Report No.:           CBLT-TPI-00F-186-12623                       AJN :
    Client:                 COBALT INTERNATIONAL ENERGY / TOTAL                           P O:                         N/A
    Location:               ANGOLA LOGISTICS BASE                                         Date / Period
    Manufacturer/s:         SCHLUMBERGER/HALLIBURTON
                                                         Item Inspected
     Sl. No.     Item Identification No.                                 Description                                    Qty (Unit)

        1           PMP – EA - 761                          ELECTRICAL TRANSFER PUMP                                         1




    Inspection Carried Out:
                                                             Result of Inspection:               Accepted   Rejected         Hold
    Stage of Inspection:

        Before assembly.                                     Non Conformance Reports (NCR):

        During assembly.                                            HOLD : SPECIFIED ON PAGE 6
        During Testing.
        Final Inspection.
                                                             Verification:
        Packing.
                                                                    Approved procedures.
        Photographic survey.
                                                                    Approved Drawings.
    Kind of Inspections:
                                                                    Operator Competency.
        Witnessing tests.
                                                                    Calibration & Traceability.
        Final inspection.
                                                                    Quality control plan & Inspection test plan.
        Document review.
                                                                    Parts Traceability.
        Expediting & vendor assessment
                                                                    Vendor Documents.
        Goods receipt inspection
    Stamping:
        Yes.           No.
    Compatibility of mating/system equipment:
    Upper Connection Type:                      N/A                   Fish-neck length:                            N/A
    Lower Connection Type:                      N/A                   Tong Space:                                  N/A
    Standards/Specification/Customer documents :
    Please see standard list as annexed for detailed description.



3




               Page 1 of 16                                                                      RSG/QA-QC/TPI Rev.01
Report No.:          CBLT-TPI-00F-186-12623                    AJN :
Inspection Details:

         Document verification has been carried out prior to starting the job, this includes the following:

              a)   Schlumberger Flow test Procedure – Electrical Transfer Pump – PMP.
              b)   Pressure Safety Valve (PSV) Calibration Certificate.
              c)   Bourdon Pressure Gauge calibration certificate.
              d)   PMP Unit Certificate of Conformity.
              e)   Annual maintenance log and 5 yearly re-certification, including UT survey.
              f)   NDT, Test and Certification of lifting equipment and skid unit.

Flow test Preparation:-

A suction pipe string was assembled using 3” pipe, connected to the pump inlet using a 3” weco union.
The pipe was then connected to a pre-filled surge tank with volume indicator showing levels, the flow
Is controlled by a 3”, 300# ball valve.

A discharge pipe string was assembled using 3” pipe, connected to the discharge line using a 3” weco
Union. The flow is controlled by a 3”, 3 way ball valve fitted to the unit diverting to the PSV. Back
pressure is controlled by a 3” ball valve located on the discharge surge tank.

In order to function test the pump at maximum working pressure a back pressure was established by
Closing the inlet valve on the discharge surge tank. This is to test the PSV.

Working pressure is to be monitored using the calibrated Bourdon pressure gauge, this gauge is a
permanent fitting.

The following topics are covered in the procedure as per attached checklist:

              a)   Connections and Preparation
              b)   Check before start
              c)   Function test at low pressure
              d)   Function test at high pressure
              e)   Final unit inspection

The unit was operated at ZERO pressure for 3 minutes, and again at 20 bar for 3 minutes. Back pressure to be
Simulated in order to activate and test PSV.

RESULT

All aspects of the attached procedure have been strictly followed, and the unit is of good working order. The serial number
of the bourdon pressure gauge was not visible/marked. Schlumberger was advised that this would need to be replaced
with a calibrated unit to conform with Cobalt requirements. The gauge was changed out and tested at min/max working
pressure.




