SlideShare a Scribd company logo
Project Project Management for Results




Management
for Results


                                                                                                Earn 35 PDUs
                                                                                                and 30 CPE
                                                                                                Credits!

October 4–8, 2010 | Arlington, VA                                                               Complete Your
Featuring Two Interactive Forums:                                                               Project on
Project Management for Results               Earned Value Management                            Time, Within
Ì   Initiate, Plan, Execute and Close out
    a Program
                                             Ì   Understand and Use EVM Tools
                                                 and Techniques
                                                                                                Budget and to
Ì   Track and Manage Projects with           Ì   Forecast Final Program Costs and               the Customer’s
    Greater Accuracy                             Scheduling Using EVM Methods
Ì   Master the Process of Closing and        Ì   Visualize and Plan Project
                                                                                                Expectations
    Executing Projects                           Activities Using a Work
Ì   Describe the Organizational Influences       Breakdown Structure
    that May Affect Your Project             Ì   Understand the Project Life Cycle



In Association with:


                           ®                                       PerformanceInstitute.org/PMR2010
                                                                                     www.ASMIweb.com/PMR2010     1
u
Project Management for Results
                                          day one:

                                          October 4, 2010
                                          8:30                                             1:00
                                          Registration & Continental Breakfast
                                                                                           Project Initiation Phase
                                          9:00                                             Ì Implement key stakeholder techniques for the
                                                                                             first customer/sponsor meetings
                                          Introduction to Project Management:
                                          The Latest Methodologies in                      Ì Identify and describe project requirements in
                                                                                             clear terms
                                          Project Management According to
                                          the PMBOK®
                                          Ì Describe the differences between operations,   Project Organization Phase
                                            projects and programs                          Ì Align project team requirements
                                          Ì Define roles, review the necessary skills        with current organizational structure
                                            of project managers and identify possible        and standards
                                            competency gaps                                Ì Define roles and develop necessary skills to
                                                                                             effectively deliver on planned objectives

                                          Review the Terminology: Understand
                                          Key Concepts and Terms                           Creating the Project Charter
                                          Ì Review key project management terminology      Ì Review criteria to determine exactly what is
                                            as it relates to the PMBOK® and project          needed in the project charter documents
                                            management methodology                         Ì Utilize best-in-class techniques for executing a
                                          Ì Differentiate the various roles and              project charter with full sponsor’s approval
                                            responsibilities of project stakeholders
                                                                                           4:00
                                                                                           Day One Adjourns
                                          Develop Project Management Skills
                                          for Success
                                          Ì Utilize various methods to enhance project
                                            team building
                                          Ì Understand the key organizational influences
                                            that may affect a project


                                          12:00
                                          Lunch Break




                                 who should attend:
                                 Ì Project Mangers                                         Ì Procurement Manager
                                 Ì Portfolio Managers                                      Ì Acquisition and Procurement Staff
                                 Ì Program Managers                                        Ì IT Architects
                                 Ì PMPs                                                    Ì IT Specialist
                                 Ì Project Support Staff                                   Ì CAPMs
                                 Ì Program Analyst                                         Ì Contract Managers


    2                            PerformanceInstitute.org/PMR2010
u
                                                                                                                        Project Management for Results
         day two:

         October 5, 2010
          8:30                                              1:00
          Registration & Continental Breakfast
                                                            Use the Work Breakdown Structure for
                                                            Effective Estimating
          9:00
                                                            Ì Differentiate cost estimating and cost budgeting
          Key Techniques for Defining
          a Project                                         Ì Develop an expected value process to create a
                                                              defensible contingency reserve
          Ì Understand and identify the components of a
            project description document
          Ì Create and describe the purpose of a project    Develop a Preliminary Schedule
            priority matrix                                 Ì Create a network diagram and identify the
                                                              critical path

          Plan the Project Infrastructure                   Ì Identify early and late schedules and produce
                                                              a preliminary Gantt Chart using this information
          Ì Determine the purpose of defining the project
            infrastructure
          Ì Develop quality standards based on project      Construct the Network Diagram
            goals and contract requirements                 Ì Monitor project timing and resources and
                                                              manage the links between them

