Step By Step Guide_______________
Before using the drama studio you must makesure that everything is present
for sound, projection and lighting:
Lighting:
In the rig there should be 10X CCT Fresnels w/gel frames. In order to make
surethat these are situated correctly and are rigged correctly, you MUST make
surethat all the following are present and done correctly;
Step One:
Plugs: it is very importantthat all plugs are properly plugged into the sockets, if
the plug isn’tin correctly then there is a health and safety
risk. When you go to plug it back in and it’s not going in at
all please make surethat there is no objects in the way of
the sockets. If this still hasn’tworked you should then go
and the college technician.
Step Two:
Safety Chain: the CCT Fresnel’s in the rig should always have a safety Chain
with them at all times to ensurethat if it was to ever fall off the rig, it then
won’tsmash on the floor. If there isn’t a safety wrapped around the CCT
Fresnel, the safety chains are situated at the back of the
main hall directly abovethe lighting rack.
Step Three:
G-Clamp: All lights should have a G-clamp on at all times; the G-Clamp should
be sitting on top of the adjustablearm. If there isn’t a G-Clamp in sight then
you should go to the back of the main hall and you will see
that they areall situated on the lighting rack.
Step Four:
Gel Frame: Itis important that all CCT Fresnel’s have gel frames attached to the
frontof the light. If there aren’t any gel frames attached to the light you should
go to the back of main hall wherethey are all situated on the wall abovethe
lighting rack.
Step Five:
Barn doors: Itis important that all CCT Fresnel’s haveBarn door attached to
the frontof the light. Dueto if there are any performancebeing held you are
then able to focus the lights easier. If there aren’t any Barn doors attached you
should go to the back of the main hall where the barn
doors are situated on the wall above the lighting rack.
Step Six:
Gels: All the CCT Fresnel’s should havegels in them, it doesn’treally matter
which colour are in the lights. If there aren’t any gels in the light you should go
to the back of the main hall and next to the lighting rack you will see a tall filing
cabinet. In there are all the Coloured gels and they are in order
of colour. You can cut out the gels to the right size.
Yes/No
If this is all complete please circle;
Lighting & Dimmers
Step Seven:
Lighting desk/dimmers: Before turning on any lights you haveto make sure
that the dimmer control box has the 32 Amp cable going in to its socket.
Step Eight:
You then make surethe switches on the dimmers are switched to the left,
if not it’s because the lights a tripped it.
Step Nine:
After this make surethat the DMX cable is in inserted in the input socket to
give all the lights power.
Step Ten:
Ensurethat the lighting desk is switched on at the back of the lighting desk in
order to the desk full power.
Step Eleven:
Make surethe grand master is up and A & B, then you can begin to play with
the lights.
Step Twelve:
Light not active: If the CCT Fresnelis working firstto do is to check if the plug is
plugged in properly. If this still isn’tworking, go and grab the ladder which is
located in the back of the hall. Switch the sockets around, for example if it’s in
socketnumber 12 put it into socket number 10 and see if it’s working. If itstill
doesn’twork take the light down fromthe rig.
Step Thirteen:
Make sureyou have a screw driver and a small brush, open the tray which is at
the bottom of the light. From there check that the bulb hasn’tpopped, for you
to know if it has popped the bulb would havegone black at the top. If the bulb
is fine give the lens and the inside a quick brush to get rid of the dust that is in
there. After this shutthe tray and tighten it back up.
The image here is my self-opening up the light to get inside the light.
The image is my self-brushing outthe the dust from
inside the light.
Step Fourteen:
Last you will check the plug; you open the plug and check if there are any loose
wires. If all the wires are connected, from there you should take the light to
the technician’s office which is located at the back of the main hall.
If this is all complete please circle;
Yes/No
Completed by: Date: Next Inspection Date:________

More Related Content

DOCX
Step by step guide
DOCX
Step by step guide
DOCX
PPTX
Analysis
PPTX
Gone girl
PPTX
Images.
PPTX
Documentary genres
PPTX
Presentation1
Step by step guide
Step by step guide
Analysis
Gone girl
Images.
Documentary genres
Presentation1

Viewers also liked (16)

