SlideShare a Scribd company logo
4
Most read
5
Most read
6
Most read
THE SUPERIOR University LAHORE
Faculty of Computer Science & IT
FINAL YEAR PROJECT
PROJECT PROPOSAL& PLAN
Smart Waste Management System
Project ID: FYP-BCSM-F21-058
Project Team
Student Name Student ID Program Contact Number Email Address
Umair Ali Bcsm-f18-263 BSCS 0322-6740020 Bcsm-f18-263@superior.edu.pk
Abdul Aziz Bcsm-f18-268 BSCS 0332-5162277 Bcsm-f18-268@superior.edu.pk
Hussnain Abbas Bcsm-f18-151 BSCS 0307-2243092 Bcsm-f18-151@superior.edu.pk
Miss Faiqa Maqsood
(Lecturer)
Smart Waste Management System
Change Record
Author(s) Version Date Notes Supervisor’s Signature
1.0 Original Draft
Changes Based on
Feedback from
Supervisor
Changes Based on
Feedback From Faculty
Added Project Plan
Changes Based on
Feedback from
Supervisor
Project Proposal
Project Title: Smart Waste Management System
Executive Summary
It creates unhygienic conditions for the citizens in the nearby surrounding, leading to the
spread of infectious diseases and illness. To avoid this problem, IoT based “Smart Waste
Management” is the best and trending solution. In the proposed system, public dustbins will be
provided with embedded device which helps in real time monitoring of level of garbage in
garbage bins. The data regarding the garbage levels will be used to provide optimized route for
garbage collecting vans, which will reduce cost associated with fuel. The load sensors will
increase efficiency of data related to garbage level and moisture sensors will be used to provide
data of waste segregation in a dust bin.
1. Introduction
The proposed system would be able to automate the solid waste monitoring process and
management of the overall collection process using IOT (Internet of Things). In the proposed
system, whenever the waste bin gets filled this is acknowledged by placing the circuit at the
waste bin, which transmits it to the receiver at the desired place in the area or spot.
In the proposed system, the received signal indicates the waste bin status at the monitoring
and controlling system.
The signal status will let waste collector (Truck drivers) know which bin is full and which is still
empty, so by this the driver can pick the fully loaded bin, and in addition it will let driver to
know which bin is still empty.
2. Existing System / Competitive Analysis
The existing system giving correct information about the collection of garbage into bin soon
when the bin level reaches its maximum level. The
system will thus provide accurate reports, increasing the
efficiency of the system. The real time monitoring of the
garbage level with the help of sensors and wireless
communication will reduce the number of trips required by
the garbage collection vehicle and thus will reduce the total
expenditure associated with the Garbage bin. This system
consists of an single ultrasonic sensor to collect information
on the level of garbage. After collection of data then send on our cloud storage and then comes
on our platform.
3. Problem Statement
Following problems are associate with waste collection:
In the typically way of collecting the waste, waste is being overflow in the bin, and areas get
messy. In some specific area sometimes due to any event bin gets unexpectedly full, so there is
no existing method to let the driver know the bin is ready to collect.
Another problem is waste of time and recourses, the truck driver didn’t know which place has
full bin, and often they went in the place which has empty bin and hence waste the time.
Major problem is overloaded bins create diseases which are harmful for the majorities.
4. Proposed Solution
The proposed system will be cost effecting and fast system.
The concept will be implement using internet of things and arduino as a hardware device.
Smart system will send notification to the truck driver if a bin is ready to collected.
Bin will be attracted with some sensors which will send the notification to the drivers.
5. Scope of the Project
1. Sensor Based Waste Collection Bins is used to identify status of waste bins if it is empty
or filled so as to customize the waste collection schedule accordingly and also save the
cost.
2. Real time waste management system by using smart dustbins to check the fill level of
dustbins whether the dustbins are full or not, through this system the information of all
smart dustbins can be accessed from anywhere and anytime by the concern person.
