SlideShare a Scribd company logo
CEE320
Winter2006
Signalized Intersections
CEE 320
Steve Muench
CEE320
Winter2006
Outline
1. Key Definitions
2. Baseline Assumptions
3. Control Delay
4. Signal Analysis
a. D/D/1
b. Random Arrivals
c. LOS Calculation
d. Optimization
CEE320
Winter2006
Key Definitions (1)
• Cycle Length (C)
– The total time for a signal to complete a cycle
• Phase
– The part of the signal cycle allocated to any combination
of traffic movements receiving the ROW simultaneously
during one or more intervals
• Green Time (G)
– The duration of the green indication of a given
movement at a signalized intersection
• Red Time (R)
– The period in the signal cycle during which, for a given
phase or lane group, the signal is red
CEE320
Winter2006
Key Definitions (2)
• Change Interval (Y)
– Yellow time
– The period in the signal cycle during which, for a given
phase or lane group, the signal is yellow
• Clearance Interval (AR)
– All red time
– The period in the signal cycle during which all
approaches have a red indication
CEE320
Winter2006
Key Definitions (3)
• Start-up Lost Time (l1)
– Time used by the first few vehicles in a queue while reacting
to the initiation of the green phase and accelerating.
2 seconds is typical.
• Clearance Lost Time (l2)
– Time between signal phases during which an intersection is
not used by traffic. 2 seconds is typical.
• Lost Time (tL)
– Time when an intersection is not effectively used by any
approach. 4 seconds is typical.
– tL = l1 + l2
• Total Lost Time (L)
– Total lost time per cycle during which the intersection is not
used by any movement.
CEE320
Winter2006
Key Definitions (4)
• Effective Green Time (g)
– Time actually available for movement
– g = G + Y + AR – tL
• Extension of Effective Green Time (e)
– The amount of the change and clearance interval at the
end of a phase that is usable for movement of vehicles
• Effective Red Time (r)
– Time during which a movement is effectively not
permitted to move.
– r = R + tL
– r = C – g
CEE320
Winter2006
Key Definitions (5)
• Saturation Flow Rate (s)
– Maximum flow that could pass through an intersection if
100% green time was allocated to that movement.
– s = 3600/h
• Approach Capacity (c)
– Saturation flow times the proportion of effective green
– c = s × g/C
• Peak Hour Factor (PHF)
– The hourly volume during the maximum-volume hour of
the day divided by the peak 15-minute flow rate within
the peak hour; a measure of traffic demand fluctuation
within the peak hour.
CEE320
Winter2006
Key Definitions (6)
• Flow Ratio
– The ratio of actual flow rate (v) to saturation flow rate (s)
for a lane group at an intersection
• Lane Group
– A set of lanes established at an intersection approach
for separate analysis
• Critical Lane Group
– The lane group that has the highest flow ratio (v/s) for a
given signal phase
• Critical Volume-to-Capacity Ratio (Xc)
– The proportion of available intersection capacity used
by vehicles in critical lane groups
– In terms of v/c and NOT v/s
fromHighwayCapacityManual2000
CEE320
Winter2006
Baseline Assumptions
• D/D/1 queuing
• Approach arrivals < departure capacity
– (no queue exists at the beginning/end of a
cycle)
CEE320
Winter2006
Quantifying Control Delay
• Two approaches
– Deterministic (uniform) arrivals (Use D/D/1)
– Probabilistic (random) arrivals (Use empirical equations)
• Total delay can be expressed as
– Total delay in an hour (vehicle-hours, person-hours)
– Average delay per vehicle (seconds per vehicle)
CEE320
Winter2006
D/D/1 Signal Analysis (Graphical)
Arrival
Rate
Departure
Rate
Time
Vehicles
Maximum delay
Maximum queue
Total vehicle delay per cycle
Red Red RedGreen Green Green
Queue dissipation
CEE320
Winter2006
D/D/1 Signal Analysis – Numerical
• Time to queue dissipation after the start of effective green
• Proportion of the cycle with a queue
• Proportion of vehicles stopped
µ
λ
ρ = 0.1<ρ
( )ρ
ρ
−
=
1
0
r
t
c
tr
Pq
0+
=
( )
( ) qs P
c
tr
gr
tr
P =
+
=
+
+
= 00
λ
λ ( )
( ) c
t
c
t
gr
tr
Ps
ρλ
µ
λ
λ 000
==
+
+
=
CEE320
Winter2006
D/D/1 Signal Analysis – Numerical
• Maximum number of vehicles in a queue
• Total delay per cycle
• Average vehicle delay per cycle
• Maximum delay of any vehicle (assume FIFO)
µ
λ
ρ = 0.1<ρ
rQm λ=
( )ρ
λ
−
=
12
2
r
Dt
( ) ( )ρλρ
λ
−
=×
−
=
12
1
12
22
c
r
c
r
Dt
rdm =
CEE320
Winter2006
Signal Analysis – Random Arrivals
• Webster’s Formula (1958) - empirical
d’ = avg. veh. delay assuming random arrivals
d = avg. veh. delay assuming uniform arrivals (D/D/1)
x = ratio of arrivals to departures (λc/µg)
g = effective green time (sec)
c = cycle length (sec)
( )
)/(52
3/1
2
2
65.0
12
' cg
x
c
x
x
dd +