ODP
Video portfolio
PPTX
Frankenstein
PPTX
Images
PPTX
Researching the market place for rock magazines
ODP
Lighting portfolio
PPTX
Working qlab
PPTX
In the heights
DOCX
Written justification
PPTX
Production pics
DOCX
Step by step guide
PPTX
Sound analysis
PDF
Aug. 27 Notes
 
PPTX
Top 8 contracts manager resume samples
PDF
Printable 08 Torsion Spring
PDF
Estudio De Empresa Tanzi
PPTX
Top 8 contract administrator resume samples
Video portfolio
Frankenstein
Images
Researching the market place for rock magazines
Lighting portfolio
Working qlab
In the heights
Written justification
Production pics
Step by step guide
Sound analysis
Aug. 27 Notes
 
Top 8 contracts manager resume samples
Printable 08 Torsion Spring
Estudio De Empresa Tanzi
Top 8 contract administrator resume samples
Ad

Similar to Step by step guide (20)

DOCX
Step by step guide
DOCX
Step by step guide table first one
DOCX
Ammended checklist
DOCX
Checklist
DOCX
Step by step guide table first one
DOCX
Equipment list drama
DOCX
Equipment list drama
DOCX
Equipment list drama amended
DOCX
Step by step 2nd draft
DOCX
Maintanence
DOCX
Maintanence
DOCX
How to fix guide (lights)
DOCX
GC3: Installing Equipment
DOCX
Maintanence
DOCX
How to fix guide (lights)
DOCX
How to fix it guide
DOCX
Photographic evidence
DOCX
Photographic evidence
PPTX
Lighting operation
DOCX
How to fix it
Step by step guide
Step by step guide table first one
Ammended checklist
Checklist
Step by step guide table first one
Equipment list drama
Equipment list drama
Equipment list drama amended
Step by step 2nd draft
Maintanence
Maintanence
How to fix guide (lights)
GC3: Installing Equipment
Maintanence
How to fix guide (lights)
How to fix it guide
Photographic evidence
Photographic evidence
Lighting operation
How to fix it
Ad

More from mattyybaldyy (20)

ODP
Analysisofaudienceresearch
PPTX
Laura croft
DOCX
Over view
DOCX
Over view
DOCX
Check list 1
DOCX
Over view
DOCX
Check list 1
DOCX
Over view
DOCX
Check list 1
PPTX
PPTX
PPTX
Arley hall
PPTX
PPTX
In the heights
PPTX
Images
PPTX
Presentation2
PPTX
Question 4
DOCX
I used quark express to create my double page spread and my contents page
DOCX
Article
Analysisofaudienceresearch
Laura croft
Over view
Over view
Check list 1
Over view
Check list 1
Over view
Check list 1
Arley hall
In the heights
Images
Presentation2
Question 4
I used quark express to create my double page spread and my contents page
Article

Recently uploaded (20)

PDF
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
PPTX
202450812 BayCHI UCSC-SV 20250812 v17.pptx
PDF
Hazard Identification & Risk Assessment .pdf
PDF
Trump Administration's workforce development strategy
PDF
AI-driven educational solutions for real-life interventions in the Philippine...
PPTX
Unit 4 Computer Architecture Multicore Processor.pptx
PDF
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
PDF
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
PDF
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
PPTX
TNA_Presentation-1-Final(SAVE)) (1).pptx
PPTX
History, Philosophy and sociology of education (1).pptx
PDF
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PPTX
Introduction to pro and eukaryotes and differences.pptx
PPTX
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
PDF
My India Quiz Book_20210205121199924.pdf
DOCX
Cambridge-Practice-Tests-for-IELTS-12.docx
PDF
International_Financial_Reporting_Standa.pdf
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf
Τίμαιος είναι φιλοσοφικός διάλογος του Πλάτωνα
202450812 BayCHI UCSC-SV 20250812 v17.pptx
Hazard Identification & Risk Assessment .pdf
Trump Administration's workforce development strategy
AI-driven educational solutions for real-life interventions in the Philippine...
Unit 4 Computer Architecture Multicore Processor.pptx
FOISHS ANNUAL IMPLEMENTATION PLAN 2025.pdf
medical_surgical_nursing_10th_edition_ignatavicius_TEST_BANK_pdf.pdf
BP 704 T. NOVEL DRUG DELIVERY SYSTEMS (UNIT 1)
TNA_Presentation-1-Final(SAVE)) (1).pptx
History, Philosophy and sociology of education (1).pptx
OBE - B.A.(HON'S) IN INTERIOR ARCHITECTURE -Ar.MOHIUDDIN.pdf
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Introduction to pro and eukaryotes and differences.pptx
Onco Emergencies - Spinal cord compression Superior vena cava syndrome Febr...
My India Quiz Book_20210205121199924.pdf
Cambridge-Practice-Tests-for-IELTS-12.docx
International_Financial_Reporting_Standa.pdf
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
CISA (Certified Information Systems Auditor) Domain-Wise Summary.pdf

