SlideShare a Scribd company logo
Aum gam ganapataye namya. 




                




Influential and Inspirational
Powers – Project
Manager's New Self
Evaluation Tool for
Building Productive Teams




Naveen Nanjundappa, PMP
Nokia India Private Limited, Bangalore




                                             
 

        



                                                                                                                          Contents
           1.1      Abstract: .................................................................................................................................................. 3 

           1.2      Keywords:  ............................................................................................................................................... 3 
                             .

           1.3      Introduction: ........................................................................................................................................... 3 

           1.4      Description of the IIP Model: .................................................................................................................. 4 

           1.5      Levels in Inspirational Power: ................................................................................................................. 4 

           1.6      Levels in Influential Power: ..................................................................................................................... 5 

           1.7      Two Situations: ....................................................................................................................................... 5 
                                   .

                1.7.1      Four Quadrants: .............................................................................................................................. 5 

           1.8      Analysis Methodology: ............................................................................................................................ 7 

                1.8.1      The summary of the survey is ......................................................................................................... 8 

           1.9      Author Profile:  ........................................................................................................................................ 9 
                                   .




2 | P a g e  
                                                                                                                                                                            

        
 

        


                1.1 Abstract:
                Results achieved by a project team are highly dependent on the level of motivation as
                well as the inspiration of the team, a Project Manager has this critical responsibility of
                bringing up and maintaining these levels so that the team achieves its goals., In order
                to fulfill this responsibility the project manager himself needs to be aware of the
                required skills and then model the required changes in the team.

                 This paper presents a model for identifying the skills to be adopted and changes to be
                done in the way of working for both the Project Manager and the team itself. It’s based
                on a survey of variety of team stakeholders (Project Managers, team members, Line
                Managers etc). This model called as Influential and Inspirational powers model (IIP)
                proposes a new way of self evaluation for Project Managers and consists of four
                quadrants each representing the level of Influential and Inspirational powers. A Project
                Manager adopting this model does a self evaluation and determines his position on
                these quadrants. Later the team does its evaluation and provides their view of the said
                Project Managers position on the quadrants. These two evaluations will help the
                Project Manager to understand his as well as teams attitude and then decide on the
                changes required to create a highly inspirational and motivated environment/team,
                thus raising team achievement and personal performance.


                1.2 Keywords:
                Influential power, inspirational power, self analysis tool


                1.3 Introduction:
                Project Managers are usually made up with different professional and management
                skills, a different set of ideas and a unique way of building relationships among the
                stakeholders. Similarly team members are also differ in various ways, thus the direct
                use of power is seldom a good option to drive the projects. Irrespective of the
                background, project manager will have to influence team members to agree on goals,
                milestones, scope, communication channel, conflicts and resolve them, share
                resources and take on responsibilities, also implement ideas and suggest new
                proposals. Project Manager should also inspire the team with good values and team
                culture; this will enhance the flow of innovative ideas and excellent thoughts at work.

                On an overview one might feel influential and inspirational powers are similar, but a
                closer look will show them as the faces of the same coin and they both go hand in
                hand.

                Influential power is a cognitive factor that tends to have an effect on what you do; the
                effect of one person on another by words or actions. It’s often a suggestion, at a low
                cost and short-lived. Influence can be positive or negative. The drive to perform comes
                from external personal.




3 | P a g e  
                                                                                                              

        
 

        

                                            Inspirational power1 is an on-going journey, in which one continually seeks to heighten
                                            his or her awareness of team and project in many shapes and forms, as well as his or
                                            her understanding of the interplay between design and the cultural, social, and
                                            economic facets of society. Inspiration is not always immediate, and it has to be
                                            earned. Its utility is nurtured and harvested over time months and even years through
                                            personal experiences. It’s the catalyst of true creativity and gives you an abstract way
                                            of thinking. The drive in inspiration is purely internal, but the source could be from
                                            anywhere.

                                            Project manager to obtain best results in the team, should combine the influential and
                                            inspirational powers. While a creative team requires inspiration to succeed, influence
                                            works best while driving a team towards a predefined goal. It is important for the
                                            project manager to know his nature; the nature of work involved in projects and team
                                            members so that appropriate power can be used to get the best results.