          Visualize and Plan the Project Activities         Ì Establish then minimize realistic project
                                                              duration while maintaining overall cost and
          Using a Work Breakdown Structure                    design requirements
          Ì Understand the purpose of a Work Breakdown
            Structure (WBS)
                                                            4:00
          Ì Create a WBS using two techniques               Day Two Adjourns



          12:00
          Lunch Break




top five reasons to attend:

 Successfully                 Break project        Develop                 Understand              Acquire the
 bring a project              work down into       project                 critical factors for    necessary units to
 from initiation to           meaningful tasks     performance             reclaiming troubled     sit for the PMP®
 execution                                         measurement and         projects                examination
                                                   reporting standards




                                                                                     PerformanceInstitute.org/PMR2010                         3
u
Project Management for Results
                                            day three:

                                           October 4, 2010
                                            8:30                                                 1:00
                                            Registration & Continental Breakfast
                                                                                                 Utilize and Load
                                                                                                 Organizational Resources
                                            9:00                                                 Ì Maintain and assign people, facility and
                                            Define Project Estimates                               equipment resources accordingly
                                            Ì Differentiate a contingency reserve and a          Ì Actively adjust loads and variable expenses
                                              management reserve                                   and understand the difference between
                                            Ì Use your WBS to provide a more accurate              generic-and specific-level resources
                                              project estimate

                                                                                                 Create the Project Budget
                                            Analyze the Network Diagram                          Ì Identify your costs and develop your own
                                            Ì Resolve project and program problems and             project budgeting process
                                              make decisions                                     Ì Create a baseline to determine if the project
                                            Ì Establish then minimize realistic project            is on track and help chart the project and
                                              duration while maintaining overall cost and          progress
                                              design requirements

                                                                                                 Optimize the Project Plan
                                            Manage Project Progress: Integrating                 Ì Develop key strategies for creating and
                                            the Gantt Chart                                        optimizing the project plan
                                            Ì Graphically document, manage and                   Ì Manage project status and anticipate problems
                                              monitor project progress to effectively minimize     that can hurt project progress
                                              setbacks
                                            Ì Maintain project scope and take corrective         4:00
                                              action to get projects back on course              Day Three Adjourns



                                            12:00
                                            Lunch Break




                                 key methodologies covered
                                 The project management process described in this course enables project managers to produce project deliverables in
                                 the least amount of time, for the lowest cost and with the highest quality. Developed from the Project Management Body
                                 of Knowledge (PMBOK) produced by The Project Management Institute, this course teaches project managers to develop
                                 specific goals, objectives and deliverables to control the elements of projects.




    4                            PerformanceInstitute.org/PMR2010
u
                                                                                                                   Earned Value Management
day four:

October 7, 2010
8:30                                                 1:00
Registration & Continental Breakfast                 Assemble the Project Team
                                                     Ì Assess project human capital needs
9:00                                                    and negotiate staff assignments with
Identify Risks                                         senior leadership
Ì Identify and evaluate project risk                 Ì Lead exercises that promote overall
                                                       team success
Ì Identify specific risks by project and by work
  package or activity
                                                     Understand the Project Manager’s Role
Utilize Risk Analysis Techniques                     in Team Development
Ì Determine how risk management will be              Ì Overcome the many challenges to being an
    executed, who will be involved and the precise     effective project leader
    techniques to use                                Ì Strengthen your leadership skills by assessing,
Ì Objectively analyze the probability and impact       developing and advancing management
  of each possible risk                                capabilities


Design a Risk Management Plan                        Report Project Status
Ì Create risk management plan to ensure              Ì Record and report project status using different
  successful project execution                         methods

Ì Analyze, control, and mitigate risks using this    Ì Ensure data accuracy when giving real project
  effective tool                                       status reports


                                                     4:00
12:00                                                Day Four Adjourns
Lunch Break




“
Very interesting combination of system and
strategy. Real demonstration of how to.”
                                                                         Teri B., Regional Project Manager, USDA


