SlideShare a Scribd company logo
Step By Step Guide_______________
Before using the drama studio you must makesure that everything is present
for sound, projection and lighting:
Lighting:
In the rig there should be 10X CCT Fresnels w/gel frames. In order to make
surethat these are situated correctly and are rigged correctly, you MUST make
surethat all the following are present and done correctly;
Step One:
Plugs: it is very importantthat all plugs are properly plugged into the sockets, if
the plug isn’tin correctly then there is a health and safety
risk. When you go to plug it back in and it’s not going in at
all please make surethat there is no objects in the way of
the sockets. If this still hasn’tworked you should then go
and the college technician.
Step Two:
Safety Chain: the CCT Fresnel’s in the rig should always have a safety Chain
with them at all times to ensurethat if it was to ever fall off the rig, it then
won’tsmash on the floor. If there isn’t a safety wrapped around the CCT
Fresnel, the safety chains are situated at the back of the
main hall directly abovethe lighting rack.
Step Three:
G-Clamp: All lights should have a G-clamp on at all times; the G-Clamp should
be sitting on top of the adjustablearm. If there isn’t a G-Clamp in sight then
you should go to the back of the main hall and you will see
that they areall situated on the lighting rack.
Step Four:
Gel Frame: Itis important that all CCT Fresnel’s have gel frames attached to the
frontof the light. If there aren’t any gel frames attached to the light you should
go to the back of main hall wherethey are all situated on the wall abovethe
lighting rack.
Step Five:
Barn doors: Itis important that all CCT Fresnel’s haveBarn door attached to
the frontof the light. Dueto if there are any performancebeing held you are
then able to focus the lights easier. If there aren’t any Barn doors attached you
should go to the back of the main hall where the barn
doors are situated on the wall above the lighting rack.
Step Six:
Gels: All the CCT Fresnel’s should havegels in them, it doesn’treally matter
which colour are in the lights. If there aren’t any gels in the light you should go
to the back of the main hall and next to the lighting rack you will see a tall filing
cabinet. In there are all the Coloured gels and they are in order
of colour. You can cut out the gels to the right size.
Yes/No
If this is all complete please circle;
Step Seven:
Light not active: If the CCT Fresnelis working firstto do is to check if the plug is
plugged in properly. If this still isn’tworking, go and grab the ladder which is
located in the back of the hall. Switch the sockets around, for example if it’s in
socketnumber 12 put it into socket number 10 and see if it’s working. If itstill
doesn’twork take the light down fromthe rig.
Step Eight:
Make sureyou have a screw driver and a small brush, open the tray which is at
the bottom of the light. From there check that the bulb hasn’tpopped, for you
to know if it has popped the bulb would havegone black at the top. If the bulb
is fine give the lens and the inside a quick brush to get rid of the dust that is in
there. After this shutthe tray and tighten it back up.
The image here is my self-opening up the light to get inside the light.
The image is my self-brushing outthe the dust from
inside the light.
Step Nine:
Last you will check the plug; you open the plug and check if there are any loose
wires. If all the wires are connected, from there you should take the light to
the technician’s office which is located at the back of the main hall.
If this is all complete please circle;
Yes/No
Completed by: Date: Next Inspection Date:________

More Related Content

DOCX
Step by step guide
DOCX
Photographic evidence
DOCX
PPTX
In the heights
DOC
Cnts Sample From Delta Airlines Case Study
DOCX
chỗ nào dịch vụ giúp việc theo giờ uy tín ở hcm
DOC
Welcome to 4-1
PPT
Presentation2
Step by step guide
Photographic evidence
In the heights
Cnts Sample From Delta Airlines Case Study
chỗ nào dịch vụ giúp việc theo giờ uy tín ở hcm
Welcome to 4-1
Presentation2

Viewers also liked (10)

PDF
SEAL Systems - PDF/A
PDF
DOCX
chỗ nào dịch vụ giúp việc trọn gói tại hồ chí minh
PDF
D 60 Monthly August 09
DOC
The Numeral Exercises
DOCX
cung cấp dịch vụ giúp việc theo tháng có kinh nghiệm ở hồ chí minh
PPS
El universo pictórico de Jorge Demirjian
PDF
Definire, configurare ed implementare soluzioni scalabili su sistemi di Cloud...
PDF
POS Data Breach, analisi di un attacco. Di Enrico Fontan - festival ICT 2015
SEAL Systems - PDF/A
chỗ nào dịch vụ giúp việc trọn gói tại hồ chí minh
D 60 Monthly August 09
The Numeral Exercises
cung cấp dịch vụ giúp việc theo tháng có kinh nghiệm ở hồ chí minh
El universo pictórico de Jorge Demirjian
Definire, configurare ed implementare soluzioni scalabili su sistemi di Cloud...
POS Data Breach, analisi di un attacco. Di Enrico Fontan - festival ICT 2015
Ad

Similar to Step by step guide (20)

DOCX
Step by step guide
DOCX
Step by step guide
DOCX
Step by step guide
DOCX
Ammended checklist
DOCX
Step by step 2nd draft
DOCX
Maintanence
DOCX
Maintanence
DOCX
Maintanence
DOCX
Photographic evidence
DOCX
Maintanence
DOCX
Checklist
DOCX
How to fix it
DOCX
Step by step guide table first one
DOCX
How to fix it guide
DOCX
Trouble shooting lights
DOCX
Equipment list drama
DOCX
Equipment list drama
DOCX
Step by step guide table first one
DOCX
Equipment list drama amended
DOCX
How to fix guide (lights)
Step by step guide
Step by step guide
Step by step guide
Ammended checklist
Step by step 2nd draft
Maintanence
Maintanence
Maintanence
Photographic evidence
Maintanence
Checklist
How to fix it
Step by step guide table first one
How to fix it guide
Trouble shooting lights
Equipment list drama
Equipment list drama
Step by step guide table first one
Equipment list drama amended
How to fix guide (lights)
Ad