                                            IIP Model maps the levels of influence and inspiration on a grid with four quadrants.
                                            Two Situations are considered to assess the manager.

                                            Situation 1: Extent to which team members get influenced and inspired by project
                                            manager

                                            Situation 2: Extent to which project manager get influenced and inspired by team

                                            Inputs from the project manager and the team are marked over these four quadrants,
                                            depending on the position with respect to both situation analysis are made. A project
                                            manager with great influential skills will eventually become a great leader, while a
                                            project manager with inspirational values creates perfect working environment for
                                            creativity and innovation. Project manager will need to use this combo powers wisely.


                                            1.4 Description of the IIP Model:
                                            IIP model has four quadrants marked with levels of influential and inspirational powers.
                                            Two situations consider mark the levels of these two powers in two different
                                            viewpoints, project manager’s view, and team’s view.


                                            1.5 Levels in Inspirational Power:
                                            When the values and thoughts of the project manager is followed by majority of the
                                            team members to a great extent then the manager is high inspiration level. At the
                                            same time if the team doesn’t incorporates the values from the manager then it’s an
                                            indication of low inspiration level.

                                            If the values from the team members are adopted by the project manager into his
                                            activities to a great extent shows high inspiration level, if none are adopted then it’s an
                                            indication for low inspiration level

                                                                   
                                            1
                                                Description will be refer to as values in this paper


4 | P a g e  
                                                                                                                                           

        
 

        

                1.6 Levels in Influential Power:
                When the project manager is capable of influencing most of the activities carried out
                by the team and the team agrees to do it as per the project manager’s guidance, this
                shows very high influence level. While if the project manager has little/no effect of his
                influence over the activities done by the team indicates low influential level.

                On the other hand if the project manager gets influenced by the team for most of the
                project activities, then it’s an indication of highly influenced level. If there is very
                little/no influence by team over the project manager and his activities this indicates low
                influence level.


                1.7 Two Situations:
                IIP model uses two situations in order to assess the nature of project manager and his
                team, their openness to change and the kind of projects handled. Situation 1 will bring
                out the nature of project manager, style of working and openness of the team, while
                situation 2 will give an understanding on nature of team and openness of the project
                manager.

                1.7.1 Four Quadrants:

                These quadrants mark various levels of influential and inspirational powers under the
                two situations stated in section 3.

                IIP situation 1: Extent to which team members get influenced and inspired by project
                manager. Following section will describe the quadrants and the nature of the project
                manager’s falling into them.




                               Figure 1: Quadrants showing the level of powers for situation 1.

                Quadrant 1: Quadrant for highly influential and high inspirational powers. Project
                manager placed in this quadrant have high values and power at work. They can drive
                the team both in innovation and predefined goals. Team respects the values and
                incorporates in their work environment. Higher management roles in an organization
                require these two powers to a great extent for the success of the projects.




5 | P a g e  
                                                                                                              

        
 

        

                Quadrant 2: Quadrant for highly influential and low inspirational powers. Project
                managers with high power and drive at work. Project manager placed in this quadrant
                can drive the team with lots of guidance and support to achieve the predefined goals.
                These managers may not encourage innovation at work, they are more result oriented.
                Team with less experience would love to work under project managers of this
                quadrant as the continuous support is ensured by the manager. Creative team
                member might feel difficult in pushing his innovation. These project managers are
                suitable for projects where innovation is not a key for success.

                Quadrant 3: Quadrant for low influential and high inspirational powers. Project
                manager placed in this quadrant can drive the team with lots of innovation and
                creativity. These managers may not worry about the short term goals and leave it to
                the team members to drive individually, and looks for a long term achievement,
                encourage innovation at work. These project managers are suitable for projects where
                innovation is a key for success and team is self driving.

                Quadrant 4: Quadrant for low influential and low inspirational powers. Project
                manager placed in this quadrant will have to analyze their existence in the specific
                project, without any of these powers in play. A few situations could be team works
                individually on an innovation without any short term goals and commitments. It might
                also be a new project manager and would require some time to get in action.

