ITEM
1.1
1.2
1.3
1.4
1.5
2.1
2.2
2.3
2.4
2.5
2.6
2.7
2.8
2.9
2.10
2.11
2.12
2.13
2.14
2.15
2.16
2.17
2.18
2.19
2.20
2.21
2.22
2.23
RESULT OF CHECKING : GOOD AVERAGE POOR
Remarks :
Checked by : Witness by : Acknowledge by :
Name : Name : Name :
Date : Date : Date :
Post : Post : Post :
Company : Company : Company :
Sole plates is correctly positioned and bear fully on supporting
Top guardrail is correctly positioned and fixed
SCAFFOLDING INSPECTION CHECKLIST
AFTER COMPLETE
ERECTION
2.0 ERECTION ITEMS
Ground condition is good, compact and can support load
LOCATION
TYPE OF SCAFFOLD
DATE OF INSPECTION
LIFT
WEEKLY
AFTER BAD
WEATHER
AFTER
MODIFICATION
REFERENCE NO
SCAFFOLD FUNCTION
TIME
TEMPORARY ACCESS
BAY
DESCRIPTION YES NO N/A REMARKS
Availiability of Scaffold Design
Sufficient Material for Scaffold Erection
Scaffold Materials are in good condition
Area barricaded or cordoned off
Proper signage already display
1.0 GENERAL
Adjustable base plates is correctly positioned
Standard or frames is correctly positioned
Transoms is correctly positioned and fixed
Ledger is correctly positioned and fixed
Braces / cross brace is correctly positioned and fixed
Diagonal brace is correctly positioned and fixed
Working platform or planks is correctly positioned and fixed
Toeboard is correctly positioned and fixed
Handrail is correctly positioned and fixed
Mid guardrail is correctly positioned and fixed
Step ladder or extension is correctly positioned and fixed
Outrigger is correctly positioned and fixed
Debris netting is correctly positioned and fixed
Wall tie are correctly positioned and fixed
Bolt and nuts for catch platform is correctly positioned and fixed
Wire rope for catch platform is correctly positioned and fixed
Plank bracing for mobile scaffold is correctly positioned and fixed
Castor wheel for mobile scaffold is correctly positioned and fixed
Tagging available and Implemented ready
Housekeeping
PROJEK PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI-ULU KELANG
PACKAGE CA2 CONSTRUCTION AND COMPLETION OF MAINLINE AND OTHER ASSOCIATED WORKS FROM CH 2400 TO CH 4200
Hasnizam Md Saad
Scaffolder Inspector
WP/18/PP/02/00556
MRCB Builders Sdn Bhd

More Related Content

DOCX
10. lifting-plan-checklist-and-method-statement-2
PDF
0-FRM_Check-List-Equipos-Varios.pdf
PDF
Machinery Inspection.pdf
DOCX
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC Rev 2.docx
DOC
Height work permit
DOCX
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
PDF
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
DOCX
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx
10. lifting-plan-checklist-and-method-statement-2
0-FRM_Check-List-Equipos-Varios.pdf
Machinery Inspection.pdf
AUXILIARY CRANE INSPECTION CHECKLIST Form # HSEQ - AC Rev 2.docx
Height work permit
MAST CLIMBER & CRADLE PERMIT Form # HSEQ - Rev 2.docx
PROJECT HEALTH, SAFETY, AND ENVIRONMENTAL PLAN
LIFE LINE INSPECTION RECORD Form # HSEQ - LLIR Rev 2.docx

What's hot (20)

