SlideShare a Scribd company logo
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3467
STUDY OF BUILDING INFORMATION MODELING PROCESS
Pinak Rahate, Dr. Rajendra R. Dighade
Department Of Civil Engineering, Yeshwantrao Chavan College of Engineering
(An Autonomous Institution Affiliated to Rashtrasant Tukdoji Maharaj Nagpur University), Nagpur, India.
---------------------------------------------------------------------***-----------------------------------------------------------------------
ABSTRACT- These days creation stakeholders don’t care
how fancy a constructing information version (BIM) is,
they care approximately having buildings accomplished
on time with minimized overruns or errors. Traditionally,
BIM has been used as a design tool to give structure,
engineering, and construction (AEC) professionals a
perception of the layout and creation of homes and
infrastructure. This thesis has cited the integration of the
extraordinary software. In this thesis it is easy to study the
BIM procedure via the use of software like AutoCAD for
2nd Plans or Drafting, then Revit is used for the 3-d
modeling, Microsoft project for Scheduling and planning
then inside the ultimate Navis paintings for 4Dth
measurement with the 3D version Simulation.
KEYWORDS: AutoCad, Revit, Naviswork, Microsoft
Project
INTRODUCTION
What is BIM? Building data modeling is one of the most
promising trends in the architecture, engineering, and
production fields. It's miles converting the way
contractors and engineers do business, however, its
software continues to be relatively new and there is a
great deal to examine. One manner to study is by
watching how other agencies are the use constructing
statistics. Modeling and their trials and tribulations
alongside the manner. Constructing records Modelling
changed added over a decade ago especially to
differentiate the records-wealthy architectural three-D
modeling from the traditional second drawing. It's miles
being acclaimed by using its advocates as a lifesaver for
complex initiatives because of its capacity to accurate
errors early within the layout degree and correctly
agenda construction.
2. 2D PLANS, 3D MODEL, SCHEDULE, AND
SIMULATION
2.1 2 DIMENSION PLANS (2D PLANS)
AutoCAD is an industrial software (CAD) and drafting
software application. Advanced and advertised through
Autodesk. AutoCAD was first launched in December
1982 as a computer app strolling on microcomputers
with internal graphics controllers. Before AutoCAD
becomes delivered most commercial CAD applications
ran on mainframe computers or minicomputers, with
every CAD operator (person) engaging at a separate pix
terminal. AutoCAD is likewise to be had as mobile and
net apps. AutoCAD is used in industry, employing
architects, challenge managers, engineers, photograph
designers, town planners, and other specialists. It had
been supported by way of 750 training centers
worldwide in 1994
2.1.1 FILE EXTENSIONS
i. Drawing Template files.Dwt: New. Dwg is created from a.
Dwt record. Even though the default template record is
acad.Dwt for AutoCAD and.Dwt for AutoCAD LT, custom
.Dwt documents may be created to include foundational
configurations inclusive of drawing gadgets and layers
Drawing requirements file .Dws the use of the CAD
standards feature of AutoCAD, a Drawing standards
document can be associated with any. Dwg or. Dwt
record to implement graphical standards.
ii.
iii. Drawing Interchange format .Dxf. the Dxf layout is an
ASCII illustration of a. Dwg document and is used to
switch records among diverse programs.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3468
Fig.no. 1 2D Ground Floor Plan
Fig.no. 2. 2D First Floor Plan
2.2. 3 DIMENSION MODELING (3D MODEL)
3-D represents the 3-dimensional geographical systems
of a building – this is the X-axis, the Y-axis, and the Z-axis
of a building. Three-D BIM entails the creation of
graphical and non-graphical building data for the sole
purpose of sharing it in a common statistics
surroundings (CDE). BIM 3-D fashions are employed for
schematic designs, layout development and
documentation, creation documentation, and record
drawings. Via the usage of three-D BIM, you may be
capable of keeping your employees up to date on the
modern-day layout traits
2.2.1 FILE EXTENSION
RTE (template) files and RVT (task) documents are real
Revit projects. The distinction between the two is that
the template is used to start a new undertaking. When
you click on the store, you will now not be allowed to
overwrite the template file, however, you'll be
precipitated for a brand new report name and area. RFA
(family) documents and RFT (own family template)
documents are own family files that could either be
loaded right into a venture or saved externally. Circle of
relative template documents is used to begin a brand
new circle of relatives from scratch and own family
documents are typically used to alternate households
among projects
Revit supports a wide range of industry standards and
file formats, including:
i. Revit native formats: RVT, RFA, RTE, RFT.