−
−
+=
λλ
CEE320
Winter2006
Signal Analysis – Random Arrivals
• Allsop’s Formula (1972) - empirical
d’ = avg. veh delay assuming random arrivals
d = avg. veh delay assuming uniform arrivals
(D/D/1)
x = ratio of arrivals to departures (λc/µg)
( )





−
+=
x
x
dd
1210
9
'
2
λ
CEE320
Winter2006
Definition – Level of Service (LOS)
• Chief measure of “quality of service”
– Describes operational conditions within a traffic
stream
– Does not include safety
– Different measures for different facilities
• Six levels of service (A through F)
CEE320
Winter2006
Signalized Intersection LOS
• Based on control delay per vehicle
– How long you wait, on average, at the stop light
from Highway Capacity Manual 2000
CEE320
Winter2006
Typical Approach
• Split control delay into three parts
– Part 1: Delay calculated assuming uniform arrivals (d1).
This is essentially a D/D/1 analysis.
– Part 2: Delay due to random arrivals (d2)
– Part 3: Delay due to initial queue at start of analysis time
period (d3). Often assumed zero.
( ) 321 ddPFdd ++=
d = Average signal delay per vehicle in s/veh
PF = progression adjustment factor
d1, d2, d3 = as defined above
CEE320
Winter2006
Uniform Delay (d1)
( ) 



−






−
=
C
g
X
C
g
C
d
,1min1
15.0
1
d1 = delay due to uniform arrivals (s/veh)
C = cycle length (seconds)
g = effective green time for lane group (seconds)
X = v/c ratio for lane group
CEE320
Winter2006
Incremental Delay (d2)
( ) ( ) 





+−+−=
cT
kIX
XXTd
8
11900
2
2
d2 = delay due to random arrivals (s/veh)
T = duration of analysis period (hours). If the analysis is based on the
peak 15-min. flow then T = 0.25 hrs.
k = delay adjustment factor that is dependent on signal controller mode.
For pretimed intersections k = 0.5. For more efficient intersections k <
0.5.
I = upstream filtering/metering adjustment factor. Adjusts for the effect of
an upstream signal on the randomness of the arrival pattern. I = 1.0
for completely random. I < 1.0 for reduced variance.
c = lane group capacity (veh/hr)
X = v/c ratio for lane group
CEE320
Winter2006
Initial Queue Delay (d3)
• Applied in cases where X > 1.0 for the
analysis period
– Vehicles arriving during the analysis period
will experience an additional delay because
there is already an existing queue
• When no initial queue…
– d3 = 0
CEE320
Winter2006
Control Optimization
• Conflicting Operational Objectives
– minimize vehicle delay
– minimize vehicle stops
– minimize lost time
– major vs. minor service (progression)
– pedestrian service
– reduce accidents/severity
– reduce fuel consumption
– Air pollution
CEE320
Winter2006
The “Art” of Signal Optimization
• Long Cycle Length
– High capacity (reduced lost time)
– High delay on movements that are not served
– Pedestrian movements? Number of Phases?
• Short Cycle Length
– Reduced capacity (increased lost time)
– Reduced delay for any given movement
CEE320
Winter2006
Minimum Cycle Length
∑=






−
×
= n
i ci
c
c
s
v
X
XL
C
1
min
Cmin = estimated minimum cycle length (seconds)
L = total lost time per cycle (seconds), 4 seconds per
phase is typical
(v/s)ci = flow ratio for critical lane group, i (seconds)
Xc = critical v/c ratio for the intersection
CEE320
Winter2006
Optimum Cycle Length Estimation
( )
∑=






−
+
= n
i ci
opt
s
v
L
C
1
1
55.1
Copt = estimated optimum cycle length (seconds) to
minimize vehicle delay
L = total lost time per cycle (seconds), 4 seconds per
phase is typical
(v/s)ci = flow ratio for critical lane group, i (seconds)
CEE320
Winter2006
Green Time Estimation












=
ii
i
X
C
s
v
g
g = effective green time for phase, i (seconds)
(v/s)i = flow ratio for lane group, i (seconds)
C = cycle length (seconds)
Xi = v/c ratio for lane group i
CEE320
Winter2006
Pedestrian Crossing Time
ft.10for7.22.3 >





