Jurijs Pavlovics
Michael Ward
Tim Corrighan
_BIMCampus
Revit 2014
Autumn 2013
MechanicalElectrical+Plumbing
Introduction
Brief
Our team has been appointed to design a new office
specifically tailored to legal firms and legal training. The building
must incorporate space for multiple companies.
Schedule of Accommodation:
Office spaces (both open plan and cellular)
Meeting/board rooms (varying sizes for specific uses, eg. 1 to
1, groups, etc.)
Achieve storage room
General storage rooms
Moot court (legal training court)
Break-out spaces throughout the building
Kitchenette/coffee points
Toilets (male,female, accessible WC’s, shower room, etc.)
Accessible lift
Cleaners store
Central reception with guest waiting area
MechanicalElectrical+Plumbing
Site
Proposed Site
The proposed site is located on the North bank of the River
Tyne, Newcastle upon Tyne.
57 Quayside
Newcastle upon Tyne
NE1 2BJ
Currently housing a ‘Pocket Park’, an initiative promoted by NE1
MechanicalElectrical+Plumbing
Site Constraints
Site Boundaries
The site is restricted on two sides by neighbouring buildings:
Flynn’s Bar
Law Building
To the front, the site is restricted by the street front and public
footpath
To the rear, the site is slight more open with room for car
parking
All buildings are limited to roughly the same height and number
of levels
Observations
Busy street to the South
Access needed to property along the East boundary
Access to car park from Broad Chare to the North East
MechanicalElectrical+Plumbing
Inspiration
Presidents
Stone + Brick
Facades
Quayside History
Glass with hard materials
Infill Architecture
Modern Architecture sitting with Classical
MechanicalElectrical+Plumbing
Using the 3D City
Model
City Model
Throughout this project and the last we have used a 3D city
model of Newcastle to create the context for our Revit model.
Used to better understand the site boundaries.
We have used the 3D city model to create more professional
external renders.
The 3D model was used to align the point cloud data to one of
the neighbouring buildings so a Revit model for these buildings
could be modelled in place.
MechanicalElectrical+Plumbing
Data Acquisition
Laser Scanning
Tutorial in laser scanning with Paul from Leica Geosystems.
Scanned the full site from several different locations
We headed straight back to the computer suit to load the point
cloud into Revit
MechanicalElectrical+Plumbing
Laser Scanning and
Modelling from the
Point Cloud Data
Modelling from Point Cloud Data
The point cloud data was opened in a new revit project and
was used to begin building a model of the adjoining buildings to
the site.
Using walls, extrusions and windows we created the facades of
the buildings.
We created custom texture to apply to these surfaces.
We then added roofs and further details to complete the
context models.
We worked individually on each of the buildings and the
models were linked together before being imported and aligned
to the site model.
MechanicalElectrical+Plumbing
DN
By Department Legend
Lift
Offices
Private
Public
WC
Drawn
Dwg. No.
Scale at A1
Project No.
Drawing
Project
Status
Rev.
Date
this drawing is copyright - check all dimensions on site - inform architect / so of any discrepancies - work to figured dimensions only - do not scale
Rev. Amendment Date
Checked1 : 100
1234 A(00)GAP900
MW
Departmental Plans
1234 - BCT2 - 57 Quayside
Preliminary
09/11/13Checker
1 : 100
Departmental Level 00
1
1 : 100
Departmental Level 0
2
1 : 100
Departmental Level 1
3
1 : 100
Departmental Level 2
4
1 : 100
Departmental Level 3
5
The Design
MechanicalElectrical+Plumbing
Architectural Model
Modelling in Revit
We all began modelling the architecture model to create a com-
prehensive mass made up of architectural elements:
Walls (with materials)
Floors
Doors
Windows and other glazing
This is the base for the BIM
MechanicalElectrical+Plumbing
Structural Model
Structural Grid
8x5 grid
Horizontal Spacing - 3000/2000/4200/2000/3000
Vertical Spacing - 4000/2000/2000/6000/6000/5000/2500
Base of steel frame
Primary Structure
Steel Frame
In-situe cast concrete floor
Concrete pile foundations
MechanicalElectrical+Plumbing
MEP Model
Lighting
150mm alound in ceiling void for recessed lighting
Whitecroft Softlighter - 500 lux
Spaced 2.4 m
Ventilation and Heating and Cooling
Duct work - rectangular 400x250
	 - circular 250 diameter/150 diameter
Extract Grill
Daikin FXFQ-M-12-36-MBH
Each unit 2.1kW cooling
Open plan office - 70-100W/m2
. FCU’s between 40-50 m2
MechanicalElectrical+Plumbing
What is Next?
Navisworks
We will then import a central model into Autodesk’s Navisworks.
Here we will run a series of clash detections between the
architectural and structural models, architecture and MEP and
structure with MEP.
In Navisworks we will also create a series of construction
animations and renders using the cloud.
We welcome any questions?
MechanicalElectrical+Plumbing