                                                                              PerformanceInstitute.org/PMR2010                      5
u
Earned Value Management
                                   day five:

                                   October 8, 2010
                                   8:30                                               1:00
                                   Registration & Continental Breakfast
                                                                                      Monitor and Control Project Processes
                                                                                      Ì Utilize proper measures and metrics to gauge
                                   9:00                                                 project processes
                                   Deal with Change                                   Ì Effectively report project processes and make
                                   Ì Manage and communicate project change              enhancements
                                   Ì Create a change management system to avoid
                                     confusion and keep your projects
                                     on track
                                                                                      Execute the Project Closeout Phase
                                                                                      Ì Name the three steps to closing out a project
                                                                                        and several choices for project closeout
                                   Establish Change Management Control                  activities
                                   Procedures                                         Ì Conduct a project closeout review
                                   Ì Initiate a change management process within
                                     your project
                                                                                      Document Lessons Learned
                                   Ì Enhance project team success through effective
                                     change initiatives                               Ì Document project successes and improvements
                                                                                      Ì Implement a system to ensure data and metrics
                                                                                        for further projects
                                   Adjust the Scope for
                                   Schedule Changes                                   4:00
                                   Ì Schedule changes that can uncontrollably alter   Conference Adjourns
                                     the project scope
                                   Ì Keep your project within scope and on time
                                     using best practices

                                   12:00
                                   Lunch Break




   6
                          “        Logical and easy-to-follow
                                   presentation.”
                          PerformanceInstitute.org/PMR2010
                                                                                                                            Tom W., True MFG
Logistics & Registration
            venue and hotel:                                                           CPE Credits
            Project Management for Results will be hosted at The Performance                                 Delivery Method: Group-live
            Institute’s training center in Arlington, VA, just one block east of                             Program Level: Basic
            the Courthouse stop on the Orange Line of the D.C. Metro. A                                      Prerequisites: None
            public parking garage is located inside of the building for $10/                                 Advanced Preparation: None
            day. Continental breakfast and refreshments will be provided for                                 CPE Credits: Up to 30
            delegates on each day.                                                     The American Strategic Management Institute (ASMI) is registered with the National Association
                                                                                       of State Boards of Accountancy (NASBA) as a sponsor of continuing professional education
            The Performance Institute Training Center                                  on the National Registry of CPE Sponsors. State boards of accountancy have final authority on
                                                                                       the acceptance of individual courses for CPE credit. Complaints regarding sponsors may be
            1515 N. Courthouse Road, Sixth Floor                                       addressed to the National Registry of CPE Sponsors, 150 Fourth Avenue North, Nashville, TN
            Arlington, VA 22201                                                        37219-2417. Website: www.nasba.org.
            877-992-9522
            A limited number of rooms have been reserved at the Arlington              PDUs
            Rosslyn Courtyard by Marriott at the prevailing rate of $300.00
                                                                                                                         PDU Credits: Up to 35
            until September 3, 2010. Please call the hotel directly and
            reference code “Project Management for Results” when making                                                   As a PMI Registered Education Provider (R.E.P), The
                                                                                   ®
            reservations to get the discounted rate. The hotel is conveniently                                            Performance Institute has agreed to abide by PMI
                                                                                       established quality assurance criteria. “PMI” and the PMI logo are service and trademarks
            located three blocks from the Rosslyn Metro station. Please ask the        registered in the United States and other nations; “PMP” is a certification mark registered
            hotel about a complimentary shuttle that is also available for your        in the United States and other nations; “PMBOK” and “CAPM” are trademarks registered
                                                                                       in the United States and other nations by the Project Management Institute, Inc., which is
            convenience.                                                               not affiliated with The Performance Institute. Earning PMI Credits: The Performance Institute
                                                                                       is a Registered Education Provider of The Project Management Institute. All of our project
            Arlington Rosslyn Courtyard by Marriott                                    management trainings, conferences and webinars offer credits to help you take the PMP Exam
            1533 Clarendon Blvd.                                                       or stay accredited with PMI.
            Arlington, VA 22209
            703-528-2222                                                               Quality Assurance:
            www.courtyardarlingtonrosslyn.com
                                                                                       The Performance Institute strives to provide you with the most productive and effective
                                                                                       educational experience possible. If after completing the course you feel there is some way
            tuition & group discounts:                                                 we can improve, please write your comments on the evaluation form provided upon your
                                                                                       arrival. Should you feel dissatisfied with your learning experience and wish to request a
            The tuition rate for attending Project Management for Results is as        credit or refund, please submit it in writing no later than 10 business days after the end
                                                                                       of the training to:
            follows:
                                                                                       The Performance Institute: Quality Assurance
             Offerings                    Public        Private       PDUs             805 15th Street, NW, 3rd Floor
                                                                                       Washington, DC 20005
             Full Project
             Management                  $1899          $2199           35             Note: As speakers are confirmed six months before the event, some speaker changes
                                                                                       or topic changes may occur in the program. The Institute is not responsible for speaker
             for Results Week                                                          changes, but will work to ensure a comparable speaker is located to participate in the
                                                                                       program.
             Project Management
                                         $1299          $1399           21
             for Results (3 Days)                                                      If for any reason The Institute decides to cancel this conference, The Institute accepts no
                                                                                       responsibility for covering airfare, hotel or other costs incurred by registrants, including
             Earned Value                                                              delegates, sponsors and guests.
                                          $899          $999            14
             Management
                                                                                       Discounts & Payment:
                                                                                       • All ‘Early Bird’ Discounts must require payment at time of registration and before the
                                                                                         cut-off date in order to receive any discount.
            * For more information on group discounts for Project
              Management for Results please contact Melvin Hall at                     • Any discounts offered whether by The Institute (including team discounts) must also
                                                                                         require payment at the time of registration.
              202-739-9630 or email him at
                                                                                       • All discount offers cannot be combined with any other offer.
              Melvin.Hall@PerformanceInstitute.org.
                                                                                       • Discounts cannot be applied retroactively

