SlideShare a Scribd company logo
Assignment No.2
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT I [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan Membina sebuah Tadika One Tingkat
di No.4 Jalan Bola Sepak 13/11, Seksyen 13, Shah Alam.
Percentage of Assessment: 20%
Submission Date: 1 July 2016 (Friday) at 10 am.
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements of the chosen building.
 Pad footings including excavations from reduce level.
 Work below ground floor level including excavations, ground floor slab and apron slab etc.
 Ground floor beams
 Column stumps, columns and stiffeners
 Roof beams
 Upper roof beams
Notes
 Excavate topsoil 150 mm deep to be disposed off- site, hardcore to be 150mm thick.
Assessment Criteria
Refer to matrix attached.
Assignment No.2
Teaching Objectives
 To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
 To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
 Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
 Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
 Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
 Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission rules
Individual submission to Group Leader will consist of the following:
 Billing paper (handwritten)
 Query list
 Taking-off list
 Dimension sheets
 Peer assessment Form
The group leader will collect all the members’ work and compile it in a binded document (comb binding)
with a COVER of the university's logo and all the names of all group members. He will also need to do a
SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work.
The Bill of Quantities will be arranged in the following sequence:
 Billing ( to insert in front of BQ and hand written )
 Pad footings
 Work below ground floor level including excavations, ground floor slab and apron slab etc.
 Ground floor beams
 Column stumps, columns and stiffeners
 Roof beams.

More Related Content

PDF
Assignment no.2
PDF
Assignment 2
DOC
Measurement Assignment 2
PDF
Measurement assignment 2 (group)
PDF
STRUCTURAL ENGINEERING
PPTX
Planning and cost analysis of the commercial building
PPTX
Ici & itd pj1
PDF
Measurement assignment 3 (site report)
Assignment no.2
Assignment 2
Measurement Assignment 2
Measurement assignment 2 (group)
STRUCTURAL ENGINEERING
Planning and cost analysis of the commercial building
Ici & itd pj1
Measurement assignment 3 (site report)

What's hot (13)

PPTX
Methods of estimation - Estimation, Costing and Valuation Engineering
PDF
Estimation and costing practical norm and thumb rules
PDF
Ici and itd project 1
PDF
Lec.2 binifits of estamations...Types of Estimation
PPTX
Structure engineer slide share
PDF
4.1 conceptual estimates
PPTX
Project 1 ICI & ITD Presentation
PDF
2 types of estimates
PPTX
Structural engineer drawings
PPTX
Ici pj1
PPTX
Methods of estimation - Estimation, Costing and Valuation Engineering
Estimation and costing practical norm and thumb rules
Ici and itd project 1
Lec.2 binifits of estamations...Types of Estimation
Structure engineer slide share
4.1 conceptual estimates
Project 1 ICI & ITD Presentation
2 types of estimates
Structural engineer drawings
Ici pj1
Ad

Similar to measurement tadika Assignment no.2 (16)

PDF
Assignment 2 - Measurement
PDF
Assignment no.2
PDF
M1 ASSIGNMENT 2 (GROUP) BRIEF
PDF
Assignment no.2 brief m1 sem1 degree
PDF
asAssignment no.2
PDF
bqs Assignment no.2
PDF
Assignment no.2
PDF
BQS bq assignment
PPTX
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
PPT
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
 
PDF
Advanced Building Measurement
PDF
SMM2 Explained
PDF
Building con 1 (arc1523) project 1 brief aug 2015
PDF
Assignment - Measurement
PDF
M2 project assignment mar 2016
PDF
Sem 2 m2 project assignment
Assignment 2 - Measurement
Assignment no.2
M1 ASSIGNMENT 2 (GROUP) BRIEF
Assignment no.2 brief m1 sem1 degree
asAssignment no.2
bqs Assignment no.2
Assignment no.2
BQS bq assignment
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
 
Advanced Building Measurement
SMM2 Explained
Building con 1 (arc1523) project 1 brief aug 2015
Assignment - Measurement
M2 project assignment mar 2016
Sem 2 m2 project assignment
Ad

More from Sheng Zhe (20)