More Related Content

PDF
Ck21 presentation team 2
PDF
Ck21 presentation team 3
PPTX
IES BIM Faculty - New IESVE Interoperability Navigator
PDF
BIM ELEMENTS BEHAVIOR IN A PARAMETRIC MODELER
PDF
Coastway SCAN to BIM Presentation may 25th cita
PDF
MEP Consultant
PDF
One Click LCA & IES Integration
PDF
The Role of Simulation in BIM
Ck21 presentation team 2
Ck21 presentation team 3
IES BIM Faculty - New IESVE Interoperability Navigator
BIM ELEMENTS BEHAVIOR IN A PARAMETRIC MODELER
Coastway SCAN to BIM Presentation may 25th cita
MEP Consultant
One Click LCA & IES Integration
The Role of Simulation in BIM

What's hot (20)

PDF
Ahmed Ibrahim Refaey Ahmed
PDF
BIM ppt
PPTX
Godrej MEP Design Consultancy Services
PDF
MEP Draftsman/ Junior Design Engineer
PPTX
Engys Presentation Harshad Joshi September 2018
PPTX
Webinar: BIM for MEP engineers | 23 March 2017
PDF
Behnam Nikouei resume
PDF
Tyron Muller Curriculum Vitae
PPTX
Ibrahim Naeem BIM Projects Portfolio
PDF
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
PDF
Scan to BIM: Step by step process of inserting point cloud data into Revit!
DOC
CV1.DOC
PDF
[Ici&itd] electrical engineer
PDF
An Introduction to Electronics Cooling
PPTX
Aec digital solutions portfolio(COBie/Level 2 BIM)
PDF
Andrew Gutteridge
PPTX
Presentation - Theunis Bridge - Dynamo BIM
PDF
Eng.khaled(cv)
PPTX
Construction Software – Design , Analysis , Estimate & ERP
Ahmed Ibrahim Refaey Ahmed
BIM ppt
Godrej MEP Design Consultancy Services
MEP Draftsman/ Junior Design Engineer
Engys Presentation Harshad Joshi September 2018
Webinar: BIM for MEP engineers | 23 March 2017
Behnam Nikouei resume
Tyron Muller Curriculum Vitae
Ibrahim Naeem BIM Projects Portfolio
Approaching BIM/FM Integration: Filling the Gaps for Success Mr. Gordon Yu, P...
Scan to BIM: Step by step process of inserting point cloud data into Revit!
CV1.DOC
[Ici&itd] electrical engineer
An Introduction to Electronics Cooling
Aec digital solutions portfolio(COBie/Level 2 BIM)
Andrew Gutteridge
Presentation - Theunis Bridge - Dynamo BIM
Eng.khaled(cv)
Construction Software – Design , Analysis , Estimate & ERP
Ad

Viewers also liked (20)