++= E
E
ped
p
p W
W
N
S
L
G
( ) ft.10for27.02.3 ≤++= Eped
p
p WN
S
L
G
Gp = minimum green time required for pedestrians (seconds)
L = crosswalk length (ft)
Sp = average pedestrian speed (ft/s) – often assumed 4 ft/s
WE = effective crosswalk width (ft)
3.2 = pedestrian startup time (seconds)
Nped = number of pedestrians crossing during an interval
CEE320
Winter2006
Effective Width (WE)
from Highway Capacity Manual 2000
CEE320
Winter2006
Example
An intersection operates using a
simple 3-phase design as
pictured.
NB
SB
EB
WB
Phase Lane
group
Saturation Flows
1 SB 3400 veh/hr
2 NB 3400 veh/hr
3 EB 1400 veh/hr
WB 1400 veh/hr
CEE320
Winter2006
Example
SB
NB
EB
WB
30
150
50
30
400
100
1000
200
300
20
What is the sum of the flow ratios for the critical lane groups?
What is the total lost time for a signal cycle assuming 2 seconds of
clearance lost time and 2 seconds of startup lost time per phase?
CEE320
Winter2006
Example
Calculate an optimal signal timing (rounded up to the nearest 5
seconds) using Webster’s formula.
( )
( )∑=
−
+
= n
i
ci
opt
sv
L
C
1
1
55.1
CEE320
Winter2006
Example
Determine the green times allocation using v/c equalization.
Assume the extension of effective green time = 2 seconds and
startup lost time = 2 seconds.












=
ii
i
X
C
s
v
g
LC
C
s
v
X
n
i i
c
−
×





=
∑=1
CEE320
Winter2006
Example
What is the intersection Level of Service (LOS)? Assume in all
cases that PF = 1.0, k = 0.5 (pretimed intersection), I = 1.0 (no
upstream signal effects).
∑
∑
=
i
i
i
ii
A
v
vd
d
∑
∑
=
k
k
k
kk
I
v
vd
d
CEE320
Winter2006
Example
Is this signal adequate for pedestrians? A pedestrian count
showed 5 pedestrians crossing the EB and WB lanes on each side
of the intersection and 10 pedestrians crossing the NB and SB
crosswalks on each side of the intersection. Lanes are 12 ft. wide.
The effective crosswalk widths are all 10 ft.
( ) ft10for27.02.3 ≤++= Eped
p
p WN
S
L
G
CEE320
Winter2006
Signal Installation: “Warrants”
• Manual of Uniform Traffic Control
Devices (MUTCD)
• Apply these rules to determine if a
signal is “warranted” at an
intersection
• If warrants are met, doesn’t mean
signals or control is mandatory
• 8 major warrants
• Multiple warrants usually required
for recommending control
http://mutcd.fhwa.dot.gov/
FYI – NOT TESTABLE
CEE320
Winter2006
Intersection Control Type
from Highway Capacity Manual 2000
FYI – NOT TESTABLE
CEE320
Winter2006
Primary References
• Mannering, F.L.; Kilareski, W.P. and Washburn, S.S. (2003).
Principles of Highway Engineering and Traffic Analysis, Third Edition
(Draft). Chapter 7
• Transportation Research Board. (2000). Highway Capacity Manual.
National Research Council, Washington, D.C.

More Related Content

PPTX
Traffic assignment
PPTX
O and d study
PPSX
highway development in india
PPTX
Geometric design of highway
PDF
Chapter 3&amp;4
PPT
Freeway & Highway LOS (Transportation Engineering)
PPTX
Introduction to highway engineering
PPT
Geometric Design - Horizontal and vertical curves
Traffic assignment
O and d study
highway development in india
Geometric design of highway
Chapter 3&amp;4
Freeway & Highway LOS (Transportation Engineering)
Introduction to highway engineering
Geometric Design - Horizontal and vertical curves

What's hot (20)

PPTX
Overtaking sight distance
PPT
Highway And traffic Engineering
PDF
Chapter 7
PDF
L1 Traffic Flow Parameters
PPTX
traffic characteristics
PPT
Elements of road x-section
PPTX
Capacity & level of service (transportation engineering)
PPT
Trip generation
PPTX
Airport drainage
PPTX
UTP Module-3.pptx
PPT
highway engineering/ transportation engineering-I
PPTX
Highway engg.
PDF
4. traffic engineering
PPTX
Accident study
PPTX
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
PPTX
Road geometrics
PPTX
traffic engineering
PPTX
Air port presentation 6th unit
PPTX
Widening of curve
PDF
Module 1(highway planning and scope of highway engineering)
Overtaking sight distance
Highway And traffic Engineering
Chapter 7
L1 Traffic Flow Parameters
traffic characteristics
Elements of road x-section
Capacity & level of service (transportation engineering)
Trip generation
Airport drainage
UTP Module-3.pptx
highway engineering/ transportation engineering-I
Highway engg.
4. traffic engineering
Accident study
TRANSPORTATION ENGINEERING - II - AIRPORT ENGINEERING
Road geometrics
traffic engineering
Air port presentation 6th unit
Widening of curve
Module 1(highway planning and scope of highway engineering)
Ad

