Assignment No.2
SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Centre for Modern Architecture Studies in Southeast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT I [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
Cadangan Membina sebuah Tadika One Tingkat
di No.4 Jalan Bola Sepak 13/11, Seksyen 13, Shah Alam.
Percentage of Assessment: 20%
Submission Date: 1 July 2016 (Friday) at 10 am.
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following
structural elements of the chosen building.
 Pad footings including excavations from reduce level.
 Work below ground floor level including excavations, ground floor slab and apron slab etc.
 Ground floor beams
 Column stumps, columns and stiffeners
 Roof beams
 Upper roof beams
Notes
 Excavate topsoil 150 mm deep to be disposed off- site, hardcore to be 150mm thick.
Assessment Criteria
Refer to matrix attached.
Assignment No.2
Teaching Objectives
 To develop an understanding of the principles of measurement and techniques in preparing the
Bills of Quantities and Specification writing.
 To develop an awareness of the nature, content, and significance of tendering and contractual
documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in
taking-off quantities.
Learning Outcomes
Upon successful completion of this assignment, students will be able to:
 Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a
systematic approach to take-off quantities from drawing for the various trades in relation to sub-
structure and reinforced concrete frame works.
 Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for
sub-structure and reinforced concrete frame works.
 Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender
Documents for sub-structure and reinforced concrete frame works.
 Generate a conceptual understanding of and the ability to competently carry out the preparation of
the Bills of Quantities for sub-structure and reinforced concrete frame works.
Submission rules
Individual submission to Group Leader will consist of the following:
 Billing paper (handwritten)
 Query list
 Taking-off list
 Dimension sheets
 Peer assessment Form
The group leader will collect all the members’ work and compile it in a binded document (comb binding)
with a COVER of the university's logo and all the names of all group members. He will also need to do a
SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work.
The Bill of Quantities will be arranged in the following sequence:
 Billing ( to insert in front of BQ and hand written )
 Pad footings
 Work below ground floor level including excavations, ground floor slab and apron slab etc.
 Ground floor beams
 Column stumps, columns and stiffeners
 Roof beams.

More Related Content

PDF
Assignment no.2
PDF
Assignment 2
DOC
Measurement Assignment 2
PDF
Measurement assignment 2 (group)
PDF
STRUCTURAL ENGINEERING
PPTX
Planning and cost analysis of the commercial building
PPTX
Ici & itd pj1
PDF
Measurement assignment 3 (site report)
Assignment no.2
Assignment 2
Measurement Assignment 2
Measurement assignment 2 (group)
STRUCTURAL ENGINEERING
Planning and cost analysis of the commercial building
Ici & itd pj1
Measurement assignment 3 (site report)

What's hot (13)

PPTX
Methods of estimation - Estimation, Costing and Valuation Engineering
PDF
Estimation and costing practical norm and thumb rules
PDF
Ici and itd project 1
PDF
Lec.2 binifits of estamations...Types of Estimation
PPTX
Structure engineer slide share
PDF
4.1 conceptual estimates
PPTX
Project 1 ICI & ITD Presentation
PDF
2 types of estimates
PPTX
Structural engineer drawings
PPTX
Ici pj1
PPTX
Methods of estimation - Estimation, Costing and Valuation Engineering
Estimation and costing practical norm and thumb rules
Ici and itd project 1
Lec.2 binifits of estamations...Types of Estimation
Structure engineer slide share
4.1 conceptual estimates
Project 1 ICI & ITD Presentation
2 types of estimates
Structural engineer drawings
Ici pj1
Ad

Similar to Assignment no.2 (20)

PDF
Assignment no.2
PDF
Assignment no.2 brief m1 sem1 degree
PDF
M1 ASSIGNMENT 2 (GROUP) BRIEF
PDF
Assignment 2 - Measurement
PDF
BQS bq assignment
PDF
asAssignment no.2
PDF
Assignment no.2
PDF
bqs Assignment no.2
PDF
CE6704_uw.pdf
DOCX
Unit 1 - General Items used for building
PPTX
Cost Estimation for civil engineering .pptx
DOC
Aiet e&c lecture_notes
PDF
SEM 6 : BTECH 2 PROJECT 2
PPT
Lecture 1 Introduction Eng Quantities.ppt
PDF
Analysis, Design and Estimation of Basement +G+2 Residential Building
PPTX
Onkar Interntship PPT.pptx
PPTX
Ici & itd
PPTX
Ici & itd
PDF
SEM 6 : BTECH 2 PROJECT 1
Assignment no.2
Assignment no.2 brief m1 sem1 degree
M1 ASSIGNMENT 2 (GROUP) BRIEF
Assignment 2 - Measurement
BQS bq assignment
asAssignment no.2
Assignment no.2
bqs Assignment no.2
CE6704_uw.pdf
Unit 1 - General Items used for building
Cost Estimation for civil engineering .pptx
Aiet e&c lecture_notes
SEM 6 : BTECH 2 PROJECT 2
Lecture 1 Introduction Eng Quantities.ppt
Analysis, Design and Estimation of Basement +G+2 Residential Building
Onkar Interntship PPT.pptx
Ici & itd
Ici & itd
SEM 6 : BTECH 2 PROJECT 1
Ad

More from Areeb Amirullah (7)

