of different points.
8
Field Data
Station Field Angles
A 89°06’00”
B 89°27’40”
C 89°05’40”
D 90°59’40”
SUM= 358°39’00”
9
D = K x s x cos²(θ) + C x cos (θ)
D = horizontal distance between survey point and instrument
s = difference between top stadia and bottom stadia
θ = vertical angle of telescope from the horizontal line when capturing the stadia readings
K = multiplying constant given by the manufacturer of the theodolite, (normally = 100) C =
additive factor given by the manufacturer of the theodolite, (normally = 0)
Distance A-B = 100 x (1.493-1.324) x cos²(
(90°−90°15′00") + (270°−269°43'20")
2
) + ( 0 x
cos(
(90°−90°15′00") + (270°−269°43'20")
2
) )
= 100 x 0.169 x cos²(0°00’50”) + 0
= 16.90
Distance B-A = 100 x (1.492-1.324) x cos²(
(90°−89°17′00") + (270°−270°45'00")
2
) + ( 0 x
cos(
(90°−89°17′00") + (270°−270°45'00")
2
) )
= 100 x 0.168 x cos²(-0°01’00”) + 0
= 16.80
Average distance = (16.90 + 16.80)/2
= 16.85
Distance B-C = 100 x (1.560-1.269) x cos²(
(90°−89°54’40”) + (270°−270°04’40”)
2
)+ ( 0 x
cos(
(90°−89°54’40”) + (270°−270°04’40”)
2
) )
= 100 x 0.291 x cos²(0°00’20”) + 0
= 29.10
Distance C-B = 100 x (1.555-1.265) x cos²(
(90°−89°41′40") + (270°−270°17'00")
2
)+ ( 0 x
cos(
(90°−89°41′40") + (270°−270°17'00")
2
) )
= 100 x 0.290 x cos²(0°00’40”) + 0
= 29.00
Average distance = (29.10 + 29.00)/2
= 29.05
10
Distance C-D = 100 x (1.492-1.327) x cos²(
(90°−89°15′00") + (270°−270°45'00")
2
)+ ( 0 x
cos(
(90°−89°15′00") + (270°−270°45'00")
2
) )
= 100 x 0.165 x cos²(0°) + 0
= 16.50
Distance D-C = 100 x (1.494-1.330) x cos²(
(90°−89°56′20") + (270°−270°02'40")
2
)+ ( 0 x
cos(
(90°−89°56′20") + (270°−270°02'40")
2
) )
= 100 x 0.164 x cos²(0°00’30”) + 0
= 16.40
Average distance = (16.50+16.40)/2
= 16.45
Distance D-A = 100 x (1.545-1.256) x cos²(
(90°−89°39'20") + (270°−270°21'00")
2
)+ ( 0 x
cos(
(90°−89°39'20") + (270°−270°21'00")
2
))
= 100 x 0.289 x cos²(-0°00’10”) + 0
= 28.90
Distance A-D = 100 x (1.555 - 1.267) x cos²(
(90°−90°02′20") + (270°−269°59'00")
2
)+ ( 0 x
cos(
(90°−90°02′20") + (270°−269°59'00")
2
) )
= 100 x 0.288 x cos²(-0°00’40”) + 0
= 28.80
Average distance = (28.90 + 28.80)/2
= 28.85
11
Angular Error & Angle Adjustments
As known the sum of the interior angles in only loop traverse is equal to (n-2)(180°)for geometric
consistency,therefore
(4-2)(180°) = 2(180°) = 360
Total angular error = 360°00’00” - 358°39’00”
= 1°21’00”
Error per angle = 1°21’00”/4
= 0°20’15”
Station Field Angles Corrections Adjusted Angles
A 89°06′00" +0°20’15” 89°26’15”
B 89°27’40” +0°20’15” 89°47’55”
C 89°05’40” +0°20’15” 89°25’55”
D 90°59′40" +0°20’15” 91°19’55”
SUM= 358°39’00” 360°00’00”
12
Computation for Course Azimuths
Station Adjusted Angles Course Azimuths Course Bearing
A-B 89°26’15” 89°26′15" N 89°26′15" E
B-C 89°47’55”
89°26′15"+89°47’55”+180°
=359°14’10”
N 0°45’50” W
C-D 89°25’55”
359°14’10”+89°25’55”-180°
=268°40’05”
S 88°40’05” W
D-A 91°19’55”
268°40’05”+91°19’55”-180°
=180°00’00”
S 0°00’00” E
13
Computation for Latitude and Departure
Cos B Sin B L Cos B L Sin B
Station Bearing,B Length,L Cosine Sine Latitude Departure
A
N 89°26’15”E 16.85 0.0098 0.9999 +0.1651 +16.8483
B
N 0°45’50”W 29.05 0.9999 -0.0133 +29.0471 -0.3864
C
S 88°40’05”W 16.45 -0.0232 -0.9997 -0.3816 -16.4451
D
S 0°00’00” 28.85 -1.0000 0.0000 -28.8500 0.0000
A
Perimeter(P)=91.20 Sum of latitudes=∑ΔY=-0.0194
Sum of departures=∑ΔX=+0.0168
14
Correction = – [ ∑∆y ] / P x L or – [ ∑∆x ] / P x L
Where,
∑∆y and ∑∆x = The error in latitude and departure
P = Total length of perimeter of the traverse
L = Length of a particular course Station
Accuracy = 1: (P/Ec)
 Therefore, the accuracy = 1: (91.20/0.0257)
= 1: 3548.6
= 1: 3549
 For average land surveying, an accuracy of about 1:300 is typical.
 Thus, the accuracy of field is acceptable.
A
A’
Error in departure
∑∆𝑥 = +0.0168 𝑚
Error in latitude
∑∆𝑦 = −0.0194 𝑚
Ec, Total Error
91.20 m
15
Adjusted Course Latitude & Departure
The compass rule:
Correction = -[y]P x L or - [x]P x L
Latitude Correction
The correction to the latitude:
Course A-B is
[-0.0194÷ 91.20] x 16.85 = -0.00358
Course B-C is
[-0.0194÷ 91.20] x 29.05 = -0.00618
Course C-D is
[-0.0194÷ 91.20] x 16.45 = -0.00350
Course D-A is
[-0.0194÷ 91.20] x 28.85 = -0.00614
Departure Correction
The correction to the departure:
Course A-B is
[0.0168÷ 91.20] x 16.85 = 0.00310
Course B-C is
[0.0168÷ 91.20] x 29.05 =0.00535
Course C-D is
[0.0168÷ 91.20] x 16.45 = 0.00303
Course D-A is
[0.0168÷ 91.20] x 28.85 =0.00531
16
Adjust Course Latitudes and Departures
Unadjusted Corrections Adjusted
Station Latitude Departure Latitude Departure Latitude Departure
A
+ 0.1651 + 16.8483 0.0036 - 0.0031 + 0.1687 + 16.8452
B
+ 29.0471 - 0.3864 0.0062 -0.0054 + 29.0533 -0.3918
C
-0.3816 -16.4451 0.0035 -0.0030 -0.3781 -16.4481
D
-28.8500 0.0000 0.0061 -0.0053 -28.8439 -0.0053
A
Check -0.0194 + 0.0168 0.0194 -0.0168 0.00 0.00
17
Computation of Station Coordinates
Assume that the coordinates of A is (100.000, 100.000)
Station N Coordinate* Latitude E Coordinate* Departure
A 100.000 (Assumed) 100.000 (Assumed)
+ 0.1687 + 16.8452
B 100.1687 116.8452
+ 29.0533 -0.3918
C 129.2220 116.4534
-0.3718 -16.4481
D 128.8439 100.0053
-28.8439 -0.0053
A 100.000 (Checked) 100.000 (Checked)
18
0
0
N 128.84
E 100.00
N 129.22
E 116.45
N 100.00
E 100.00
N 100.17
E 116.85
z
D
100
110
120
130
z
120110100
A
B
C
NORTH
EAST
19
Summary
In this second fieldwork, we are required to do a closed loop traverse by using a theodolite at
the carpark in Taylor’s University Lakeside Campus. The first thing we did is to set up the
instrument and to mark four points for station which are station A, B, C and D. Before we took
the measurement, we levelled the theodolite.
First of all, we know that the point A, B, C and D are laid out on the site respectively. The
theodolite is placed at station A which is our starting point and adjust it until it is in horizontal
level. Besides, the other stations (A, B, C, D) must be stated on the site to form a loop traverse
by using liquid ink. After that, we used theodolite to measure the angles of four stations as our
field data. As we taught in class that the horizontal reading must be taken twice which is the first
reading is taken, then turn back again to take the second reading. The angles of the theodolite
must be read from left to right in order to obtain a more accurate reading.
In order to obtain the angles form each point, the process is repeated at each of the points on
the site. During the measurement, the vertical and horizontal angles will be shown on the digital
readout panel. Everything went well but the readings were imperfect so we had to do the
distribution error.
Our total angular for the loop traverse is 358°〖39〗^' 00'' and the total error angular is about 1°
〖21〗^' 00''. Therefore, it has 0°20'15'' error in angle for each angle.
Our error in latitude is -0.0194 and our error in departure is +0.0168. Thus, the total error is
0.0257. Using the following formula, we calculated the accuracy of our traverse survey:
Accuracy = 1: (P/EC), 1: [Perimeter/ Error Closure]
We obtained an accuracy of 1:3549. For average land surveying an accuracy of 1:3000 is
typical. Therefore, our traverse survey is acceptable.
In conclusion, we faced a lot of obstacles during the fieldwork. One of obstacles is we have to
ensure that the spirit bubbles have to be exactly at the centre point. We took a lot of time to set
up the theodolite at the first time because we have to make sure the spirit level is always in
middle in every position. Although the formula was really hard for us to apply compare to
levelling, but we try hard to learning with a spirit of not giving up.
20
References
http://surfcivil.blogspot.my/2010/05/traverse-surveying.html
http://www.state.nj.us/transportation/eng/documents/survey/Chapter5.shtm
Photo of group members:
Phon Kit Poi Ng Sheng Zhe
Sew Yue Ling Lieu Xue Qi