Viewers also liked (20)

PPT
28 pavement design
PDF
Lecture02(constants, variable & data types)
PDF
Lecture 5: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
PPT
Trip Generation & Mode Choice (Transportation Engineering)
PDF
Lecture 3: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
PDF
Lec 07 Intersection Design (Transportation Engineering Dr.Lina Shbeeb)
PPT
Freeway LOS (Transportation Engineering)
PDF
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
PDF
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
PPT
Traffic Concepts (Transportation Engineering)
PPT
Trip attraction rate
PDF
Lecture05(control structure part ii)
PDF
Lecture 2: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
PPT
Intelligent Transportation Systems (Transportation Engineering)
PDF
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
PDF
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
PPT
ppt on pavement design
PDF
Soil Mechanics ميكانيكا التربة & Eng. Ahmed S. Al-Agha
PPT
Traffic Forecasting (Transportation Engineering)
PDF
02-Aggregate ( Highway and Airport Engineering Dr. Sherif El-Badawy )
28 pavement design
Lecture02(constants, variable & data types)
Lecture 5: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Trip Generation & Mode Choice (Transportation Engineering)
Lecture 3: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Lec 07 Intersection Design (Transportation Engineering Dr.Lina Shbeeb)
Freeway LOS (Transportation Engineering)
01-Introduction ( Highway and Airport Engineering Dr. Sherif El-Badawy )
10-Intersection Control ( Transportation and Traffic Engineering Dr. Sheriff ...
Traffic Concepts (Transportation Engineering)
Trip attraction rate
Lecture05(control structure part ii)
Lecture 2: Railway Engineering ( هندسة السكك الحديدية ) Dr. Alaa Gabr
Intelligent Transportation Systems (Transportation Engineering)
Lecture 04 Capacity for TWSC (Traffic Engineering هندسة المرور & Dr. Usama Sh...
Annex 14 ICAO ( Arabic Version ) الإصدار العربي
ppt on pavement design
Soil Mechanics ميكانيكا التربة & Eng. Ahmed S. Al-Agha
Traffic Forecasting (Transportation Engineering)
02-Aggregate ( Highway and Airport Engineering Dr. Sherif El-Badawy )
Ad

Similar to Signalized Intersections (Transportation Engineering) (20)

PDF
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
PDF
SIGNAL DESIGNING OF TRAFFIC INTERSECTIONS
PPTX
webster method of signal design in traffic ..pptx
PPTX
Basics of Signal Designing
PDF
30120130405026
PDF
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
PDF
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
PDF
Lect 30- traffic signal i
PDF
PDF
L16 Progression
PDF
L15 Actuated Signal Timing Design
PPTX
Design principles of traffic signal
PDF
Designing of a Traffic Signaling System at T-Intersection
PDF
L11 Signal Timing Design
PPTX
Study of urban traffic flow
PDF
Traffic signal design (1)
PDF
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
PDF
Channelizing Traffic Flow by Reducing Delay at Intersection
PDF
IRJET- Traffic Survey and Signal Design at Kalwa-Court Naka Cross Road
PDF
Central moments of traffic delay at a signalized intersection
Lec 13A Signalized Intersections (Transportation Engineering Dr.Lina Shbeeb)
SIGNAL DESIGNING OF TRAFFIC INTERSECTIONS
webster method of signal design in traffic ..pptx
Basics of Signal Designing
30120130405026
12 Basic Principle Of Intersection Signalization (Traffic Engineering هندسة ا...
Lecture 06 Signalized Intersections (Traffic Engineering هندسة المرور & Dr. U...
Lect 30- traffic signal i
L16 Progression
L15 Actuated Signal Timing Design
Design principles of traffic signal
Designing of a Traffic Signaling System at T-Intersection
L11 Signal Timing Design
Study of urban traffic flow
Traffic signal design (1)
Design of traffic signal on NH-12 near Barkatullah University, Bhopal Distric...
Channelizing Traffic Flow by Reducing Delay at Intersection
IRJET- Traffic Survey and Signal Design at Kalwa-Court Naka Cross Road
Central moments of traffic delay at a signalized intersection

More from Hossam Shafiq I (20)