3. It will inform the status of each and every dustbin in real time so that concerned
authority can send the garbage collection metropolitan cities it is not possible to check
each and every place where the garbage dump yard is full or not.
4. We are going to implement a project called IoT Based Smart Garbage and Waste
Collection bins. This system also helps to monitor the fake reports and hence can reduce
the corruption in the overall management system.
5. The smart garbage management system makes the garbage collection more efficient the
use of solar panels in such systems may reduce the energy consumption.
6. System Architectural Design
The IOT Garbage Monitoring system is a very innovative system which will help to keep the
cities clean. This system monitors the garbage bins and informs about the level of garbage
collected in the garbage bins via a web page. For this the system uses ultrasonic sensors placed
over the bins to detect the garbage level and compare it with the garbage bins depth. The
system makes use of Arduino family microcontroller, LCD screen, Wi-Fi modem for sending data
and a buzzer. The system is powered by a 12V transformer. The LCD screen is used to display
the status of the level of garbage collected in the bins. Whereas a web page is built to show the
status to the user monitoring it. The web page gives a graphical view of the garbage bins and
highlights the garbage collected in color in order to show the level of garbage collected. The
LCD screen shows the status of the garbage level. The system puts on the buzzer when the level
of garbage collected crosses the set limit. Thus, this system helps to keep the city clean by
informing about the garbage levels of the bins by providing graphical image of the bins via a
web page. The ESP8266 Wi-Fi Module is a self-contained SOC with integrated TCP/IP protocol
stack that can give any microcontroller access to your Wi-Fi network.
7. Implementation Tools and Techniques
Techniques:
Image processing
Data Analysis
Machine Learning
Artificial Intelligence (optional)
Tools:
Php Charm
Visual Studio Code
Frontend Technology:
HTML
CSS
JAVASCRIPT
REACT.JS + VUE.JS+ ANGULAR.JS
Backend Technology:
PHP
Python
NodeJS
Database
MySQL
Mongo DB
8. Project Plan
• Electronics
1. Power Supply Unit
2. Sensor Module
3. Wi-Fi Module
• Programming
• Application/Cloud Development
• 3D Designing
• Mechanical Structure
8.1. Work Breakdown Structure
[A work breakdown structure (WBS) is deliverable based decomposition of project scope. The WBS includes 100% of
the work defined by the project scope and captures all deliverables – internal, external, interim – in terms of the
work to be completed, including project management. You have to give division of responsibilities and duties
among team members.]
Sample WBS
1. Project Management
1.1. Work Breakdown Structure (WBS)
1.2. Roles & Responsibility Matrix
1.3. Change Control System
2. Reports / Documentation
2.1. Final Documentation Introduction
2.2. Literature / Markey Survey
2.3. Requirements Analysis
2.4. System Design
2.5. Implementation
2.6. Testing & Performance Evaluation
2.7. Conclusion & Outlook
2.8. End User Documentation
2.9. Application Administration Documentation
2.10. System Administrator Documentation
3. System
3.1. Development Environment
3.1.1. IDE
3.1.2. Version Control
3.1.3. Server
3.1.4. Database
3.2. Presentation Layer
3.2.1. Deliverable 1
3.2.2. Deliverable 2
3.2.3. . . .
3.3. Business Logic Layer
3.3.1. Deliverable 1
3.3.2. Deliverable 2
3.3.3. . . .
3.4. Data Management Layer
3.4.1. Deliverable 1
3.4.2. Deliverable 2
3.4.3. . . .
3.5. Physical Layer
3.5.1. Deliverable 1
3.5.2. Deliverable 2
3.5.3. . . .
Roles & Responsibility Matrix:
The purpose of roles & responsibility matrix is to identify who will do what.
