SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku
Omar, Perak.
Percentage of Assessment: 20%
Submission Date: 2nd July 2015
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements for the chosen building.
 Pilecaps including excavations from reduce level.
 Work below ground floor level including site clearance and excavation, ground floor slab etc.
 All first floor to fourth floor slabs and beams
 Roof slabs and beams
Notes:
 Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick.

Assessment Criteria
Refer to matrix attached.
Teaching Objectives
 To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
 To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
 Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
 Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
 Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
 Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission
Each section is to submit to the group leader in the following sequence:
 Billing ( handwritten )
 Query list
 Taking off list
 Dimension sheets
The Leader of each group is to collect from all the group members and attach the front cover page with the
names of group members. He is to compile every member’s Billing in ONE Billing Paper only .and arranges
the rest in the following sequence:
 Billing ( to insert in front of BQ and hand written )
 Pilecaps including excavations from reduce level.
 Work below ground floor level including site clearance and excavation, ground floor slab etc.
 First floor slabs to fourth floor slabs and beams.
 Roof slabs and beams

More Related Content

PDF
measurement tadika Assignment no.2
PDF
Assignment no.2
DOC
Measurement Assignment 2
PDF
Measurement assignment 2 (group)
PPTX
Structure engineer slide share
PPTX
Methods of estimation - Estimation, Costing and Valuation Engineering
PDF
Measurement assignment 3 (site report)
PDF
Seminar 1 - Question 1
measurement tadika Assignment no.2
Assignment no.2
Measurement Assignment 2
Measurement assignment 2 (group)
Structure engineer slide share
Methods of estimation - Estimation, Costing and Valuation Engineering
Measurement assignment 3 (site report)
Seminar 1 - Question 1

What's hot (9)

DOC
Michael Street CV.2016
PDF
Cv with photo
PDF
Estimation And Costing Of A Building
DOCX
New Resume for Hays
PDF
NAJIB ADOMA MAMAIRI CV
PDF
Measurement 4 presentation
RTF
4) ext walls-element-revised-query
DOC
Icifinalprojectnov2015 (1)
Michael Street CV.2016
Cv with photo
Estimation And Costing Of A Building
New Resume for Hays
NAJIB ADOMA MAMAIRI CV
Measurement 4 presentation
4) ext walls-element-revised-query
Icifinalprojectnov2015 (1)
Ad

Similar to bqs Assignment no.2 (17)

PDF
Assignment no.2
PDF
Group Assignment: Bill Quantities
PDF
Assignment 2 - Measurement
PDF
Assignment no.2
PDF
M1 ASSIGNMENT 2 (GROUP) BRIEF
PDF
Assignment no.2 brief m1 sem1 degree
PPTX
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
PPT
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
 
DOCX
Civil Engineering Measurment
DOCX
NCIT civil Syllabus 2013-2014
PDF
SMM2 Explained
PPTX
estimating and costing introduction ppt.pptx
PDF
chapter1-210122051628.pdf
PPTX
Fundamentals of Estimating and Costing
PDF
MEASUREMENT PDF
PPTX
MEASUREMENT TENDER DOCUMENTATION
PPT
Lecture 1 Introduction Eng Quantities.ppt
Assignment no.2
Group Assignment: Bill Quantities
Assignment 2 - Measurement
Assignment no.2
M1 ASSIGNMENT 2 (GROUP) BRIEF
Assignment no.2 brief m1 sem1 degree
3. QUANTITY SURVEYING.pptxgajanjsjsjjsjh
Lec- 3.ppt domabd gerhjddj gedawquun bhajk
 
Civil Engineering Measurment
NCIT civil Syllabus 2013-2014
SMM2 Explained
estimating and costing introduction ppt.pptx
chapter1-210122051628.pdf
Fundamentals of Estimating and Costing
MEASUREMENT PDF
MEASUREMENT TENDER DOCUMENTATION
Lecture 1 Introduction Eng Quantities.ppt
Ad

More from Felix Vong (20)