PDF
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
PDF
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
PDF
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
PDF
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
PDF
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
PDF
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
PDF
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
PDF
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
PDF
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
PDF
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
PDF
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
PDF
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
PDF
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
PDF
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
PDF
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
PDF
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
PDF
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
PDF
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
PDF
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
PDF
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
14 Signalling and Control Systems (Railway Engineering Lectures هندسة السكك ا...
13 Equipments in Railway Stations and Yards (Railway Engineering Lectures هند...
12 Points and Crossings (Railway Engineering Lectures هندسة السكك الحديدية & ...
12 Railway Yards and Terminals (Railway Engineering Lectures هندسة السكك الحد...
11 Geometric Design of Railway Track [Vertical Alignment] (Railway Engineerin...
10 Geometric Design of Railway Track [Horizontal Alignment] (Railway Engineer...
09 Drainage (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A...
08 Maintenance of Railway Tracks (Railway Engineering Lectures هندسة السكك ال...
07 Construction and Renewal of Tracks (Railway Engineering Lectures هندسة الس...
06 Creep of Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wa...
05 Welded Track (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...
05 Rail Joints (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walie...
05 Rails (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A. E...
04 Ballast (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied A....
04 Rail Sleepers (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wal...
03 Train Resistance and Tractive Power (Railway Engineering Lectures هندسة ال...
02 Handout #1 (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Walied...
02 Rail Transport Systems (Railway Engineering Lectures هندسة السكك الحديدية ...
02 Railway Terminology (Railway Engineering Lectures هندسة السكك الحديدية & D...
01 Introduction (Railway Engineering Lectures هندسة السكك الحديدية & Dr. Wali...

Recently uploaded (20)

PPTX
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
PPTX
web development for engineering and engineering
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
PDF
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
PDF
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
DOCX
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PDF
PPT on Performance Review to get promotions
DOCX
573137875-Attendance-Management-System-original
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PDF
composite construction of structures.pdf
PPT
Project quality management in manufacturing
PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
Lecture Notes Electrical Wiring System Components
PPT
Mechanical Engineering MATERIALS Selection
PPTX
UNIT 4 Total Quality Management .pptx
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd
CARTOGRAPHY AND GEOINFORMATION VISUALIZATION chapter1 NPTE (2).pptx
web development for engineering and engineering
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
TFEC-4-2020-Design-Guide-for-Timber-Roof-Trusses.pdf
BMEC211 - INTRODUCTION TO MECHATRONICS-1.pdf
ASol_English-Language-Literature-Set-1-27-02-2023-converted.docx
PPT on Performance Review to get promotions
573137875-Attendance-Management-System-original
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
composite construction of structures.pdf
Project quality management in manufacturing
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Lecture Notes Electrical Wiring System Components
Mechanical Engineering MATERIALS Selection
UNIT 4 Total Quality Management .pptx
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
IOT PPTs Week 10 Lecture Material.pptx of NPTEL Smart Cities contd

Signalized Intersections (Transportation Engineering)