More from mattyybaldyy (20)

ODP
Analysisofaudienceresearch
PPTX
Laura croft
PPTX
Frankenstein
DOCX
Over view
DOCX
Over view
DOCX
Check list 1
DOCX
Over view
DOCX
Check list 1
DOCX
Over view
DOCX
Check list 1
PPTX
Sound analysis
PPTX
PPTX
PPTX
Arley hall
PPTX
Documentary genres
PPTX
PPTX
Images
PPTX
Researching the market place for rock magazines
PPTX
Presentation2
Analysisofaudienceresearch
Laura croft
Frankenstein
Over view
Over view
Check list 1
Over view
Check list 1
Over view
Check list 1
Sound analysis
Arley hall
Documentary genres
Images
Researching the market place for rock magazines
Presentation2

Recently uploaded (20)

PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
PDF
Uderstanding digital marketing and marketing stratergie for engaging the digi...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
PDF
International_Financial_Reporting_Standa.pdf
PDF
Complications of Minimal Access-Surgery.pdf
PDF
Trump Administration's workforce development strategy
PPTX
History, Philosophy and sociology of education (1).pptx
PPTX
Computer Architecture Input Output Memory.pptx
PDF
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
What if we spent less time fighting change, and more time building what’s rig...
PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PDF
My India Quiz Book_20210205121199924.pdf
PDF
Environmental Education MCQ BD2EE - Share Source.pdf
PDF
Weekly quiz Compilation Jan -July 25.pdf
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 2).pdf
Uderstanding digital marketing and marketing stratergie for engaging the digi...
Unit 4 Computer Architecture Multicore Processor.pptx
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
International_Financial_Reporting_Standa.pdf
Complications of Minimal Access-Surgery.pdf
Trump Administration's workforce development strategy
History, Philosophy and sociology of education (1).pptx
Computer Architecture Input Output Memory.pptx
Vision Prelims GS PYQ Analysis 2011-2022 www.upscpdf.com.pdf
Chinmaya Tiranga quiz Grand Finale.pdf
What if we spent less time fighting change, and more time building what’s rig...
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
My India Quiz Book_20210205121199924.pdf
Environmental Education MCQ BD2EE - Share Source.pdf
Weekly quiz Compilation Jan -July 25.pdf
LDMMIA Reiki Yoga Finals Review Spring Summer
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
1.3 FINAL REVISED K-10 PE and Health CG 2023 Grades 4-10 (1).pdf
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS

Step by step guide

  • 1. Step By Step Guide_______________ Before using the drama studio you must makesure that everything is present for sound, projection and lighting: Lighting: In the rig there should be 10X CCT Fresnels w/gel frames. In order to make surethat these are situated correctly and are rigged correctly, you MUST make surethat all the following are present and done correctly; Step One: Plugs: it is very importantthat all plugs are properly plugged into the sockets, if the plug isn’tin correctly then there is a health and safety risk. When you go to plug it back in and it’s not going in at all please make surethat there is no objects in the way of the sockets. If this still hasn’tworked you should then go and the college technician. Step Two: Safety Chain: the CCT Fresnel’s in the rig should always have a safety Chain with them at all times to ensurethat if it was to ever fall off the rig, it then won’tsmash on the floor. If there isn’t a safety wrapped around the CCT Fresnel, the safety chains are situated at the back of the main hall directly abovethe lighting rack.
  • 2. Step Three: G-Clamp: All lights should have a G-clamp on at all times; the G-Clamp should be sitting on top of the adjustablearm. If there isn’t a G-Clamp in sight then you should go to the back of the main hall and you will see that they areall situated on the lighting rack. Step Four: Gel Frame: Itis important that all CCT Fresnel’s have gel frames attached to the frontof the light. If there aren’t any gel frames attached to the light you should go to the back of main hall wherethey are all situated on the wall abovethe lighting rack. Step Five: Barn doors: Itis important that all CCT Fresnel’s haveBarn door attached to the frontof the light. Dueto if there are any performancebeing held you are then able to focus the lights easier. If there aren’t any Barn doors attached you should go to the back of the main hall where the barn doors are situated on the wall above the lighting rack. Step Six: Gels: All the CCT Fresnel’s should havegels in them, it doesn’treally matter which colour are in the lights. If there aren’t any gels in the light you should go to the back of the main hall and next to the lighting rack you will see a tall filing cabinet. In there are all the Coloured gels and they are in order of colour. You can cut out the gels to the right size. Yes/No If this is all complete please circle;
  • 3. Step Seven: Light not active: If the CCT Fresnelis working firstto do is to check if the plug is plugged in properly. If this still isn’tworking, go and grab the ladder which is located in the back of the hall. Switch the sockets around, for example if it’s in socketnumber 12 put it into socket number 10 and see if it’s working. If itstill doesn’twork take the light down fromthe rig. Step Eight: Make sureyou have a screw driver and a small brush, open the tray which is at the bottom of the light. From there check that the bulb hasn’tpopped, for you to know if it has popped the bulb would havegone black at the top. If the bulb is fine give the lens and the inside a quick brush to get rid of the dust that is in there. After this shutthe tray and tighten it back up. The image here is my self-opening up the light to get inside the light. The image is my self-brushing outthe the dust from inside the light. Step Nine:
  • 4. Last you will check the plug; you open the plug and check if there are any loose wires. If all the wires are connected, from there you should take the light to the technician’s office which is located at the back of the main hall. If this is all complete please circle; Yes/No Completed by: Date: Next Inspection Date:________