Step by step
using a total
station
Setting up Apparatus
Choose Target Locations
- At the site, appropriate location must
be chosen in order to begin being
marker locations. Then tripods are
placed on these locations.
- When tripods are set up, ensure they
are level and directly over survey
point.
Mount the instrument
- After tripod locations are set, the total
station and prisms can be mounted onto
tripods. The total stations are secured
with the centring screw.
- Ensure the levelling and position of the
tripod are not moved during this process.
Levelling the Total Station
 Before any measurements can be made and recorded, the
total station and any other used equipment for the
process must be levelled, otherwise the measurements
taken will not provide a high level of accuracy.
 The total station is levelled using the foot screws
displayed above, aligning the bullseye bubble until centre.
Focus on Survey Point
 Once Mounted, position the total station so that it is
facing the prism. Ensure to align the peep sights with the
triangle above the prism (gun site).
Adjust Image to Focus
 Using the focus rings, adjust the focus of the cross hairs
and the image until they are both sharply focussed and
visible. This process can vary slightly from person to
person depending on visual capabilities.
Measuring and Checking Angles
 step 1 – measuring angles
Set the current position of the total station at 0 degrees, then
rotate the apparatus so that it is facing the desired prism. Align
the instrument with the gunsight as previously explained and
record the given visual angle.
 Step 2 – checking angle
Flip the total station so that the reading now says 180 degrees,
then realign the total station with the first prism before recording
the second reading. Minus 180 degrees from the second reading
and the value should be close or exact to the same value to the
first angle measurement.

More Related Content

PDF
Total station
PPTX
Total station Surveying
PPT
Total station
PPTX
Electronic distance measurement (EDM)
PPSX
Welcome to the presentation on ‘total station
PDF
Introduction to Surveying LEVELLING PROCEDURES
PDF
Profiles (longitudinal section) & cross sections
Total station
Total station Surveying
Total station
Electronic distance measurement (EDM)
Welcome to the presentation on ‘total station
Introduction to Surveying LEVELLING PROCEDURES
Profiles (longitudinal section) & cross sections

What's hot (20)

PPTX
Total station
PPTX
Total Station & GPS
PDF
Total station surveying
PDF
Levelling
PPTX
Surveying
PPTX
Aerial photogrammetry ppt 1
PDF
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
PDF
Traversing
PPTX
Theodolite angle measurement
PPTX
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
PPTX
Theodolite Traversing
PDF
Introduction to Surveying under ECE
PDF
Total station
PDF
Compass surveying
PDF
Sokkia Total station setup and operation
DOCX
Surveying practical work book
PPTX
Tutor l1 setting out
PPTX
Aerial Photogrammetry 01
PPTX
Total station topcon exp procedures
PPTX
Advance surveying equipments
Total station
Total Station & GPS
Total station surveying
Levelling
Surveying
Aerial photogrammetry ppt 1
ROAD PROFILING, CROSS SECTION & SETTING OUT SEWER LINE
Traversing
Theodolite angle measurement
9. MORDAN SURVEYING INSTRUMENTS (SUR) 3140601 GTU
Theodolite Traversing
Introduction to Surveying under ECE
Total station
Compass surveying
Sokkia Total station setup and operation
Surveying practical work book
Tutor l1 setting out
Aerial Photogrammetry 01
Total station topcon exp procedures
Advance surveying equipments
Ad

Similar to Step by step using a total station (20)