More Related Content

PDF
Site Surveying Traversing
DOCX
Closed Traverse Surveying - Report
DOCX
Fieldwork 2 (Traversing)
DOCX
Tranverse report
DOCX
Assignment 2 - Traverse
DOCX
Levelling report
PDF
Leveling final-report
DOCX
Contouring Report
Site Surveying Traversing
Closed Traverse Surveying - Report
Fieldwork 2 (Traversing)
Tranverse report
Assignment 2 - Traverse
Levelling report
Leveling final-report
Contouring Report

What's hot (20)

PDF
Traversing final-report
DOCX
Profile and Cross-Section - Report
PDF
Tacheometry @surveyingreport
DOCX
Project 2- traversing
DOCX
Two Peg Test - Report
DOCX
Theodolite report
PPT
Topic 2 area & volume
DOCX
DOC
Area and Volume Survey Engineering (RZ)
DOCX
Assignment 1 - Levelling
DOCX
SITE SURVEYING: Transversing
PPTX
Lecture 11 traverse computations
PPTX
Traverse surveiying
DOCX
Site surveying report i
PDF
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
DOCX
Site Surveying Report - Traversing
PDF
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
DOCX
Site Surveying Report 2 (Traversing)
DOCX
SITE SURVEYING LEVELING
PPTX
Curves and there application in Survey
Traversing final-report
Profile and Cross-Section - Report
Tacheometry @surveyingreport
Project 2- traversing
Two Peg Test - Report
Theodolite report
Topic 2 area & volume
Area and Volume Survey Engineering (RZ)
Assignment 1 - Levelling
SITE SURVEYING: Transversing
Lecture 11 traverse computations
Traverse surveiying
Site surveying report i
REPORT SURVEY RANGING CURVE CIVIL ENGINEERING.pdf
Site Surveying Report - Traversing
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
Site Surveying Report 2 (Traversing)
SITE SURVEYING LEVELING
Curves and there application in Survey
Ad

Viewers also liked (10)

DOCX
Site survey Fieldwork1 (levelling)
PDF
Ss report 1
DOCX
Site report for Measurement 1
PDF
Site Surveying report2 traversing
DOCX
Project 1- Levelling
DOCX
Levelling final
DOCX
Site Surveying Fieldwork 2
DOCX
Site surveying report1
DOC
Site Surveying Report 1 (Levelling)
PDF
State of the Word 2011
Site survey Fieldwork1 (levelling)
Ss report 1
Site report for Measurement 1
Site Surveying report2 traversing
Project 1- Levelling
Levelling final
Site Surveying Fieldwork 2
Site surveying report1
Site Surveying Report 1 (Levelling)
State of the Word 2011
Ad