WBS
#
WBS Deliverable Activity # Activity to
Complete the
Deliverable
Duration
(# of Days)
Responsible
Team Member(s)
& Role(s)
8.2. Gantt Chart
[Gantt Chart consisting of Timeline with milestone. Specific items to include in this section are as follows:
• Timeline with milestones: Gantt chart in Microsoft project 2013. The following are required elements of
your Gantt chart:
o Project duration is from the date your project is enrolled to the completion date:
o Each milestone is to be labeled with a title.
o Schedule all tasks not just “Design” or “Testing.” Break this schedule down to specific
assignments.
o Each task is to be labeled with a title and person or persons assigned to the task.
o Subdivide larger items so that no task is longer than about one week
o Link tasks which are dependent on the completion of a previous task.]
8.3. Empathy Map
References
[12 pt, Calibri, Justified]
[Give references to the resources you have consulted in finalizing your project topic.]
List of Faculty Proposed Changes
Project Title
Proposed Change Proposed By Supervisor’s Decision
Name of Faculty
Member(s) who proposed
this change
Approved/Disapproved
and/or Comments
Date: __________________ Supervisor’s Signature: ______________
APPROVAL
Project Supervisor
Comments: ___________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Name:______________________________
Date:_______________________________ Signature:__________________________
Project Manager
Comments: ___________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
_____________________________________________________________________________
Date:_______________________________ Signature:__________________________

More Related Content

PPTX
Smart Dustbin for Smart City
PPTX
Iot based smart bus tracking system
PPTX
Autonomous car Working (Deep learning)
PPTX
ObjectDetection.pptx
PDF
2017 Autonomous Vehicle Presentation Package
PDF
IoT Based Smart Trash Bins – A Step Toward Smart City
PPTX
Smart Garbage Management System.pptx
PPTX
Mahesh_Smart Garbage Management System.pptx
Smart Dustbin for Smart City
Iot based smart bus tracking system
Autonomous car Working (Deep learning)
ObjectDetection.pptx
2017 Autonomous Vehicle Presentation Package
IoT Based Smart Trash Bins – A Step Toward Smart City
Smart Garbage Management System.pptx
Mahesh_Smart Garbage Management System.pptx

Similar to Template 03 - project proposal & plan (20)

PPTX
Copy of dustbin.pptx
PDF
IRJET- Smart Dustbin Container using IoT Notification
PDF
IRJET- Smart Garbage Monitoring System using Internet of Things
PDF
IRJET- Implementation of IoT based Smart Garbage and Waste Collection System
PDF
waste management system for urban use app
PDF
IRJET- Smart Dustbin for Smart City
PDF
IRJET- IoT based Connected Dustbins for Waste Management in Commercial Places
PPT
Internet of Things- IoT (application to waste management)
PDF
Smart Dustbin Using aurduino and Iot Used to Collect Waste
PDF
IRJET- Smart Garbage Monitoring System using IoT
PDF
IRJET- Waste Management System based on IoT
PDF
IRJET- Trash Clearance Management System
PDF
engproc-02-00090.pdffghfhhdhbfghfghdfhfghfghfg
PDF
IOT BASED TOOL GARBAGE MONITORING SYSTEM
PDF
IJSRED-V2I5P40
PDF
IRJET- Trash can Monitoring System
PDF
IRJET- Trash can Monitoring System
PDF