         Page 2 of 16                                                                 RSG/QA-QC/TPI Rev.01
Report No.:       CBLT-TPI-00F-186-12623             AJN :


                                    EQUIPMENT DATA AND SPECIFICATION




         MODEL            TYPE             PUMP      APPLICATION        CAPACITY      MAX WP
        PMP - EA       ELECTRICAL          SCREW      STANDARD         4000 BBL/D     300 PSI

          INLET          OUTLET            FLUID     SUPPLY VOLTS      GROSS WEIGHT    SUPPLY
                                                                                         KW
         FEMALE           MALE              OIL        400 @ 50Hz         1500 kg        33
                                                       460 @ 60Hz




        Page 3 of 16                                                   RSG/QA-QC/TPI Rev.01
Report No.:        CBLT-TPI-00F-186-12623                    AJN :
 Annex 1 - Standards/Specifications/Customer documents :
                           Title                                     Reference No.                   Revision
 Operator Quality Plan                                                                              th
                                                                      A21-10-018                  24 Feb. 2012

 Metallic products -Types of inspection documents                    EN 10204:2004
 General principles for the selection of cracking-
                                                           NACE MRO175 / ISO 15156 Part 1
 resistant materials
 European Pressure Equipment Directive                                 97/23/EC

 ATEX Directive – Certified for explosive areas – Zone 2                94/9/EC

 British Standard – Offshore Cargo Carrying Units                       BS 7072                          1989
 ASME- American Society of Mechanical Engineers:
                                                                         B31.3
 Process Piping Design.
 Testing of Bourdon Pressure Gauges                                    EN 837 - 1

 Pressure Gauge Calibration                                            ISO 17025
 ASME – Performance Test Code – Pressure Relief
                                                                        PTC25                            1994
 Devices
 ASME – Performance Test Code –Pressure
                                                                        PTC19.2                          1998
 measurement
 ASME – Performance Test Code –Displacement Pumps                       PTC7.1                           1969
 ASME- American Society of Mechanical Engineers:
                                                                         B31.9
 Working pressure and temperature limits
 ASME- American Society of Mechanical Engineers: Pipe
                                                                         B16.5
 flanges and flange fittings
 MSS – Manufacturers Standardization Society –
 Standard marking systems for valves, fittings, flanges                  SP25
 and unions
 API – American Petroleum Society – Pipeline valve
                                                                        API 6D
 specification.
 API - American Petroleum Society –Pressure relief
                                                               API.RP.520 / API.RP.521
 Systems
 Surface Testing – Pressure testing manual                             3045666

 Schlumberger – 4000 BOPD PMP Maintenance manual




         Page 4 of 16                                                                RSG/QA-QC/TPI Rev.01
Report No.:         CBLT-TPI-00F-186-12623                    AJN :


            DOCUMENT AUDIT CHECK LIST                                                            INTL

                                   ELECTRICAL TRANSFER PUMP – PMP-EA-761
 Vendor:         VALE TONG                Signed:                                Position: MAINTENANCE MANAGER

 Auditor:        RYAN GILLESPIE           Signed:                                Department: RUSSEL SMITH TPI

 Item No.                  Title                                Location                            Compliance
    01           Procurement Records                             QA File                                YES

    02           Maintenance Records                             QA File                                YES

    03           Replacement Records                  QA File (See Correction note 1)                   YES

                    Bourdon Gauge
    04                                    QA File / attached herein (See Correction note 1)             YES
                      Calibration

    05              Annual Survey                                QA File                                YES

    06           5 Yearly Certification                          QA File                                YES

    07              As Built P & ID                              QA File                                YES

    08          SKID Test Certification                 QA File / Attached herein                          NO

    09             SKID MPI Report                      QA File / Attached herein                          NO

    10            LOLER SI2307 - LGI                    QA File / Attached herein                          NO

    11              PRV Calibration                     QA File / Attached herein                       YES

                 Pressure Equipment
    12                                                  QA File / Attached herein                       YES
                   Directive - DOC

                  Safety of Machinery
    13                                                  QA File / Attached herein                       YES
                    Directive - DOC

    14         Quality Conformity -DOC                  QA File / Attached herein                       YES

                   PMP 4000 bpd
    15                                              Surface Testing Maintenance Office                  YES
                 Maintenance Manual

                   Surface Testing –
    16                                              Surface Testing Maintenance Office                  YES
               Pressure Testing Manual

                  Pressure Recorder
    17                                                  QA File / Attached herein                       YES
                     Calibration


            Page 5 of 16                                                            RSG/QA-QC/TPI Rev.01
Report No.:         CBLT-TPI-00F-186-12623                    AJN :

   CORRECTIVE ACTION RECORD / REQUEST                                                                   INTL

                               ELECTRICAL TRANSFER PUMP – PMP-EA-761
 Vendor:         VALENTINE TONG           Signed:                                    Position: MAINTENANCE MANAGER

