INTRODUCTION TO THE PROJECT
 The project was undertaken to find Logistics gap
throughout the whole distribution system,
 To find the current status of the OTD service of the co.,
because it reflects brand image which is directly
concerned to company market share,
 Where we can save logistics cost along with improved
Delivery at customer end,
 What are the major causes which affect timely delivery
service of the company,
 Possible solutions to make entire Logistics efficient &
effective.
QUESTIONNAIRE DESIGN & SURVEY RESEARCH
 Three questionnaire was designed for each respondent.
 The targeted population was Dealers (comes under
Jaipur 1 Depot), C&F Agent and responsible persons of
the company.
 FILTER approach is used in designing questions i.e.,
general to specific.
 A Survey was Descriptive Conclusive type.
 The technique taken for sampling was Proportionate
Stratified Sampling.
 T-test was conducted to test the difference of the mean of
Average sales of Population & selected sample size.
ORDER STATUS
By observing this graph we can say that timely delivery is
affected by both works and fields problem, so we have to find
gaps of not delivering material on time at both stations.
MAJOR GAP FINDINGS
Problems at Works :
 Shortage of fly Ash & other raw material,
 Under load order size,
 Seasonality during crop farming,
 Poor demand by customer,
 Less attention on Road shipment during Rake loading etc.
Problems at Field:
 Vehicle Unavailability,
 Labor unavailability or strike,
 Centralized Distribution system,
 Locational issues,
 Lacking in right number, type & mix of vehicles,
 More Secondary Distance from Depot,
 Govt. restrictions etc.
COMPARATIVE STUDY OF TPT MODE
REGRESSION ANALYSIS
 Regression Analysis was done to know the degree of correlation
between Secondary Distance (Depot to destination point) and
Secondary freight per bag.
 As I observed that the only controllable factor, as distance was
concerned, was the secondary distance.
 By reducing this distance we can serve customers timely and
ultimately better brand image in the mind of customer.
 Actually the radius of dispatching material from depot was 200
kms., much more than competitors.
 This higher distance causes more transportation cost and poor
timely delivery service at consumer end.
 Secondary freight per bag was taken as dependent variable (Y)
while Secondary Distance was taken as independent variable (X).
"Efficient and Effective Logistics by way of On Time Delivery (OTD)- A study of Birla Uttam Cement"
C&F COST STRUCTURE COMPARISON
Rail Mode: Rake to Depot to Dealers movement Rail Mode: Rake to direct Dealer movement
Road Mode: Plant to Depot to Dealer Movement
TRANSPORTATION COST- DISPATCH STRATEGY
Current Delivery status
from each source and
associated logistics cost
incurred
Optimum way of delivering
material from each source to each
destination,
Monthly Saving = 90,000 p.m.
Annual saving = Rs. 10,80,000 p.a.
DECENTRALIZED DISTRIBUTION SYSTEM
Decentralized distribution system means, opening of more depot in the existed
geographical area and then supplying material to the radius of not more than 40-
50 km from a particular Depot. This mainly aims to reduce secondary distance
which has greatly influenced the total logistics cost per bag. By doing so material
can also be delivered at customer end fast, i.e., improved OTD.
Delivery from works via new presumed Depot (by road)
CONCLUSION & RECOMMENDATION
 Mainly the company facing serious problem in delivering material on
time at consumer end, and hence market share compare to other
brand is not reasonable, ultimately causes low customer satisfaction.
 Composite cost structure given to C&F Agent must be redesigned,
which can save up to 9,40,000 p.a. from Jaipur 1 Depot only (in case
of Rake).
 Dispatch strategy must be improved to optimum level as suggested
by solving Transportation problem, which can save up to 10,80,000
per annum.
 OTD service can be improved up to 80% level by implementing
Decentralized Distribution System (DCS), which can save huge total
logistics cost of Rs. 85,72,800 p.a.
 Totally about 10.5 Million (per annum) Logistics cost can be saved if
immediate actions will taken by top management surely.
Any Queries ???
.
.
.
Thank You

More Related Content

DOC
Logistics-project-report
PDF
A STUDY ON CUSTOMER’S SATISFACTION MARKS CARGO PRIVATE LIMITED - 2
DOC
Study of outbound logistics in Singapore shipping industry
PPTX
Logistics Management
DOCX
Trapping exception and failure stories in hub operation quality issues.
DOCX
Logistic system analysis
PDF
Logistics performance thailand
DOC
16319859 Indian Logistics Industry
Logistics-project-report
A STUDY ON CUSTOMER’S SATISFACTION MARKS CARGO PRIVATE LIMITED - 2
Study of outbound logistics in Singapore shipping industry
Logistics Management
Trapping exception and failure stories in hub operation quality issues.
Logistic system analysis
Logistics performance thailand
16319859 Indian Logistics Industry

What's hot (20)