                IIP situation 2: Extent to which project manager get influenced and inspired by team.
                Following section will describe the quadrants and the nature of the project manager’s
                falling into them as seen by the team.




                               Figure 2: Quadrants showing the level of powers for situation 2.

                Quadrant 1: Highly influenced and highly inspired quadrant. Project manager
                placed in this quadrant are easily influenced by the team and are also creative in
                implementing the team’s values into their work. These project managers can
                adjust to any new team working on innovation and long term goals. They are
                open for new ideas and follow up the values of the team very closely. Team will
                find it easy to work with such a project manager. This quadrant project manager
                is suitable for projects where innovation is a key for success. A manager newly
                added to the team may also fall into this quadrant.




6 | P a g e  
                                                                                                         

        
 

        

                                            Quadrant 2: Highly influenced and low inspired quadrant. Project manager placed in
                                            this quadrant are easily influenced by the team and they might be rigid to accept new
                                            culture and values of working from team. These project managers usually go with the
                                            team decision or open for changes most of the times. Team will find it easy to work
                                            with such a project manager, but the project manager might find it difficult to adjust to
                                            a new team. This quadrant might have less experienced project managers, this
                                            quadrant indicates a self drive to improve on the openness within the team and also
                                            focus on the commitments and goals. In rare cases lazy project managers2 might fall
                                            into this quadrant.

                                            Quadrant 3: Low influenced and highly inspired quadrant. Project managers placed in
                                            this quadrant are again easily influenced by the team and implement the team’s
                                            values into their work. Unlike quadrant 1 project manager, he/she will have a fixed
                                            goal to achieve and will not get so easily influenced by the team. A project manager in
                                            this quadrant has good experience and can drive the project mostly alone; they can
                                            focus on the commitments, keeping the values of the team high. They are matured
                                            and balanced in their activities and thoughts. A new team will find it easy to work with
                                            such these project managers.

                                            Quadrant 4: Low influenced and low inspired quadrant. Project manager placed in this
                                            quadrant will mostly be an individual contributor focus on the goal and are tough in
                                            actions. They mostly work alone hence doesn’t worry much about the team values.
                                            These project managers are suitable for projects that run with a fixed short term goal
                                            and they might find it difficult to get along with a new team.


                                            1.8 Analysis Methodology:
                                            Step 1: Mark the quadrant with respect to situation 1 on figure 1.

                                            Step 2: Mark the quadrant with respect to situation 2 on figure 2.

                                            Step 3: List the nature of team, project and the project manager’s personality.

                                            Step 4: compare with the quadrants in situation 1 and situation 2.

                                            Step 5: identify the blind spots and strengths and take corrective actions to improve
                                            the team work culture and productivity.

                                            When the right match is obtained for the nature of project manager and team, the
                                            productivity and values in project execution show up brightly.

                                            If there is any mismatch then try to understand. For example, if the work requires more
                                            influencing skills to drive the project but the team is not getting influenced then take
                                            necessary steps 3to bridge this gap. Similarly if the team needs less influence from
                                            the project manager and but a highly influential natured project manager is assigned

                                                                   
                                            2
                                                Project manager who doesn’t care about the values of the team nor for the goals.




7 | P a g e  
                                                                                                                                         

        
 

        

                then he/she will influence the team on every aspect, instead he/she should give some
                room for the team to voice out their thoughts.

                Success factor: The success of IIP model will depend on the true analysis of the
                nature of the team and project manager and their mapping with respect to the two
                powers. If rightly mapped, IIP model will immediately point the blind spots for
                improving the team productivity and innovation.

                Survey Results: A survey was conducted with a sample of about 100 participants
                from various roles ( project managers, line managers, engineers, architects and so on)

                1.8.1 The summary of the survey is

                    Most of the participants were influenced and inspired by their family and friends
                    more compared to colleagues.
                    Most of the participants thought they influence and inspire their colleagues more
                    than their family.
                    Most of the participants thought they have high influencing and inspiring power
                    than getting influenced and inspired by colleagues
                The survey showed that there is some mismatch which needs to be
                address by individual analyzing the influencing and inspiring powers.