ii. CAD formats: DGN, DWF, DWG, DXF, IFC, SAT, and
SKP
iii. Image formats: BMP, PNG, JPG, JPEG, and TIF.
iv. Other formats: ODBC, HTML, TXT, and gb XML
Fig. no. 3 3D Frame Structure
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3469
Fig. no. 4. Complete 3D Model
Fig. no. 5. Rendered Image of the Complete 3D Model
Fig. no. 6. Rendered Image of a Bedroom
3.3 SCHEDULING
The 4th dimension in a BIM model shows the period of
an undertaking. The inclusion of a timeline and
scheduling statistics in the BIM version helps display
how the project will evolve over the years. This
visualization of this data is extraordinarily beneficial in
early-stage conflict detection. Using a 4D version will
help improve website planning and scheduling
optimization. It's going to also increase the preparedness
of stakeholders by way of better speaking the
subsequent steps at some point of each stage of
production
3.3.1 FILE EXTENSION
MPP is the extension associated with the Microsoft
project facts file, developed through Microsoft employer.
Microsoft's mission is the challenge control software for
organizing, monitoring, and preserving project plans,
utilized by challenge managers, stakeholders, and those
inside the challenge crew. It is miles designed for human
beings, teams, and agencies of all sizes to offer
assignment control assets and tools, in addition to
related systems for collaboration. Microsoft mission is
often used alongside Microsoft project Server to unify
mission management by imparting web-based
collaboration equipment for reporting, enterprise
instances, and prolonged interoperability
Fig.no. 7. Schedule Plan
3.4. SIMULATION
Autodesk Navisworks control is pleasantly described as
a version aggregator that is designed to convey
collectively 3-d fashions and their related design
information into a single running surrounding for layout
assessment, coordination evaluation, simulation, and
presentation.
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3470
Fig. no. 8. Simulation 1
Fig. no. 9. Simulation of PCC, Footing, Stub Column
Fig. no. 10. Simulation of Plinth Beam, Plinth Floor,
Ground level Columns and, Ground Floor Beam
Fig. no. 11. Simulation of Walls, Fist Floor Columns and,
Terrace Slab
Fig. no. 12. Final Simulation
4. PROBLEM STATEMENT:
To study the Building Information Modeling process
(BIM). I studied the different stages of the BIM process
and learned about the software involved in this process.
5. METHODOLOGY:
In this study paintings. I made a hypothetical 2d plan in
AutoCAD 2d and taking that plan as a reference I made a
3-D model inside the software called Revit structure.
Then I Scheduled every activity with the aid of giving the
pastime a begin date and cease Date in Microsoft
assignment, the software program used for Scheduling.
After that, I exported the Revit model into the software
program Naviswork control for a 3-d simulation of the
designed three-D version. Additionally inserted the
agenda plan into this software
6. RESULT:
The result of this venture is that it made the entire
production procedure quite less difficult. BIM is a whole
technique that every mission stakeholders take whilst
planning, building, and dealing with a new task. The use
of BIM gives a couple of blessings to everybody involved
in the task. And, ultimately, it results in better effect
7. CONCLUSION:
Using BIM and BIM-conscious gear which include those
defined in the challenge can provide you with early
information on what the scale, website online, and
constructing situations are and what the cost of a project
is. The use of BIM, and the technology that assist its
various makes to uses, help tell the mission crew and
streamline approaches. You could use web page
evaluation equipment to recognize multiple websites
and speak capability advantages and disadvantages of
International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056
Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072
© 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3471
each without leaving your table. As a layout version
modifications at some stage in the route of an
undertaking, you may use the BIM as a device to
coordinate takeoff and fees. The use of this indicates of
estimating creates a proactive design-to-budget
technique with the architect and engineering team,
instead of handling a reactive response to fee
engineering situations later. The usage of BIM entails the
usage of both evaluation tools and modeling equipment,
and each is important to a systemic BIM process.
