•CERC (Indian Electricity Grid Code) (Fourth
Amendment) Regulations, 2016 Dated
06.04.2016 refers about Technical
Minimum Schedule for operation of Central
Generating Stations and Inter-State
Generating Stations
 The technical minimum for operation shall be
55% of MCR loading or installed capacity of
the unit on bar at generating station.
 RLDC/SLDC to direct station to operate above
the technical minimum but below the
normative plant availability factor
 This may be due to grid security or fewer
schedule given by the beneficiaries.”
 Unit may be compensated depending on
average unit loading duly taking into
account the:
 forced outages
 planned outages
 number of start-stop
 secondary fuel oil consumption
 aux. energy consumption in due
consideration of actual and normative
operating parameters on monthly basis.”
Technical minimum schedule for  ppt f
Technical minimum schedule for  ppt f
Technical minimum schedule for  ppt f
 Compensation for SHR and APC shall be
worked out in terms of energy charges
 The compensation shall be borne by the
entity who has caused the plant to be
operated at schedule lower than the PAF up
to technical minimum
 No compensation for HR degradation and
APC shall be admissible if actual HR and /
or APC are lower than the normative SHR
and APC
 Cold Start:
 means start up after a shutdown period exceeding
72 hours (turbine metal temperatures below
approximately 40% of their full load values).
 Hot Start
 means start up after a shutdown period of less
than 10 hours (turbine metal temperatures below
approximately 80% of their full load values).
 Warm Start
 means start up after a shutdown period between
10 hours and 72 hours (turbine metal temperatures
between approximately 40% to 80% of their full
load values).
start
Submission of DC information by Generating Stations
(0600 hrs of D-1)
Calculation of Entitlements by RLDC
(0800 hrs of D-1)
Requisition by Beneficiaries
(1500 hrs of D-1)
Preparation of R-0 Schedule by RLDCs
(1800 hrs of D-1)
RLDC to display on its website
(Intimation regarding less than technical minimum schedule)
(1900 hrs of D-1)
Submission of Revised Requisition by Beneficiaries
(2000 hrs of D-1)
SG < TM
Y
Y
SG <TM
Y
NO
Issue of final day
ahead schedule by
RLDCs
NOIssue of final day ahead
schedule by RLDCs
NO
Issue of R-1 Schedule
Whether to go under
Shutdown
Y
Intimation by station to
RLDC and RLDC to indicate
on its website
Issue of final day ahead
schedule by RLDCs
Increase of SG to TM for smooth
operation ?YES
Issue of
final day
ahead
schedule by
RLDCs
NO
Issue of final day
ahead schedule by
RLDCs
Average Unit Loading : (in %) means loading of the
station during the Calculation Period
(AUL in %) = Eff. generation of station (MWh) X 100
Eff. capacity (MWh) x (1-Nor. AUX)
 Calculation Period: means the period for which compensation
calculation shall be carried out. Generally, there shall be
twelve calculations during a financial year on cumulative
basis.
 Effective Capacity in MWh means maximum
possible generation from a station during
calculation period and shall be calculated as :
 Total Installed Capacity of the designated
generating station (in MWh) minus Installed
Capacity (MW) of the Unit(s) of the said station
under outage (planned or forced outage) and under
reserve shut down during the calculation period X
outage time .
 Effective Generation of the Station in MWh means
the actual generation Ex-bus of the designated
station or the Schedule generation during the
calculation period whichever is higher.
 EC (A) means total energy charges in rupees computed for a
designated generating station during the calculation period
on actual parameters of SHR and AEC.
 EC (N) means total energy charges in rupees computed for a
designated generating station during the calculation period
on normative parameters considering degraded SHR and AEC
based on average unit loading
 ECR (Comp) means increase in normative Energy Charge Rate
in rupees/kWh for the calculation period considering
degraded SHR and AEC based on average unit loading.
 ECR (DC) means Energy Charge Rate in Rs. /kWh based on
degraded SHR and AEC considering average Declared
Capacity (DC) as average unit loading during the Calculation
period.
 ECR (SE) means Energy Charge Rate in rupees/kWh
based on degraded SHR and AEC considering
average unit loading of generating station during
the calculation period
 ECR corresponding to average Declared Capacity
(DC) i.e. ECR (DC) for the calculation period shall
also be calculated using the formula specified in
Tariff Regulations
 Calculation for Secondary Fuel Oil
consumption:
 (i) No compensation for degradation of
Secondary Fuel oil consumption is payable for
the year if total number of start-ups is equal
to or less than 7 x no. of units in the
generating station or the Actual Secondary
Fuel Oil consumption is less than Normative
Fuel Oil Consumption.
 (ii) Compensation (in terms of KL of
Secondary Oil) shall be payable to CGS/ISGS
for the year due to degradation of Secondary
Fuel Oil Consumption shall be calculated by
multiplying no. of start-ups exceeding 7 per
unit and solely attributable to reserve shut-
downs with the appropriate value of
additional secondary oil consumption
specified in Regulation.
 (iv) Compensation in terms of Rupees shall be
calculated by multiplying compensation in
terms of KL as calculated and average landed
price of Secondary fuel oil for the year.
 (v) Each start-up due to reserve shutdown
shall be attributed to the beneficiaries, who
had requisitioned below 55% of their
entitlement.
 Compensation (in terms of Rupees) shall be shared
amongst the beneficiaries in the following manner:
Compensation payable by beneficiary i :
=Ni x Ai *compensation payable to CGS/ ISGS
Σ Ni x Ai
Ni = Number of start-ups attributable to the
beneficiary i
Ai = Weightage Average Percentage share of
the beneficiary in the generating station
THANK YOU