Similar to Site survey Fieldwork 2 traversing (20)

DOCX
Fieldwork 2
DOCX
Fieldwork 2
DOCX
Site surveying report 2
DOCX
Site survey report 2
DOCX
Project 2- traversing
DOCX
ABC Report - 123 (gathered with reference)
DOC
Ss report 2
PDF
Ss report 2
PDF
S2 6 theodolites
DOCX
Radiacion poligonal abierta
PDF
Traversing
DOCX
Site surveying-report-2
DOCX
Site surveying report 2
PPTX
surveying using method of Tacheometory.pptx
DOCX
Tacheometry 1
DOCX
2 nd report
PPTX
GALES TABLE surveying engineering. .pptx
PPTX
GALES TABLE. .pptx
PDF
Ss report 1
PPT
Chap.6 traverse surveys
Fieldwork 2
Fieldwork 2
Site surveying report 2
Site survey report 2
Project 2- traversing
ABC Report - 123 (gathered with reference)
Ss report 2
Ss report 2
S2 6 theodolites
Radiacion poligonal abierta
Traversing
Site surveying-report-2
Site surveying report 2
surveying using method of Tacheometory.pptx
Tacheometry 1
2 nd report
GALES TABLE surveying engineering. .pptx
GALES TABLE. .pptx
Ss report 1
Chap.6 traverse surveys

More from Sheng Zhe (20)

PDF
Bs solar energy report
PDF
Leading 21st stress presentation
PDF
Leading 21st stress report
PPTX
Mpu leading 21st presentation (finalized)
PPTX
Bs solar energy presentation
DOCX
Ct & bm & mea assignment brickwall report
PDF
MPU Assignment guidelines
PDF
Mpu assignment
PDF
measurement tadika Assignment no.2
PDF
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
PDF
Integrated assignment ct1 and bm aug15
DOCX
Business charity drive report final version
DOCX
Business charity drive report
DOC
Bus30104 intro to biz final project - charity drive brief sept 2015
PPTX
Business project 1 - business plan slides
DOCX
Accounting final project - financial ration analysis
DOCX
Psychology video clip report
PPTX
Psychology assignment 3 video clip presentation slides
PPTX
Psycho assignment 2 - comic strip
DOCX
Psychology assignment 1 - journal
Bs solar energy report
Leading 21st stress presentation
Leading 21st stress report
Mpu leading 21st presentation (finalized)
Bs solar energy presentation
Ct & bm & mea assignment brickwall report
MPU Assignment guidelines
Mpu assignment
measurement tadika Assignment no.2
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment ct1 and bm aug15
Business charity drive report final version
Business charity drive report
Bus30104 intro to biz final project - charity drive brief sept 2015
Business project 1 - business plan slides
Accounting final project - financial ration analysis
Psychology video clip report
Psychology assignment 3 video clip presentation slides
Psycho assignment 2 - comic strip
Psychology assignment 1 - journal

Recently uploaded (20)

PPTX
Cell Types and Its function , kingdom of life
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
Sports Quiz easy sports quiz sports quiz
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
Lesson notes of climatology university.
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PDF
Anesthesia in Laparoscopic Surgery in India
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
Computing-Curriculum for Schools in Ghana
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
Cell Types and Its function , kingdom of life
O5-L3 Freight Transport Ops (International) V1.pdf
Sports Quiz easy sports quiz sports quiz
Final Presentation General Medicine 03-08-2024.pptx
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
Lesson notes of climatology university.
PPH.pptx obstetrics and gynecology in nursing
STATICS OF THE RIGID BODIES Hibbelers.pdf
human mycosis Human fungal infections are called human mycosis..pptx
Anesthesia in Laparoscopic Surgery in India
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Supply Chain Operations Speaking Notes -ICLT Program
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Computing-Curriculum for Schools in Ghana
Microbial diseases, their pathogenesis and prophylaxis
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
2.FourierTransform-ShortQuestionswithAnswers.pdf