Step by step guide

  • 1. Step By Step Guide_______________ Before using the drama studio you must makesure that everything is present for sound, projection and lighting: Lighting: In the rig there should be 10X CCT Fresnels w/gel frames. In order to make surethat these are situated correctly and are rigged correctly, you MUST make surethat all the following are present and done correctly; Step One: Plugs: it is very importantthat all plugs are properly plugged into the sockets, if the plug isn’tin correctly then there is a health and safety risk. When you go to plug it back in and it’s not going in at all please make surethat there is no objects in the way of the sockets. If this still hasn’tworked you should then go and the college technician. Step Two: Safety Chain: the CCT Fresnel’s in the rig should always have a safety Chain with them at all times to ensurethat if it was to ever fall off the rig, it then won’tsmash on the floor. If there isn’t a safety wrapped around the CCT Fresnel, the safety chains are situated at the back of the main hall directly abovethe lighting rack.
  • 2. Step Three: G-Clamp: All lights should have a G-clamp on at all times; the G-Clamp should be sitting on top of the adjustablearm. If there isn’t a G-Clamp in sight then you should go to the back of the main hall and you will see that they areall situated on the lighting rack. Step Four: Gel Frame: Itis important that all CCT Fresnel’s have gel frames attached to the frontof the light. If there aren’t any gel frames attached to the light you should go to the back of main hall wherethey are all situated on the wall abovethe lighting rack. Step Five: Barn doors: Itis important that all CCT Fresnel’s haveBarn door attached to the frontof the light. Dueto if there are any performancebeing held you are then able to focus the lights easier. If there aren’t any Barn doors attached you should go to the back of the main hall where the barn doors are situated on the wall above the lighting rack. Step Six: Gels: All the CCT Fresnel’s should havegels in them, it doesn’treally matter which colour are in the lights. If there aren’t any gels in the light you should go to the back of the main hall and next to the lighting rack you will see a tall filing cabinet. In there are all the Coloured gels and they are in order of colour. You can cut out the gels to the right size. Yes/No If this is all complete please circle;
  • 3. Lighting & Dimmers Step Seven: Lighting desk/dimmers: Before turning on any lights you haveto make sure that the dimmer control box has the 32 Amp cable going in to its socket. Step Eight: You then make surethe switches on the dimmers are switched to the left, if not it’s because the lights a tripped it. Step Nine: After this make surethat the DMX cable is in inserted in the input socket to give all the lights power. Step Ten: Ensurethat the lighting desk is switched on at the back of the lighting desk in order to the desk full power. Step Eleven: Make surethe grand master is up and A & B, then you can begin to play with the lights. Step Twelve: Light not active: If the CCT Fresnelis working firstto do is to check if the plug is plugged in properly. If this still isn’tworking, go and grab the ladder which is located in the back of the hall. Switch the sockets around, for example if it’s in
  • 4. socketnumber 12 put it into socket number 10 and see if it’s working. If itstill doesn’twork take the light down fromthe rig. Step Thirteen: Make sureyou have a screw driver and a small brush, open the tray which is at the bottom of the light. From there check that the bulb hasn’tpopped, for you to know if it has popped the bulb would havegone black at the top. If the bulb is fine give the lens and the inside a quick brush to get rid of the dust that is in there. After this shutthe tray and tighten it back up. The image here is my self-opening up the light to get inside the light. The image is my self-brushing outthe the dust from inside the light. Step Fourteen: Last you will check the plug; you open the plug and check if there are any loose wires. If all the wires are connected, from there you should take the light to the technician’s office which is located at the back of the main hall.
  • 5. If this is all complete please circle; Yes/No Completed by: Date: Next Inspection Date:________