PDF
Total station setup and operation
PDF
Total station setup and operation
PPTX
How to use a total station
PDF
Total station setup and operation
PDF
Surveying 1 lab-manual_syb_tech
PDF
micro-optic-theodolite.pdf
PDF
lecture_(1)_(Leveling-Centering-Tilting-FUNC-total station
PDF
Total station For Btech Engineering Students
PDF
US Optics TS 6x/8x Instruction Manual | Optics Trade
PDF
2017-18 surveying lab 2 manual total sta
PPTX
3.Lensometery.pptx
PDF
Instructions VORTEX VIPER HS-T Riflescope | Optics Trade
PDF
US Optics TS 12x Instruction Manual | Optics Trade
PPTX
Advanced surveying equipment ppt
PDF
Instruction Manual | Burris Eliminator IV Laserscope Series | Optics Trade
DOCX
Surveying and leveling-2
PDF
Surveying by using Digital Theodolite
PDF
Two pegtest
PPTX
METROLOGY LESSON 4-5.pptx TUP MANILAAAAA
PDF
Instruction Manual | C-More C3 Riflescopes | Optics Trade
Total station setup and operation
Total station setup and operation
How to use a total station
Total station setup and operation
Surveying 1 lab-manual_syb_tech
micro-optic-theodolite.pdf
lecture_(1)_(Leveling-Centering-Tilting-FUNC-total station
Total station For Btech Engineering Students
US Optics TS 6x/8x Instruction Manual | Optics Trade
2017-18 surveying lab 2 manual total sta
3.Lensometery.pptx
Instructions VORTEX VIPER HS-T Riflescope | Optics Trade
US Optics TS 12x Instruction Manual | Optics Trade
Advanced surveying equipment ppt
Instruction Manual | Burris Eliminator IV Laserscope Series | Optics Trade
Surveying and leveling-2
Surveying by using Digital Theodolite
Two pegtest
METROLOGY LESSON 4-5.pptx TUP MANILAAAAA
Instruction Manual | C-More C3 Riflescopes | Optics Trade
Ad

Recently uploaded (20)

PPTX
Safety Seminar civil to be ensured for safe working.
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PDF
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PDF
R24 SURVEYING LAB MANUAL for civil enggi
PDF
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
PPTX
Module 8- Technological and Communication Skills.pptx
PPT
Occupational Health and Safety Management System
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
Categorization of Factors Affecting Classification Algorithms Selection
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PPT
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
PPTX
communication and presentation skills 01
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
Safety Seminar civil to be ensured for safe working.
Exploratory_Data_Analysis_Fundamentals.pdf
BIO-INSPIRED HORMONAL MODULATION AND ADAPTIVE ORCHESTRATION IN S-AI-GPT
distributed database system" (DDBS) is often used to refer to both the distri...
R24 SURVEYING LAB MANUAL for civil enggi
22EC502-MICROCONTROLLER AND INTERFACING-8051 MICROCONTROLLER.pdf
Module 8- Technological and Communication Skills.pptx
Occupational Health and Safety Management System
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Categorization of Factors Affecting Classification Algorithms Selection
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
INTRODUCTION -Data Warehousing and Mining-M.Tech- VTU.ppt
Fundamentals of Mechanical Engineering.pptx
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
communication and presentation skills 01
Nature of X-rays, X- Ray Equipment, Fluoroscopy

Step by step using a total station

  • 1. Step by step using a total station
  • 2. Setting up Apparatus Choose Target Locations - At the site, appropriate location must be chosen in order to begin being marker locations. Then tripods are placed on these locations. - When tripods are set up, ensure they are level and directly over survey point.
  • 3. Mount the instrument - After tripod locations are set, the total station and prisms can be mounted onto tripods. The total stations are secured with the centring screw. - Ensure the levelling and position of the tripod are not moved during this process.
  • 4. Levelling the Total Station  Before any measurements can be made and recorded, the total station and any other used equipment for the process must be levelled, otherwise the measurements taken will not provide a high level of accuracy.  The total station is levelled using the foot screws displayed above, aligning the bullseye bubble until centre.
  • 5. Focus on Survey Point  Once Mounted, position the total station so that it is facing the prism. Ensure to align the peep sights with the triangle above the prism (gun site).
  • 6. Adjust Image to Focus  Using the focus rings, adjust the focus of the cross hairs and the image until they are both sharply focussed and visible. This process can vary slightly from person to person depending on visual capabilities.
  • 7. Measuring and Checking Angles  step 1 – measuring angles Set the current position of the total station at 0 degrees, then rotate the apparatus so that it is facing the desired prism. Align the instrument with the gunsight as previously explained and record the given visual angle.  Step 2 – checking angle Flip the total station so that the reading now says 180 degrees, then realign the total station with the first prism before recording the second reading. Minus 180 degrees from the second reading and the value should be close or exact to the same value to the first angle measurement.