IRJET- Smart Dustbin Container using IoT Notification
PPTX
Iot Enabled waste management system.pptx
PDF
IRJET- Efficient IoT based Smart Dustbin for Clean Environment
Copy of dustbin.pptx
IRJET- Smart Dustbin Container using IoT Notification
IRJET- Smart Garbage Monitoring System using Internet of Things
IRJET- Implementation of IoT based Smart Garbage and Waste Collection System
waste management system for urban use app
IRJET- Smart Dustbin for Smart City
IRJET- IoT based Connected Dustbins for Waste Management in Commercial Places
Internet of Things- IoT (application to waste management)
Smart Dustbin Using aurduino and Iot Used to Collect Waste
IRJET- Smart Garbage Monitoring System using IoT
IRJET- Waste Management System based on IoT
IRJET- Trash Clearance Management System
engproc-02-00090.pdffghfhhdhbfghfghdfhfghfghfg
IOT BASED TOOL GARBAGE MONITORING SYSTEM
IJSRED-V2I5P40
IRJET- Trash can Monitoring System
IRJET- Trash can Monitoring System
IRJET- Smart Dustbin Container using IoT Notification
Iot Enabled waste management system.pptx
IRJET- Efficient IoT based Smart Dustbin for Clean Environment
Ad

Recently uploaded (20)

PDF
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
PPTX
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
PDF
Empowerment Technology for Senior High School Guide
PDF
Supply Chain Operations Speaking Notes -ICLT Program
DOC
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
PDF
LDMMIA Reiki Yoga Finals Review Spring Summer
PPTX
Cell Types and Its function , kingdom of life
PDF
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
PDF
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
PPTX
A powerpoint presentation on the Revised K-10 Science Shaping Paper
PPTX
Orientation - ARALprogram of Deped to the Parents.pptx
PDF
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
PDF
Hazard Identification & Risk Assessment .pdf
PPTX
Lesson notes of climatology university.
PDF
Chinmaya Tiranga quiz Grand Finale.pdf
PDF
Complications of Minimal Access Surgery at WLH
PDF
Indian roads congress 037 - 2012 Flexible pavement
PDF
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
PDF
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
PPTX
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
A GUIDE TO GENETICS FOR UNDERGRADUATE MEDICAL STUDENTS
CHAPTER IV. MAN AND BIOSPHERE AND ITS TOTALITY.pptx
Empowerment Technology for Senior High School Guide
Supply Chain Operations Speaking Notes -ICLT Program
Soft-furnishing-By-Architect-A.F.M.Mohiuddin-Akhand.doc
LDMMIA Reiki Yoga Finals Review Spring Summer
Cell Types and Its function , kingdom of life
RTP_AR_KS1_Tutor's Guide_English [FOR REPRODUCTION].pdf
SOIL: Factor, Horizon, Process, Classification, Degradation, Conservation
A powerpoint presentation on the Revised K-10 Science Shaping Paper
Orientation - ARALprogram of Deped to the Parents.pptx
ChatGPT for Dummies - Pam Baker Ccesa007.pdf
Hazard Identification & Risk Assessment .pdf
Lesson notes of climatology university.
Chinmaya Tiranga quiz Grand Finale.pdf
Complications of Minimal Access Surgery at WLH
Indian roads congress 037 - 2012 Flexible pavement
Black Hat USA 2025 - Micro ICS Summit - ICS/OT Threat Landscape
LNK 2025 (2).pdf MWEHEHEHEHEHEHEHEHEHEHE
1st Inaugural Professorial Lecture held on 19th February 2020 (Governance and...