  • 2. CEE320 Winter2006 Outline 1. Key Definitions 2. Baseline Assumptions 3. Control Delay 4. Signal Analysis a. D/D/1 b. Random Arrivals c. LOS Calculation d. Optimization
  • 3. CEE320 Winter2006 Key Definitions (1) • Cycle Length (C) – The total time for a signal to complete a cycle • Phase – The part of the signal cycle allocated to any combination of traffic movements receiving the ROW simultaneously during one or more intervals • Green Time (G) – The duration of the green indication of a given movement at a signalized intersection • Red Time (R) – The period in the signal cycle during which, for a given phase or lane group, the signal is red
  • 4. CEE320 Winter2006 Key Definitions (2) • Change Interval (Y) – Yellow time – The period in the signal cycle during which, for a given phase or lane group, the signal is yellow • Clearance Interval (AR) – All red time – The period in the signal cycle during which all approaches have a red indication
  • 5. CEE320 Winter2006 Key Definitions (3) • Start-up Lost Time (l1) – Time used by the first few vehicles in a queue while reacting to the initiation of the green phase and accelerating. 2 seconds is typical. • Clearance Lost Time (l2) – Time between signal phases during which an intersection is not used by traffic. 2 seconds is typical. • Lost Time (tL) – Time when an intersection is not effectively used by any approach. 4 seconds is typical. – tL = l1 + l2 • Total Lost Time (L) – Total lost time per cycle during which the intersection is not used by any movement.
  • 6. CEE320 Winter2006 Key Definitions (4) • Effective Green Time (g) – Time actually available for movement – g = G + Y + AR – tL • Extension of Effective Green Time (e) – The amount of the change and clearance interval at the end of a phase that is usable for movement of vehicles • Effective Red Time (r) – Time during which a movement is effectively not permitted to move. – r = R + tL – r = C – g
  • 7. CEE320 Winter2006 Key Definitions (5) • Saturation Flow Rate (s) – Maximum flow that could pass through an intersection if 100% green time was allocated to that movement. – s = 3600/h • Approach Capacity (c) – Saturation flow times the proportion of effective green – c = s × g/C • Peak Hour Factor (PHF) – The hourly volume during the maximum-volume hour of the day divided by the peak 15-minute flow rate within the peak hour; a measure of traffic demand fluctuation within the peak hour.
  • 8. CEE320 Winter2006 Key Definitions (6) • Flow Ratio – The ratio of actual flow rate (v) to saturation flow rate (s) for a lane group at an intersection • Lane Group – A set of lanes established at an intersection approach for separate analysis • Critical Lane Group – The lane group that has the highest flow ratio (v/s) for a given signal phase • Critical Volume-to-Capacity Ratio (Xc) – The proportion of available intersection capacity used by vehicles in critical lane groups – In terms of v/c and NOT v/s
  • 10. CEE320 Winter2006 Baseline Assumptions • D/D/1 queuing • Approach arrivals < departure capacity – (no queue exists at the beginning/end of a cycle)
  • 11. CEE320 Winter2006 Quantifying Control Delay • Two approaches – Deterministic (uniform) arrivals (Use D/D/1) – Probabilistic (random) arrivals (Use empirical equations) • Total delay can be expressed as – Total delay in an hour (vehicle-hours, person-hours) – Average delay per vehicle (seconds per vehicle)
  • 12. CEE320 Winter2006 D/D/1 Signal Analysis (Graphical) Arrival Rate Departure Rate Time Vehicles Maximum delay Maximum queue Total vehicle delay per cycle Red Red RedGreen Green Green Queue dissipation
  • 13. CEE320 Winter2006 D/D/1 Signal Analysis – Numerical • Time to queue dissipation after the start of effective green • Proportion of the cycle with a queue • Proportion of vehicles stopped µ λ ρ = 0.1<ρ ( )ρ ρ − = 1 0 r t c tr Pq 0+ = ( ) ( ) qs P c tr gr tr P = + = + + = 00 λ λ ( ) ( ) c t c t gr tr Ps ρλ µ λ λ 000 == + + =
  • 14. CEE320 Winter2006 D/D/1 Signal Analysis – Numerical • Maximum number of vehicles in a queue • Total delay per cycle • Average vehicle delay per cycle • Maximum delay of any vehicle (assume FIFO) µ λ ρ = 0.1<ρ rQm λ= ( )ρ λ − = 12 2 r Dt ( ) ( )ρλρ λ − =× − = 12 1 12 22 c r c r Dt rdm =
  • 15. CEE320 Winter2006 Signal Analysis – Random Arrivals • Webster’s Formula (1958) - empirical d’ = avg. veh. delay assuming random arrivals d = avg. veh. delay assuming uniform arrivals (D/D/1) x = ratio of arrivals to departures (λc/µg) g = effective green time (sec) c = cycle length (sec) ( ) )/(52 3/1 2 2 65.0 12 ' cg x c x x dd +       − − += λλ
  • 16. CEE320 Winter2006 Signal Analysis – Random Arrivals • Allsop’s Formula (1972) - empirical d’ = avg. veh delay assuming random arrivals d = avg. veh delay assuming uniform arrivals (D/D/1) x = ratio of arrivals to departures (λc/µg) ( )      − += x x dd 1210 9 ' 2 λ
  • 17. CEE320 Winter2006 Definition – Level of Service (LOS) • Chief measure of “quality of service” – Describes operational conditions within a traffic stream – Does not include safety – Different measures for different facilities • Six levels of service (A through F)
  • 18. CEE320 Winter2006 Signalized Intersection LOS • Based on control delay per vehicle – How long you wait, on average, at the stop light from Highway Capacity Manual 2000
  • 19. CEE320 Winter2006 Typical Approach • Split control delay into three parts – Part 1: Delay calculated assuming uniform arrivals (d1). This is essentially a D/D/1 analysis. – Part 2: Delay due to random arrivals (d2) – Part 3: Delay due to initial queue at start of analysis time period (d3). Often assumed zero. ( ) 321 ddPFdd ++= d = Average signal delay per vehicle in s/veh PF = progression adjustment factor d1, d2, d3 = as defined above
