Total Cost of Ownership, AKA ,True Cost to Own

   General definition: Estimate of all direct and indirect costs
    associated with an asset or acquisition over its entire life
    cycle.

   Depreciable life (The number of years over which an asset
    will be depreciated).
   Economic life ( he number of years in which the acquisition
    returns more value to the owner than it costs to own, operate,
    and maintain).
   Service life ( The number of years the acquisition will actually
    be in service).
   Budgeting & planning.
   Asset life cycle management.
   Prioritizing capital acquisition proposals.
   Vendor selection.
   Lease vs. buy decisions.
   Identify "hidden" costs of ownership.
   Put the spotlight on potential cost problems
    before they become problems.
   Know the service provisioning
    cost(chargeback)
Total Cost of Ownership, what is it ? and why do we need to know more about it.
   Responding to growing dependence on IT, the UK Government's
    CCTA ( Central Computer & Telecom. Agency) in the 1980s
    recognized that without standard practices, government
    agencies and private sector contracts had started independently
    creating their own IT management practices.

   Information Technology Infrastructure Library ITIL was created
    and ITIL V1 was published 1989-1996 in 30 books.

   ITIL V2 was published 2007
   ITIL V3 was published 2010

   CCTA became OGC ( Office of Government Commerce) then
    became part of UK Cabinet.
   ISO20000 is the International ITIL compliance standard for any IT
    facility aiming at performance excellence.
   ITIL is a set of procedures to handle
    situations that any IT organization would
    come in contact with.

   Using a series of check lists, tasks and
    procedures, an IT organization can take what
    is available to it and implement it in such a
    way that ensures the company’s success.
   Service Desk/Service Request Management
   Incident Management
   Problem Management
   Change Management
   Release Management
   Configuration Management
   Service Level Management
   Capacity Management
   Continuity Management
   Availability Management
   AND …
   Financial Management
   ITIL Financial Management is about getting
    the job done within budget.
   Budgeting:
    ◦ Predicting how much money is needed to deliver
      and support IT services
   Accounting:
    ◦ Keeping track of where, when, how much and by
      whom the money is being spent.
   Charging:
    ◦ Optionally recover (some of) the money incurred.
   Initial hardware
   Initial software
   Implementation, including system downtime
   Management
   Research of vendors & contracts
   Service
   Support & training
   Administration
   Upgrades & related re-training
   Capital purchases
   Direct and indirect labor
   Subscriptions
   System integration
   Maintenance
Software              Staff               Infrastructure    Services          Other

Acquisition           DBA                 Server SW         Implementation    Cost of capital

Implementation        Sys. Admin.         Server OS         Data conversion   Third party content
                                                                              (clinical decision
                                                                              support)
Maintenance           LAN/WAN             Workstations      Interfaces        Downtime

Reporting             PC support          Data center       Education         Service disruption

Upgrades              Communication       H/W maintenance   Project mgmt.     Energy
                                                                              consumption
Third party content   Temporary           Internet          Upgrade support   Comm. Lines cost
(clinical decision    manpower
support)
BI Analytics          Hiring cost         Remote admin.     Upgrade re-
                                                            training
                      Employee churning   Server Maint.

                      Employee ramp-up    HW renewal

                                          Security
Real life example of actual
   operational savings.




             Source International Technology Group ITG
IT services
 company
Manufacturing company
Distribution company
Retail company
Real life example of actual
   operational savings.
$ in 1,000s
               Acquisition Operating Change   Total        % of
                 Costs      Costs     Costs                  TCO



 Software        274         82        138       494        2.9%

 Hardware        539         97         71        707       4.1%

 Personnel        55      8,873       5,952   14,879        86.2%

 NW & Comm       146        543         459     1,149       6.7%

 Facilities        0         15         15            29    0.2%

 Total          1,104     9,610       6,634    17,258        —

% of TCO        5.9%      55.7%      38.4%       —         100.0%
$ in 1,000s   Acquisition Operating Change   Total    % of
                Costs      Costs     Costs              TCO