PDF
Royal properties sdn bhd MS
DOC
Individual assignment brief ct3-2015
PDF
Traversing final-report
PDF
Leveling final-report
DOC
CT2 group-assignment-brief (video)+2015
DOC
Individual assignment brief ct2-2014
PPTX
Presentation
DOCX
Ct project 1 bqs
PDF
Ct1 assignment bqs
PDF
Assignment brief for site report bqs
PPTX
bqs Building materials presentation 2
PDF
BQS bq assignment
DOCX
bqs Site report
PPTX
Epc presentation 1.1 Taman Ayun Temple
PPTX
Epc 2.1 Lembah Kiara Park
DOCX
School of-architecture-group 1.1
DOCX
Psychology final journal 2.1
DOCX
Psy journal 2 1.2
DOCX
Psy 2 essay
PPT
Power bank presentation
Royal properties sdn bhd MS
Individual assignment brief ct3-2015
Traversing final-report
Leveling final-report
CT2 group-assignment-brief (video)+2015
Individual assignment brief ct2-2014
Presentation
Ct project 1 bqs
Ct1 assignment bqs
Assignment brief for site report bqs
bqs Building materials presentation 2
BQS bq assignment
bqs Site report
Epc presentation 1.1 Taman Ayun Temple
Epc 2.1 Lembah Kiara Park
School of-architecture-group 1.1
Psychology final journal 2.1
Psy journal 2 1.2
Psy 2 essay
Power bank presentation

Recently uploaded (20)

PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PDF
O7-L3 Supply Chain Operations - ICLT Program
PPTX
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PPTX
GDM (1) (1).pptx small presentation for students
PDF
Complications of Minimal Access Surgery at WLH
PPTX
Pharma ospi slides which help in ospi learning
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
A systematic review of self-coping strategies used by university students to ...
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
RMMM.pdf make it easy to upload and study
PDF
Anesthesia in Laparoscopic Surgery in India
PPTX
Cell Types and Its function , kingdom of life
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Final Presentation General Medicine 03-08-2024.pptx
Final Presentation General Medicine 03-08-2024.pptx
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
O7-L3 Supply Chain Operations - ICLT Program
Introduction-to-Literarature-and-Literary-Studies-week-Prelim-coverage.pptx
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
GDM (1) (1).pptx small presentation for students
Complications of Minimal Access Surgery at WLH
Pharma ospi slides which help in ospi learning
2.FourierTransform-ShortQuestionswithAnswers.pdf
A systematic review of self-coping strategies used by university students to ...
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Chinmaya Tiranga quiz Grand Finale.pdf
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
Microbial diseases, their pathogenesis and prophylaxis
RMMM.pdf make it easy to upload and study
Anesthesia in Laparoscopic Surgery in India
Cell Types and Its function , kingdom of life

bqs Assignment no.2

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan pembangunan 5 blok bangunan asrama pelajar 5 tingkat di Politeknik Tengku Omar, Perak. Percentage of Assessment: 20% Submission Date: 2nd July 2015 Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements for the chosen building.  Pilecaps including excavations from reduce level.  Work below ground floor level including site clearance and excavation, ground floor slab etc.  All first floor to fourth floor slabs and beams  Roof slabs and beams Notes:  Excavate topsoil 150 mm deep to be used on site, hardcore to be 100mm thick.  Assessment Criteria Refer to matrix attached. Teaching Objectives  To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.
  • 2.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to:  Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works.  Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works.  Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works.  Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission Each section is to submit to the group leader in the following sequence:  Billing ( handwritten )  Query list  Taking off list  Dimension sheets The Leader of each group is to collect from all the group members and attach the front cover page with the names of group members. He is to compile every member’s Billing in ONE Billing Paper only .and arranges the rest in the following sequence:  Billing ( to insert in front of BQ and hand written )  Pilecaps including excavations from reduce level.  Work below ground floor level including site clearance and excavation, ground floor slab etc.  First floor slabs to fourth floor slabs and beams.  Roof slabs and beams