  • 20. CEE320 Winter2006 Uniform Delay (d1) ( )     −       − = C g X C g C d ,1min1 15.0 1 d1 = delay due to uniform arrivals (s/veh) C = cycle length (seconds) g = effective green time for lane group (seconds) X = v/c ratio for lane group
  • 21. CEE320 Winter2006 Incremental Delay (d2) ( ) ( )       +−+−= cT kIX XXTd 8 11900 2 2 d2 = delay due to random arrivals (s/veh) T = duration of analysis period (hours). If the analysis is based on the peak 15-min. flow then T = 0.25 hrs. k = delay adjustment factor that is dependent on signal controller mode. For pretimed intersections k = 0.5. For more efficient intersections k < 0.5. I = upstream filtering/metering adjustment factor. Adjusts for the effect of an upstream signal on the randomness of the arrival pattern. I = 1.0 for completely random. I < 1.0 for reduced variance. c = lane group capacity (veh/hr) X = v/c ratio for lane group
  • 22. CEE320 Winter2006 Initial Queue Delay (d3) • Applied in cases where X > 1.0 for the analysis period – Vehicles arriving during the analysis period will experience an additional delay because there is already an existing queue • When no initial queue… – d3 = 0
  • 23. CEE320 Winter2006 Control Optimization • Conflicting Operational Objectives – minimize vehicle delay – minimize vehicle stops – minimize lost time – major vs. minor service (progression) – pedestrian service – reduce accidents/severity – reduce fuel consumption – Air pollution
  • 24. CEE320 Winter2006 The “Art” of Signal Optimization • Long Cycle Length – High capacity (reduced lost time) – High delay on movements that are not served – Pedestrian movements? Number of Phases? • Short Cycle Length – Reduced capacity (increased lost time) – Reduced delay for any given movement
  • 25. CEE320 Winter2006 Minimum Cycle Length ∑=       − × = n i ci c c s v X XL C 1 min Cmin = estimated minimum cycle length (seconds) L = total lost time per cycle (seconds), 4 seconds per phase is typical (v/s)ci = flow ratio for critical lane group, i (seconds) Xc = critical v/c ratio for the intersection
  • 26. CEE320 Winter2006 Optimum Cycle Length Estimation ( ) ∑=       − + = n i ci opt s v L C 1 1 55.1 Copt = estimated optimum cycle length (seconds) to minimize vehicle delay L = total lost time per cycle (seconds), 4 seconds per phase is typical (v/s)ci = flow ratio for critical lane group, i (seconds)
  • 27. CEE320 Winter2006 Green Time Estimation             = ii i X C s v g g = effective green time for phase, i (seconds) (v/s)i = flow ratio for lane group, i (seconds) C = cycle length (seconds) Xi = v/c ratio for lane group i
  • 28. CEE320 Winter2006 Pedestrian Crossing Time ft.10for7.22.3 >      ++= E E ped p p W W N S L G ( ) ft.10for27.02.3 ≤++= Eped p p WN S L G Gp = minimum green time required for pedestrians (seconds) L = crosswalk length (ft) Sp = average pedestrian speed (ft/s) – often assumed 4 ft/s WE = effective crosswalk width (ft) 3.2 = pedestrian startup time (seconds) Nped = number of pedestrians crossing during an interval
  • 29. CEE320 Winter2006 Effective Width (WE) from Highway Capacity Manual 2000
  • 30. CEE320 Winter2006 Example An intersection operates using a simple 3-phase design as pictured. NB SB EB WB Phase Lane group Saturation Flows 1 SB 3400 veh/hr 2 NB 3400 veh/hr 3 EB 1400 veh/hr WB 1400 veh/hr
  • 31. CEE320 Winter2006 Example SB NB EB WB 30 150 50 30 400 100 1000 200 300 20 What is the sum of the flow ratios for the critical lane groups? What is the total lost time for a signal cycle assuming 2 seconds of clearance lost time and 2 seconds of startup lost time per phase?
  • 32. CEE320 Winter2006 Example Calculate an optimal signal timing (rounded up to the nearest 5 seconds) using Webster’s formula. ( ) ( )∑= − + = n i ci opt sv L C 1 1 55.1
  • 33. CEE320 Winter2006 Example Determine the green times allocation using v/c equalization. Assume the extension of effective green time = 2 seconds and startup lost time = 2 seconds.             = ii i X C s v g LC C s v X n i i c − ×      = ∑=1
  • 34. CEE320 Winter2006 Example What is the intersection Level of Service (LOS)? Assume in all cases that PF = 1.0, k = 0.5 (pretimed intersection), I = 1.0 (no upstream signal effects). ∑ ∑ = i i i ii A v vd d ∑ ∑ = k k k kk I v vd d
  • 35. CEE320 Winter2006 Example Is this signal adequate for pedestrians? A pedestrian count showed 5 pedestrians crossing the EB and WB lanes on each side of the intersection and 10 pedestrians crossing the NB and SB crosswalks on each side of the intersection. Lanes are 12 ft. wide. The effective crosswalk widths are all 10 ft. ( ) ft10for27.02.3 ≤++= Eped p p WN S L G
  • 36. CEE320 Winter2006 Signal Installation: “Warrants” • Manual of Uniform Traffic Control Devices (MUTCD) • Apply these rules to determine if a signal is “warranted” at an intersection • If warrants are met, doesn’t mean signals or control is mandatory • 8 major warrants • Multiple warrants usually required for recommending control http://mutcd.fhwa.dot.gov/ FYI – NOT TESTABLE
  • 37. CEE320 Winter2006 Intersection Control Type from Highway Capacity Manual 2000 FYI – NOT TESTABLE
  • 38. CEE320 Winter2006 Primary References • Mannering, F.L.; Kilareski, W.P. and Washburn, S.S. (2003). Principles of Highway Engineering and Traffic Analysis, Third Edition (Draft). Chapter 7 • Transportation Research Board. (2000). Highway Capacity Manual. National Research Council, Washington, D.C.