PDF
Integrated assignment m1 ct1 and bm mac 2016
PDF
Integrated assignment ct1 and bm aug15
PDF
PDF
Final Presentation
PDF
English2 151207154354-lva1-app6892 (1)
PDF
English 2 essay
PPTX
Fnbe0115integrated awesome-150618191954-lva1-app6891 2
Integrated assignment m1 ct1 and bm mac 2016
Integrated assignment ct1 and bm aug15
Final Presentation
English2 151207154354-lva1-app6892 (1)
English 2 essay
Fnbe0115integrated awesome-150618191954-lva1-app6891 2

Recently uploaded (20)

PPT
BCH3201 (Enzymes and biocatalysis)-JEB (1).ppt
PDF
esg-supply-chain-webinar-nov2018hkhkkh.pdf
PPTX
Principles of Inheritance and variation class 12.pptx
PPTX
Job-opportunities lecture about it skills
PPTX
Surgical thesis protocol formation ppt.pptx
PPTX
A slide for students with the advantagea
DOCX
How to Become a Criminal Profiler or Behavioural Analyst.docx
PPTX
ESD MODULE-5hdbdhbdbdbdbbdbdbbdndbdbdbdbbdbd
PPTX
cse couse aefrfrqewrbqwrgbqgvq2w3vqbvq23rbgw3rnw345
PPTX
The Stock at arrangement the stock and product.pptx
PPTX
FINAL PPT.pptx cfyufuyfuyuy8ioyoiuvy ituyc utdfm v
PPTX
Cerebral_Palsy_Detailed_Presentation.pptx
PDF
Blue-Modern-Elegant-Presentation (1).pdf
PPT
Gsisgdkddkvdgjsjdvdbdbdbdghjkhgcvvkkfcxxfg
PPTX
1751884730-Visual Basic -Unitj CS B.pptx
PPTX
Autonomic_Nervous_SystemM_Drugs_PPT.pptx
PPTX
OnePlus 13R – ⚡ All-Rounder King Performance: Snapdragon 8 Gen 3 – same as iQ...
PPTX
DPT-MAY24.pptx for review and ucploading
PDF
Understanding the Rhetorical Situation Presentation in Blue Orange Muted Il_2...
PPT
notes_Lecture2 23l3j2 dfjl dfdlkj d 2.ppt
BCH3201 (Enzymes and biocatalysis)-JEB (1).ppt
esg-supply-chain-webinar-nov2018hkhkkh.pdf
Principles of Inheritance and variation class 12.pptx
Job-opportunities lecture about it skills
Surgical thesis protocol formation ppt.pptx
A slide for students with the advantagea
How to Become a Criminal Profiler or Behavioural Analyst.docx
ESD MODULE-5hdbdhbdbdbdbbdbdbbdndbdbdbdbbdbd
cse couse aefrfrqewrbqwrgbqgvq2w3vqbvq23rbgw3rnw345
The Stock at arrangement the stock and product.pptx
FINAL PPT.pptx cfyufuyfuyuy8ioyoiuvy ituyc utdfm v
Cerebral_Palsy_Detailed_Presentation.pptx
Blue-Modern-Elegant-Presentation (1).pdf
Gsisgdkddkvdgjsjdvdbdbdbdghjkhgcvvkkfcxxfg
1751884730-Visual Basic -Unitj CS B.pptx
Autonomic_Nervous_SystemM_Drugs_PPT.pptx
OnePlus 13R – ⚡ All-Rounder King Performance: Snapdragon 8 Gen 3 – same as iQ...
DPT-MAY24.pptx for review and ucploading
Understanding the Rhetorical Situation Presentation in Blue Orange Muted Il_2...
notes_Lecture2 23l3j2 dfjl dfdlkj d 2.ppt

Assignment no.2

  • 1. Assignment No.2 SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Centre for Modern Architecture Studies in Southeast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT I [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) Cadangan Membina sebuah Tadika One Tingkat di No.4 Jalan Bola Sepak 13/11, Seksyen 13, Shah Alam. Percentage of Assessment: 20% Submission Date: 1 July 2016 (Friday) at 10 am. Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements of the chosen building.  Pad footings including excavations from reduce level.  Work below ground floor level including excavations, ground floor slab and apron slab etc.  Ground floor beams  Column stumps, columns and stiffeners  Roof beams  Upper roof beams Notes  Excavate topsoil 150 mm deep to be disposed off- site, hardcore to be 150mm thick. Assessment Criteria Refer to matrix attached.
  • 2. Assignment No.2 Teaching Objectives  To develop an understanding of the principles of measurement and techniques in preparing the Bills of Quantities and Specification writing.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities. Learning Outcomes Upon successful completion of this assignment, students will be able to:  Explain and able to interpret clauses in the Standard Method of Measurement (SMM) and adopt a systematic approach to take-off quantities from drawing for the various trades in relation to sub- structure and reinforced concrete frame works.  Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works.  Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-structure and reinforced concrete frame works.  Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission rules Individual submission to Group Leader will consist of the following:  Billing paper (handwritten)  Query list  Taking-off list  Dimension sheets  Peer assessment Form The group leader will collect all the members’ work and compile it in a binded document (comb binding) with a COVER of the university's logo and all the names of all group members. He will also need to do a SUMMARY of all the Billing Papers and to submit a complete BILL followed by everyone's work. The Bill of Quantities will be arranged in the following sequence:  Billing ( to insert in front of BQ and hand written )  Pad footings  Work below ground floor level including excavations, ground floor slab and apron slab etc.  Ground floor beams  Column stumps, columns and stiffeners  Roof beams.