PPTX
MEP- Building services
PPT
Process Map(MEP)
PPSX
Building services
PPTX
Mep presentation team 1
PDF
Team 5 mep presentation
PPT
Mep training
PDF
MEP BIM design
PPT
Types of wires and cables ic
PDF
The Bim Process Explained
PPTX
Building Services
PPT
Introduction to building services part 2
PPTX
Types of wires and cables
PPTX
Electrical wiring BY Jemish
PDF
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
PPTX
Building Services Engg. (Electrical installations)
PPTX
HOME WIRING(domestic wiring)
PDF
Introduction To Building Services
PPTX
Building Services Electrical (MEP)
DOC
ELECTRICAL WIRING
PDF
Wires & cables
MEP- Building services
Process Map(MEP)
Building services
Mep presentation team 1
Team 5 mep presentation
Mep training
MEP BIM design
Types of wires and cables ic
The Bim Process Explained
Building Services
Introduction to building services part 2
Types of wires and cables
Electrical wiring BY Jemish
BIM (Building Information Modeling) Services | Revit Architecture | Revit Str...
Building Services Engg. (Electrical installations)
HOME WIRING(domestic wiring)
Introduction To Building Services
Building Services Electrical (MEP)
ELECTRICAL WIRING
Wires & cables
Ad

Similar to Team 2 mep presentation (20)

PDF
ETDP 2015 D1 The Digitally Enabling Electrification Project - Atkins & Laing ...
PDF
Alistair Haley CV
PDF
Besix BIMopen 2015
PDF
Mohamed Sabry El Banna's CV-Final[1]
DOC
gomaa tawfik.Elec.Draftsman
DOC
Electrical Draftsman
PPTX
Customer presentation
PDF
Ahmed Naeim Kamel CV 5-2-2016
PDF
Ahmed Naeim Kamel CV 5-2-2016
PDF
Ahmed Naeim Kamel CV 5-2-2016
PPTX
Untitled (2).pptx for eduction purpose only
PPTX
PPTX
Untitled design (2).pptx for education purpose
PDF
DELTAPOWER Comapny Profile
PDF
WHY CHOOSE US
PPTX
MEP Engineering Services in Oxford, UK
PDF
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
PDF
CTS a SANDIS Company
PDF
CTS a SANDIS Company
DOC
Aftab_14-06-15
ETDP 2015 D1 The Digitally Enabling Electrification Project - Atkins & Laing ...
Alistair Haley CV
Besix BIMopen 2015
Mohamed Sabry El Banna's CV-Final[1]
gomaa tawfik.Elec.Draftsman
Electrical Draftsman
Customer presentation
Ahmed Naeim Kamel CV 5-2-2016
Ahmed Naeim Kamel CV 5-2-2016
Ahmed Naeim Kamel CV 5-2-2016
Untitled (2).pptx for eduction purpose only
Untitled design (2).pptx for education purpose
DELTAPOWER Comapny Profile
WHY CHOOSE US
MEP Engineering Services in Oxford, UK
Eng Ahmed Naeim CV ( Mechanical Engineer ) (may 2016 )
CTS a SANDIS Company
CTS a SANDIS Company
Aftab_14-06-15

More from Campus (19)

