HSE
DEPARTMENT
(738-C02)
• Scaffolding materials as per standards (Tube and Coupler scaffold
acceptable. NO frame scaffold)
• Competent scaffold supervisor to supervise all scaffolding
erection / dismantling / modifications
• Scaff Tags a must.
– Green Scaff Tag – OK for Use
– Red Scaff Tag – Don’t Use
– Yellow Tag – Use Full Body Harness
• Scaff Tag to be revalidated / inspected everyday.
If it is without inspection – DO NOT USE!
• Only trained scaffolders to perform or modify scaffolding works
• Full body harness @ 1.6 meters high and above
BASIC RULE OF SCAFFOLD
0.95 m – 1.15 m
(38” – 45”)
6”
36” min.
Scaffold Basic Components
SCAFFOLD PLANKS (BOARDS)
BEARER (TRANSOM)
LONGITUDINAL (FACADE) BRACING
SWIVEL COUPLER
FIXED COUPLER (90o)
TRANSVERSE (SECTIONAL) BRACING
BASE LIFT (KICKER LIFT)
MID RAIL
SELF-CLOSING DROP
BAR (INSIDE POSTS)
FALSE UPRIGHT
(PUNCHEON)
LADDER CLAMP
TOEBOARD
POST (STANDARD)
RUNNER (LEDGER)
BASE PLATE
SILL (SOLE BOARD)
INDEPENDENT (DOUBLE POLE) SCAFFOLD
TOP RAIL
TIMBER
COVER FOR
ACCESS HOLE
(or hinged)
PLAN BRACE
UNDER DECK
PLAN BRACE
LONGITUDINAL
(FAÇADE)
BRACING
TOP RAIL
MID RAIL
WIRE LASHING
(TOP, MIDDLE
& BOTTOM OF
LADDER
TOEBOARD
LADDER SHOULD BE
FIXED TO NARROWER
WIDTH OF TOWER
TRANSVERSE
(LEDGER)
BRACING
LOCKING
CASTERS
MOBILE SCAFFOLD
When ascending /
descending ladder,
FACE IT with
both hands FREE.
Always maintain
3-point contact
• 2 hands, 1 foot
• 2 feet, 1 hand

Ladders of insufficient length pose potential fall
hazard. Ensure the top of ladder is extended 36”
(min) above the landing or provide grab bar.
To firm
footing
top rail
mid
rail
drop bar

Ladder inclined at 75O with the horizontal, positioned
to allow sideway step to and from the landing.

Ladders must be secured by the side rails (stiles), not by the
rungs, by means of lashing or ladder clamp.
Load bearing
coupler as a
temporary
positive stop
during scaffold
erection.
Do not hook
lanyard onto a
ladder / hole of
scaffold post.

Use rope to lower
or raise tools / materialsNever drop tools

Cover all OPENINGS on the
platform deck


Transom
Substitute Scaffold Board for Transom
DON’T
(scaffold load bearing tube)

Don’t use / work on an
incomplete scaffold

Don’t move scaffold with
person on platform
Use mobile scaffold
only on paved areas.
Poorly supported Planks

Scaffold planks must be piled evenly supported to prevent
warping / distortion.
DO NOT EXTEND SCAFFOLD TUBES
TOO LONG
POOR
HOUSEKEEPING
…materials left cluttered
on the ground
… couplers rusting in
storage drum filled with
water
Keep
materials
orderly and
tidy

Scaffold

More Related Content

PPTX
SCAFFOLDING Safety Training
DOCX
Painting risk assessment template
PPTX
Visitors SHE Induction Presentation 2016
PPTX
Factory act
PPT
Logos ethos pathos
PPT
Working at heights
PPTX
Scaffolding safety at construction site
SCAFFOLDING Safety Training
Painting risk assessment template
Visitors SHE Induction Presentation 2016
Factory act
Logos ethos pathos
Working at heights
Scaffolding safety at construction site

What's hot (20)

