Problem No 11.1.
Seven jobs go first over Machine 1 and then over Machine 2.
Processing times in Hours are given as:
Job A B C D E F G
Machine 1 6 24 30 12 20 22 18
Machine 1 16 20 20 12 24 2 6
Find the optimum sequence in which jobs should be processed.
Solution:
We find the Smallest processing time between two machine
is 2 hours for job F on machine 2. Thus we shall schedule job
F in the last as shown below:
F
The Reduced set of processing times becomes:
Job A B C D E G
Machine 1 6 24 30 12 20 18
Machine 1 16 20 20 12 24 6
We find the Smallest processing time between two machine
is 6 hours for job A in machine 1 & job G in machine 2. we
shall schedule job A in the First and job G in the 2nd last as
shown below:
A G F
The Reduced set of processing times becomes:
Job B C D E
Machine 1 24 30 12 20
Machine 1 20 20 12 24
We find the Smallest processing time between two machine
is 12 hours for job D in machine 1 and machine 2. we shall
schedule job D in the Next to Job A or previous to Job G.
Here, we sequences Job D in next to Job A. shown below:
A D G F
The Reduced set of processing times becomes:
Job B C E
Machine 1 24 30 20
Machine 1 20 20 24
Here, We find the Smallest processing time between two
machine is 20 hours for job E in machine 1 and Job B & C in
machine 2. we shall schedule job E in the Next to Job D
and Job B in previous to Job G again job C in previous to
Job B. Here, we sequences Job B,C And job E shown below:
A D E C B G F
The minimum elapsed time can now be computed cumulatively
As flow:
Job Time in Time out Time in Time out Idle time for machine 2
A 0 6 6 22 6
D 6 18 22 34 0
E 18 38 38 62 4
C 38 68 68 88 6
B 68 92 92 112 4
G 92 110 112 118 0
F 110 132 132 134 14
Machine 1 Machine 2
Idle time for machine 2 is 34 hours
From the above table, it is apparent that the minimum
total time to finish all the 7 jobs is 134 hours and idle
time for machine 1 is 2 hours (132-134) and for machine
2 is 34 hours.
Sequencing problems  &  mathematical Solution
Sequencing problems  &  mathematical Solution

More Related Content

DOCX
Programming-I assignment for BSCS students , NCBA&e
PPTX
Sequential Models - Meaning, assumptions, Types and Problems
PDF
Copy of Financial report
PDF
Earned value management
PDF
Heys D&T Revision 1: Approaches to Designing Practice Questions
PPTX
Assembly line balancing
PDF
403 e86280b994e71948f9e0c1b385947
PPT
Mecosoft Commercial Case Study
Programming-I assignment for BSCS students , NCBA&e
Sequential Models - Meaning, assumptions, Types and Problems
Copy of Financial report
Earned value management
Heys D&T Revision 1: Approaches to Designing Practice Questions
Assembly line balancing
403 e86280b994e71948f9e0c1b385947
Mecosoft Commercial Case Study

Similar to Sequencing problems & mathematical Solution (20)

PDF
Chapter 6 Job Scheduling in Production Planning.pdf
PPTX
Job Shop Scheduling.pptx
PPTX
MATERIAL MANAGEMENT Job Shop Scheduling.pptx
PPTX
Sequencing problem__2-machine-casePart-1.pptx
PPTX
SCHEDULING RULES DONE.pptx
PPTX
Sequencing and shedulding problems for Operations management
PDF
Job shop scheduling
PPTX
PPTX
Operations Research -Sequencing Problems
PPT
Sequencing
PDF
Sequencing model
PPTX
Scheduling jobs on identical parallel machines
PDF
Operations Research_18ME735_module 5 sequencing notes.pdf
PPT
Sequencing problems in Operations Research
DOC
Parallel machines
PPT
Unit iii-2-sp
PPT
scheduling_1.ppt
PDF
R0260950100
PPT
scheduling and sequencing PPT for Engineering
PPT
scheduling.ppt course not for industrial engineering students
Chapter 6 Job Scheduling in Production Planning.pdf
Job Shop Scheduling.pptx
MATERIAL MANAGEMENT Job Shop Scheduling.pptx
Sequencing problem__2-machine-casePart-1.pptx
SCHEDULING RULES DONE.pptx
Sequencing and shedulding problems for Operations management
Job shop scheduling
Operations Research -Sequencing Problems
Sequencing
Sequencing model
Scheduling jobs on identical parallel machines
Operations Research_18ME735_module 5 sequencing notes.pdf
Sequencing problems in Operations Research
Parallel machines
Unit iii-2-sp
scheduling_1.ppt
R0260950100
scheduling and sequencing PPT for Engineering
scheduling.ppt course not for industrial engineering students
Ad