Ad

Template 03 - project proposal & plan

  • 1. THE SUPERIOR University LAHORE Faculty of Computer Science & IT FINAL YEAR PROJECT PROJECT PROPOSAL& PLAN Smart Waste Management System Project ID: FYP-BCSM-F21-058 Project Team Student Name Student ID Program Contact Number Email Address Umair Ali Bcsm-f18-263 BSCS 0322-6740020 Bcsm-f18-263@superior.edu.pk Abdul Aziz Bcsm-f18-268 BSCS 0332-5162277 Bcsm-f18-268@superior.edu.pk Hussnain Abbas Bcsm-f18-151 BSCS 0307-2243092 Bcsm-f18-151@superior.edu.pk Miss Faiqa Maqsood (Lecturer)
  • 2. Smart Waste Management System Change Record Author(s) Version Date Notes Supervisor’s Signature 1.0 Original Draft Changes Based on Feedback from Supervisor Changes Based on Feedback From Faculty Added Project Plan Changes Based on Feedback from Supervisor
  • 3. Project Proposal Project Title: Smart Waste Management System Executive Summary It creates unhygienic conditions for the citizens in the nearby surrounding, leading to the spread of infectious diseases and illness. To avoid this problem, IoT based “Smart Waste Management” is the best and trending solution. In the proposed system, public dustbins will be provided with embedded device which helps in real time monitoring of level of garbage in garbage bins. The data regarding the garbage levels will be used to provide optimized route for garbage collecting vans, which will reduce cost associated with fuel. The load sensors will increase efficiency of data related to garbage level and moisture sensors will be used to provide data of waste segregation in a dust bin. 1. Introduction The proposed system would be able to automate the solid waste monitoring process and management of the overall collection process using IOT (Internet of Things). In the proposed system, whenever the waste bin gets filled this is acknowledged by placing the circuit at the waste bin, which transmits it to the receiver at the desired place in the area or spot. In the proposed system, the received signal indicates the waste bin status at the monitoring and controlling system. The signal status will let waste collector (Truck drivers) know which bin is full and which is still empty, so by this the driver can pick the fully loaded bin, and in addition it will let driver to know which bin is still empty.
  • 4. 2. Existing System / Competitive Analysis The existing system giving correct information about the collection of garbage into bin soon when the bin level reaches its maximum level. The system will thus provide accurate reports, increasing the efficiency of the system. The real time monitoring of the garbage level with the help of sensors and wireless communication will reduce the number of trips required by the garbage collection vehicle and thus will reduce the total expenditure associated with the Garbage bin. This system consists of an single ultrasonic sensor to collect information on the level of garbage. After collection of data then send on our cloud storage and then comes on our platform. 3. Problem Statement Following problems are associate with waste collection: In the typically way of collecting the waste, waste is being overflow in the bin, and areas get messy. In some specific area sometimes due to any event bin gets unexpectedly full, so there is no existing method to let the driver know the bin is ready to collect. Another problem is waste of time and recourses, the truck driver didn’t know which place has full bin, and often they went in the place which has empty bin and hence waste the time. Major problem is overloaded bins create diseases which are harmful for the majorities.
  • 5. 4. Proposed Solution The proposed system will be cost effecting and fast system. The concept will be implement using internet of things and arduino as a hardware device. Smart system will send notification to the truck driver if a bin is ready to collected. Bin will be attracted with some sensors which will send the notification to the drivers. 5. Scope of the Project 1. Sensor Based Waste Collection Bins is used to identify status of waste bins if it is empty or filled so as to customize the waste collection schedule accordingly and also save the cost. 2. Real time waste management system by using smart dustbins to check the fill level of dustbins whether the dustbins are full or not, through this system the information of all smart dustbins can be accessed from anywhere and anytime by the concern person. 3. It will inform the status of each and every dustbin in real time so that concerned authority can send the garbage collection metropolitan cities it is not possible to check each and every place where the garbage dump yard is full or not. 4. We are going to implement a project called IoT Based Smart Garbage and Waste Collection bins. This system also helps to monitor the fake reports and hence can reduce the corruption in the overall management system.
  • 6. 5. The smart garbage management system makes the garbage collection more efficient the use of solar panels in such systems may reduce the energy consumption. 6. System Architectural Design The IOT Garbage Monitoring system is a very innovative system which will help to keep the cities clean. This system monitors the garbage bins and informs about the level of garbage collected in the garbage bins via a web page. For this the system uses ultrasonic sensors placed over the bins to detect the garbage level and compare it with the garbage bins depth. The system makes use of Arduino family microcontroller, LCD screen, Wi-Fi modem for sending data and a buzzer. The system is powered by a 12V transformer. The LCD screen is used to display the status of the level of garbage collected in the bins. Whereas a web page is built to show the status to the user monitoring it. The web page gives a graphical view of the garbage bins and highlights the garbage collected in color in order to show the level of garbage collected. The LCD screen shows the status of the garbage level. The system puts on the buzzer when the level of garbage collected crosses the set limit. Thus, this system helps to keep the city clean by informing about the garbage levels of the bins by providing graphical image of the bins via a web page. The ESP8266 Wi-Fi Module is a self-contained SOC with integrated TCP/IP protocol stack that can give any microcontroller access to your Wi-Fi network.