Expertise that there may be a distinction between the 2
tools will clarify destiny responsibilities and
applications. This e-book indicates which equipment
(and identifies similar tools) are relevant to each
challenge, a method for how it can be achieved, and the
ability to quantify the time and effort it takes to perform
those tasks for destiny reference.
8. REFERENCE:
[1] Bilal Succar “Building Information Modelling:
conceptual constructs and performance improvement
tools” University of Newcastle December 2013.
[2] Willy Sher, Anthony Williams “An integrated
approach to BIM competency assessment, acquisition
and application” University of Newcastle 20 June 2013
[3] Guillermo Aranda-Mena, Tony Williams “A
proposed framework to investigate building information
modeling through knowledge elicitation and visual
models”, RMIT, University of Newcastle, October 2013
[4] Barazzetti, F. Banfi, R. Brumana, G. Gusmeroli, D.
Oreni, M. Previtali, F. Roncoroni, G. Schiantarelli “Bim
from laser clouds and finite element analysis: combining
structural analysis and geometric complexity” European
School Of Architecture February 2015.
[5] Mohamad Kassem, “Macro-BIM adoption
Conceptual structures” Centre for Interdisciplinary Built
Environment Research (CIBER), University of Newcastle,
Australia Technology Futures Institute, Teesside
University, United Kingdom April 2015.
[6] Sherif M. Ahmed, Hassan H. Emam, and Peter
Farrall,“Use of Gantt Charts for Scheduling and Planning”
June 2015
[7] Nassar, Reema, and AL-Qasem, Imad. “Cost
estimation is a key part for any project planning”
September 2020.
[8] Dr. Keith D. Hampson, Dr. Judy A. Kraatz,
Adriana X. Sanchez, MSc “Integrated Project
Environments: Briefing Report for Industry” Sustainable
Built Environment National Research Centre, July 2014
[9] C. Achille, N. Lombardini, and C. Tommasi, “BIM
and cultural heritage: compatibility tests in an
archaeological site” 3D Survey Group, ABC Department,
Politecnico di Milano, Italy July 2015
[10] Steve Rollinson, Martin Tuuli, Ronan Collins,
“Relationship Management with the help of BIM”
Loughborough University Institutional Repository, June
2009

More Related Content

PDF
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
PDF
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
PDF
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
PDF
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
PDF
Software Report
PDF
Application of Building Information Modelling Software’s for Planning and Sch...
PDF
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
PDF
Application of BIM and Construction Process Simulation using 5D BIM for Resid...
REAL TIME 4D AND 5D ANALYSIS BY USING BUILDING INFORMATION MODELLING
“Analysis and Planning of Residential Building by Using AutoCAD and Revit.”
IRJET- Application of Revit as Building Information Modeling (BIM) for Integr...
IRJET- 4D Simulation of MEP using Bim for Residential Building Project
Software Report
Application of Building Information Modelling Software’s for Planning and Sch...
Computer-Aided Design of Raft Foundation using Excel VBA and FORTRAN
Application of BIM and Construction Process Simulation using 5D BIM for Resid...

Similar to STUDY OF BUILDING INFORMATION MODELING PROCESS (20)

PDF
“Design and modeling of commercial cum residential building by using Autodesk...
PDF
“Design and modeling of commercial cum residential building by using Autodesk...
PDF
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
PDF
Software Assignment
PDF
Software assignment 1
PDF
3D Modelling and Detailing in Tekla Structures
PDF
2D to 3D dynamic modeling of architectural plans in Augmented Reality
PDF
Advancing Electrical Design in High-Rise Buildings with Revit 3D Modeling
PDF
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
PDF
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
PDF
Cost and Time Optimization for Construction of Residential Building by Clash ...