                Conclusion: Project managers are always advised to have good influencing and
                motivating skills but this paper address a rare combination of influential and
                inspirational powers to assess the nature of work. It’s important to know the balance
                between the two powers and when to use these powers, this paper aims to clearly
                show that both powers are equally important for the productivity of the team and
                project manager. Most inspirational person might not be the most influential; IIP model
                gives a quick analysis of the gap in the nature of project manager and his team/project.
                IIP model is still under study and is continuously evolving with new challenges and
                case studies.

                References: Most of the material is self prepared and based on the discussion with
                my peers and friends.




8 | P a g e  
                                                                                                          

        
 

        


                1.9 Author Profile:




                Naveen Nanjundappa PMP, is project manager at Nokia India, Bangalore.
                He has worked in various stages of SDLC. His work is in the area of Symbian
                OS hardware platform and System Test. He has mastered over agile
                methodologies and act as agile mentor and coach within the organisation. He
                is vice president since 4 years for Bangalore Astronomical Society, he has
                organized and participated in various astronomy workshops, popularizing
                astronomy and teaching are his passion.

                E-mail: naveen.nanjundappa@nokia.com




9 | P a g e  
                                                                                               

        

More Related Content

PDF
Coaching and-mentoring
PDF
Soft skills world corporate ppt for real estate comapny m3 m
PPTX
PRISM CENTER OF LEARNING
PDF
Paradigm Shift- Mentor Mentee Relationship Alignment
PDF
20121025 Pm Lci Portfolio
PDF
Trust Building in Teams - Case Study
PDF
PDF
P745 Pi
Coaching and-mentoring
Soft skills world corporate ppt for real estate comapny m3 m
PRISM CENTER OF LEARNING
Paradigm Shift- Mentor Mentee Relationship Alignment
20121025 Pm Lci Portfolio
Trust Building in Teams - Case Study
P745 Pi

Viewers also liked (7)

PDF
PDF
PDF
PDF
PDF
PDF
PDF
Ad

Similar to Sft 02 (20)

PDF
PPSX
Igniting human potential
PDF
LPM4
PDF
LPM5
PPTX
Building influence for 1st time mgrs
PDF
Cultivate Talent AMP Brochure
PDF
Training Coaching Mentoring
PDF
Nurturing Ideas And Talent 2012 01 10
PDF
Which way do you eat your banana
PPTX
101 leadership rev1
PPTX
Leadership challenges in project management
PDF
Flame Handout
PPTX
Influencing styles for effective leadership
PPTX
4_5917825889998998321.pptx
PDF
PDF
Topic 14 - Project Team Management.pdf
PPTX
Change!!presentation for Management Students .pptx
PDF
Topic 15 - Leadership in Project Management.pdf
PPT
Chap010
PPT
The Project Management Process - Week 6 Leadership
Igniting human potential
LPM4
LPM5
Building influence for 1st time mgrs
Cultivate Talent AMP Brochure
Training Coaching Mentoring
Nurturing Ideas And Talent 2012 01 10
Which way do you eat your banana
101 leadership rev1
Leadership challenges in project management
Flame Handout
Influencing styles for effective leadership
4_5917825889998998321.pptx
Topic 14 - Project Team Management.pdf
Change!!presentation for Management Students .pptx
Topic 15 - Leadership in Project Management.pdf
Chap010
The Project Management Process - Week 6 Leadership
Ad

More from PMInstituteIndia (20)

PDF
Piyush govil archana_sharma
PDF
D john peter
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
PDF
Piyush govil archana_sharma
D john peter

Recently uploaded (20)

PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Business model innovation report 2022.pdf
PDF
How to Get Funding for Your Trucking Business
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PPT
Data mining for business intelligence ch04 sharda
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Laughter Yoga Basic Learning Workshop Manual
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
A Brief Introduction About Julia Allison
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
Unit 1 Cost Accounting - Cost sheet
DOCX
Business Management - unit 1 and 2
PDF
Nidhal Samdaie CV - International Business Consultant
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
COST SHEET- Tender and Quotation unit 2.pdf
DOC-20250806-WA0002._20250806_112011_0000.pdf
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Lecture (1)-Introduction.pptx business communication
Business model innovation report 2022.pdf
How to Get Funding for Your Trucking Business
ICG2025_ICG 6th steering committee 30-8-24.pptx
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
Power and position in leadershipDOC-20250808-WA0011..pdf
Data mining for business intelligence ch04 sharda
Chapter 5_Foreign Exchange Market in .pdf
Laughter Yoga Basic Learning Workshop Manual
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
A Brief Introduction About Julia Allison
Reconciliation AND MEMORANDUM RECONCILATION
Unit 1 Cost Accounting - Cost sheet
Business Management - unit 1 and 2
Nidhal Samdaie CV - International Business Consultant
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise

Sft 02

  • 1. Aum gam ganapataye namya.    Influential and Inspirational Powers – Project Manager's New Self Evaluation Tool for Building Productive Teams Naveen Nanjundappa, PMP Nokia India Private Limited, Bangalore  
  • 2.     Contents 1.1  Abstract: .................................................................................................................................................. 3  1.2  Keywords:  ............................................................................................................................................... 3  . 1.3  Introduction: ........................................................................................................................................... 3  1.4  Description of the IIP Model: .................................................................................................................. 4  1.5  Levels in Inspirational Power: ................................................................................................................. 4  1.6  Levels in Influential Power: ..................................................................................................................... 5  1.7  Two Situations: ....................................................................................................................................... 5  . 1.7.1  Four Quadrants: .............................................................................................................................. 5  1.8  Analysis Methodology: ............................................................................................................................ 7  1.8.1  The summary of the survey is ......................................................................................................... 8  1.9  Author Profile:  ........................................................................................................................................ 9  . 2 | P a g e      
  • 3.     1.1 Abstract: Results achieved by a project team are highly dependent on the level of motivation as well as the inspiration of the team, a Project Manager has this critical responsibility of bringing up and maintaining these levels so that the team achieves its goals., In order to fulfill this responsibility the project manager himself needs to be aware of the required skills and then model the required changes in the team. This paper presents a model for identifying the skills to be adopted and changes to be done in the way of working for both the Project Manager and the team itself. It’s based on a survey of variety of team stakeholders (Project Managers, team members, Line Managers etc). This model called as Influential and Inspirational powers model (IIP) proposes a new way of self evaluation for Project Managers and consists of four quadrants each representing the level of Influential and Inspirational powers. A Project Manager adopting this model does a self evaluation and determines his position on these quadrants. Later the team does its evaluation and provides their view of the said Project Managers position on the quadrants. These two evaluations will help the Project Manager to understand his as well as teams attitude and then decide on the changes required to create a highly inspirational and motivated environment/team, thus raising team achievement and personal performance. 1.2 Keywords: Influential power, inspirational power, self analysis tool 1.3 Introduction: Project Managers are usually made up with different professional and management skills, a different set of ideas and a unique way of building relationships among the stakeholders. Similarly team members are also differ in various ways, thus the direct use of power is seldom a good option to drive the projects. Irrespective of the background, project manager will have to influence team members to agree on goals, milestones, scope, communication channel, conflicts and resolve them, share resources and take on responsibilities, also implement ideas and suggest new proposals. Project Manager should also inspire the team with good values and team culture; this will enhance the flow of innovative ideas and excellent thoughts at work. On an overview one might feel influential and inspirational powers are similar, but a closer look will show them as the faces of the same coin and they both go hand in hand. Influential power is a cognitive factor that tends to have an effect on what you do; the effect of one person on another by words or actions. It’s often a suggestion, at a low cost and short-lived. Influence can be positive or negative. The drive to perform comes from external personal. 3 | P a g e      
  • 4.     Inspirational power1 is an on-going journey, in which one continually seeks to heighten his or her awareness of team and project in many shapes and forms, as well as his or her understanding of the interplay between design and the cultural, social, and economic facets of society. Inspiration is not always immediate, and it has to be earned. Its utility is nurtured and harvested over time months and even years through personal experiences. It’s the catalyst of true creativity and gives you an abstract way of thinking. The drive in inspiration is purely internal, but the source could be from anywhere. Project manager to obtain best results in the team, should combine the influential and inspirational powers. While a creative team requires inspiration to succeed, influence works best while driving a team towards a predefined goal. It is important for the project manager to know his nature; the nature of work involved in projects and team members so that appropriate power can be used to get the best results. IIP Model maps the levels of influence and inspiration on a grid with four quadrants. Two Situations are considered to assess the manager. Situation 1: Extent to which team members get influenced and inspired by project manager Situation 2: Extent to which project manager get influenced and inspired by team Inputs from the project manager and the team are marked over these four quadrants, depending on the position with respect to both situation analysis are made. A project manager with great influential skills will eventually become a great leader, while a project manager with inspirational values creates perfect working environment for creativity and innovation. Project manager will need to use this combo powers wisely. 