Recently uploaded (20)

PDF
Complications of Minimal Access Surgery at WLH
PPTX
master seminar digital applications in india
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
PPH.pptx obstetrics and gynecology in nursing
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
RMMM.pdf make it easy to upload and study
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
Pre independence Education in Inndia.pdf
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PDF
TR - Agricultural Crops Production NC III.pdf
PDF
Basic Mud Logging Guide for educational purpose
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PDF
Classroom Observation Tools for Teachers
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Complications of Minimal Access Surgery at WLH
master seminar digital applications in india
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPH.pptx obstetrics and gynecology in nursing
Renaissance Architecture: A Journey from Faith to Humanism
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
RMMM.pdf make it easy to upload and study
O5-L3 Freight Transport Ops (International) V1.pdf
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
VCE English Exam - Section C Student Revision Booklet
Pre independence Education in Inndia.pdf
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
TR - Agricultural Crops Production NC III.pdf
Basic Mud Logging Guide for educational purpose
Final Presentation General Medicine 03-08-2024.pptx
Abdominal Access Techniques with Prof. Dr. R K Mishra
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Classroom Observation Tools for Teachers
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Ad

Sequencing problems & mathematical Solution

  • 1. Md. Tarek Aziz Id: M21221111049 Batch:28th
  • 3. It is the selection of an appropriate order in which a number of jobs (Operations) can be assigned to a finite number of service facilities (Machines or equipment's) so as to optimize the outputs in terms of time, cost or profit. Sequencing problems
  • 4. Problem No 11.1. Seven jobs go first over Machine 1 and then over Machine 2. Processing times in Hours are given as: Job A B C D E F G Machine 1 6 24 30 12 20 22 18 Machine 1 16 20 20 12 24 2 6 Find the optimum sequence in which jobs should be processed.
  • 5. Solution: We find the Smallest processing time between two machine is 2 hours for job F on machine 2. Thus we shall schedule job F in the last as shown below: F The Reduced set of processing times becomes: Job A B C D E G Machine 1 6 24 30 12 20 18 Machine 1 16 20 20 12 24 6
  • 6. We find the Smallest processing time between two machine is 6 hours for job A in machine 1 & job G in machine 2. we shall schedule job A in the First and job G in the 2nd last as shown below: A G F The Reduced set of processing times becomes: Job B C D E Machine 1 24 30 12 20 Machine 1 20 20 12 24
  • 7. We find the Smallest processing time between two machine is 12 hours for job D in machine 1 and machine 2. we shall schedule job D in the Next to Job A or previous to Job G. Here, we sequences Job D in next to Job A. shown below: A D G F The Reduced set of processing times becomes: Job B C E Machine 1 24 30 20 Machine 1 20 20 24
  • 8. Here, We find the Smallest processing time between two machine is 20 hours for job E in machine 1 and Job B & C in machine 2. we shall schedule job E in the Next to Job D and Job B in previous to Job G again job C in previous to Job B. Here, we sequences Job B,C And job E shown below: A D E C B G F
  • 9. The minimum elapsed time can now be computed cumulatively As flow: Job Time in Time out Time in Time out Idle time for machine 2 A 0 6 6 22 6 D 6 18 22 34 0 E 18 38 38 62 4 C 38 68 68 88 6 B 68 92 92 112 4 G 92 110 112 118 0 F 110 132 132 134 14 Machine 1 Machine 2 Idle time for machine 2 is 34 hours
  • 10. From the above table, it is apparent that the minimum total time to finish all the 7 jobs is 134 hours and idle time for machine 1 is 2 hours (132-134) and for machine 2 is 34 hours.