The document outlines a step-by-step procedure for determining the minimum required operating room for parallel cuts, based on various specifications of a truck and shovel. Critical calculations include safety berm width, truck centerline distance, working bench dimensions, cut width, and bench slope. The final results inform the drilling and blasting pattern for optimal operation.