1. The transfer reactances between a generator and an infinite bus bar operating at
   200KV under various conditions on the interconnector are:
   Prefault:         150ohm per phase
   During Fault: 400ohm/phase
   Post Fault:       200ohm/phase
   If the fault is cleared when the rotor has advanced 600 electrical from its prefault
   position, determine the maximum load that could be transferred without loss of
   stability.                                                    [127.3MW]




   It is nowhere mentioned that the generator is supplying any load and hence we
   have to assume that the voltage is same as that of the infinite bus(=200KV),
   although I have taken it as E and at the end substituted the same.
   A1 = A2
   Integrate to get the above areas and apply the limits as shown in the figure above.
   Pe1 = 1.33Esin(del)
   Pe2 = 0.5Esin(del)
   Pe3 = Esin(del)
   A1 = 0.957Esin(del0) – 0.25Ecos(del0)
   A2 = E(cos(del0 + 600) – cos(pi – del1)) – 1.33E (sin del0)(pi – del1 - del0 - 60)*pi/180
   And P = Esin del1 = 1.33sin(del0)
   So we get a relation between the 2 deltas
   Assume del0 initial value (intelligent guess is < 30 as the increase is 60 and 60+30
   should be less than 90 in most of the cases )
   After 2 or three 3 trials u will get del0 = 280; del1 = 38.630
   P = Pe3 at del1
   Hence P = 200*200/200sin(del1) = 125MW

More Related Content

PDF
Per unit analysis
PPTX
vector control of induction motor
DOC
PPTX
bio battery ppt
PDF
Balanced faults
PPTX
Power Theft Detection
PPTX
Symmetrical Fault Analysis
PPTX
ULTRASONIC MOTORS
Per unit analysis
vector control of induction motor
bio battery ppt
Balanced faults
Power Theft Detection
Symmetrical Fault Analysis
ULTRASONIC MOTORS

What's hot (20)

PDF
Synchronous Motor Drives
PDF
Plc report
PDF
Analysis of a bidirectional isolated dc – dc converter for hybrid system
PPTX
Speed control of dc motor using chopper
PDF
Classical and Modern Control Theory
DOCX
single axis solar tracker with out micro controller
PPTX
Speed control in 3 phase induction motor
PPTX
Three phase half wave controlled converter
PPTX
Electrical ac & dc drives ppt
PPTX
Sun trackin solar panel with auto dust cleaning system
PDF
The admittance model and network calculation
PPTX
Power System Dynamics and Control Presentation on Unit 3
PPTX
Unit-2 Three Phase controlled converter
PPTX
Method of voltage control
PPTX
Electrical machines lecture notes
PPTX
Home Security System using Arduino & GSM
PPTX
Self control of synchronous motor drives
PDF
Power generation by using railway track\\Final year project
PPT
Unit I design of electrical machines
PPTX
Electrical Power Systems Synchronous Generator
Synchronous Motor Drives
Plc report
Analysis of a bidirectional isolated dc – dc converter for hybrid system
Speed control of dc motor using chopper
Classical and Modern Control Theory
single axis solar tracker with out micro controller
Speed control in 3 phase induction motor
Three phase half wave controlled converter
Electrical ac & dc drives ppt
Sun trackin solar panel with auto dust cleaning system
The admittance model and network calculation
Power System Dynamics and Control Presentation on Unit 3
Unit-2 Three Phase controlled converter
Method of voltage control
Electrical machines lecture notes
Home Security System using Arduino & GSM
Self control of synchronous motor drives
Power generation by using railway track\\Final year project
Unit I design of electrical machines
Electrical Power Systems Synchronous Generator
Ad

Similar to Soln unit5 (20)

DOC
Questions From 1st Unit Nagrath
DOC
Unit1 And 2 Sample Solutions
DOC
Chapter1 Questions
DOC
Questions unit4
DOC
Unit1 and 2 sample solutions
PPTX
Optimum design and performance for nablus network
DOC
Power system Stability, Equal area criteria
DOCX
Answer assigment stabilitas & control. by suparman
PPTX
Newton raphson method
PDF
Generator protection calculations settings
PPSX
ECNG 3015 - PU system and 3Phase Fault calculation
DOC
(5) infinite
PDF
Nf2421722176
PDF
Power System Modeling and Simulation lab manual
PDF
Welcome to International Journal of Engineering Research and Development (IJERD)
PPT
Stability with analysis and psa and load flow.ppt
DOC
Unit4questions
PDF
Dh34667671
DOCX
Transmission and distribution line design final
PDF
Generator protection
Questions From 1st Unit Nagrath
Unit1 And 2 Sample Solutions
Chapter1 Questions
Questions unit4
Unit1 and 2 sample solutions
Optimum design and performance for nablus network
Power system Stability, Equal area criteria
Answer assigment stabilitas & control. by suparman
Newton raphson method
Generator protection calculations settings
ECNG 3015 - PU system and 3Phase Fault calculation
(5) infinite
Nf2421722176
Power System Modeling and Simulation lab manual
Welcome to International Journal of Engineering Research and Development (IJERD)
Stability with analysis and psa and load flow.ppt
Unit4questions
Dh34667671
Transmission and distribution line design final
Generator protection
Ad