Site survey Fieldwork 2 traversing

  • 1. 1 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN BACHELOR OF QUANTITY SURVEYING (HONOURS) [QSB 60203] SITE SURVEYING FIELDWORK 2 Traversing NAME STUDENT ID NG SHENG ZHE 0323830 SEW YUE LING 0327032 LIEU XUE QI 0327523 PHON KIT POI 0328435
  • 2. 2 CONTENTS CONTENT PAGE NUMBER Cover page 1 Contents 2 Objectives 3 Introduction to Traversing 4-5 Apparatus Used for Traversing 6-7 Field Data 8-10 Adjusted Data 11-18 Summary 19 References 20
  • 3. 3 Objectives ● To allow us to have a better understanding or knowledge about the process of using the instrument (Theodolite) rather than learning from a video in class. ● To enable us to have the experience in using theodolite such as setting up, collaborating, calculating and recording data. ● To allow us to have the teamwork while carrying out the fieldwork. ● To apply the theories that had learnt in class. ● To learn how to analyse the data collected. ● To enable us to have a basic knowledge on how to set up the points. ● To determine the error of misclosure in order whether is it acceptable or not in the traversing calculation. ● To enable us to know the precautions should be taken while using Theodolite. ● To allow us to experience and expose to the actual working environment in site such as working under the hot weather. ● To allow us to understand how to distribute different types of error from the data collected on field.
  • 4. 4 Introduction to Traversing Traversing is a method of survey and establish and a method to carry out a survey plan. From the framework, the direction and length of the survey line must have a few of connected survey lines because it is provide help for the angle measure instrument. When the connected line formed a loop is called closed traverse, if the connected lines that did not formed a loop called open traverse. Two Types of Traverse 1) Closed Traverse 2) Open Traverse 1) Closed Traverse Closed traverses are used extensively in control, construction, property, and topographic surveys. The loop traverse starts and ends at the same points. To check a validity and accuracy of field measurements can use closed Traverses methods.
  • 5. 5 2) Open Traverse A traverse whose end point is different from the starting point or is at an unknown position. Normally, Open Traverse is apply on underground surveys. In addition, repeated observation is required to minimize error.
  • 6. 6 Apparatus Usedfor Traversing Theodolite A theodolite is an instrument for measuring angles in the horizontal and vertical planes. Theodolites are used mainly for surveying applications, and have been adapted for specialized purposes in fields like meteorology and rocket launch technology. Tripod A surveyor's tripod is a gadget used to support any one of a number of surveying instruments, such as theodolites, total stations, levels or transits. The surveyor will adjust on the legs'
  • 7. 7 platforms to securely anchor the legs in soil or drive the feet to a low position on uneven, pock- marked pavement. Plumb Bob A plumb bob is a weight, at the bottom has a pointed tip that suspended from a string and used as a vertical reference line. Barcode Level Rod for Site Survey It is made by wood or steel. It is used to determine the height of different points.
  • 8. 8 Field Data Station Field Angles A 89°06’00” B 89°27’40” C 89°05’40” D 90°59’40” SUM= 358°39’00”