PDF
Application of BIM for Scheduling and Costing of Construction Project
PPTX
AutoCAD is a 2D and 3D computer desi.pptx
PDF
Software Application report
PDF
Software Application Report
PDF
PP1 report
PDF
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
PPTX
INTERSHIP PPT.pptx
PDF
Autodesk Recap Empowering Businesses with 3D Modelling
PDF
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
“Design and modeling of commercial cum residential building by using Autodesk...
“Design and modeling of commercial cum residential building by using Autodesk...
STUDY ON BUILDING INFORMATION MODELING AND IMPLEMENTATION OF CLASH DETECTION ...
Software Assignment
Software assignment 1
3D Modelling and Detailing in Tekla Structures
2D to 3D dynamic modeling of architectural plans in Augmented Reality
Advancing Electrical Design in High-Rise Buildings with Revit 3D Modeling
Application Of Building Information Modeling (BIM) To Civil Engineering Projects
“PLANNING AND SCHEDULING OF MULTI STOREY BUILDING USING BIM”
Cost and Time Optimization for Construction of Residential Building by Clash ...
Application of BIM for Scheduling and Costing of Construction Project
AutoCAD is a 2D and 3D computer desi.pptx
Software Application report
Software Application Report
PP1 report
IRJET - Digital Engineering & Project Management for AEC Industry using BIM
INTERSHIP PPT.pptx
Autodesk Recap Empowering Businesses with 3D Modelling
IRJET- Digital Engineering & Project Management for AEC Industry using BIM
Ad

More from IRJET Journal (20)

PDF
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
PDF
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
PDF
Kiona – A Smart Society Automation Project
PDF
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
PDF
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
PDF
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
PDF
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
PDF
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
PDF
BRAIN TUMOUR DETECTION AND CLASSIFICATION
PDF
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
PDF
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
PDF
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
PDF
Breast Cancer Detection using Computer Vision
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
PDF
Auto-Charging E-Vehicle with its battery Management.
PDF
Analysis of high energy charge particle in the Heliosphere
PDF
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Enhanced heart disease prediction using SKNDGR ensemble Machine Learning Model
Utilizing Biomedical Waste for Sustainable Brick Manufacturing: A Novel Appro...
Kiona – A Smart Society Automation Project
DESIGN AND DEVELOPMENT OF BATTERY THERMAL MANAGEMENT SYSTEM USING PHASE CHANG...
Invest in Innovation: Empowering Ideas through Blockchain Based Crowdfunding
SPACE WATCH YOUR REAL-TIME SPACE INFORMATION HUB
A Review on Influence of Fluid Viscous Damper on The Behaviour of Multi-store...
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Explainable AI(XAI) using LIME and Disease Detection in Mango Leaf by Transfe...
BRAIN TUMOUR DETECTION AND CLASSIFICATION
The Project Manager as an ambassador of the contract. The case of NEC4 ECC co...
"Enhanced Heat Transfer Performance in Shell and Tube Heat Exchangers: A CFD ...
Advancements in CFD Analysis of Shell and Tube Heat Exchangers with Nanofluid...
Breast Cancer Detection using Computer Vision
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
A Novel System for Recommending Agricultural Crops Using Machine Learning App...
Auto-Charging E-Vehicle with its battery Management.
Analysis of high energy charge particle in the Heliosphere
Wireless Arduino Control via Mobile: Eliminating the Need for a Dedicated Wir...
Ad

Recently uploaded (20)

PDF
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
PPTX
Internet of Things (IOT) - A guide to understanding
PDF
Structs to JSON How Go Powers REST APIs.pdf
PPT
Project quality management in manufacturing
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
PPTX
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
PPTX
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
PPTX
Lecture Notes Electrical Wiring System Components
PDF
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
PPTX
web development for engineering and engineering
DOCX
573137875-Attendance-Management-System-original
PDF
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
PPTX
Lesson 3_Tessellation.pptx finite Mathematics
PDF
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
PPTX
additive manufacturing of ss316l using mig welding
PDF
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
PPTX
CYBER-CRIMES AND SECURITY A guide to understanding
PPTX
Foundation to blockchain - A guide to Blockchain Tech
PPTX
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx
Evaluating the Democratization of the Turkish Armed Forces from a Normative P...