More Related Content

PPTX
OPEN ACCESS REGULATION
PPTX
Deviation Settlement Mechanism (DSM)
DOCX
Epc service proposal for setting up solar power project standard template
PPT
ABT a complete report and a case study
PPTX
Grid-connected PV system
PPSX
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
PDF
Making sense of kusum
PPTX
DSM.pptx
OPEN ACCESS REGULATION
Deviation Settlement Mechanism (DSM)
Epc service proposal for setting up solar power project standard template
ABT a complete report and a case study
Grid-connected PV system
ABT (Availability Based Tariff) - UI (Unscheduled Interchange)
Making sense of kusum
DSM.pptx

What's hot (20)

PPTX
WIND POWER
PPT
Wind Energy 1
PPT
Solar Photovoltaic Power Plant
PDF
Quotation 50 kva_std_ongrid
PPTX
Power grid operation in India
PPSX
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
PPTX
Economic load dispatch
PPTX
Solar dryers
PDF
Wind energy system india
PDF
Deviation settelment mechanism
PPTX
RES 1.pptx
PPTX
Wind power forecasting an application of machine
PPTX
Ppt on diff. load curve
PPTX
Financial Analysis
PDF
Ancillary Services
PPTX
How solar rooftop system works
DOCX
Harmonics
PDF
Growth of Electricity Sector in India since 1947 to 2015
WIND POWER
Wind Energy 1
Solar Photovoltaic Power Plant
Quotation 50 kva_std_ongrid
Power grid operation in India
Cerc Deviation Settlement Mechanism ( DSM ) 4th ammendment Summary wef 01/01/...
Economic load dispatch
Solar dryers
Wind energy system india
Deviation settelment mechanism
RES 1.pptx
Wind power forecasting an application of machine
Ppt on diff. load curve
Financial Analysis
Ancillary Services
How solar rooftop system works
Harmonics
Growth of Electricity Sector in India since 1947 to 2015
Ad

Similar to Technical minimum schedule for ppt f (20)