PPTX
Erection of scaffolding
PDF
Eta Scaffold Training
PDF
Risk assessment for testing & commissioning of cranes
PDF
TOOLBOX TALK | lifting & rigging operations
PPT
Scaffolding safety training.ppt
PPT
Safe Rigging Training
PDF
Rigging and lifting
PPT
Liftingproedure
PPT
Basics of crane
PPT
working at hight
PDF
A Part 6 Lifting Operations
PPTX
Rescue at heights westfields 2017
PDF
scaffolding safety.pdf
PDF
Crane safety and_awareness_presentation_ttp
PPT
presentation on mobile cranes
PDF
Rigger signalman handbook
PPT
Below the hook
PPTX
Struck by hazards 2019
PPTX
Mobile crane
DOCX
12 sheet piling operations (temporary works) risk assessment templates
Erection of scaffolding
Eta Scaffold Training
Risk assessment for testing & commissioning of cranes
TOOLBOX TALK | lifting & rigging operations
Scaffolding safety training.ppt
Safe Rigging Training
Rigging and lifting
Liftingproedure
Basics of crane
working at hight
A Part 6 Lifting Operations
Rescue at heights westfields 2017
scaffolding safety.pdf
Crane safety and_awareness_presentation_ttp
presentation on mobile cranes
Rigger signalman handbook
Below the hook
Struck by hazards 2019
Mobile crane
12 sheet piling operations (temporary works) risk assessment templates
Ad

Viewers also liked (15)

PPTX
Basic Scaffolding Awareness
PPT
Scaffolding
PDF
Rigging slinging Training
PPTX
Scaffolding safety
PPTX
Do’s And Don’ts For Scaffolding Safety
PPT
SG4:10 presentation
PPTX
HNI U - Brace Yourself: Fall Protection and Safety Strategies to Prevent Work...
PDF
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
PDF
Do's and Don'ts of Scaffold Safety
PDF
Kee Anchor - Dead Weight Fall Protection Anchor
PPTX
Selecting Fall Protection Anchorage Points
PDF
Confined_space_rescue_procedure
PPT
Effective Fall Protection Training
PPTX
Fall Protection Guide
PPT
Carleton Rescue Safety Equipment Ltd.
Basic Scaffolding Awareness
Scaffolding
Rigging slinging Training
Scaffolding safety
Do’s And Don’ts For Scaffolding Safety
SG4:10 presentation
HNI U - Brace Yourself: Fall Protection and Safety Strategies to Prevent Work...
OLEAMS PRESENTATION-Fall Protection & Rescue Solutions for Industries 2016
Do's and Don'ts of Scaffold Safety
Kee Anchor - Dead Weight Fall Protection Anchor
Selecting Fall Protection Anchorage Points
Confined_space_rescue_procedure
Effective Fall Protection Training
Fall Protection Guide
Carleton Rescue Safety Equipment Ltd.
Ad

Similar to Scaffold (20)

PPT
HSE-BMS-018 Scaffolding Safety.......ppt
PDF
DOC-20231115-WA0057..pdf
PPTX
Scaffolding Safety HSE Presentation  HSE Formats.pptx
PPT
SCAFFOLDING safety training PRESENTATION .ppt
PPTX
Ladder safety
PPT
HSE-BMS-018 Scaffolding Safety training.ppt
PPTX
WORKING AT HEIGHT pptx
PPTX
WORK AT HEIGHT TRAINING WORK AT HEIGHT TRAINING.pptx
PPT
Scaffolding2. CO3.ppt
PPT
Work at height at industries and PPE.ppt
PPT
Work-at-Height-Training.ppt slides for sharing
PPTX
WORK AT HEIGHT.pptx
PPTX
Crane Hoist Operations
PPTX
Lifting & Rigging Safety.pptx
PPT
fall_hazards2.ppt
PDF
Ladder Types & Safety & Requirements
PPTX
Aramco scaffolding safety presentation -1.pptx
PPS
کنترل تجهیزات باربرداری
PDF
Scaffold Erection & Inspection training for all
PPTX
DO 128 - 13 SCAFFOLDING SAFETY.pptx
HSE-BMS-018 Scaffolding Safety.......ppt
DOC-20231115-WA0057..pdf
Scaffolding Safety HSE Presentation  HSE Formats.pptx
SCAFFOLDING safety training PRESENTATION .ppt
Ladder safety
HSE-BMS-018 Scaffolding Safety training.ppt
WORKING AT HEIGHT pptx
WORK AT HEIGHT TRAINING WORK AT HEIGHT TRAINING.pptx
Scaffolding2. CO3.ppt
Work at height at industries and PPE.ppt
Work-at-Height-Training.ppt slides for sharing
WORK AT HEIGHT.pptx
Crane Hoist Operations
Lifting & Rigging Safety.pptx
fall_hazards2.ppt
Ladder Types & Safety & Requirements
Aramco scaffolding safety presentation -1.pptx
کنترل تجهیزات باربرداری
Scaffold Erection & Inspection training for all
DO 128 - 13 SCAFFOLDING SAFETY.pptx