1.4 Description of the IIP Model: IIP model has four quadrants marked with levels of influential and inspirational powers. Two situations consider mark the levels of these two powers in two different viewpoints, project manager’s view, and team’s view. 1.5 Levels in Inspirational Power: When the values and thoughts of the project manager is followed by majority of the team members to a great extent then the manager is high inspiration level. At the same time if the team doesn’t incorporates the values from the manager then it’s an indication of low inspiration level. If the values from the team members are adopted by the project manager into his activities to a great extent shows high inspiration level, if none are adopted then it’s an indication for low inspiration level                                                              1 Description will be refer to as values in this paper 4 | P a g e      
  • 5.     1.6 Levels in Influential Power: When the project manager is capable of influencing most of the activities carried out by the team and the team agrees to do it as per the project manager’s guidance, this shows very high influence level. While if the project manager has little/no effect of his influence over the activities done by the team indicates low influential level. On the other hand if the project manager gets influenced by the team for most of the project activities, then it’s an indication of highly influenced level. If there is very little/no influence by team over the project manager and his activities this indicates low influence level. 1.7 Two Situations: IIP model uses two situations in order to assess the nature of project manager and his team, their openness to change and the kind of projects handled. Situation 1 will bring out the nature of project manager, style of working and openness of the team, while situation 2 will give an understanding on nature of team and openness of the project manager. 1.7.1 Four Quadrants: These quadrants mark various levels of influential and inspirational powers under the two situations stated in section 3. IIP situation 1: Extent to which team members get influenced and inspired by project manager. Following section will describe the quadrants and the nature of the project manager’s falling into them. Figure 1: Quadrants showing the level of powers for situation 1. Quadrant 1: Quadrant for highly influential and high inspirational powers. Project manager placed in this quadrant have high values and power at work. They can drive the team both in innovation and predefined goals. Team respects the values and incorporates in their work environment. Higher management roles in an organization require these two powers to a great extent for the success of the projects. 5 | P a g e      
  • 6.     Quadrant 2: Quadrant for highly influential and low inspirational powers. Project managers with high power and drive at work. Project manager placed in this quadrant can drive the team with lots of guidance and support to achieve the predefined goals. These managers may not encourage innovation at work, they are more result oriented. Team with less experience would love to work under project managers of this quadrant as the continuous support is ensured by the manager. Creative team member might feel difficult in pushing his innovation. These project managers are suitable for projects where innovation is not a key for success. Quadrant 3: Quadrant for low influential and high inspirational powers. Project manager placed in this quadrant can drive the team with lots of innovation and creativity. These managers may not worry about the short term goals and leave it to the team members to drive individually, and looks for a long term achievement, encourage innovation at work. These project managers are suitable for projects where innovation is a key for success and team is self driving. Quadrant 4: Quadrant for low influential and low inspirational powers. Project manager placed in this quadrant will have to analyze their existence in the specific project, without any of these powers in play. A few situations could be team works individually on an innovation without any short term goals and commitments. It might also be a new project manager and would require some time to get in action. IIP situation 2: Extent to which project manager get influenced and inspired by team. Following section will describe the quadrants and the nature of the project manager’s falling into them as seen by the team. Figure 2: Quadrants showing the level of powers for situation 2. Quadrant 1: Highly influenced and highly inspired quadrant. Project manager placed in this quadrant are easily influenced by the team and are also creative in implementing the team’s values into their work. These project managers can adjust to any new team working on innovation and long term goals. They are open for new ideas and follow up the values of the team very closely. Team will find it easy to work with such a project manager. This quadrant project manager is suitable for projects where innovation is a key for success. A manager newly added to the team may also fall into this quadrant. 6 | P a g e      