  • 9. 9 D = K x s x cos²(θ) + C x cos (θ) D = horizontal distance between survey point and instrument s = difference between top stadia and bottom stadia θ = vertical angle of telescope from the horizontal line when capturing the stadia readings K = multiplying constant given by the manufacturer of the theodolite, (normally = 100) C = additive factor given by the manufacturer of the theodolite, (normally = 0) Distance A-B = 100 x (1.493-1.324) x cos²( (90°−90°15′00") + (270°−269°43'20") 2 ) + ( 0 x cos( (90°−90°15′00") + (270°−269°43'20") 2 ) ) = 100 x 0.169 x cos²(0°00’50”) + 0 = 16.90 Distance B-A = 100 x (1.492-1.324) x cos²( (90°−89°17′00") + (270°−270°45'00") 2 ) + ( 0 x cos( (90°−89°17′00") + (270°−270°45'00") 2 ) ) = 100 x 0.168 x cos²(-0°01’00”) + 0 = 16.80 Average distance = (16.90 + 16.80)/2 = 16.85 Distance B-C = 100 x (1.560-1.269) x cos²( (90°−89°54’40”) + (270°−270°04’40”) 2 )+ ( 0 x cos( (90°−89°54’40”) + (270°−270°04’40”) 2 ) ) = 100 x 0.291 x cos²(0°00’20”) + 0 = 29.10 Distance C-B = 100 x (1.555-1.265) x cos²( (90°−89°41′40") + (270°−270°17'00") 2 )+ ( 0 x cos( (90°−89°41′40") + (270°−270°17'00") 2 ) ) = 100 x 0.290 x cos²(0°00’40”) + 0 = 29.00 Average distance = (29.10 + 29.00)/2 = 29.05
  • 10. 10 Distance C-D = 100 x (1.492-1.327) x cos²( (90°−89°15′00") + (270°−270°45'00") 2 )+ ( 0 x cos( (90°−89°15′00") + (270°−270°45'00") 2 ) ) = 100 x 0.165 x cos²(0°) + 0 = 16.50 Distance D-C = 100 x (1.494-1.330) x cos²( (90°−89°56′20") + (270°−270°02'40") 2 )+ ( 0 x cos( (90°−89°56′20") + (270°−270°02'40") 2 ) ) = 100 x 0.164 x cos²(0°00’30”) + 0 = 16.40 Average distance = (16.50+16.40)/2 = 16.45 Distance D-A = 100 x (1.545-1.256) x cos²( (90°−89°39'20") + (270°−270°21'00") 2 )+ ( 0 x cos( (90°−89°39'20") + (270°−270°21'00") 2 )) = 100 x 0.289 x cos²(-0°00’10”) + 0 = 28.90 Distance A-D = 100 x (1.555 - 1.267) x cos²( (90°−90°02′20") + (270°−269°59'00") 2 )+ ( 0 x cos( (90°−90°02′20") + (270°−269°59'00") 2 ) ) = 100 x 0.288 x cos²(-0°00’40”) + 0 = 28.80 Average distance = (28.90 + 28.80)/2 = 28.85
  • 11. 11 Angular Error & Angle Adjustments As known the sum of the interior angles in only loop traverse is equal to (n-2)(180°)for geometric consistency,therefore (4-2)(180°) = 2(180°) = 360 Total angular error = 360°00’00” - 358°39’00” = 1°21’00” Error per angle = 1°21’00”/4 = 0°20’15” Station Field Angles Corrections Adjusted Angles A 89°06′00" +0°20’15” 89°26’15” B 89°27’40” +0°20’15” 89°47’55” C 89°05’40” +0°20’15” 89°25’55” D 90°59′40" +0°20’15” 91°19’55” SUM= 358°39’00” 360°00’00”
  • 12. 12 Computation for Course Azimuths Station Adjusted Angles Course Azimuths Course Bearing A-B 89°26’15” 89°26′15" N 89°26′15" E B-C 89°47’55” 89°26′15"+89°47’55”+180° =359°14’10” N 0°45’50” W C-D 89°25’55” 359°14’10”+89°25’55”-180° =268°40’05” S 88°40’05” W D-A 91°19’55” 268°40’05”+91°19’55”-180° =180°00’00” S 0°00’00” E
  • 13. 13 Computation for Latitude and Departure Cos B Sin B L Cos B L Sin B Station Bearing,B Length,L Cosine Sine Latitude Departure A N 89°26’15”E 16.85 0.0098 0.9999 +0.1651 +16.8483 B N 0°45’50”W 29.05 0.9999 -0.0133 +29.0471 -0.3864 C S 88°40’05”W 16.45 -0.0232 -0.9997 -0.3816 -16.4451 D S 0°00’00” 28.85 -1.0000 0.0000 -28.8500 0.0000 A Perimeter(P)=91.20 Sum of latitudes=∑ΔY=-0.0194 Sum of departures=∑ΔX=+0.0168
  • 14. 14 Correction = – [ ∑∆y ] / P x L or – [ ∑∆x ] / P x L Where, ∑∆y and ∑∆x = The error in latitude and departure P = Total length of perimeter of the traverse L = Length of a particular course Station Accuracy = 1: (P/Ec)  Therefore, the accuracy = 1: (91.20/0.0257) = 1: 3548.6 = 1: 3549  For average land surveying, an accuracy of about 1:300 is typical.  Thus, the accuracy of field is acceptable. A A’ Error in departure ∑∆𝑥 = +0.0168 𝑚 Error in latitude ∑∆𝑦 = −0.0194 𝑚 Ec, Total Error 91.20 m