More from Abha Tripathi (20)

DOCX
Practice questions for unit ii
PDF
Practice questions
DOC
Questions practice unit iv
DOC
Questions unit3
DOC
Unit 2 samplesolutions
DOC
Unit 1, Power system Analysis
DOC
Non Conventional (Renewable) Energy Sources 01
DOC
Conventional sources of energy (power generation) 01
PDF
Symmetrical components
PDF
Representation of power system components
DOC
Questions unit2 ch3
DOC
Unit1questions
PPT
Renewable Sor
PPT
Gas and diesel Plant
PPT
NPP, Nuclear Power Plant,
PPT
Hydro E
PPT
Thermal power plant
DOC
Solutions -unit4
DOC
Unit 2 Questions_Nagrath kothari
DOC
Unit 3 Part 1
Practice questions for unit ii
Practice questions
Questions practice unit iv
Questions unit3
Unit 2 samplesolutions
Unit 1, Power system Analysis
Non Conventional (Renewable) Energy Sources 01
Conventional sources of energy (power generation) 01
Symmetrical components
Representation of power system components
Questions unit2 ch3
Unit1questions
Renewable Sor
Gas and diesel Plant
NPP, Nuclear Power Plant,
Hydro E
Thermal power plant
Solutions -unit4
Unit 2 Questions_Nagrath kothari
Unit 3 Part 1

Recently uploaded (20)

PDF
STATICS OF THE RIGID BODIES Hibbelers.pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Complications of Minimal Access Surgery at WLH
PDF
Yogi Goddess Pres Conference Studio Updates
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
PPTX
Lesson notes of climatology university.
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
Microbial disease of the cardiovascular and lymphatic systems
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Trump Administration's workforce development strategy
STATICS OF THE RIGID BODIES Hibbelers.pdf
Chinmaya Tiranga quiz Grand Finale.pdf
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Complications of Minimal Access Surgery at WLH
Yogi Goddess Pres Conference Studio Updates
Orientation - ARALprogram of Deped to the Parents.pptx
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Lesson notes of climatology university.
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Final Presentation General Medicine 03-08-2024.pptx
FourierSeries-QuestionsWithAnswers(Part-A).pdf
Weekly quiz Compilation Jan -July 25.pdf
Microbial disease of the cardiovascular and lymphatic systems
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
2.FourierTransform-ShortQuestionswithAnswers.pdf
Supply Chain Operations Speaking Notes -ICLT Program
Abdominal Access Techniques with Prof. Dr. R K Mishra
Trump Administration's workforce development strategy

Soln unit5

  • 1. 1. The transfer reactances between a generator and an infinite bus bar operating at 200KV under various conditions on the interconnector are: Prefault: 150ohm per phase During Fault: 400ohm/phase Post Fault: 200ohm/phase If the fault is cleared when the rotor has advanced 600 electrical from its prefault position, determine the maximum load that could be transferred without loss of stability. [127.3MW] It is nowhere mentioned that the generator is supplying any load and hence we have to assume that the voltage is same as that of the infinite bus(=200KV), although I have taken it as E and at the end substituted the same. A1 = A2 Integrate to get the above areas and apply the limits as shown in the figure above. Pe1 = 1.33Esin(del) Pe2 = 0.5Esin(del) Pe3 = Esin(del) A1 = 0.957Esin(del0) – 0.25Ecos(del0) A2 = E(cos(del0 + 600) – cos(pi – del1)) – 1.33E (sin del0)(pi – del1 - del0 - 60)*pi/180 And P = Esin del1 = 1.33sin(del0) So we get a relation between the 2 deltas Assume del0 initial value (intelligent guess is < 30 as the increase is 60 and 60+30 should be less than 90 in most of the cases ) After 2 or three 3 trials u will get del0 = 280; del1 = 38.630 P = Pe3 at del1 Hence P = 200*200/200sin(del1) = 125MW