  • 7.     Quadrant 2: Highly influenced and low inspired quadrant. Project manager placed in this quadrant are easily influenced by the team and they might be rigid to accept new culture and values of working from team. These project managers usually go with the team decision or open for changes most of the times. Team will find it easy to work with such a project manager, but the project manager might find it difficult to adjust to a new team. This quadrant might have less experienced project managers, this quadrant indicates a self drive to improve on the openness within the team and also focus on the commitments and goals. In rare cases lazy project managers2 might fall into this quadrant. Quadrant 3: Low influenced and highly inspired quadrant. Project managers placed in this quadrant are again easily influenced by the team and implement the team’s values into their work. Unlike quadrant 1 project manager, he/she will have a fixed goal to achieve and will not get so easily influenced by the team. A project manager in this quadrant has good experience and can drive the project mostly alone; they can focus on the commitments, keeping the values of the team high. They are matured and balanced in their activities and thoughts. A new team will find it easy to work with such these project managers. Quadrant 4: Low influenced and low inspired quadrant. Project manager placed in this quadrant will mostly be an individual contributor focus on the goal and are tough in actions. They mostly work alone hence doesn’t worry much about the team values. These project managers are suitable for projects that run with a fixed short term goal and they might find it difficult to get along with a new team. 1.8 Analysis Methodology: Step 1: Mark the quadrant with respect to situation 1 on figure 1. Step 2: Mark the quadrant with respect to situation 2 on figure 2. Step 3: List the nature of team, project and the project manager’s personality. Step 4: compare with the quadrants in situation 1 and situation 2. Step 5: identify the blind spots and strengths and take corrective actions to improve the team work culture and productivity. When the right match is obtained for the nature of project manager and team, the productivity and values in project execution show up brightly. If there is any mismatch then try to understand. For example, if the work requires more influencing skills to drive the project but the team is not getting influenced then take necessary steps 3to bridge this gap. Similarly if the team needs less influence from the project manager and but a highly influential natured project manager is assigned                                                              2 Project manager who doesn’t care about the values of the team nor for the goals. 7 | P a g e      
  • 8.     then he/she will influence the team on every aspect, instead he/she should give some room for the team to voice out their thoughts. Success factor: The success of IIP model will depend on the true analysis of the nature of the team and project manager and their mapping with respect to the two powers. If rightly mapped, IIP model will immediately point the blind spots for improving the team productivity and innovation. Survey Results: A survey was conducted with a sample of about 100 participants from various roles ( project managers, line managers, engineers, architects and so on) 1.8.1 The summary of the survey is Most of the participants were influenced and inspired by their family and friends more compared to colleagues. Most of the participants thought they influence and inspire their colleagues more than their family. Most of the participants thought they have high influencing and inspiring power than getting influenced and inspired by colleagues The survey showed that there is some mismatch which needs to be address by individual analyzing the influencing and inspiring powers. Conclusion: Project managers are always advised to have good influencing and motivating skills but this paper address a rare combination of influential and inspirational powers to assess the nature of work. It’s important to know the balance between the two powers and when to use these powers, this paper aims to clearly show that both powers are equally important for the productivity of the team and project manager. Most inspirational person might not be the most influential; IIP model gives a quick analysis of the gap in the nature of project manager and his team/project. IIP model is still under study and is continuously evolving with new challenges and case studies. References: Most of the material is self prepared and based on the discussion with my peers and friends. 8 | P a g e      
  • 9.     1.9 Author Profile: Naveen Nanjundappa PMP, is project manager at Nokia India, Bangalore. He has worked in various stages of SDLC. His work is in the area of Symbian OS hardware platform and System Test. He has mastered over agile methodologies and act as agile mentor and coach within the organisation. He is vice president since 4 years for Bangalore Astronomical Society, he has organized and participated in various astronomy workshops, popularizing astronomy and teaching are his passion. E-mail: naveen.nanjundappa@nokia.com 9 | P a g e     Â