 Software       444        121        220      785      5.5%

 Hardware       874        222        122     1,218     8.5%

 Personnel      188      5,699       3,925    9,812    68.8%

 NW & Comm      255      1,082        892     2,229    15.6%

 Facilities      60         46        106       212    1.5%

 Total         1,821     7,170      5,264    14,256     —

 % of TCO     12.8%      50.3%      36.9%       —     100.0%
$ in 1,000s   Acquisition   Operating   Change
                Costs        Costs       Costs




 Software     170           38          83

 Hardware     335           125         51

 Personnel    133           (3174)      (2027)

 NW & Comm    109           539         432

 Facilities   60            31          91
   IBM proposes to conduct a TCO workshop at
    no charge on KFSH.
   At the end, you will understand the costs of
    operating your mainframe or distributed
    platforms for business applications over a
    period of five years.
   Project preparation
    ◦ The IBM TCO team works with KFSH IBM account team to prepare for the
      on-site customer meeting, gathering information in advance to minimize
      time requirements.
   On-site Customer Meeting
    ◦ Gathering business information (business goals, growth strategies, current
      costs and pricing information.
    ◦ Gathering of technical information (details and costs of current IT
      infrastructure, applications, workloads, utilization, quality of service
      requirements, and approaches under consideration for improving the IT
      infrastructure.
   Report Preparation
    ◦ The report is prepared offsite by IBM (in approximately two weeks), during
      which time the customer is available for phone/email consultation and
      clarification.
   Report Presentation
    ◦ In a follow-up customer meeting, the IBM team will deliver the final report
      to include all inputs, assumptions and the financials, reflecting key
      operating costs for all alternatives discussed. The full analysis is made
      available to you.

Total Cost of Ownership, what is it ? and why do we need to know more about it.

More Related Content

PDF
The Application TCO Journey
PDF
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
PDF
Total cost of ownership
PPTX
Total cost of ownership1
PPTX
Software AG’s webMethods Integration Cloud: Integrate Cloud Apps with ease
PDF
Throughput accounting
PPT
Top 10 Procurement KPI\'s
PPTX
Introduction to supply chain management
The Application TCO Journey
Engineering & Construction 4.0 – A Digital pathway to a more profitable future
Total cost of ownership
Total cost of ownership1
Software AG’s webMethods Integration Cloud: Integrate Cloud Apps with ease
Throughput accounting
Top 10 Procurement KPI\'s
Introduction to supply chain management

What's hot (20)

PPTX
Scm ppt
PDF
"FinOps and its role in Arity / Allstate" - Mike Rosenberg at the Chicago AWS...
PDF
Cost terms, Concepts and classification-C1.ppt.pdf
PDF
Itil foundation 4 edition
PPTX
The role of technology in procurement
PDF
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
PPTX
How Gartner Helps Across the Entire IT Cost Optimization Life Cycle
PDF
ARCHIMATE Physical layer "My Little PanCake Factory"
PDF
Process architecture - Part II
PPT
Knowledge creation and knowledge architecture
PDF
So You Think You Need A Digital Strategy
PPS
OSS Service Assurance -Concept Presentation by Biju M Rr
PPTX
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
PPT
E Procurement
PPT
Standard Costing
PPT
Cost Driver
PDF
Enterprise Content Management
PDF
Cloud Migration Checklist | Microsoft Azure Migration
PPTX
Chapter 13 Total Cost of Ownership
Scm ppt
"FinOps and its role in Arity / Allstate" - Mike Rosenberg at the Chicago AWS...
Cost terms, Concepts and classification-C1.ppt.pdf
Itil foundation 4 edition
The role of technology in procurement
Purchasing, Procurement, Vendor, Contract and RFP Process Management with Sha...
How Gartner Helps Across the Entire IT Cost Optimization Life Cycle
ARCHIMATE Physical layer "My Little PanCake Factory"
Process architecture - Part II
Knowledge creation and knowledge architecture
So You Think You Need A Digital Strategy
OSS Service Assurance -Concept Presentation by Biju M Rr
MRO PROCUREMENT: 3 KEYS TO MANAGING THE COMPLEXITY
E Procurement
Standard Costing
Cost Driver
Enterprise Content Management
Cloud Migration Checklist | Microsoft Azure Migration
Chapter 13 Total Cost of Ownership
Ad