Internet of Things (IOT) - A guide to understanding
Structs to JSON How Go Powers REST APIs.pdf
Project quality management in manufacturing
UNIT 4 Total Quality Management .pptx
Engineering Ethics, Safety and Environment [Autosaved] (1).pptx
Recipes for Real Time Voice AI WebRTC, SLMs and Open Source Software.pptx
MCN 401 KTU-2019-PPE KITS-MODULE 2.pptx
Lecture Notes Electrical Wiring System Components
The CXO Playbook 2025 – Future-Ready Strategies for C-Suite Leaders Cerebrai...
web development for engineering and engineering
573137875-Attendance-Management-System-original
SM_6th-Sem__Cse_Internet-of-Things.pdf IOT
Lesson 3_Tessellation.pptx finite Mathematics
July 2025 - Top 10 Read Articles in International Journal of Software Enginee...
additive manufacturing of ss316l using mig welding
keyrequirementskkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkkk
CYBER-CRIMES AND SECURITY A guide to understanding
Foundation to blockchain - A guide to Blockchain Tech
M Tech Sem 1 Civil Engineering Environmental Sciences.pptx

STUDY OF BUILDING INFORMATION MODELING PROCESS

  • 1. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3467 STUDY OF BUILDING INFORMATION MODELING PROCESS Pinak Rahate, Dr. Rajendra R. Dighade Department Of Civil Engineering, Yeshwantrao Chavan College of Engineering (An Autonomous Institution Affiliated to Rashtrasant Tukdoji Maharaj Nagpur University), Nagpur, India. ---------------------------------------------------------------------***----------------------------------------------------------------------- ABSTRACT- These days creation stakeholders don’t care how fancy a constructing information version (BIM) is, they care approximately having buildings accomplished on time with minimized overruns or errors. Traditionally, BIM has been used as a design tool to give structure, engineering, and construction (AEC) professionals a perception of the layout and creation of homes and infrastructure. This thesis has cited the integration of the extraordinary software. In this thesis it is easy to study the BIM procedure via the use of software like AutoCAD for 2nd Plans or Drafting, then Revit is used for the 3-d modeling, Microsoft project for Scheduling and planning then inside the ultimate Navis paintings for 4Dth measurement with the 3D version Simulation. KEYWORDS: AutoCad, Revit, Naviswork, Microsoft Project INTRODUCTION What is BIM? Building data modeling is one of the most promising trends in the architecture, engineering, and production fields. It's miles converting the way contractors and engineers do business, however, its software continues to be relatively new and there is a great deal to examine. One manner to study is by watching how other agencies are the use constructing statistics. Modeling and their trials and tribulations alongside the manner. Constructing records Modelling changed added over a decade ago especially to differentiate the records-wealthy architectural three-D modeling from the traditional second drawing. It's miles being acclaimed by using its advocates as a lifesaver for complex initiatives because of its capacity to accurate errors early within the layout degree and correctly agenda construction. 2. 2D PLANS, 3D MODEL, SCHEDULE, AND SIMULATION 2.1 2 DIMENSION PLANS (2D PLANS) AutoCAD is an industrial software (CAD) and drafting software application. Advanced and advertised through Autodesk. AutoCAD was first launched in December 1982 as a computer app strolling on microcomputers with internal graphics controllers. Before AutoCAD becomes delivered most commercial CAD applications ran on mainframe computers or minicomputers, with every CAD operator (person) engaging at a separate pix terminal. AutoCAD is likewise to be had as mobile and net apps. AutoCAD is used in industry, employing architects, challenge managers, engineers, photograph designers, town planners, and other specialists. It had been supported by way of 750 training centers worldwide in 1994 2.1.1 FILE EXTENSIONS i. Drawing Template files.Dwt: New. Dwg is created from a. Dwt record. Even though the default template record is acad.Dwt for AutoCAD and.Dwt for AutoCAD LT, custom .Dwt documents may be created to include foundational configurations inclusive of drawing gadgets and layers Drawing requirements file .Dws the use of the CAD standards feature of AutoCAD, a Drawing standards document can be associated with any. Dwg or. Dwt record to implement graphical standards. ii. iii. Drawing Interchange format .Dxf. the Dxf layout is an ASCII illustration of a. Dwg document and is used to switch records among diverse programs.