Editor's Notes

  • #22: When intersection v/c approaches 1.0 then an actuated controller will tend to behave like a pretimed one
  • #26: If you truly want to minimize cycle length then set Xc = 1.0, which means that your critical v/c will be 1 and you can just squeeze all the vehicles through on that phase’s green time. However, due to the stochastic nature of arrivals, if you set Xc = 1 then there will be times when more arrivals than your assumed v will show up and the cycle will fail (not all vehicles will be let through on a particular green). Therefore, often values less than 1 are assumed for Xc (such as 0.90).
  • #27: This is only one estimation Values between 0.75Copt and 1.5 Copt give similar delay times
  • #29: Assumes 15th percentile walking speed of pedestrians is 4 ft/s
  • #32: PHASE 1 SB T/left/right= (400+150+30)/3400 = 0.171 PHASE 2 NB T/left/right = (1000+100+50)/3400 = 0.338 PHASE 3 EB T/right = (200+20)/1400 = 0.157 WB T/right = (300+30)/1400 = 0.236  limiting since v/s is highest Yc = 0.171 + 0.338 + 0.236 = 0.745 Total lost time = 3(2+2) = 12 seconds
  • #33: Copt = 1.5(12 seconds) + 5/(1-0.745) = 90.2 seconds = 95 seconds (rounded up to nearest 5 seconds)
  • #34: DETERMINE Xc Xc = 0.745(95)/(95 – 12) = 0.853 CALCULATE EFFECTIVE GREEN TIMES gSB = 0.171(95/0.853) = 19.04 seconds gNB = 0.338(95/0.853) = 37.64 seconds gEBWB = 0.236 (95/0.853) = 26.28 seconds CHECK 19.04 + 37.64 + 26.28 + 12 = 94.96 = 95 seconds ACTUAL GREEN TIMES In this case, they are the same as g G = g+e-l1 = g +2 -2 = g
  • #35: Determine the delay for each lane group SB lane group c = s (g/C) = 3200(19.04/95) = 641.35 vehicles d1 = (0.5)(95)(1 – 19.04/95)/(1 – 0.853(19.04/95)) = 45.81 seconds d2 = 900(0.25)((0.853-1) + sqrt((0.853 – 1)2 + 8(0.5)(1.0)(0.853)/((641.35)(0.25))) = 13.52 seconds d3 = 0 (assumed) d = 45.81 + 13.52 + 0 = 59.33 NB lane group c = s (g/C) = 3200(37.64/95) = 1267.87 vehicles d1 = (0.5)(95)(1 – 37.64/95)/(1 – 0.853(37.64/95)) = 47.50 seconds d2 = 900(0.25)((0.853-1) + sqrt((0.853 – 1)2 + 8(0.5)(1.0)(0.853)/((1267.87)(0.25))) = 7.41 seconds d3 = 0 (assumed) d = 47.50 + 7.41 + 0 = 54.91 EB lane group c = s (g/C) = 1400(26.28/95) = 387.28 vehicles d1 = (0.5)(95)(1 – 26.28/95)/(1 – 0.853(26.28/95)) = 44.97 seconds d2 = 900(0.25)((0.853-1) + sqrt((0.853 – 1)2 + 8(0.5)(1.0)(0.853)/((387.28)(0.25))) = 20.57 seconds d3 = 0 (assumed) d = 44.97 + 20.57 + 0 = 65.54 WB lane group c = s (g/C) = 1400(26.28/95) = 387.28 vehicles d1 = (0.5)(95)(1 – 26.28/95)/(1 – 0.853(26.28/95)) = 44.97 seconds d2 = 900(0.25)((0.853-1) + sqrt((0.853 – 1)2 + 8(0.5)(1.0)(0.853)/((387.28)(0.25))) = 20.57 seconds d3 = 0 (assumed) d = 44.97 + 20.57 + 0 = 65.54 Find the weighted average of delay for the four lane groups dI = ((59.33)(580) + 54.91(1150) + 65.54(220) + 65.54(330))/(580 + 1150 + 220 + 330) = 58.60 seconds From Table 7.4 this equates to LOS E (not very good)
  • #36: EB/WB Gp = 3.2 + 24/4 + 0.27(5) = 10.55 seconds NB/SB Gp = 3.2 + 48/4 + 0.27(10) = 17.90 seconds OK
  • #37: Warrant 1, Eight-Hour Vehicular Volume.Warrant 2, Four-Hour Vehicular Volume.Warrant 3, Peak Hour.Warrant 4, Pedestrian Volume.Warrant 5, School Crossing.Warrant 6, Coordinated Signal System.Warrant 7, Crash Experience.Warrant 8, Roadway Network.