Viewers also liked (9)

PPTX
Falando de TCO na Nuvem AWS
PPT
• Technology Leadership, Planning and Implementation: Specific Strategies fo...
PDF
Ricardo total cost of ownership-economics of emerging fleet technologies
PPT
Total cost of ownership
PPT
Chap003 the purchasing function
PPTX
ERP Pre-Implementation TCO Total Cost of Ownership
PDF
Comparing the TCO of Desktops
PPT
Cost Reduction Strategies:Focus and Techniques
PDF
life cycle costing
Falando de TCO na Nuvem AWS
• Technology Leadership, Planning and Implementation: Specific Strategies fo...
Ricardo total cost of ownership-economics of emerging fleet technologies
Total cost of ownership
Chap003 the purchasing function
ERP Pre-Implementation TCO Total Cost of Ownership
Comparing the TCO of Desktops
Cost Reduction Strategies:Focus and Techniques
life cycle costing
Ad

Similar to Total Cost of Ownership, what is it ? and why do we need to know more about it. (20)

PPT
Internal service fund overview r3
PDF
Smarter Computing and Breakthrough IT Economics
PDF
Cost Analysis in IT - Educause10
PDF
Configuration Management
PPT
Relocation
PDF
Cost Analysis In IT - HES08
PDF
ServiceNow Knowledge11 IT Cost Management Session
PPTX
Iaitam 2011-itam final frontier
PDF
Microsoft India – Demonstrating Business Value Analyst Report
PPTX
Vfm v mware vdi tco and roi framework
PDF
Approach to improve effectiveness of Enterprise IT
PDF
Id105 fortify your ibm lotus notes and ibm lotus domino infrastructure agai...
PPTX
Cost effective azure
PDF
Case Study - HPs Own Data Centre Transformation
PPTX
Peter Clarke, CTO at Isle of Man Government - A dive into the clouds
PDF
Itam Consulting Group Aug 2009
PDF
Higher education IAM-seminar Turku 10.12.2009
PDF
Webinar: A Total Cost of Ownership Analysis for MongoDB
PDF
Day 3 p1 - itsm
PDF
Day 3 p1 - itsm
Internal service fund overview r3
Smarter Computing and Breakthrough IT Economics
Cost Analysis in IT - Educause10
Configuration Management
Relocation
Cost Analysis In IT - HES08
ServiceNow Knowledge11 IT Cost Management Session
Iaitam 2011-itam final frontier
Microsoft India – Demonstrating Business Value Analyst Report
Vfm v mware vdi tco and roi framework
Approach to improve effectiveness of Enterprise IT
Id105 fortify your ibm lotus notes and ibm lotus domino infrastructure agai...
Cost effective azure
Case Study - HPs Own Data Centre Transformation
Peter Clarke, CTO at Isle of Man Government - A dive into the clouds
Itam Consulting Group Aug 2009
Higher education IAM-seminar Turku 10.12.2009
Webinar: A Total Cost of Ownership Analysis for MongoDB
Day 3 p1 - itsm
Day 3 p1 - itsm

More from Ashraf Osman (20)