                                                                                   Payment must be secured prior to the conference. If payment is not received by the conference
                                                                                   start date, a method of payment must be presented at the time of registration in order to
                                                                                   guarantee your participation at the event.




PMP® exam voucher: $600
If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for $600. The benefits of purchasing the voucher
from The Institute are:
Ì   No out-of-pocket expense to register for the exam
Ì   All costs associated with PMP certification included on one invoice
Ì   Add all PMP certification expenses to the cost of this training

                                                                                                                          PerformanceInstitute.org/PMR2010                              7
logistics & Registration
    to register u
                call                                 fax this form to                          visit
                877-992-9521                         866-234-0680                              PerformanceInstitute.org/PMR2010


      Registration Form
      o Yes! Register me for Full Project Management for Results Week
      o Please register me for Project Management for Results only
      o Please register me for Earned Value Management only
      o Please call me. I am interested in a special Group Discount for my team


      Delegate Information


      Name                                                                   Title




      Organization                                               Dept.




      Address




      City                                                                   State                                   Zip




      Telephone                                                              Fax




      Email


      Payment Information
      o Check              o Purchase Order / Training Form              o Credit Card



      Credit Card Number                                                     Expiration Date                                    Verification no.




      Name on Card                                                           Billing Zip


      Please make checks payable to: The Performance Institute


      CAnCEllATIOn POlICY: The Performance Institute will provide a full refund less a $399 administration fee for cancellations requested four
      weeks prior to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested
      less than two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the
      event will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance
      confirmation email. Please note that cancellation is not final until you receive a cancellation confirmation email.

      o I have read and accepted the Cancellation Policy above.