PPT
Commercial presentation
PPTX
CERC REGULATION ON TARIFF OF COAL BASED POWER GENERATION AND SOLAR GENERATION
PPTX
23.01.2023_Tariff Presentations_O_M.pptx
PPT
Commercial and ABT proper description. Ppt
PPTX
test E4.pptx
PPTX
Levellised generic tariff
PDF
Small Power Generation Plant
PPT
Presentation on Group - Incentive - scheme
PDF
Cost Appraisal of Chhabra Thermal Power Station(250 mw)
PDF
Cost appraisal of chhabra thermal
PDF
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
PDF
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
PPTX
Renewable Energy - Recent Initiatives
PDF
DhofarPower(IPO)Research
PPTX
REC status
PDF
storagePMR
PDF
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
PDF
What is availability tariff
PPTX
COMPETITIVE TARRIFF BIDDING
PDF
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
Commercial presentation
CERC REGULATION ON TARIFF OF COAL BASED POWER GENERATION AND SOLAR GENERATION
23.01.2023_Tariff Presentations_O_M.pptx
Commercial and ABT proper description. Ppt
test E4.pptx
Levellised generic tariff
Small Power Generation Plant
Presentation on Group - Incentive - scheme
Cost Appraisal of Chhabra Thermal Power Station(250 mw)
Cost appraisal of chhabra thermal
Comparative Study on Forecasting & Scheduling - Solar & Wind 05.03.19
Tender Summary for SECI 150 MW Rihand Dam Floating Solar - 13.05.2018
Renewable Energy - Recent Initiatives
DhofarPower(IPO)Research
REC status
storagePMR
Executive Summary of “Forecasting, Scheduling, Deviation settlement and relat...
What is availability tariff
COMPETITIVE TARRIFF BIDDING
Estimating Quadratic Cost Curve Coefficients of Thermal Power Plant Without U...
Ad

Recently uploaded (20)

PDF
Design Guidelines and solutions for Plastics parts
PPTX
CyberSecurity Mobile and Wireless Devices
PPTX
mechattonicsand iotwith sensor and actuator
PPTX
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
PDF
Java Basics-Introduction and program control
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PPTX
Building constraction Conveyance of water.pptx
PPTX
"Array and Linked List in Data Structures with Types, Operations, Implementat...
PPTX
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
PPTX
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
PDF
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
PPTX
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
PDF
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
PPTX
wireless networks, mobile computing.pptx
PDF
Abrasive, erosive and cavitation wear.pdf
PDF
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
Applications of Equal_Area_Criterion.pdf
PDF
distributed database system" (DDBS) is often used to refer to both the distri...
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
Design Guidelines and solutions for Plastics parts
CyberSecurity Mobile and Wireless Devices
mechattonicsand iotwith sensor and actuator
AUTOMOTIVE ENGINE MANAGEMENT (MECHATRONICS).pptx
Java Basics-Introduction and program control
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
Building constraction Conveyance of water.pptx
"Array and Linked List in Data Structures with Types, Operations, Implementat...
Sorting and Hashing in Data Structures with Algorithms, Techniques, Implement...
CN_Unite_1 AI&DS ENGGERING SPPU PUNE UNIVERSITY
UEFA_Carbon_Footprint_Calculator_Methology_2.0.pdf
Chapter 2 -Technology and Enginerring Materials + Composites.pptx
Unit I -OPERATING SYSTEMS_SRM_KATTANKULATHUR.pptx.pdf
wireless networks, mobile computing.pptx
Abrasive, erosive and cavitation wear.pdf
Accra-Kumasi Expressway - Prefeasibility Report Volume 1 of 7.11.2018.pdf
Information Storage and Retrieval Techniques Unit III
Applications of Equal_Area_Criterion.pdf
distributed database system" (DDBS) is often used to refer to both the distri...
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...