PDF
vcms_a_global_perspective_short_paper
PDF
Segment_001_of_PMoton-EMT-BIM-uptake
PDF
Virtual City Models Avoidance of Obsolescence
PDF
Why should I be thinking of BIM - BIM for LA's
PDF
BIMCampus presentation - Northumbria University Graduates - Josh, Angus and Rob
PDF
140117 nu architecture
PDF
Ck21 presentation team 3
PDF
Ck21 presentation team 5
PDF
Ck21 presentation team 4
PDF
Ck21 presentation team 2
PDF
Ck21 presentation team 1
PPTX
thinkBIM 2013 pecha kucha
PPTX
131121 North East BIM Hub presentation
PDF
Team 4 mep presentation
PPTX
Mep team 3
PDF
Ck21 presentation team 4
PDF
Ck21 presentation team 1
PDF
Ck21 presentation team 5
PPT
01 plus3 arch presentation
vcms_a_global_perspective_short_paper
Segment_001_of_PMoton-EMT-BIM-uptake
Virtual City Models Avoidance of Obsolescence
Why should I be thinking of BIM - BIM for LA's
BIMCampus presentation - Northumbria University Graduates - Josh, Angus and Rob
140117 nu architecture
Ck21 presentation team 3
Ck21 presentation team 5
Ck21 presentation team 4
Ck21 presentation team 2
Ck21 presentation team 1
thinkBIM 2013 pecha kucha
131121 North East BIM Hub presentation
Team 4 mep presentation
Mep team 3
Ck21 presentation team 4
Ck21 presentation team 1
Ck21 presentation team 5
01 plus3 arch presentation

Recently uploaded (20)

PPTX
Astra-Investor- business Presentation (1).pptx
PDF
income tax laws notes important pakistan
PPTX
IITM - FINAL Option - 01 - 12.08.25.pptx
PDF
Daniels 2024 Inclusive, Sustainable Development
PDF
Solaris Resources Presentation - Corporate August 2025.pdf
PPTX
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
DOCX
Hand book of Entrepreneurship 4 Chapters.docx
PDF
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
PPT
Lecture notes on Business Research Methods
DOCX
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
PDF
Chapter 2 - AI chatbots and prompt engineering.pdf
PDF
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
PPTX
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PDF
Ron Thomas - Top Influential Business Leaders Shaping the Modern Industry – 2025
PPTX
operations management : demand supply ch
PDF
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
PDF
Keppel_Proposed Divestment of M1 Limited
PDF
1911 Gold Corporate Presentation Aug 2025.pdf
Astra-Investor- business Presentation (1).pptx
income tax laws notes important pakistan
IITM - FINAL Option - 01 - 12.08.25.pptx
Daniels 2024 Inclusive, Sustainable Development
Solaris Resources Presentation - Corporate August 2025.pdf
BUSINESS CYCLE_INFLATION AND UNEMPLOYMENT.pptx
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Hand book of Entrepreneurship 4 Chapters.docx
TyAnn Osborn: A Visionary Leader Shaping Corporate Workforce Dynamics
Lecture notes on Business Research Methods
Handbook of Entrepreneurship- Chapter 5: Identifying business opportunity.docx
Chapter 2 - AI chatbots and prompt engineering.pdf
THE COMPLETE GUIDE TO BUILDING PASSIVE INCOME ONLINE
interschool scomp.pptxzdkjhdjvdjvdjdhjhieij
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Ron Thomas - Top Influential Business Leaders Shaping the Modern Industry – 2025
operations management : demand supply ch
Robin Fischer: A Visionary Leader Making a Difference in Healthcare, One Day ...
Keppel_Proposed Divestment of M1 Limited
1911 Gold Corporate Presentation Aug 2025.pdf

