This document provides the assessment brief for a group project on taking off structural quantities from drawings for a building. Students are required to prepare a complete taking off for pilecaps, work below ground level including excavation and ground floor elements, first floor slab and beams, roof slab and beams, and columns. The assessment will be evaluated based on attached criteria and submissions must include taking off lists, queries, dimension sheets, bills of quantities, and a cover page with group members' names arranged in the specified sequence. The objectives are to demonstrate measurement techniques, tender documentation, use of standard method of measurement, and preparation of bills of quantities and specifications. Upon completion, students will be able to interpret standard method of measurement, write descriptions, relate