  • 2. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3468 Fig.no. 1 2D Ground Floor Plan Fig.no. 2. 2D First Floor Plan 2.2. 3 DIMENSION MODELING (3D MODEL) 3-D represents the 3-dimensional geographical systems of a building – this is the X-axis, the Y-axis, and the Z-axis of a building. Three-D BIM entails the creation of graphical and non-graphical building data for the sole purpose of sharing it in a common statistics surroundings (CDE). BIM 3-D fashions are employed for schematic designs, layout development and documentation, creation documentation, and record drawings. Via the usage of three-D BIM, you may be capable of keeping your employees up to date on the modern-day layout traits 2.2.1 FILE EXTENSION RTE (template) files and RVT (task) documents are real Revit projects. The distinction between the two is that the template is used to start a new undertaking. When you click on the store, you will now not be allowed to overwrite the template file, however, you'll be precipitated for a brand new report name and area. RFA (family) documents and RFT (own family template) documents are own family files that could either be loaded right into a venture or saved externally. Circle of relative template documents is used to begin a brand new circle of relatives from scratch and own family documents are typically used to alternate households among projects Revit supports a wide range of industry standards and file formats, including: i. Revit native formats: RVT, RFA, RTE, RFT. ii. CAD formats: DGN, DWF, DWG, DXF, IFC, SAT, and SKP iii. Image formats: BMP, PNG, JPG, JPEG, and TIF. iv. Other formats: ODBC, HTML, TXT, and gb XML Fig. no. 3 3D Frame Structure
  • 3. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3469 Fig. no. 4. Complete 3D Model Fig. no. 5. Rendered Image of the Complete 3D Model Fig. no. 6. Rendered Image of a Bedroom 3.3 SCHEDULING The 4th dimension in a BIM model shows the period of an undertaking. The inclusion of a timeline and scheduling statistics in the BIM version helps display how the project will evolve over the years. This visualization of this data is extraordinarily beneficial in early-stage conflict detection. Using a 4D version will help improve website planning and scheduling optimization. It's going to also increase the preparedness of stakeholders by way of better speaking the subsequent steps at some point of each stage of production 3.3.1 FILE EXTENSION MPP is the extension associated with the Microsoft project facts file, developed through Microsoft employer. Microsoft's mission is the challenge control software for organizing, monitoring, and preserving project plans, utilized by challenge managers, stakeholders, and those inside the challenge crew. It is miles designed for human beings, teams, and agencies of all sizes to offer assignment control assets and tools, in addition to related systems for collaboration. Microsoft mission is often used alongside Microsoft project Server to unify mission management by imparting web-based collaboration equipment for reporting, enterprise instances, and prolonged interoperability Fig.no. 7. Schedule Plan 3.4. SIMULATION Autodesk Navisworks control is pleasantly described as a version aggregator that is designed to convey collectively 3-d fashions and their related design information into a single running surrounding for layout assessment, coordination evaluation, simulation, and presentation.