      ACKnOWlEDGED AnD AGREED

      By: _________________________________________________________________________________Date: _______________________________________
                                                                                                                 Priority Code: T355-WEB



8   PerformanceInstitute.org/PMR2010

More Related Content

PDF
T349 Asmi Web
PDF
T348 Pi
PDF
T348 Asm Iweb
PDF
T348 Asm Iweb
PDF
T349 Asmi Web
T348 Pi
T348 Asm Iweb
T348 Asm Iweb

What's hot (18)

PDF
T347 Asm Iweb
PDF
T349 Pi Web
PDF
T347 Asm Iweb
PDF
T349 Pi Web
PDF
T348 P Iweb
PDF
High Performance Project Management - A Holistic Approach
PDF
Romeo.mitchell
PDF
PPSX
IM04 - BI Project Management
PDF
T353 Web Asmi
PPT
3 skill sets for it managers
PPT
3 skill sets for it managers
PDF
T347 P Iweb
PPTX
Managing eLearning Projects
PDF
Carol.mullenax
T347 Asm Iweb
T349 Pi Web
T347 Asm Iweb
T349 Pi Web
T348 P Iweb
High Performance Project Management - A Holistic Approach
Romeo.mitchell
IM04 - BI Project Management
T353 Web Asmi
3 skill sets for it managers
3 skill sets for it managers
T347 P Iweb
Managing eLearning Projects
Carol.mullenax
Ad

Viewers also liked (7)

PDF
T353 Web Asmi
PDF
T350 web asmi
Ad

Similar to T355 p iweb (20)

PDF
T348 Asm Iweb
PDF
T335 Web
PDF
T335 Web
PDF
T335asmi
PDF
T335 Asmiweb
PDF
T353 Web
PDF
Business PMO & IT Pmo What Is The Difference
PDF
T356 Asmi
T348 Asm Iweb
T335 Web
T335 Web
T335asmi
T335 Asmiweb
T353 Web
Business PMO & IT Pmo What Is The Difference
T356 Asmi

More from performanceweb (20)

PDF
Cheatsheet
PPT
5 Deadly Workplace Legal Risks
PDF
T354 asmi
PDF
PDF
T355 p iweb

Recently uploaded (20)

DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
PPTX
New Microsoft PowerPoint Presentation - Copy.pptx
PDF
How to Get Funding for Your Trucking Business
PPT
Chapter four Project-Preparation material
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
Amazon (Business Studies) management studies
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Types of control:Qualitative vs Quantitative
PPTX
Lecture (1)-Introduction.pptx business communication
PDF
Business model innovation report 2022.pdf
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PPTX
5 Stages of group development guide.pptx
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
DOCX
Euro SEO Services 1st 3 General Updates.docx
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
IFRS Notes in your pocket for study all the time
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Traveri Digital Marketing Seminar 2025 by Corey and Jessica Perlman
New Microsoft PowerPoint Presentation - Copy.pptx
How to Get Funding for Your Trucking Business
Chapter four Project-Preparation material
Nidhal Samdaie CV - International Business Consultant
Amazon (Business Studies) management studies
Unit 1 Cost Accounting - Cost sheet
Chapter 5_Foreign Exchange Market in .pdf
Types of control:Qualitative vs Quantitative
Lecture (1)-Introduction.pptx business communication
Business model innovation report 2022.pdf
unit 1 COST ACCOUNTING AND COST SHEET
Belch_12e_PPT_Ch18_Accessible_university.pptx
5 Stages of group development guide.pptx
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Euro SEO Services 1st 3 General Updates.docx
ICG2025_ICG 6th steering committee 30-8-24.pptx
IFRS Notes in your pocket for study all the time