DOCX
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
DOCX
8 lifting operations with mobile crane risk assessment templates
DOCX
9 lifting operations with tower crane risk assessment templates
PDF
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
PPTX
Monthly HSE Report March for overall HSE
PDF
December -15 Daily Observation Report
DOCX
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
PPTX
PPT ON PERMIT TO WORK, by Ekemezie E
DOCX
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
PDF
313440656 crane-lifting-calculation-sheet
PDF
Forklift safety
PDF
Risk assessment for testing & commissioning of cranes
PDF
Rigging and lifting
PDF
Fire Risk Assessment.pdf
DOCX
HSE Monitoring schedule plan
DOCX
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
PDF
Weekly welding machine checklist
DOCX
2 fire risk assessment template risk assessment templates
PPT
Safety In Gas Cutting.
PDF
bar bending safety precautions.pdf
WORK AT HEIGHT PERMIT Form # HSEQ - WHP Rev.docx
8 lifting operations with mobile crane risk assessment templates
9 lifting operations with tower crane risk assessment templates
Job Safety Analysis For Lifting Activity By Crane | JSA | Gaurav Singh Rajput
Monthly HSE Report March for overall HSE
December -15 Daily Observation Report
LIFTING WORK PERMIT Form # HSEQ - LWP Rev 2.docx
PPT ON PERMIT TO WORK, by Ekemezie E
TOWER CRANE INSPECTION CHECKLIST Form # HSEQ - TCI Rev 2 -.docx
313440656 crane-lifting-calculation-sheet
Forklift safety
Risk assessment for testing & commissioning of cranes
Rigging and lifting
Fire Risk Assessment.pdf
HSE Monitoring schedule plan
FULL BODY HARNESS INSPECTION RECORD Form # HSEQ - FBHIR Rev 2.docx
Weekly welding machine checklist
2 fire risk assessment template risk assessment templates
Safety In Gas Cutting.
bar bending safety precautions.pdf
Ad

More from HASNIZAM BIN MD SAAD (20)

PDF
SYARAT-SYARAT PENTAULIAHAN PEGAWAI PENILAI (ASSESSOR) SHASSIC™ (PEMBAHARUAN)
PDF
SYARAT-SYARAT PENTAULIAHAN PEGAWAI PENILAI (ASSESSOR) SHASSIC™ (BARU)
PDF
TANGGUNGJAWAB TENAGA PENGAJAR (TRAINER) SHASSIC
PDF
TANGGUNGJAWAB PEGAWAI PENILAI (ASSESSOR) SHASSIC
PDF
GARIS PANDUAN PENTAULIAHAN SHASSIC ASSESSOR
PDF
SHASSIC KV.pdf
PDF
KV Segamat SHASSIC.pdf
PDF
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
PDF
SHASSIC HASNIZAM.pdf
PDF
Latihan Asas Pengawal Bendera
PDF
PDF
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
PDF
SHASSIC CIS 10 2020
PDF
Standard Industri Pembinaan cis 10 2020
PDF
Handbook for rigger signalman hasnizam
PDF
SHASSIC CIS 10 : 2018
PDF
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
PDF
Sila pakai topeng muka
PDF
Prosidur standard operasi (sop) kebenaran pkp
PDF
Garispanduan pkp pembinaan
SYARAT-SYARAT PENTAULIAHAN PEGAWAI PENILAI (ASSESSOR) SHASSIC™ (PEMBAHARUAN)
SYARAT-SYARAT PENTAULIAHAN PEGAWAI PENILAI (ASSESSOR) SHASSIC™ (BARU)
TANGGUNGJAWAB TENAGA PENGAJAR (TRAINER) SHASSIC
TANGGUNGJAWAB PEGAWAI PENILAI (ASSESSOR) SHASSIC
GARIS PANDUAN PENTAULIAHAN SHASSIC ASSESSOR
SHASSIC KV.pdf
KV Segamat SHASSIC.pdf
HASNIZAM SHASSIC CIS 10 2020 (CIDB).pdf
SHASSIC HASNIZAM.pdf
Latihan Asas Pengawal Bendera
HEALTH EFFECTS OF CIGARETTE SMOKING.pdf
SHASSIC CIS 10 2020
Standard Industri Pembinaan cis 10 2020
Handbook for rigger signalman hasnizam
SHASSIC CIS 10 : 2018
SAFETY REQUIREMENTS FOR FORMWORK STRUCTURES
Sila pakai topeng muka
Prosidur standard operasi (sop) kebenaran pkp
Garispanduan pkp pembinaan
Ad