  • 4. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3470 Fig. no. 8. Simulation 1 Fig. no. 9. Simulation of PCC, Footing, Stub Column Fig. no. 10. Simulation of Plinth Beam, Plinth Floor, Ground level Columns and, Ground Floor Beam Fig. no. 11. Simulation of Walls, Fist Floor Columns and, Terrace Slab Fig. no. 12. Final Simulation 4. PROBLEM STATEMENT: To study the Building Information Modeling process (BIM). I studied the different stages of the BIM process and learned about the software involved in this process. 5. METHODOLOGY: In this study paintings. I made a hypothetical 2d plan in AutoCAD 2d and taking that plan as a reference I made a 3-D model inside the software called Revit structure. Then I Scheduled every activity with the aid of giving the pastime a begin date and cease Date in Microsoft assignment, the software program used for Scheduling. After that, I exported the Revit model into the software program Naviswork control for a 3-d simulation of the designed three-D version. Additionally inserted the agenda plan into this software 6. RESULT: The result of this venture is that it made the entire production procedure quite less difficult. BIM is a whole technique that every mission stakeholders take whilst planning, building, and dealing with a new task. The use of BIM gives a couple of blessings to everybody involved in the task. And, ultimately, it results in better effect 7. CONCLUSION: Using BIM and BIM-conscious gear which include those defined in the challenge can provide you with early information on what the scale, website online, and constructing situations are and what the cost of a project is. The use of BIM, and the technology that assist its various makes to uses, help tell the mission crew and streamline approaches. You could use web page evaluation equipment to recognize multiple websites and speak capability advantages and disadvantages of
  • 5. International Research Journal of Engineering and Technology (IRJET) e-ISSN: 2395-0056 Volume: 09 Issue: 06 | June 2022 www.irjet.net p-ISSN: 2395-0072 © 2022, IRJET | Impact Factor value: 7.529 | ISO 9001:2008 Certified Journal | Page 3471 each without leaving your table. As a layout version modifications at some stage in the route of an undertaking, you may use the BIM as a device to coordinate takeoff and fees. The use of this indicates of estimating creates a proactive design-to-budget technique with the architect and engineering team, instead of handling a reactive response to fee engineering situations later. The usage of BIM entails the usage of both evaluation tools and modeling equipment, and each is important to a systemic BIM process. Expertise that there may be a distinction between the 2 tools will clarify destiny responsibilities and applications. This e-book indicates which equipment (and identifies similar tools) are relevant to each challenge, a method for how it can be achieved, and the ability to quantify the time and effort it takes to perform those tasks for destiny reference. 8. REFERENCE: [1] Bilal Succar “Building Information Modelling: conceptual constructs and performance improvement tools” University of Newcastle December 2013. [2] Willy Sher, Anthony Williams “An integrated approach to BIM competency assessment, acquisition and application” University of Newcastle 20 June 2013 [3] Guillermo Aranda-Mena, Tony Williams “A proposed framework to investigate building information modeling through knowledge elicitation and visual models”, RMIT, University of Newcastle, October 2013 [4] Barazzetti, F. Banfi, R. Brumana, G. Gusmeroli, D. Oreni, M. Previtali, F. Roncoroni, G. Schiantarelli “Bim from laser clouds and finite element analysis: combining structural analysis and geometric complexity” European School Of Architecture February 2015. [5] Mohamad Kassem, “Macro-BIM adoption Conceptual structures” Centre for Interdisciplinary Built Environment Research (CIBER), University of Newcastle, Australia Technology Futures Institute, Teesside University, United Kingdom April 2015. [6] Sherif M. Ahmed, Hassan H. Emam, and Peter Farrall,“Use of Gantt Charts for Scheduling and Planning” June 2015 [7] Nassar, Reema, and AL-Qasem, Imad. “Cost estimation is a key part for any project planning” September 2020. [8] Dr. Keith D. Hampson, Dr. Judy A. Kraatz, Adriana X. Sanchez, MSc “Integrated Project Environments: Briefing Report for Industry” Sustainable Built Environment National Research Centre, July 2014 [9] C. Achille, N. Lombardini, and C. Tommasi, “BIM and cultural heritage: compatibility tests in an archaeological site” 3D Survey Group, ABC Department, Politecnico di Milano, Italy July 2015 [10] Steve Rollinson, Martin Tuuli, Ronan Collins, “Relationship Management with the help of BIM” Loughborough University Institutional Repository, June 2009