PDF
Fintech Revolution Summit.
PDF
CEQUENS white paper on Social perspective of Fintech world
PPTX
Hello 2020! Are you ready for your business plan
PDF
Can you manage sales numbers
PDF
Sales simulation flower of the nile
PDF
Egypt Air prospecting
PDF
المقال السادس دور الاقتصاد الوطني في التحول الرقمي ..احتفظوا بالأموال داخل اق...
PDF
المقال الخامس دور الاقتصاد الوطني في التحول الرقمي
PDF
المقال الرابع الاقتصاد الوطني و التحول الرقمي
PDF
المقال الثالث الاقتصاد الوطني و التحول الرقمي
PDF
المقال الثاني الاقتصاد الوطني و التحول الرقمي
PDF
مقال الاقتصاد الوطني و التحول الرقمي
PDF
مقال البيتكوين هل هي ثوره ماليه ام فقاعه مثل غيرها
PDF
الحوسبه السحابيه و السياسه
PDF
المقال الثاني نقص الايرادات وتدني أرباح شركات التكنولوجيا في مصر
PDF
المقال الاول نقص الايرادات وتدني أرباح شركات التكنولوجيا في مصر بعد الربيع ...
PDF
Article product planning, buyers
PDF
Article product planning, accounts
PDF
Why do we develop and launch new products
PDF
Cracking The Business Development Management Code (2-3 days)
Fintech Revolution Summit.
CEQUENS white paper on Social perspective of Fintech world
Hello 2020! Are you ready for your business plan
Can you manage sales numbers
Sales simulation flower of the nile
Egypt Air prospecting
المقال السادس دور الاقتصاد الوطني في التحول الرقمي ..احتفظوا بالأموال داخل اق...
المقال الخامس دور الاقتصاد الوطني في التحول الرقمي
المقال الرابع الاقتصاد الوطني و التحول الرقمي
المقال الثالث الاقتصاد الوطني و التحول الرقمي
المقال الثاني الاقتصاد الوطني و التحول الرقمي
مقال الاقتصاد الوطني و التحول الرقمي
مقال البيتكوين هل هي ثوره ماليه ام فقاعه مثل غيرها
الحوسبه السحابيه و السياسه
المقال الثاني نقص الايرادات وتدني أرباح شركات التكنولوجيا في مصر
المقال الاول نقص الايرادات وتدني أرباح شركات التكنولوجيا في مصر بعد الربيع ...
Article product planning, buyers
Article product planning, accounts
Why do we develop and launch new products
Cracking The Business Development Management Code (2-3 days)

Recently uploaded (20)

PDF
How to Get Funding for Your Trucking Business
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PPT
Chapter four Project-Preparation material
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Business model innovation report 2022.pdf
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
Power and position in leadershipDOC-20250808-WA0011..pdf
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
WRN_Investor_Presentation_August 2025.pdf
PDF
Deliverable file - Regulatory guideline analysis.pdf
PDF
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
How to Get Funding for Your Trucking Business
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
340036916-American-Literature-Literary-Period-Overview.ppt
Chapter four Project-Preparation material
Chapter 5_Foreign Exchange Market in .pdf
Business model innovation report 2022.pdf
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Ôn tập tiếng anh trong kinh doanh nâng cao
Belch_12e_PPT_Ch18_Accessible_university.pptx
Power and position in leadershipDOC-20250808-WA0011..pdf
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
ICG2025_ICG 6th steering committee 30-8-24.pptx
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
Euro SEO Services 1st 3 General Updates.docx
WRN_Investor_Presentation_August 2025.pdf
Deliverable file - Regulatory guideline analysis.pdf
SIMNET Inc – 2023’s Most Trusted IT Services & Solution Provider
unit 1 COST ACCOUNTING AND COST SHEET

Total Cost of Ownership, what is it ? and why do we need to know more about it.