  • 7. 7. Implementation Tools and Techniques Techniques: Image processing Data Analysis Machine Learning Artificial Intelligence (optional) Tools: Php Charm Visual Studio Code Frontend Technology: HTML CSS JAVASCRIPT REACT.JS + VUE.JS+ ANGULAR.JS Backend Technology: PHP Python NodeJS Database MySQL Mongo DB
  • 8. 8. Project Plan • Electronics 1. Power Supply Unit 2. Sensor Module 3. Wi-Fi Module • Programming • Application/Cloud Development • 3D Designing • Mechanical Structure 8.1. Work Breakdown Structure [A work breakdown structure (WBS) is deliverable based decomposition of project scope. The WBS includes 100% of the work defined by the project scope and captures all deliverables – internal, external, interim – in terms of the work to be completed, including project management. You have to give division of responsibilities and duties among team members.] Sample WBS 1. Project Management 1.1. Work Breakdown Structure (WBS) 1.2. Roles & Responsibility Matrix 1.3. Change Control System 2. Reports / Documentation 2.1. Final Documentation Introduction 2.2. Literature / Markey Survey 2.3. Requirements Analysis 2.4. System Design 2.5. Implementation 2.6. Testing & Performance Evaluation 2.7. Conclusion & Outlook
  • 9. 2.8. End User Documentation 2.9. Application Administration Documentation 2.10. System Administrator Documentation 3. System 3.1. Development Environment 3.1.1. IDE 3.1.2. Version Control 3.1.3. Server 3.1.4. Database 3.2. Presentation Layer 3.2.1. Deliverable 1 3.2.2. Deliverable 2 3.2.3. . . . 3.3. Business Logic Layer 3.3.1. Deliverable 1 3.3.2. Deliverable 2 3.3.3. . . . 3.4. Data Management Layer 3.4.1. Deliverable 1 3.4.2. Deliverable 2 3.4.3. . . . 3.5. Physical Layer 3.5.1. Deliverable 1 3.5.2. Deliverable 2 3.5.3. . . . Roles & Responsibility Matrix: The purpose of roles & responsibility matrix is to identify who will do what.
  • 10. WBS # WBS Deliverable Activity # Activity to Complete the Deliverable Duration (# of Days) Responsible Team Member(s) & Role(s) 8.2. Gantt Chart [Gantt Chart consisting of Timeline with milestone. Specific items to include in this section are as follows: • Timeline with milestones: Gantt chart in Microsoft project 2013. The following are required elements of your Gantt chart: o Project duration is from the date your project is enrolled to the completion date: o Each milestone is to be labeled with a title. o Schedule all tasks not just “Design” or “Testing.” Break this schedule down to specific assignments. o Each task is to be labeled with a title and person or persons assigned to the task. o Subdivide larger items so that no task is longer than about one week o Link tasks which are dependent on the completion of a previous task.] 8.3. Empathy Map
  • 11. References [12 pt, Calibri, Justified] [Give references to the resources you have consulted in finalizing your project topic.]
  • 12. List of Faculty Proposed Changes Project Title Proposed Change Proposed By Supervisor’s Decision Name of Faculty Member(s) who proposed this change Approved/Disapproved and/or Comments Date: __________________ Supervisor’s Signature: ______________
  • 13. APPROVAL Project Supervisor Comments: ___________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ Name:______________________________ Date:_______________________________ Signature:__________________________ Project Manager Comments: ___________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ _____________________________________________________________________________ Date:_______________________________ Signature:__________________________