  • 15. 15 Adjusted Course Latitude & Departure The compass rule: Correction = -[y]P x L or - [x]P x L Latitude Correction The correction to the latitude: Course A-B is [-0.0194÷ 91.20] x 16.85 = -0.00358 Course B-C is [-0.0194÷ 91.20] x 29.05 = -0.00618 Course C-D is [-0.0194÷ 91.20] x 16.45 = -0.00350 Course D-A is [-0.0194÷ 91.20] x 28.85 = -0.00614 Departure Correction The correction to the departure: Course A-B is [0.0168÷ 91.20] x 16.85 = 0.00310 Course B-C is [0.0168÷ 91.20] x 29.05 =0.00535 Course C-D is [0.0168÷ 91.20] x 16.45 = 0.00303 Course D-A is [0.0168÷ 91.20] x 28.85 =0.00531
  • 16. 16 Adjust Course Latitudes and Departures Unadjusted Corrections Adjusted Station Latitude Departure Latitude Departure Latitude Departure A + 0.1651 + 16.8483 0.0036 - 0.0031 + 0.1687 + 16.8452 B + 29.0471 - 0.3864 0.0062 -0.0054 + 29.0533 -0.3918 C -0.3816 -16.4451 0.0035 -0.0030 -0.3781 -16.4481 D -28.8500 0.0000 0.0061 -0.0053 -28.8439 -0.0053 A Check -0.0194 + 0.0168 0.0194 -0.0168 0.00 0.00
  • 17. 17 Computation of Station Coordinates Assume that the coordinates of A is (100.000, 100.000) Station N Coordinate* Latitude E Coordinate* Departure A 100.000 (Assumed) 100.000 (Assumed) + 0.1687 + 16.8452 B 100.1687 116.8452 + 29.0533 -0.3918 C 129.2220 116.4534 -0.3718 -16.4481 D 128.8439 100.0053 -28.8439 -0.0053 A 100.000 (Checked) 100.000 (Checked)
  • 18. 18 0 0 N 128.84 E 100.00 N 129.22 E 116.45 N 100.00 E 100.00 N 100.17 E 116.85 z D 100 110 120 130 z 120110100 A B C NORTH EAST
  • 19. 19 Summary In this second fieldwork, we are required to do a closed loop traverse by using a theodolite at the carpark in Taylor’s University Lakeside Campus. The first thing we did is to set up the instrument and to mark four points for station which are station A, B, C and D. Before we took the measurement, we levelled the theodolite. First of all, we know that the point A, B, C and D are laid out on the site respectively. The theodolite is placed at station A which is our starting point and adjust it until it is in horizontal level. Besides, the other stations (A, B, C, D) must be stated on the site to form a loop traverse by using liquid ink. After that, we used theodolite to measure the angles of four stations as our field data. As we taught in class that the horizontal reading must be taken twice which is the first reading is taken, then turn back again to take the second reading. The angles of the theodolite must be read from left to right in order to obtain a more accurate reading. In order to obtain the angles form each point, the process is repeated at each of the points on the site. During the measurement, the vertical and horizontal angles will be shown on the digital readout panel. Everything went well but the readings were imperfect so we had to do the distribution error. Our total angular for the loop traverse is 358°〖39〗^' 00'' and the total error angular is about 1° 〖21〗^' 00''. Therefore, it has 0°20'15'' error in angle for each angle. Our error in latitude is -0.0194 and our error in departure is +0.0168. Thus, the total error is 0.0257. Using the following formula, we calculated the accuracy of our traverse survey: Accuracy = 1: (P/EC), 1: [Perimeter/ Error Closure] We obtained an accuracy of 1:3549. For average land surveying an accuracy of 1:3000 is typical. Therefore, our traverse survey is acceptable. In conclusion, we faced a lot of obstacles during the fieldwork. One of obstacles is we have to ensure that the spirit bubbles have to be exactly at the centre point. We took a lot of time to set up the theodolite at the first time because we have to make sure the spirit level is always in middle in every position. Although the formula was really hard for us to apply compare to levelling, but we try hard to learning with a spirit of not giving up.