T355 p iweb

  • 1. Project Project Management for Results Management for Results Earn 35 PDUs and 30 CPE Credits! October 4–8, 2010 | Arlington, VA Complete Your Featuring Two Interactive Forums: Project on Project Management for Results Earned Value Management Time, Within Ì Initiate, Plan, Execute and Close out a Program Ì Understand and Use EVM Tools and Techniques Budget and to Ì Track and Manage Projects with Ì Forecast Final Program Costs and the Customer’s Greater Accuracy Scheduling Using EVM Methods Ì Master the Process of Closing and Ì Visualize and Plan Project Expectations Executing Projects Activities Using a Work Ì Describe the Organizational Influences Breakdown Structure that May Affect Your Project Ì Understand the Project Life Cycle In Association with: ® PerformanceInstitute.org/PMR2010 www.ASMIweb.com/PMR2010 1
  • 2. u Project Management for Results day one: October 4, 2010 8:30 1:00 Registration & Continental Breakfast Project Initiation Phase 9:00 Ì Implement key stakeholder techniques for the first customer/sponsor meetings Introduction to Project Management: The Latest Methodologies in Ì Identify and describe project requirements in clear terms Project Management According to the PMBOK® Ì Describe the differences between operations, Project Organization Phase projects and programs Ì Align project team requirements Ì Define roles, review the necessary skills with current organizational structure of project managers and identify possible and standards competency gaps Ì Define roles and develop necessary skills to effectively deliver on planned objectives Review the Terminology: Understand Key Concepts and Terms Creating the Project Charter Ì Review key project management terminology Ì Review criteria to determine exactly what is as it relates to the PMBOK® and project needed in the project charter documents management methodology Ì Utilize best-in-class techniques for executing a Ì Differentiate the various roles and project charter with full sponsor’s approval responsibilities of project stakeholders 4:00 Day One Adjourns Develop Project Management Skills for Success Ì Utilize various methods to enhance project team building Ì Understand the key organizational influences that may affect a project 12:00 Lunch Break who should attend: Ì Project Mangers Ì Procurement Manager Ì Portfolio Managers Ì Acquisition and Procurement Staff Ì Program Managers Ì IT Architects Ì PMPs Ì IT Specialist Ì Project Support Staff Ì CAPMs Ì Program Analyst Ì Contract Managers 2 PerformanceInstitute.org/PMR2010
  • 3. u Project Management for Results day two: October 5, 2010 8:30 1:00 Registration & Continental Breakfast Use the Work Breakdown Structure for Effective Estimating 9:00 Ì Differentiate cost estimating and cost budgeting Key Techniques for Defining a Project Ì Develop an expected value process to create a defensible contingency reserve Ì Understand and identify the components of a project description document Ì Create and describe the purpose of a project Develop a Preliminary Schedule priority matrix Ì Create a network diagram and identify the critical path Plan the Project Infrastructure Ì Identify early and late schedules and produce a preliminary Gantt Chart using this information Ì Determine the purpose of defining the project infrastructure Ì Develop quality standards based on project Construct the Network Diagram goals and contract requirements Ì Monitor project timing and resources and manage the links between them Visualize and Plan the Project Activities Ì Establish then minimize realistic project duration while maintaining overall cost and Using a Work Breakdown Structure design requirements Ì Understand the purpose of a Work Breakdown Structure (WBS) 4:00 Ì Create a WBS using two techniques Day Two Adjourns 12:00 Lunch Break top five reasons to attend: Successfully Break project Develop Understand Acquire the bring a project work down into project critical factors for necessary units to from initiation to meaningful tasks performance reclaiming troubled sit for the PMP® execution measurement and projects examination reporting standards PerformanceInstitute.org/PMR2010 3
  • 4. u Project Management for Results day three: October 4, 2010 8:30 1:00 Registration & Continental Breakfast Utilize and Load Organizational Resources 9:00 Ì Maintain and assign people, facility and Define Project Estimates equipment resources accordingly Ì Differentiate a contingency reserve and a Ì Actively adjust loads and variable expenses management reserve and understand the difference between Ì Use your WBS to provide a more accurate generic-and specific-level resources project estimate Create the Project Budget Analyze the Network Diagram Ì Identify your costs and develop your own Ì Resolve project and program problems and project budgeting process make decisions Ì Create a baseline to determine if the project Ì Establish then minimize realistic project is on track and help chart the project and duration while maintaining overall cost and progress design requirements Optimize the Project Plan Manage