DOCX
Project Report on 3rd Party Logistics
PDF
Supply chain management
PPTX
Dr. ruth ecr08 lpat-1
DOC
supply chain and logistics management copy
PDF
logistics outsourcing-ben himanshu 1
PPTX
Supply Chain Infrastructure
DOCX
logistics and warehousing
PDF
Market Research Report : Project logistics market in india 2014 - Sample
PDF
Comprehensive Study of Third Party Logistics
PDF
safexpress report - 2016
PPTX
3 pl ppt
PPTX
Internship PPT - The Effectiveness of Logistics and Distribution - DTDC Couriers
PPTX
Logistic Management in India
DOCX
Logistics management 100 marks assignment
PDF
Selection of 3pl or Logistics Service Providers
PPTX
Logistics related issues and solutions of some core questions of SCM
PDF
Third party logistics
PPTX
Logistics in india
DOC
Logistics
PPT
International Logistics & Warehouse Management
Project Report on 3rd Party Logistics
Supply chain management
Dr. ruth ecr08 lpat-1
supply chain and logistics management copy
logistics outsourcing-ben himanshu 1
Supply Chain Infrastructure
logistics and warehousing
Market Research Report : Project logistics market in india 2014 - Sample
Comprehensive Study of Third Party Logistics
safexpress report - 2016
3 pl ppt
Internship PPT - The Effectiveness of Logistics and Distribution - DTDC Couriers
Logistic Management in India
Logistics management 100 marks assignment
Selection of 3pl or Logistics Service Providers
Logistics related issues and solutions of some core questions of SCM
Third party logistics
Logistics in india
Logistics
International Logistics & Warehouse Management
Ad

Viewers also liked (19)

DOCX
Ultratech Cement_FAM_Rakesh Choudhary_2014220_D
DOC
Final report taq cargo
PPTX
Logistics Project Presentation
DOCX
Logistics management in indian automotive component industry
PDF
Warehouse Safety & OSHA Regulations
PPT
3pl
PPTX
Corrective Action & Preventive Action
PPT
3pl 4pl logistic final
PPTX
Supply chain of maruti suzuki in india
PPTX
3patry and 4 party logistics
PPT
3pl and 4pl
PPTX
maruti suzuki overview
PPSX
Warehouse safety
PPSX
Toyota SCM
PDF
Root Cause Analysis (RCA) Tools
PPTX
Maruti suzuki ppt
PPS
PPTX
Warehousing
PPT
Corrective and Preventive action (CAPA)
Ultratech Cement_FAM_Rakesh Choudhary_2014220_D
Final report taq cargo
Logistics Project Presentation
Logistics management in indian automotive component industry
Warehouse Safety & OSHA Regulations
3pl
Corrective Action & Preventive Action
3pl 4pl logistic final
Supply chain of maruti suzuki in india
3patry and 4 party logistics
3pl and 4pl
maruti suzuki overview
Warehouse safety
Toyota SCM
Root Cause Analysis (RCA) Tools
Maruti suzuki ppt
Warehousing
Corrective and Preventive action (CAPA)
Ad

Similar to "Efficient and Effective Logistics by way of On Time Delivery (OTD)- A study of Birla Uttam Cement" (20)

PDF
Sip report Avijit Halder
PDF
Unit A_Introduction to Logistics_Topic 1.pdf
PPTX
LOGISTICS_MANAGEMENT IN ACCONTANCY .pptx
PDF
A transportation scheduling management system using decision tree and iterate...
PPTX
Logistics management in Business analytics...pptx
DOC
Distribution and logistics
PPTX
PSM -602 Storage & Distribution_lecture slide_Mid term
PPTX
Logistics-.pptx
PPTX
Supply chain
DOCX
45694501 logistics-project
PDF
Building Understanding of Modern Last-mile Delivery Systems
PDF
Production & Operation Management Chapter25[1]
PPTX
Dimentions of logistics.pptx is very important to everyone in a business
PPTX
Facility location
PDF
Solution Manual for Contemporary Logistics, 10th Edition by Murphy
PPTX
Logistics and Transportation Part 12.pptx
PPTX
Logistics and Transportation Part 13.pptx
DOCX
Logistics for better exports
PPT
Summary scm
Sip report Avijit Halder
Unit A_Introduction to Logistics_Topic 1.pdf
LOGISTICS_MANAGEMENT IN ACCONTANCY .pptx
A transportation scheduling management system using decision tree and iterate...
Logistics management in Business analytics...pptx
Distribution and logistics
PSM -602 Storage & Distribution_lecture slide_Mid term
Logistics-.pptx
Supply chain
45694501 logistics-project
Building Understanding of Modern Last-mile Delivery Systems
Production & Operation Management Chapter25[1]
Dimentions of logistics.pptx is very important to everyone in a business
Facility location
Solution Manual for Contemporary Logistics, 10th Edition by Murphy
Logistics and Transportation Part 12.pptx
Logistics and Transportation Part 13.pptx
Logistics for better exports
Summary scm

Recently uploaded (20)

PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPTX
Amazon (Business Studies) management studies
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
PPT
Chapter four Project-Preparation material
PDF
How to Get Funding for Your Trucking Business
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Types of control:Qualitative vs Quantitative
PPTX
5 Stages of group development guide.pptx
PPT
Data mining for business intelligence ch04 sharda
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PPTX
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
Roadmap Map-digital Banking feature MB,IB,AB
Amazon (Business Studies) management studies
COST SHEET- Tender and Quotation unit 2.pdf
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
Chapter four Project-Preparation material
How to Get Funding for Your Trucking Business
340036916-American-Literature-Literary-Period-Overview.ppt
Unit 1 Cost Accounting - Cost sheet
Types of control:Qualitative vs Quantitative
5 Stages of group development guide.pptx
Data mining for business intelligence ch04 sharda
unit 1 COST ACCOUNTING AND COST SHEET
Reconciliation AND MEMORANDUM RECONCILATION
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Probability Distribution, binomial distribution, poisson distribution
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
2025 Product Deck V1.0.pptxCATALOGTCLCIA
job Avenue by vinith.pptxvnbvnvnvbnvbnbmnbmbh
New Microsoft PowerPoint Presentation - Copy.pptx

"Efficient and Effective Logistics by way of On Time Delivery (OTD)- A study of Birla Uttam Cement"

  • 1. A SIP PROJECT REPORT PRESENTATION ON “Efficient and Effective Logistics by Way of On Time Delivery” (A STUDY OF BIRLA UTTAM CEMENT) PRESENTED BY: RAVINDER DAHIYA (R600211047)
  • 2. INTRODUCTION TO THE PROJECT  The project was undertaken to find Logistics gap throughout the whole distribution system,  To find the current status of the OTD service of the co., because it reflects brand image which is directly concerned to company market share,  Where we can save logistics cost along with improved Delivery at customer end,  What are the major causes which affect timely delivery service of the company,  Possible solutions to make entire Logistics efficient & effective.
  • 3. QUESTIONNAIRE DESIGN & SURVEY RESEARCH  Three questionnaire was designed for each respondent.  The targeted population was Dealers (comes under Jaipur 1 Depot), C&F Agent and responsible persons of the company.  FILTER approach is used in designing questions i.e., general to specific.  A Survey was Descriptive Conclusive type.  The technique taken for sampling was Proportionate Stratified Sampling.  T-test was conducted to test the difference of the mean of Average sales of Population & selected sample size.
  • 4. ORDER STATUS By observing this graph we can say that timely delivery is affected by both works and fields problem, so we have to find gaps of not delivering material on time at both stations.
  • 5. MAJOR GAP FINDINGS Problems at Works :  Shortage of fly Ash & other raw material,  Under load order size,  Seasonality during crop farming,  Poor demand by customer,  Less attention on Road shipment during Rake loading etc. Problems at Field:  Vehicle Unavailability,  Labor unavailability or strike,  Centralized Distribution system,  Locational issues,  Lacking in right number, type & mix of vehicles,  More Secondary Distance from Depot,  Govt. restrictions etc.
  • 7. REGRESSION ANALYSIS  Regression Analysis was done to know the degree of correlation between Secondary Distance (Depot to destination point) and Secondary freight per bag.  As I observed that the only controllable factor, as distance was concerned, was the secondary distance.  By reducing this distance we can serve customers timely and ultimately better brand image in the mind of customer.  Actually the radius of dispatching material from depot was 200 kms., much more than competitors.  This higher distance causes more transportation cost and poor timely delivery service at consumer end.  Secondary freight per bag was taken as dependent variable (Y) while Secondary Distance was taken as independent variable (X).
  • 9. C&F COST STRUCTURE COMPARISON Rail Mode: Rake to Depot to Dealers movement Rail Mode: Rake to direct Dealer movement Road Mode: Plant to Depot to Dealer Movement
  • 10. TRANSPORTATION COST- DISPATCH STRATEGY Current Delivery status from each source and associated logistics cost incurred
  • 11. Optimum way of delivering material from each source to each destination, Monthly Saving = 90,000 p.m. Annual saving = Rs. 10,80,000 p.a.
  • 12. DECENTRALIZED DISTRIBUTION SYSTEM Decentralized distribution system means, opening of more depot in the existed geographical area and then supplying material to the radius of not more than 40- 50 km from a particular Depot. This mainly aims to reduce secondary distance which has greatly influenced the total logistics cost per bag. By doing so material can also be delivered at customer end fast, i.e., improved OTD. Delivery from works via new presumed Depot (by road)
  • 13. CONCLUSION & RECOMMENDATION  Mainly the company facing serious problem in delivering material on time at consumer end, and hence market share compare to other brand is not reasonable, ultimately causes low customer satisfaction.  Composite cost structure given to C&F Agent must be redesigned, which can save up to 9,40,000 p.a. from Jaipur 1 Depot only (in case of Rake).  Dispatch strategy must be improved to optimum level as suggested by solving Transportation problem, which can save up to 10,80,000 per annum.  OTD service can be improved up to 80% level by implementing Decentralized Distribution System (DCS), which can save huge total logistics cost of Rs. 85,72,800 p.a.  Totally about 10.5 Million (per annum) Logistics cost can be saved if immediate actions will taken by top management surely.