  • 2. Total Cost of Ownership, AKA ,True Cost to Own  General definition: Estimate of all direct and indirect costs associated with an asset or acquisition over its entire life cycle.  Depreciable life (The number of years over which an asset will be depreciated).  Economic life ( he number of years in which the acquisition returns more value to the owner than it costs to own, operate, and maintain).  Service life ( The number of years the acquisition will actually be in service).
  • 3. Budgeting & planning.  Asset life cycle management.  Prioritizing capital acquisition proposals.  Vendor selection.  Lease vs. buy decisions.  Identify "hidden" costs of ownership.  Put the spotlight on potential cost problems before they become problems.  Know the service provisioning cost(chargeback)
  • 5. Responding to growing dependence on IT, the UK Government's CCTA ( Central Computer & Telecom. Agency) in the 1980s recognized that without standard practices, government agencies and private sector contracts had started independently creating their own IT management practices.  Information Technology Infrastructure Library ITIL was created and ITIL V1 was published 1989-1996 in 30 books.  ITIL V2 was published 2007  ITIL V3 was published 2010  CCTA became OGC ( Office of Government Commerce) then became part of UK Cabinet.  ISO20000 is the International ITIL compliance standard for any IT facility aiming at performance excellence.
  • 6. ITIL is a set of procedures to handle situations that any IT organization would come in contact with.  Using a series of check lists, tasks and procedures, an IT organization can take what is available to it and implement it in such a way that ensures the company’s success.
  • 7. Service Desk/Service Request Management  Incident Management  Problem Management  Change Management  Release Management  Configuration Management  Service Level Management  Capacity Management  Continuity Management  Availability Management  AND …
  • 8. Financial Management  ITIL Financial Management is about getting the job done within budget.  Budgeting: ◦ Predicting how much money is needed to deliver and support IT services  Accounting: ◦ Keeping track of where, when, how much and by whom the money is being spent.  Charging: ◦ Optionally recover (some of) the money incurred.
  • 9. Initial hardware  Initial software  Implementation, including system downtime  Management  Research of vendors & contracts  Service  Support & training  Administration  Upgrades & related re-training  Capital purchases  Direct and indirect labor  Subscriptions  System integration  Maintenance
  • 10. Software Staff Infrastructure Services Other Acquisition DBA Server SW Implementation Cost of capital Implementation Sys. Admin. Server OS Data conversion Third party content (clinical decision support) Maintenance LAN/WAN Workstations Interfaces Downtime Reporting PC support Data center Education Service disruption Upgrades Communication H/W maintenance Project mgmt. Energy consumption Third party content Temporary Internet Upgrade support Comm. Lines cost (clinical decision manpower support) BI Analytics Hiring cost Remote admin. Upgrade re- training Employee churning Server Maint. Employee ramp-up HW renewal Security
  • 11. Real life example of actual operational savings. Source International Technology Group ITG
  • 16. Real life example of actual operational savings.
  • 17. $ in 1,000s Acquisition Operating Change Total % of Costs Costs Costs TCO Software 274 82 138 494 2.9% Hardware 539 97 71 707 4.1% Personnel 55 8,873 5,952 14,879 86.2% NW & Comm 146 543 459 1,149 6.7% Facilities 0 15 15 29 0.2% Total 1,104 9,610 6,634 17,258 — % of TCO 5.9% 55.7% 38.4% — 100.0%
  • 18. $ in 1,000s Acquisition Operating Change Total % of Costs Costs Costs TCO Software 444 121 220 785 5.5% Hardware 874 222 122 1,218 8.5% Personnel 188 5,699 3,925 9,812 68.8% NW & Comm 255 1,082 892 2,229 15.6% Facilities 60 46 106 212 1.5% Total 1,821 7,170 5,264 14,256 — % of TCO 12.8% 50.3% 36.9% — 100.0%
  • 19. $ in 1,000s Acquisition Operating Change Costs Costs Costs Software 170 38 83 Hardware 335 125 51 Personnel 133 (3174) (2027) NW & Comm 109 539 432 Facilities 60 31 91
  • 20. IBM proposes to conduct a TCO workshop at no charge on KFSH.  At the end, you will understand the costs of operating your mainframe or distributed platforms for business applications over a period of five years.
  • 21. Project preparation ◦ The IBM TCO team works with KFSH IBM account team to prepare for the on-site customer meeting, gathering information in advance to minimize time requirements.  On-site Customer Meeting ◦ Gathering business information (business goals, growth strategies, current costs and pricing information. ◦ Gathering of technical information (details and costs of current IT infrastructure, applications, workloads, utilization, quality of service requirements, and approaches under consideration for improving the IT infrastructure.  Report Preparation ◦ The report is prepared offsite by IBM (in approximately two weeks), during which time the customer is available for phone/email consultation and clarification.  Report Presentation ◦ In a follow-up customer meeting, the IBM team will deliver the final report to include all inputs, assumptions and the financials, reflecting key operating costs for all alternatives discussed. The full analysis is made available to you. 