Scaffold

  • 2. • Scaffolding materials as per standards (Tube and Coupler scaffold acceptable. NO frame scaffold) • Competent scaffold supervisor to supervise all scaffolding erection / dismantling / modifications • Scaff Tags a must. – Green Scaff Tag – OK for Use – Red Scaff Tag – Don’t Use – Yellow Tag – Use Full Body Harness • Scaff Tag to be revalidated / inspected everyday. If it is without inspection – DO NOT USE! • Only trained scaffolders to perform or modify scaffolding works • Full body harness @ 1.6 meters high and above BASIC RULE OF SCAFFOLD
  • 3. 0.95 m – 1.15 m (38” – 45”) 6” 36” min. Scaffold Basic Components SCAFFOLD PLANKS (BOARDS) BEARER (TRANSOM) LONGITUDINAL (FACADE) BRACING SWIVEL COUPLER FIXED COUPLER (90o) TRANSVERSE (SECTIONAL) BRACING BASE LIFT (KICKER LIFT) MID RAIL SELF-CLOSING DROP BAR (INSIDE POSTS) FALSE UPRIGHT (PUNCHEON) LADDER CLAMP TOEBOARD POST (STANDARD) RUNNER (LEDGER) BASE PLATE SILL (SOLE BOARD) INDEPENDENT (DOUBLE POLE) SCAFFOLD TOP RAIL
  • 4. TIMBER COVER FOR ACCESS HOLE (or hinged) PLAN BRACE UNDER DECK PLAN BRACE LONGITUDINAL (FAÇADE) BRACING TOP RAIL MID RAIL WIRE LASHING (TOP, MIDDLE & BOTTOM OF LADDER TOEBOARD LADDER SHOULD BE FIXED TO NARROWER WIDTH OF TOWER TRANSVERSE (LEDGER) BRACING LOCKING CASTERS MOBILE SCAFFOLD
  • 5. When ascending / descending ladder, FACE IT with both hands FREE. Always maintain 3-point contact • 2 hands, 1 foot • 2 feet, 1 hand 
  • 6. Ladders of insufficient length pose potential fall hazard. Ensure the top of ladder is extended 36” (min) above the landing or provide grab bar. To firm footing top rail mid rail drop bar  Ladder inclined at 75O with the horizontal, positioned to allow sideway step to and from the landing.
  • 7.  Ladders must be secured by the side rails (stiles), not by the rungs, by means of lashing or ladder clamp.
  • 8. Load bearing coupler as a temporary positive stop during scaffold erection. Do not hook lanyard onto a ladder / hole of scaffold post. 
  • 9. Use rope to lower or raise tools / materialsNever drop tools 
  • 10. Cover all OPENINGS on the platform deck 
  • 11.  Transom Substitute Scaffold Board for Transom DON’T (scaffold load bearing tube)
  • 12.  Don’t use / work on an incomplete scaffold
  • 13.  Don’t move scaffold with person on platform Use mobile scaffold only on paved areas.
  • 14. Poorly supported Planks  Scaffold planks must be piled evenly supported to prevent warping / distortion.
  • 15. DO NOT EXTEND SCAFFOLD TUBES TOO LONG
  • 16. POOR HOUSEKEEPING …materials left cluttered on the ground … couplers rusting in storage drum filled with water