SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN
Cent re f or Modern Archit ect ure St udies in Sout heast Asia
Bachelor of Quantity Surveying (Honours)
MEASUREMENT 1 [QSB 10604]
____________________________________________________________
Assignment Title: No.2 (Group Project)
% of Assessment: 20%
Assignment date: 27 May 2014
Submission date: 4 July 2014
___________________________________________________________________
Assessment brief
Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural
elements for the chosen building.
 Pilecaps including excavations from reduce level
 Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and
apron slab.
 First floor slab and beams
 Roof slab and roof beams
 Columns stumps, columns and stiffeners.
Notes:
 Excavate topsoil 50 mm deep to be disposed off site.
Assessment Criteria
Refer to matrix attached.
Teaching Objectives
 To demonstrate a knowledge and understanding of measurement techniques and their application.
 To develop an awareness of the nature, content, and significance of tendering and contractual documentation.
 To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities.
 To develop an understanding of the principles of measurement in preparing the Bills of Quantities and
Specification writing.
Learning Outcomes
Upon successful completion of the module, students will be able to:
1. Explain and able to interpret clauses in the Standard Method of Measurement (SMM) for the various trades in
relation to sub-structure and reinforced concrete frame works.
2. Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure
and reinforced concrete frame works.
3. Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub-
structure and reinforced concrete frame works.
4. Adopt a systematic approach to take-off quantities from drawings for the preparation of Bills of Quantities for
sub-structure and reinforced concrete frame works.
5. Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of
Quantities for sub-structure and reinforced concrete frame works.
Submission
Each student is to submit in the following sequence:
 Taking off list
 Query list
 Dimension sheets
 Billing (in own handwriting)
 Appropriate front cover with the names of group members.
The Leader of each group is to collect from everyone in the group and attach the front cover page and arrange it in
the following sequence.
 Pilecaps including excavations from reduce level.
 Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and
apron slab.
 First floor slab and beams
 Roof slab and roof beams
 Columns and stiffeners.

More Related Content

DOC
Measurement Assignment 2
PDF
Measurement assignment 3 (site report)
PDF
measurement tadika Assignment no.2
PDF
Assignment 2
PDF
Assignment no.2
PPTX
Quantity surveying -scope and purpose
PDF
Lec.2 binifits of estamations...Types of Estimation
PPTX
Planning and cost analysis of the commercial building
Measurement Assignment 2
Measurement assignment 3 (site report)
measurement tadika Assignment no.2
Assignment 2
Assignment no.2
Quantity surveying -scope and purpose
Lec.2 binifits of estamations...Types of Estimation
Planning and cost analysis of the commercial building

What's hot (13)

PDF
Estimation and costing practical norm and thumb rules
PDF
Estimation And Costing Of A Building
PDF
Seminar 1 - Question 1
PDF
Assignment - Cost Plan
DOCX
Taking off qs
PPTX
Introduction to estimating & costing
PDF
Estimating part 2
PPTX
Bill of quantities
DOCX
Assignment - Financial Analysis
PPT
Scope of work
PDF
Estimation and Evaluation of G+3 Residential Building
PPTX
Crotti final reports_prousall
DOCX
Construction report (boq, wbs, reports, evm)
Estimation and costing practical norm and thumb rules
Estimation And Costing Of A Building
Seminar 1 - Question 1
Assignment - Cost Plan
Taking off qs
Introduction to estimating & costing
Estimating part 2
Bill of quantities
Assignment - Financial Analysis
Scope of work
Estimation and Evaluation of G+3 Residential Building
Crotti final reports_prousall
Construction report (boq, wbs, reports, evm)
Ad

Viewers also liked (19)