 Auditor:        RYAN GILLESPIE           Signed:                                    Department: RUSSEL SMITH TPI

        NON CONFORMANCE / ACTION REQUESTED                        DATE REQUESTED / DATE RECTIFIED / CLOSED OUT

   Bourdon pressure
   gauge – no                     Replace with a traceable
   identification number
 1                                Calibrated gauge.                   22 June 2012       22 June 2012
   or calibration
   certificate. No auditable      Record in the QA file
   test/inspection history




                                                      Non-Conformance:
     1) Skid unit has not proof load test certification and is out of compliance

 Recommendation – The skid unit is to be proof load tested by a third party as per BS7072 – offshore Cargo
 Carrying Units

     2) No NDT reports available, it is required that lifting points on BS7072 units undergo an MPI
        examination within a 24 month period.

 Recommendation – The lifting points of BS7072 units are to undergo an MPI examination every 12 months by
 a third party.

     3) SI2307 certification is out of compliance. The skid unit is to be certified every 6 months by a third
        party.

 Recommendation – The skid unit is to undergo a visual examination as per SI2307:LOLER1998

     4) SI2307 certification is out of compliance. The lifting accessories i.e the lifting set, inclusive of 4 leg
        sling and 4 x shackles are to be certified every 6 months by a third party

 Recommendation – The lifting accessories inclusive of quad sling and shackles are to undergo a visual
 examination as per SI2307:LOLER1998



NOTE - All of the above should be carried out at the same time by a specialist lifting
equipment inspection company



            Page 6 of 16                                                             RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 7 of 16                             RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 8 of 16                             RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 9 of 16                             RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 10 of 16                            RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 11 of 16                            RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 12 of 16                            RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 13 of 16                            RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 14 of 16                            RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 15 of 16                            RSG/QA-QC/TPI Rev.01
Report No.:     CBLT-TPI-00F-186-12623   AJN :




        Page 16 of 16                            RSG/QA-QC/TPI Rev.01

More Related Content

PPT
Lesson 18_RP-571_Damage_New2.ppt
PDF
Qc piping guide
PDF
Surge Control for Parallel Centrifugal Compressor Operations
PDF
Piping Material Specification
PDF
Quality assurance plan
PDF
Demzy's Presentation on HDD
PDF
Inspection of-pressure-vessels
PDF
Beer vector mechanics for engineers statics 10th solutions
Lesson 18_RP-571_Damage_New2.ppt
Qc piping guide
Surge Control for Parallel Centrifugal Compressor Operations
Piping Material Specification
Quality assurance plan
Demzy's Presentation on HDD
Inspection of-pressure-vessels
Beer vector mechanics for engineers statics 10th solutions

What's hot (20)

PDF
Piping sample report
DOC
Api 570 01_api_570
PDF
RT Acceptance criteria
PDF
Aramco inspection handbook
DOCX
495265750-Hydro-Test-Procedure.docx
PPTX
asme sec ix w
PDF
Asme viii Div. 1 presentation rev.0
PDF
ASME SEC IX PPT.pdf
PDF
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
PPTX
Flange management presentation
PDF
Saudi Aramco Inspection Procedure (SAIP)
PPT
DOC
Api 650 & 653 questions closed book with answers
PDF
Api 570 course material
PDF
How to Qualify a Welding Procedure
DOC
QC WELDING INSPECTOR
PPT
Hydrotest
PPT
Asme sec ix overview
PPT
criteria of weld defects
Piping sample report
Api 570 01_api_570
RT Acceptance criteria
Aramco inspection handbook
495265750-Hydro-Test-Procedure.docx
asme sec ix w
Asme viii Div. 1 presentation rev.0
ASME SEC IX PPT.pdf
Inspection & Test Plan - Electrical - Telecommunications & Security Systems -...
Flange management presentation
Saudi Aramco Inspection Procedure (SAIP)
Api 650 & 653 questions closed book with answers
Api 570 course material
How to Qualify a Welding Procedure
QC WELDING INSPECTOR
Hydrotest
Asme sec ix overview
criteria of weld defects
Ad

Similar to TPI - Example Report. (20)