Technical minimum schedule for ppt f

  • 2. •CERC (Indian Electricity Grid Code) (Fourth Amendment) Regulations, 2016 Dated 06.04.2016 refers about Technical Minimum Schedule for operation of Central Generating Stations and Inter-State Generating Stations
  • 3.  The technical minimum for operation shall be 55% of MCR loading or installed capacity of the unit on bar at generating station.  RLDC/SLDC to direct station to operate above the technical minimum but below the normative plant availability factor  This may be due to grid security or fewer schedule given by the beneficiaries.”
  • 4.  Unit may be compensated depending on average unit loading duly taking into account the:  forced outages  planned outages  number of start-stop  secondary fuel oil consumption  aux. energy consumption in due consideration of actual and normative operating parameters on monthly basis.”
  • 8.  Compensation for SHR and APC shall be worked out in terms of energy charges  The compensation shall be borne by the entity who has caused the plant to be operated at schedule lower than the PAF up to technical minimum  No compensation for HR degradation and APC shall be admissible if actual HR and / or APC are lower than the normative SHR and APC
  • 9.  Cold Start:  means start up after a shutdown period exceeding 72 hours (turbine metal temperatures below approximately 40% of their full load values).  Hot Start  means start up after a shutdown period of less than 10 hours (turbine metal temperatures below approximately 80% of their full load values).  Warm Start  means start up after a shutdown period between 10 hours and 72 hours (turbine metal temperatures between approximately 40% to 80% of their full load values).
  • 10. start Submission of DC information by Generating Stations (0600 hrs of D-1) Calculation of Entitlements by RLDC (0800 hrs of D-1) Requisition by Beneficiaries (1500 hrs of D-1) Preparation of R-0 Schedule by RLDCs (1800 hrs of D-1)
  • 11. RLDC to display on its website (Intimation regarding less than technical minimum schedule) (1900 hrs of D-1) Submission of Revised Requisition by Beneficiaries (2000 hrs of D-1) SG < TM Y Y SG <TM Y NO Issue of final day ahead schedule by RLDCs NOIssue of final day ahead schedule by RLDCs
  • 12. NO Issue of R-1 Schedule Whether to go under Shutdown Y Intimation by station to RLDC and RLDC to indicate on its website Issue of final day ahead schedule by RLDCs Increase of SG to TM for smooth operation ?YES Issue of final day ahead schedule by RLDCs NO Issue of final day ahead schedule by RLDCs
  • 13. Average Unit Loading : (in %) means loading of the station during the Calculation Period (AUL in %) = Eff. generation of station (MWh) X 100 Eff. capacity (MWh) x (1-Nor. AUX)  Calculation Period: means the period for which compensation calculation shall be carried out. Generally, there shall be twelve calculations during a financial year on cumulative basis.
  • 14.  Effective Capacity in MWh means maximum possible generation from a station during calculation period and shall be calculated as :  Total Installed Capacity of the designated generating station (in MWh) minus Installed Capacity (MW) of the Unit(s) of the said station under outage (planned or forced outage) and under reserve shut down during the calculation period X outage time .  Effective Generation of the Station in MWh means the actual generation Ex-bus of the designated station or the Schedule generation during the calculation period whichever is higher.
  • 15.  EC (A) means total energy charges in rupees computed for a designated generating station during the calculation period on actual parameters of SHR and AEC.  EC (N) means total energy charges in rupees computed for a designated generating station during the calculation period on normative parameters considering degraded SHR and AEC based on average unit loading  ECR (Comp) means increase in normative Energy Charge Rate in rupees/kWh for the calculation period considering degraded SHR and AEC based on average unit loading.  ECR (DC) means Energy Charge Rate in Rs. /kWh based on degraded SHR and AEC considering average Declared Capacity (DC) as average unit loading during the Calculation period.
  • 16.  ECR (SE) means Energy Charge Rate in rupees/kWh based on degraded SHR and AEC considering average unit loading of generating station during the calculation period  ECR corresponding to average Declared Capacity (DC) i.e. ECR (DC) for the calculation period shall also be calculated using the formula specified in Tariff Regulations
  • 17.  Calculation for Secondary Fuel Oil consumption:  (i) No compensation for degradation of Secondary Fuel oil consumption is payable for the year if total number of start-ups is equal to or less than 7 x no. of units in the generating station or the Actual Secondary Fuel Oil consumption is less than Normative Fuel Oil Consumption.
  • 18.  (ii) Compensation (in terms of KL of Secondary Oil) shall be payable to CGS/ISGS for the year due to degradation of Secondary Fuel Oil Consumption shall be calculated by multiplying no. of start-ups exceeding 7 per unit and solely attributable to reserve shut- downs with the appropriate value of additional secondary oil consumption specified in Regulation.
  • 19.  (iv) Compensation in terms of Rupees shall be calculated by multiplying compensation in terms of KL as calculated and average landed price of Secondary fuel oil for the year.  (v) Each start-up due to reserve shutdown shall be attributed to the beneficiaries, who had requisitioned below 55% of their entitlement.
  • 20.  Compensation (in terms of Rupees) shall be shared amongst the beneficiaries in the following manner: Compensation payable by beneficiary i : =Ni x Ai *compensation payable to CGS/ ISGS Σ Ni x Ai Ni = Number of start-ups attributable to the beneficiary i Ai = Weightage Average Percentage share of the beneficiary in the generating station