Project Progress: Integrating Ì Develop key strategies for creating and the Gantt Chart optimizing the project plan Ì Graphically document, manage and Ì Manage project status and anticipate problems monitor project progress to effectively minimize that can hurt project progress setbacks Ì Maintain project scope and take corrective 4:00 action to get projects back on course Day Three Adjourns 12:00 Lunch Break key methodologies covered The project management process described in this course enables project managers to produce project deliverables in the least amount of time, for the lowest cost and with the highest quality. Developed from the Project Management Body of Knowledge (PMBOK) produced by The Project Management Institute, this course teaches project managers to develop specific goals, objectives and deliverables to control the elements of projects. 4 PerformanceInstitute.org/PMR2010
  • 5. u Earned Value Management day four: October 7, 2010 8:30 1:00 Registration & Continental Breakfast Assemble the Project Team Ì Assess project human capital needs 9:00 and negotiate staff assignments with Identify Risks senior leadership Ì Identify and evaluate project risk Ì Lead exercises that promote overall team success Ì Identify specific risks by project and by work package or activity Understand the Project Manager’s Role Utilize Risk Analysis Techniques in Team Development Ì Determine how risk management will be Ì Overcome the many challenges to being an executed, who will be involved and the precise effective project leader techniques to use Ì Strengthen your leadership skills by assessing, Ì Objectively analyze the probability and impact developing and advancing management of each possible risk capabilities Design a Risk Management Plan Report Project Status Ì Create risk management plan to ensure Ì Record and report project status using different successful project execution methods Ì Analyze, control, and mitigate risks using this Ì Ensure data accuracy when giving real project effective tool status reports 4:00 12:00 Day Four Adjourns Lunch Break “ Very interesting combination of system and strategy. Real demonstration of how to.” Teri B., Regional Project Manager, USDA PerformanceInstitute.org/PMR2010 5
  • 6. u Earned Value Management day five: October 8, 2010 8:30 1:00 Registration & Continental Breakfast Monitor and Control Project Processes Ì Utilize proper measures and metrics to gauge 9:00 project processes Deal with Change Ì Effectively report project processes and make Ì Manage and communicate project change enhancements Ì Create a change management system to avoid confusion and keep your projects on track Execute the Project Closeout Phase Ì Name the three steps to closing out a project and several choices for project closeout Establish Change Management Control activities Procedures Ì Conduct a project closeout review Ì Initiate a change management process within your project Document Lessons Learned Ì Enhance project team success through effective change initiatives Ì Document project successes and improvements Ì Implement a system to ensure data and metrics for further projects Adjust the Scope for Schedule Changes 4:00 Ì Schedule changes that can uncontrollably alter Conference Adjourns the project scope Ì Keep your project within scope and on time using best practices 12:00 Lunch Break 6 “ Logical and easy-to-follow presentation.” PerformanceInstitute.org/PMR2010 Tom W., True MFG
  • 7. Logistics & Registration venue and hotel: CPE Credits Project Management for Results will be hosted at The Performance Delivery Method: Group-live Institute’s training center in Arlington, VA, just one block east of Program Level: Basic the Courthouse stop on the Orange Line of the D.C. Metro. A Prerequisites: None public parking garage is located inside of the building for $10/ Advanced Preparation: None day. Continental breakfast and refreshments will be provided for CPE Credits: Up to 30 delegates on each day. The American Strategic Management Institute (ASMI) is registered with the National Association of State Boards of Accountancy (NASBA) as a sponsor of continuing professional education The Performance Institute Training Center on the National Registry of CPE Sponsors. State boards of accountancy have final authority on the acceptance of individual courses for CPE credit. Complaints regarding sponsors may be 1515 N. Courthouse Road, Sixth Floor addressed to the National Registry of CPE Sponsors, 150 Fourth Avenue North, Nashville, TN Arlington, VA 22201 37219-2417. Website: www.nasba.org. 877-992-9522 A limited number of rooms have been reserved at the Arlington PDUs Rosslyn Courtyard by Marriott at the prevailing rate of $300.00 PDU Credits: Up to 35 until September 3, 2010. Please call the hotel directly and reference code “Project Management for Results” when making As a PMI Registered Education Provider (R.E.P), The ® reservations to get the discounted rate. The hotel is conveniently Performance Institute has agreed to abide by PMI established quality assurance criteria. “PMI” and the