PDF
Aproved QCP.pdf
PDF
L&T Valves - Role of NDT in Valve Industries
PPTX
Control-Plan-Training with Example for .pptx
PPTX
Control-Plan-Training.pptx for the Automotive standard AIAG
PPTX
NONG YAO PROJECT SUBSEA VALVE Rev 0
PDF
PDF
292751693 eddy-current-rft-procedure
PPTX
What , how ,codes of inspection
PPT
Inspection-Repair-Alteration-Rerating.ppt
PDF
Qaulity Assurance Plan for RVDF System.pdf
PDF
THOMAS BUS SOP
PDF
Inspector ,ElectroMechanical engineer resume rev.01
PPT
35 Insp, Ndt, Stat Reqmts Fope
PDF
Fat procedure for lv switchboards
PDF
Txmer quality plan 2
PPTX
Qualification of gc equipment by manoj kumar
PDF
The MVAC system equipment installation approval
PPTX
Qualification of Analytical Equipments
DOCX
Hydrotest REPORT FOR 4'' 158m Line.
PPTX
G.c power point by royal debnath
Aproved QCP.pdf
L&T Valves - Role of NDT in Valve Industries
Control-Plan-Training with Example for .pptx
Control-Plan-Training.pptx for the Automotive standard AIAG
NONG YAO PROJECT SUBSEA VALVE Rev 0
292751693 eddy-current-rft-procedure
What , how ,codes of inspection
Inspection-Repair-Alteration-Rerating.ppt
Qaulity Assurance Plan for RVDF System.pdf
THOMAS BUS SOP
Inspector ,ElectroMechanical engineer resume rev.01
35 Insp, Ndt, Stat Reqmts Fope
Fat procedure for lv switchboards
Txmer quality plan 2
Qualification of gc equipment by manoj kumar
The MVAC system equipment installation approval
Qualification of Analytical Equipments
Hydrotest REPORT FOR 4'' 158m Line.
G.c power point by royal debnath
Ad

Recently uploaded (20)

PPTX
Amazon (Business Studies) management studies
PPTX
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
PPTX
Principles of Marketing, Industrial, Consumers,
PDF
A Brief Introduction About Julia Allison
PDF
Nidhal Samdaie CV - International Business Consultant
PPTX
HR Introduction Slide (1).pptx on hr intro
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Reconciliation AND MEMORANDUM RECONCILATION
PPTX
Lecture (1)-Introduction.pptx business communication
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PDF
Types of control:Qualitative vs Quantitative
PPTX
2025 Product Deck V1.0.pptxCATALOGTCLCIA
PDF
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Roadmap Map-digital Banking feature MB,IB,AB
Amazon (Business Studies) management studies
svnfcksanfskjcsnvvjknsnvsdscnsncxasxa saccacxsax
Principles of Marketing, Industrial, Consumers,
A Brief Introduction About Julia Allison
Nidhal Samdaie CV - International Business Consultant
HR Introduction Slide (1).pptx on hr intro
MSPs in 10 Words - Created by US MSP Network
Reconciliation AND MEMORANDUM RECONCILATION
Lecture (1)-Introduction.pptx business communication
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Types of control:Qualitative vs Quantitative
2025 Product Deck V1.0.pptxCATALOGTCLCIA
Outsourced Audit & Assurance in USA Why Globus Finanza is Your Trusted Choice
Chapter 5_Foreign Exchange Market in .pdf
Roadmap Map-digital Banking feature MB,IB,AB

TPI - Example Report.