Team 2 mep presentation

  • 1. Jurijs Pavlovics Michael Ward Tim Corrighan _BIMCampus Revit 2014 Autumn 2013 MechanicalElectrical+Plumbing
  • 2. Introduction Brief Our team has been appointed to design a new office specifically tailored to legal firms and legal training. The building must incorporate space for multiple companies. Schedule of Accommodation: Office spaces (both open plan and cellular) Meeting/board rooms (varying sizes for specific uses, eg. 1 to 1, groups, etc.) Achieve storage room General storage rooms Moot court (legal training court) Break-out spaces throughout the building Kitchenette/coffee points Toilets (male,female, accessible WC’s, shower room, etc.) Accessible lift Cleaners store Central reception with guest waiting area MechanicalElectrical+Plumbing
  • 3. Site Proposed Site The proposed site is located on the North bank of the River Tyne, Newcastle upon Tyne. 57 Quayside Newcastle upon Tyne NE1 2BJ Currently housing a ‘Pocket Park’, an initiative promoted by NE1 MechanicalElectrical+Plumbing
  • 4. Site Constraints Site Boundaries The site is restricted on two sides by neighbouring buildings: Flynn’s Bar Law Building To the front, the site is restricted by the street front and public footpath To the rear, the site is slight more open with room for car parking All buildings are limited to roughly the same height and number of levels Observations Busy street to the South Access needed to property along the East boundary Access to car park from Broad Chare to the North East MechanicalElectrical+Plumbing
  • 5. Inspiration Presidents Stone + Brick Facades Quayside History Glass with hard materials Infill Architecture Modern Architecture sitting with Classical MechanicalElectrical+Plumbing
  • 6. Using the 3D City Model City Model Throughout this project and the last we have used a 3D city model of Newcastle to create the context for our Revit model. Used to better understand the site boundaries. We have used the 3D city model to create more professional external renders. The 3D model was used to align the point cloud data to one of the neighbouring buildings so a Revit model for these buildings could be modelled in place. MechanicalElectrical+Plumbing
  • 7. Data Acquisition Laser Scanning Tutorial in laser scanning with Paul from Leica Geosystems. Scanned the full site from several different locations We headed straight back to the computer suit to load the point cloud into Revit MechanicalElectrical+Plumbing
  • 8. Laser Scanning and Modelling from the Point Cloud Data Modelling from Point Cloud Data The point cloud data was opened in a new revit project and was used to begin building a model of the adjoining buildings to the site. Using walls, extrusions and windows we created the facades of the buildings. We created custom texture to apply to these surfaces. We then added roofs and further details to complete the context models. We worked individually on each of the buildings and the models were linked together before being imported and aligned to the site model. MechanicalElectrical+Plumbing
  • 9. DN By Department Legend Lift Offices Private Public WC Drawn Dwg. No. Scale at A1 Project No. Drawing Project Status Rev. Date this drawing is copyright - check all dimensions on site - inform architect / so of any discrepancies - work to figured dimensions only - do not scale Rev. Amendment Date Checked1 : 100 1234 A(00)GAP900 MW Departmental Plans 1234 - BCT2 - 57 Quayside Preliminary 09/11/13Checker 1 : 100 Departmental Level 00 1 1 : 100 Departmental Level 0 2 1 : 100 Departmental Level 1 3 1 : 100 Departmental Level 2 4 1 : 100 Departmental Level 3 5 The Design MechanicalElectrical+Plumbing
  • 10. Architectural Model Modelling in Revit We all began modelling the architecture model to create a com- prehensive mass made up of architectural elements: Walls (with materials) Floors Doors Windows and other glazing This is the base for the BIM MechanicalElectrical+Plumbing
  • 11. Structural Model Structural Grid 8x5 grid Horizontal Spacing - 3000/2000/4200/2000/3000 Vertical Spacing - 4000/2000/2000/6000/6000/5000/2500 Base of steel frame Primary Structure Steel Frame In-situe cast concrete floor Concrete pile foundations MechanicalElectrical+Plumbing
  • 12. MEP Model Lighting 150mm alound in ceiling void for recessed lighting Whitecroft Softlighter - 500 lux Spaced 2.4 m Ventilation and Heating and Cooling Duct work - rectangular 400x250 - circular 250 diameter/150 diameter Extract Grill Daikin FXFQ-M-12-36-MBH Each unit 2.1kW cooling Open plan office - 70-100W/m2 . FCU’s between 40-50 m2 MechanicalElectrical+Plumbing
  • 13. What is Next? Navisworks We will then import a central model into Autodesk’s Navisworks. Here we will run a series of clash detections between the architectural and structural models, architecture and MEP and structure with MEP. In Navisworks we will also create a series of construction animations and renders using the cloud. We welcome any questions? MechanicalElectrical+Plumbing