PMI logo are service and trademarks located three blocks from the Rosslyn Metro station. Please ask the registered in the United States and other nations; “PMP” is a certification mark registered hotel about a complimentary shuttle that is also available for your in the United States and other nations; “PMBOK” and “CAPM” are trademarks registered in the United States and other nations by the Project Management Institute, Inc., which is convenience. not affiliated with The Performance Institute. Earning PMI Credits: The Performance Institute is a Registered Education Provider of The Project Management Institute. All of our project Arlington Rosslyn Courtyard by Marriott management trainings, conferences and webinars offer credits to help you take the PMP Exam 1533 Clarendon Blvd. or stay accredited with PMI. Arlington, VA 22209 703-528-2222 Quality Assurance: www.courtyardarlingtonrosslyn.com The Performance Institute strives to provide you with the most productive and effective educational experience possible. If after completing the course you feel there is some way tuition & group discounts: we can improve, please write your comments on the evaluation form provided upon your arrival. Should you feel dissatisfied with your learning experience and wish to request a The tuition rate for attending Project Management for Results is as credit or refund, please submit it in writing no later than 10 business days after the end of the training to: follows: The Performance Institute: Quality Assurance Offerings Public Private PDUs 805 15th Street, NW, 3rd Floor Washington, DC 20005 Full Project Management $1899 $2199 35 Note: As speakers are confirmed six months before the event, some speaker changes or topic changes may occur in the program. The Institute is not responsible for speaker for Results Week changes, but will work to ensure a comparable speaker is located to participate in the program. Project Management $1299 $1399 21 for Results (3 Days) If for any reason The Institute decides to cancel this conference, The Institute accepts no responsibility for covering airfare, hotel or other costs incurred by registrants, including Earned Value delegates, sponsors and guests. $899 $999 14 Management Discounts & Payment: • All ‘Early Bird’ Discounts must require payment at time of registration and before the cut-off date in order to receive any discount. * For more information on group discounts for Project Management for Results please contact Melvin Hall at • Any discounts offered whether by The Institute (including team discounts) must also require payment at the time of registration. 202-739-9630 or email him at • All discount offers cannot be combined with any other offer. Melvin.Hall@PerformanceInstitute.org. • Discounts cannot be applied retroactively Payment must be secured prior to the conference. If payment is not received by the conference start date, a method of payment must be presented at the time of registration in order to guarantee your participation at the event. PMP® exam voucher: $600 If you plan on taking the PMP Exam, you may purchase a voucher from The Performance Institute for $600. The benefits of purchasing the voucher from The Institute are: Ì No out-of-pocket expense to register for the exam Ì All costs associated with PMP certification included on one invoice Ì Add all PMP certification expenses to the cost of this training PerformanceInstitute.org/PMR2010 7
  • 8. logistics & Registration to register u call fax this form to visit 877-992-9521 866-234-0680 PerformanceInstitute.org/PMR2010 Registration Form o Yes! Register me for Full Project Management for Results Week o Please register me for Project Management for Results only o Please register me for Earned Value Management only o Please call me. I am interested in a special Group Discount for my team Delegate Information Name Title Organization Dept. Address City State Zip Telephone Fax Email Payment Information o Check o Purchase Order / Training Form o Credit Card Credit Card Number Expiration Date Verification no. Name on Card Billing Zip Please make checks payable to: The Performance Institute CAnCEllATIOn POlICY: The Performance Institute will provide a full refund less a $399 administration fee for cancellations requested four weeks prior to the event start date unless cancellation occurs within two weeks prior to the event start date. If a cancellation is requested less than two weeks prior to the event start date, no refund will be issued. Registrants who fail to attend and do not cancel prior to the event will be charged the entire registration fee. All cancellations must be requested through the cancellation link found in your attendance confirmation email. Please note that cancellation is not final until you receive a cancellation confirmation email. o I have read and accepted the Cancellation Policy above. ACKnOWlEDGED AnD AGREED By: _________________________________________________________________________________Date: _______________________________________ Priority Code: T355-WEB 8 PerformanceInstitute.org/PMR2010