  • 1. Report No.: CBLT-TPI-00F-186-12623 AJN : Client: COBALT INTERNATIONAL ENERGY / TOTAL P O: N/A Location: ANGOLA LOGISTICS BASE Date / Period Manufacturer/s: SCHLUMBERGER/HALLIBURTON Item Inspected Sl. No. Item Identification No. Description Qty (Unit) 1 PMP – EA - 761 ELECTRICAL TRANSFER PUMP 1 Inspection Carried Out: Result of Inspection: Accepted Rejected Hold Stage of Inspection: Before assembly. Non Conformance Reports (NCR): During assembly. HOLD : SPECIFIED ON PAGE 6 During Testing. Final Inspection. Verification: Packing. Approved procedures. Photographic survey. Approved Drawings. Kind of Inspections: Operator Competency. Witnessing tests. Calibration & Traceability. Final inspection. Quality control plan & Inspection test plan. Document review. Parts Traceability. Expediting & vendor assessment Vendor Documents. Goods receipt inspection Stamping: Yes. No. Compatibility of mating/system equipment: Upper Connection Type: N/A Fish-neck length: N/A Lower Connection Type: N/A Tong Space: N/A Standards/Specification/Customer documents : Please see standard list as annexed for detailed description. 3 Page 1 of 16 RSG/QA-QC/TPI Rev.01
  • 2. Report No.: CBLT-TPI-00F-186-12623 AJN : Inspection Details: Document verification has been carried out prior to starting the job, this includes the following: a) Schlumberger Flow test Procedure – Electrical Transfer Pump – PMP. b) Pressure Safety Valve (PSV) Calibration Certificate. c) Bourdon Pressure Gauge calibration certificate. d) PMP Unit Certificate of Conformity. e) Annual maintenance log and 5 yearly re-certification, including UT survey. f) NDT, Test and Certification of lifting equipment and skid unit. Flow test Preparation:- A suction pipe string was assembled using 3” pipe, connected to the pump inlet using a 3” weco union. The pipe was then connected to a pre-filled surge tank with volume indicator showing levels, the flow Is controlled by a 3”, 300# ball valve. A discharge pipe string was assembled using 3” pipe, connected to the discharge line using a 3” weco Union. The flow is controlled by a 3”, 3 way ball valve fitted to the unit diverting to the PSV. Back pressure is controlled by a 3” ball valve located on the discharge surge tank. In order to function test the pump at maximum working pressure a back pressure was established by Closing the inlet valve on the discharge surge tank. This is to test the PSV. Working pressure is to be monitored using the calibrated Bourdon pressure gauge, this gauge is a permanent fitting. The following topics are covered in the procedure as per attached checklist: a) Connections and Preparation b) Check before start c) Function test at low pressure d) Function test at high pressure e) Final unit inspection The unit was operated at ZERO pressure for 3 minutes, and again at 20 bar for 3 minutes. Back pressure to be Simulated in order to activate and test PSV. RESULT All aspects of the attached procedure have been strictly followed, and the unit is of good working order. The serial number of the bourdon pressure gauge was not visible/marked. Schlumberger was advised that this would need to be replaced with a calibrated unit to conform with Cobalt requirements. The gauge was changed out and tested at min/max working pressure. Page 2 of 16 RSG/QA-QC/TPI Rev.01
  • 3. Report No.: CBLT-TPI-00F-186-12623 AJN : EQUIPMENT DATA AND SPECIFICATION MODEL TYPE PUMP APPLICATION CAPACITY MAX WP PMP - EA ELECTRICAL SCREW STANDARD 4000 BBL/D 300 PSI INLET OUTLET FLUID SUPPLY VOLTS GROSS WEIGHT SUPPLY KW FEMALE MALE OIL 400 @ 50Hz 1500 kg 33 460 @ 60Hz Page 3 of 16 RSG/QA-QC/TPI Rev.01
  • 4. Report No.: CBLT-TPI-00F-186-12623 AJN : Annex 1 - Standards/Specifications/Customer documents : Title Reference No. Revision Operator Quality Plan th A21-10-018 24 Feb. 2012 Metallic products -Types of inspection documents EN 10204:2004 General principles for the selection of cracking- NACE MRO175 / ISO 15156 Part 1 resistant materials European Pressure Equipment Directive 97/23/EC ATEX Directive – Certified for explosive areas – Zone 2 94/9/EC British Standard – Offshore Cargo Carrying Units BS 7072 1989 ASME- American Society of Mechanical Engineers: B31.3 Process Piping Design. Testing of Bourdon Pressure Gauges EN 837 - 1 Pressure Gauge Calibration ISO 17025 ASME – Performance Test Code – Pressure Relief PTC25 1994 Devices ASME – Performance Test Code –Pressure PTC19.2 1998 measurement ASME – Performance Test Code –Displacement Pumps PTC7.1 1969 ASME- American Society of Mechanical Engineers: B31.9 Working pressure and temperature limits ASME- American Society of Mechanical Engineers: Pipe B16.5 flanges and flange fittings MSS – Manufacturers Standardization Society – Standard marking systems for valves, fittings, flanges SP25 and unions API – American Petroleum Society – Pipeline valve API 6D specification. API - American Petroleum Society –Pressure relief API.RP.520 / API.RP.521 Systems Surface Testing – Pressure testing manual 3045666 Schlumberger – 4000 BOPD PMP Maintenance manual Page 4 of 16 RSG/QA-QC/TPI Rev.01