PPTX
Measurement 4 Assignment Presentation
DOCX
Measurement III:Doors & Windows
PPTX
Sgp4813 measurement of quantities
PPTX
Measurement and layout tools
DOCX
Software application:assignment
PDF
Software Application Group Assignment
DOCX
Bill of Quantities ( Door and Window )
DOCX
Assignment on Entrepreneurship development( stories of a successful entrepren...
PDF
SMM7 Bill of Quantities
DOCX
Acknowledgements
PPT
Construction productivity
PPTX
construction site safety and management
PDF
Standard bill of quantities
DOCX
Example of acknowledgment
PPT
Construction site safety
DOCX
Acknowledgement
PPTX
Formwork
DOC
Acknowledgement For Assignment
Measurement 4 Assignment Presentation
Measurement III:Doors & Windows
Sgp4813 measurement of quantities
Measurement and layout tools
Software application:assignment
Software Application Group Assignment
Bill of Quantities ( Door and Window )
Assignment on Entrepreneurship development( stories of a successful entrepren...
SMM7 Bill of Quantities
Acknowledgements
Construction productivity
construction site safety and management
Standard bill of quantities
Example of acknowledgment
Construction site safety
Acknowledgement
Formwork
Acknowledgement For Assignment
Ad

Similar to Measurement assignment 2 (group) (20)

PDF
Group Assignment: Bill Quantities
PDF
Assignment no.2
PDF
BQS bq assignment
PDF
asAssignment no.2
PDF
Assignment no.2
PDF
bqs Assignment no.2
PDF
Assignment no.2
PDF
Assignment no.2 brief m1 sem1 degree
PDF
M1 ASSIGNMENT 2 (GROUP) BRIEF
PDF
Assignment 2 - Measurement
PDF
Assignment
PDF
Assignment - software application for qs
PDF
7th_8th_SEM_SYLLABUS.pdf
PPTX
Cost Estimation for civil engineering .pptx
PDF
CE6704_uw.pdf
PDF
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
PDF
Project brief 2 b construction 2 march 2016 1
PPT
Quantity Surveying & valuation.ppt
DOC
Aiet e&c lecture_notes
PDF
Project brief 2 b construction 2 march 2016 (new)
Group Assignment: Bill Quantities
Assignment no.2
BQS bq assignment
asAssignment no.2
Assignment no.2
bqs Assignment no.2
Assignment no.2
Assignment no.2 brief m1 sem1 degree
M1 ASSIGNMENT 2 (GROUP) BRIEF
Assignment 2 - Measurement
Assignment
Assignment - software application for qs
7th_8th_SEM_SYLLABUS.pdf
Cost Estimation for civil engineering .pptx
CE6704_uw.pdf
SEMESTER 3 : PROJECT 2 BRIEF BCON 2
Project brief 2 b construction 2 march 2016 1
Quantity Surveying & valuation.ppt
Aiet e&c lecture_notes
Project brief 2 b construction 2 march 2016 (new)

More from Syafiq Zariful (20)

DOC
Conference paper-11-9-2017
DOCX
De assignment compile
DOCX
Pm group-compileddd
DOCX
Finalized dissertation (print 80 gram hardcover)
DOCX
07 cl-assignment-syafiq-qy-macy-huiyong-deric
DOCX
Vm report-most-updated-2
PPTX
Pp2 seminar
DOCX
Research proposal final draft
DOCX
Software assignment
PPTX
Software applications-presentation
DOCX
Community service-report-syafiq-2
DOCX
1,2 & 3,4 ratio analysis updated
DOCX
Financial management assignment (f) summarized 4
PPTX
Building economics presentation 3 2
PPTX
Fm presentation final
DOCX
Compiled fm assignment (complete)
PPTX
Estimating presentation
DOCX
Software application finalized group report
PPTX
Presentation measurement part 2
PPTX
Bs 2 assignment presentation1
Conference paper-11-9-2017
De assignment compile
Pm group-compileddd
Finalized dissertation (print 80 gram hardcover)
07 cl-assignment-syafiq-qy-macy-huiyong-deric
Vm report-most-updated-2
Pp2 seminar
Research proposal final draft
Software assignment
Software applications-presentation
Community service-report-syafiq-2
1,2 & 3,4 ratio analysis updated
Financial management assignment (f) summarized 4
Building economics presentation 3 2
Fm presentation final
Compiled fm assignment (complete)
Estimating presentation
Software application finalized group report
Presentation measurement part 2
Bs 2 assignment presentation1

Recently uploaded (20)