DOCX
Site survey Fieldwork 2 traversing
DOCX
Site survey Fieldwork1 (levelling)
PDF
Bs solar energy report
PDF
Leading 21st stress presentation
PDF
Leading 21st stress report
PPTX
Mpu leading 21st presentation (finalized)
PPTX
Bs solar energy presentation
DOCX
Ct & bm & mea assignment brickwall report
PDF
MPU Assignment guidelines
PDF
Mpu assignment
PDF
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
PDF
Integrated assignment ct1 and bm aug15
DOCX
Business charity drive report final version
DOCX
Business charity drive report
DOC
Bus30104 intro to biz final project - charity drive brief sept 2015
PPTX
Business project 1 - business plan slides
DOCX
Accounting final project - financial ration analysis
DOCX
Psychology video clip report
PPTX
Psychology assignment 3 video clip presentation slides
PPTX
Psycho assignment 2 - comic strip
Site survey Fieldwork 2 traversing
Site survey Fieldwork1 (levelling)
Bs solar energy report
Leading 21st stress presentation
Leading 21st stress report
Mpu leading 21st presentation (finalized)
Bs solar energy presentation
Ct & bm & mea assignment brickwall report
MPU Assignment guidelines
Mpu assignment
(BRICK WALL) Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment ct1 and bm aug15
Business charity drive report final version
Business charity drive report
Bus30104 intro to biz final project - charity drive brief sept 2015
Business project 1 - business plan slides
Accounting final project - financial ration analysis
Psychology video clip report
Psychology assignment 3 video clip presentation slides
Psycho assignment 2 - comic strip

Recently uploaded (20)

PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PPTX
Cell Structure & Organelles in detailed.
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
Practical Manual AGRO-233 Principles and Practices of Natural Farming
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
Paper A Mock Exam 9_ Attempt review.pdf.
PDF
A systematic review of self-coping strategies used by university students to ...
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
Complications of Minimal Access Surgery at WLH
PDF
Updated Idioms and Phrasal Verbs in English subject
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PPTX
UNIT III MENTAL HEALTH NURSING ASSESSMENT
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
Orientation - ARALprogram of Deped to the Parents.pptx
Cell Structure & Organelles in detailed.
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Radiologic_Anatomy_of_the_Brachial_plexus [final].pptx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
Microbial diseases, their pathogenesis and prophylaxis
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Practical Manual AGRO-233 Principles and Practices of Natural Farming
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
Paper A Mock Exam 9_ Attempt review.pdf.
A systematic review of self-coping strategies used by university students to ...
202450812 BayCHI UCSC-SV 20250812 v17.pptx
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Complications of Minimal Access Surgery at WLH
Updated Idioms and Phrasal Verbs in English subject
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
Tissue processing ( HISTOPATHOLOGICAL TECHNIQUE
STATICS OF THE RIGID BODIES Hibbelers.pdf
UNIT III MENTAL HEALTH NURSING ASSESSMENT

measurement tadika Assignment no.2

  • 1. Assignment No.2 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT I [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan Membina sebuah Tadika One Tingkat di No.4 Jalan Bola Sepak 13/11, Seksyen 13, Shah Alam. Percentage of Assessment: 20% Submission Date: 1 July 2016 (Friday) at 10 am. Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements of the chosen building.  Pad footings including excavations from reduce level.  Work below ground floor level including excavations, ground floor slab and apron slab etc.  Ground floor beams  Column stumps, columns and stiffeners  Roof beams  Upper roof beams Notes  Excavate topsoil 150 mm deep to be disposed off- site, hardcore to be 150mm thick. Assessment Criteria Refer to matrix attached.
  • 2. Assignment No.2 Teaching Objectives  To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to:  Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works.  Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works.  Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works.  Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission rules Individual submission to Group Leader will consist of the following:  Billing paper (handwritten)  Query list  Taking-off list  Dimension sheets  Peer assessment Form The group leader will collect all the members’ work and compile it in a binded document (comb binding) with a COVER of the university's logo and all the names of all group members. He will also need to do a SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work. The Bill of Quantities will be arranged in the following sequence:  Billing ( to insert in front of BQ and hand written )  Pad footings  Work below ground floor level including excavations, ground floor slab and apron slab etc.  Ground floor beams  Column stumps, columns and stiffeners  Roof beams.