  • 5. Report No.: CBLT-TPI-00F-186-12623 AJN : DOCUMENT AUDIT CHECK LIST INTL ELECTRICAL TRANSFER PUMP – PMP-EA-761 Vendor: VALE TONG Signed: Position: MAINTENANCE MANAGER Auditor: RYAN GILLESPIE Signed: Department: RUSSEL SMITH TPI Item No. Title Location Compliance 01 Procurement Records QA File YES 02 Maintenance Records QA File YES 03 Replacement Records QA File (See Correction note 1) YES Bourdon Gauge 04 QA File / attached herein (See Correction note 1) YES Calibration 05 Annual Survey QA File YES 06 5 Yearly Certification QA File YES 07 As Built P & ID QA File YES 08 SKID Test Certification QA File / Attached herein NO 09 SKID MPI Report QA File / Attached herein NO 10 LOLER SI2307 - LGI QA File / Attached herein NO 11 PRV Calibration QA File / Attached herein YES Pressure Equipment 12 QA File / Attached herein YES Directive - DOC Safety of Machinery 13 QA File / Attached herein YES Directive - DOC 14 Quality Conformity -DOC QA File / Attached herein YES PMP 4000 bpd 15 Surface Testing Maintenance Office YES Maintenance Manual Surface Testing – 16 Surface Testing Maintenance Office YES Pressure Testing Manual Pressure Recorder 17 QA File / Attached herein YES Calibration Page 5 of 16 RSG/QA-QC/TPI Rev.01
  • 6. Report No.: CBLT-TPI-00F-186-12623 AJN : CORRECTIVE ACTION RECORD / REQUEST INTL ELECTRICAL TRANSFER PUMP – PMP-EA-761 Vendor: VALENTINE TONG Signed: Position: MAINTENANCE MANAGER Auditor: RYAN GILLESPIE Signed: Department: RUSSEL SMITH TPI NON CONFORMANCE / ACTION REQUESTED DATE REQUESTED / DATE RECTIFIED / CLOSED OUT Bourdon pressure gauge – no Replace with a traceable identification number 1 Calibrated gauge. 22 June 2012 22 June 2012 or calibration certificate. No auditable Record in the QA file test/inspection history Non-Conformance: 1) Skid unit has not proof load test certification and is out of compliance Recommendation – The skid unit is to be proof load tested by a third party as per BS7072 – offshore Cargo Carrying Units 2) No NDT reports available, it is required that lifting points on BS7072 units undergo an MPI examination within a 24 month period. Recommendation – The lifting points of BS7072 units are to undergo an MPI examination every 12 months by a third party. 3) SI2307 certification is out of compliance. The skid unit is to be certified every 6 months by a third party. Recommendation – The skid unit is to undergo a visual examination as per SI2307:LOLER1998 4) SI2307 certification is out of compliance. The lifting accessories i.e the lifting set, inclusive of 4 leg sling and 4 x shackles are to be certified every 6 months by a third party Recommendation – The lifting accessories inclusive of quad sling and shackles are to undergo a visual examination as per SI2307:LOLER1998 NOTE - All of the above should be carried out at the same time by a specialist lifting equipment inspection company Page 6 of 16 RSG/QA-QC/TPI Rev.01
  • 7. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 7 of 16 RSG/QA-QC/TPI Rev.01
  • 8. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 8 of 16 RSG/QA-QC/TPI Rev.01
  • 9. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 9 of 16 RSG/QA-QC/TPI Rev.01
  • 10. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 10 of 16 RSG/QA-QC/TPI Rev.01
  • 11. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 11 of 16 RSG/QA-QC/TPI Rev.01
  • 12. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 12 of 16 RSG/QA-QC/TPI Rev.01
  • 13. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 13 of 16 RSG/QA-QC/TPI Rev.01
  • 14. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 14 of 16 RSG/QA-QC/TPI Rev.01
  • 15. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 15 of 16 RSG/QA-QC/TPI Rev.01
  • 16. Report No.: CBLT-TPI-00F-186-12623 AJN : Page 16 of 16 RSG/QA-QC/TPI Rev.01