Recently uploaded (20)

PDF
HVAC Specification 2024 according to central public works department
PPTX
B.Sc. DS Unit 2 Software Engineering.pptx
PDF
International_Financial_Reporting_Standa.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PDF
Weekly quiz Compilation Jan -July 25.pdf
PPTX
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
PDF
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
advance database management system book.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PDF
Hazard Identification & Risk Assessment .pdf
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PPTX
Share_Module_2_Power_conflict_and_negotiation.pptx
PPTX
Computer Architecture Input Output Memory.pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
FORM 1 BIOLOGY MIND MAPS and their schemes
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
HVAC Specification 2024 according to central public works department
B.Sc. DS Unit 2 Software Engineering.pptx
International_Financial_Reporting_Standa.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
Weekly quiz Compilation Jan -July 25.pdf
ELIAS-SEZIURE AND EPilepsy semmioan session.pptx
احياء السادس العلمي - الفصل الثالث (التكاثر) منهج متميزين/كلية بغداد/موهوبين
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
advance database management system book.pdf
Introduction to pro and eukaryotes and differences.pptx
Hazard Identification & Risk Assessment .pdf
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
Share_Module_2_Power_conflict_and_negotiation.pptx
Computer Architecture Input Output Memory.pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
FORM 1 BIOLOGY MIND MAPS and their schemes
ChatGPT for Dummies - Pam Baker Ccesa007.pdf

Scaffolding checklist

  • 1. ITEM 1.1 1.2 1.3 1.4 1.5 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 2.9 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 RESULT OF CHECKING : GOOD AVERAGE POOR Remarks : Checked by : Witness by : Acknowledge by : Name : Name : Name : Date : Date : Date : Post : Post : Post : Company : Company : Company : Sole plates is correctly positioned and bear fully on supporting Top guardrail is correctly positioned and fixed SCAFFOLDING INSPECTION CHECKLIST AFTER COMPLETE ERECTION 2.0 ERECTION ITEMS Ground condition is good, compact and can support load LOCATION TYPE OF SCAFFOLD DATE OF INSPECTION LIFT WEEKLY AFTER BAD WEATHER AFTER MODIFICATION REFERENCE NO SCAFFOLD FUNCTION TIME TEMPORARY ACCESS BAY DESCRIPTION YES NO N/A REMARKS Availiability of Scaffold Design Sufficient Material for Scaffold Erection Scaffold Materials are in good condition Area barricaded or cordoned off Proper signage already display 1.0 GENERAL Adjustable base plates is correctly positioned Standard or frames is correctly positioned Transoms is correctly positioned and fixed Ledger is correctly positioned and fixed Braces / cross brace is correctly positioned and fixed Diagonal brace is correctly positioned and fixed Working platform or planks is correctly positioned and fixed Toeboard is correctly positioned and fixed Handrail is correctly positioned and fixed Mid guardrail is correctly positioned and fixed Step ladder or extension is correctly positioned and fixed Outrigger is correctly positioned and fixed Debris netting is correctly positioned and fixed Wall tie are correctly positioned and fixed Bolt and nuts for catch platform is correctly positioned and fixed Wire rope for catch platform is correctly positioned and fixed Plank bracing for mobile scaffold is correctly positioned and fixed Castor wheel for mobile scaffold is correctly positioned and fixed Tagging available and Implemented ready Housekeeping PROJEK PENSWASTAAN LEBUHRAYA BERTINGKAT SUNGAI BESI-ULU KELANG PACKAGE CA2 CONSTRUCTION AND COMPLETION OF MAINLINE AND OTHER ASSOCIATED WORKS FROM CH 2400 TO CH 4200 Hasnizam Md Saad Scaffolder Inspector WP/18/PP/02/00556 MRCB Builders Sdn Bhd