PPTX
Lecture Notes Electrical Wiring System Components
PPTX
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
PPT on Performance Review to get promotions
PPTX
bas. eng. economics group 4 presentation 1.pptx
PPTX
additive manufacturing of ss316l using mig welding
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PDF
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
PPTX
UNIT-1 - COAL BASED THERMAL POWER PLANTS
PDF
Well-logging-methods_new................
PPTX
UNIT 4 Total Quality Management .pptx
DOCX
573137875-Attendance-Management-System-original
PPTX
CH1 Production IntroductoryConcepts.pptx
PDF
composite construction of structures.pdf
PPTX
Construction Project Organization Group 2.pptx
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
web development for engineering and engineering
Lecture Notes Electrical Wiring System Components
Infosys Presentation by1.Riyan Bagwan 2.Samadhan Naiknavare 3.Gaurav Shinde 4...
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPT on Performance Review to get promotions
bas. eng. economics group 4 presentation 1.pptx
additive manufacturing of ss316l using mig welding
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Internet of Things (IOT) - A guide to understanding
Mohammad Mahdi Farshadian CV - Prospective PhD Student 2026
PRIZ Academy - 9 Windows Thinking Where to Invest Today to Win Tomorrow.pdf
UNIT-1 - COAL BASED THERMAL POWER PLANTS
Well-logging-methods_new................
UNIT 4 Total Quality Management .pptx
573137875-Attendance-Management-System-original
CH1 Production IntroductoryConcepts.pptx
composite construction of structures.pdf
Construction Project Organization Group 2.pptx
Foundation to blockchain - A guide to Blockchain Tech
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
web development for engineering and engineering

Measurement assignment 2 (group)

  • 1. SCHOOL OF ARCHITECTURE, BUILDING AND DESIGN Cent re f or Modern Archit ect ure St udies in Sout heast Asia Bachelor of Quantity Surveying (Honours) MEASUREMENT 1 [QSB 10604] ____________________________________________________________ Assignment Title: No.2 (Group Project) % of Assessment: 20% Assignment date: 27 May 2014 Submission date: 4 July 2014 ___________________________________________________________________ Assessment brief Based on the drawings provided, you are required to prepare a COMPLETE TAKING-OFF for the following structural elements for the chosen building.  Pilecaps including excavations from reduce level  Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and apron slab.  First floor slab and beams  Roof slab and roof beams  Columns stumps, columns and stiffeners. Notes:  Excavate topsoil 50 mm deep to be disposed off site. Assessment Criteria Refer to matrix attached.
  • 2. Teaching Objectives  To demonstrate a knowledge and understanding of measurement techniques and their application.  To develop an awareness of the nature, content, and significance of tendering and contractual documentation.  To have sufficient knowledge and understanding of the Standard Method of Measurement in taking-off quantities.  To develop an understanding of the principles of measurement in preparing the Bills of Quantities and Specification writing. Learning Outcomes Upon successful completion of the module, students will be able to: 1. Explain and able to interpret clauses in the Standard Method of Measurement (SMM) for the various trades in relation to sub-structure and reinforced concrete frame works. 2. Distinguish and illustrate differences in writing-up descriptions in accordance to design changes for sub-structure and reinforced concrete frame works. 3. Evaluate the relationship between Specifications, Drawings and Bill of Quantities in Tender Documents for sub- structure and reinforced concrete frame works. 4. Adopt a systematic approach to take-off quantities from drawings for the preparation of Bills of Quantities for sub-structure and reinforced concrete frame works. 5. Generate a conceptual understanding of and the ability to competently carry out the preparation of the Bills of Quantities for sub-structure and reinforced concrete frame works. Submission Each student is to submit in the following sequence:  Taking off list  Query list  Dimension sheets  Billing (in own handwriting)  Appropriate front cover with the names of group members. The Leader of each group is to collect from everyone in the group and attach the front cover page and arrange it in the following sequence.  Pilecaps including excavations from reduce level.  Work below ground floor level including site clearance and excavation, ground floor slab, ground beams and apron slab.  First floor slab and beams  Roof slab and roof beams  Columns and stiffeners.