SlideShare a Scribd company logo
This document is part of a series that
 explain the newly released PMBOK 5th
 edition. These documents provide simple
 explanation and summary of the book.
 However they do not replace the necessity
 of reading the book.




Project
Management
Processes

   Based on PMBOK® Guide 5th Edition


Amr Miqdadi, PMP
info@pmlead.net

Project Life Cycle
  A process is a set of interrelated actions and activities performed to
   achieve a pre-specified product, result, or service
  Each process is characterized by its inputs, the tools and techniques that
   can be applied, and the resulting outputs
  In order for a project to be successful, the project team must:
      o Select appropriate processes required to meet the project objectives;
      o Use a defined approach that can be adopted to meet requirements;
      o Comply with requirements to meet stakeholder needs and
        expectations;
      o Establish and maintain appropriate communication & engagement
        with stockholders;
      o Balance the competing constraints.
 The project processes are performed by the project team and generally fall
   into one of two major categories:
     o Project management processes ensure the effective flow of the
        project throughout its existence.
     o Product-oriented processes specify and create the project’s product.

Process Groups
  Initiating process group: recognizing a project or phase should begin
   (authorizing the project or phase)
  Planning process group: devising and maintaining a workable plan
  Executing process group: coordinating resources to execute the plan
  Monitoring & Controlling process group: ensuring project objectives are
   met; monitoring, correcting and measuring progress
  Closing process group: formalized acceptance
 Common Project Management Processes Interactions:
    o Monitoring & Controlling Process Group interacts with the other
      Process Groups
    o Project Management Process Groups are linked by the outputs that
      are produced
    o The Process groups are overlapping activities that occur throughout
      the project
    o The output of one process generally becomes an input to another
      process or is a deliverable of the project, subproject or phase
    o Deliverables of subproject or project level may be called incremental
      deliverables
    o The Planning Process Group provides the Executing Process Group
      with project management plan and project documents
    o Project management plan and project documents always revisited and
      updated
o If the project is divided into phases, the process groups interact with
  each phase
o The Process Groups are not Project Life Cycle Phases
Initiating Process Group

    Defines and authorizes the project.
    Are often done external to the project’s scope of control.
    Facilitate formal authorization to start a new project.
    Project manager assigned
    Funding and approval happens external to project boundaries
    Many large or complex projects are divided into phases, and repeating it
     for each subsequent phases.


                            Initiating Process Group

                              Develop Project Charter

                               Identify Stakeholders
Planning Process Group
  Defines and refines the objectives, and plan the course of action required
   to attain the objective and scope that the project was undertaken to
   address.
  Develops project management plan and also refines project scope, project
   cost and schedule.
  It is updated and refined throughout execution process group by rolling
   wave planning.
  All necessary stakeholders are involved in this process.
Planning Process Group
               Develop Project Management Plan


Plan Scope Management, Collect Requirments, Define Scope, Create
                             WBS


Plan Schedula Management, Define Activities, Sequance Activities,
 Estimate Activity Resources, Estimate Activty Durations, Develop
                            Schedule


    Plan Cost Management, Estimate Costs, Determine Budget

                    Plan Quality Management

               Plan Human Resource Management

               Plan Communications Management

 Plan Risk Management, Identify Risks, Perform Qualititative Risk
                          Analysis,
     Perform Quantitative Risk Analysis, Plan Risk Responses

                 Plan Procurment Management

                 Plan Stakeholder Management
Execution Process Group


  Majority of the project budget will be spent in performing Executing
   Process Group.
  Integrates people and other resources to carry out the project
   management plan.
  During the project execution, results may require planning updates
   and rebaselining.
Execution Process Group

               Direct and Manage Project Work

                  Perform Quality Assurance


Acquire project team, Develop Project team, Manage Project team

                   Manage Communications


                     Conduct Procurments


               Manage Stakeholders Engagement
Monitoring & Controlling Process Group
  The main benefit of M&E Process Groups is that the project
   performance is measured and analyzed at regular intervals.
  Monitoring the ongoing project activities against the project
   management plan and the project performance measurement
   baseline
  Influencing the factors that could circumvent change control or
   configuration management so only approved changes are
   implemented.
  Controlling changes and recommending corrective or preventing
   action in anticipation of possible problems.
  M&E Process Group not only monitors and controls the work being
   done within a Process Group, but also monitors and controls the
   entire project effort.
Monitoring & Controlling Process Group

Monitor & Control Project Work, Perform Integrated Change Control

                  Validate Scope, Control Scope

                        Control Schedule


                          Control Costs

                         Control Quality

                    Control Communications

               Plan Communications Management

                          Control Risks

                      Control Procurments

                Control Stakeholders Engagement
Closing Process Group
  Formalizes acceptance of the project or phase deliverable.
  Obtain acceptance by the customer or sponsor to formally close the
   project or the phase
  Conduct post-project or phase-end review
  Record impacts of tailoring to any process
  Document lessons learned
  Apply appropriate updates to organizational process assets.
  Achieve all relevant project documents in the PMIS to be used as
   historical data
  Close out all procurement activities
  Perform team members’ assessments
  Release project resources
                               Closing Process Group
                                  Close Project or Phase
                                    Close Procurment
Project Information
 The project data are continuously collected and analyzed during the
 dynamic context of the project execution. The project team should use
 appropriate terminologies. Such as:
  Work performance data: the row observations and measurements
   identified during activities performed to carry out the project work.
   (Ex: reported present of work physically completed, quality and
   technical performance measures, start and finish date of scheduled
   activities, number of defects, actual cost, actual duration, etc..)
  Work performance information: the performance data collected from
   various controlling processes, analyzed in context and integrated
   based on relationships across areas.(ex: status of deliverables,
   implementation status for change requests, and furcated estimates to
   complete).
  Work performance reports: the physical or electronic representation
   of work performance information is compiled in project documents,
   intended to raise issues or generate decisions (ex: status reports,
   memos, justifications, information notes, etc…)
You need to understand the terms and the logic relationships between the inputs, outputs and tools& techniques.
Memorizing them is not enough and will lead you nowhere.

Refer to the PMBoK 5h Edition for more details. &
Please do not hesitate to contact me anytime if you have any questions, comments, and feedbacks.


Success is yours,

Prepared By: Amr Miqdadi, PMP
info@pmlead.net
http://www.pmlead.net




                      PMI®, PMP®, CAPM® and PMBOK® Guide are trademarks of the Project Management Institute, Inc.
PMI® has not endorsed and did not participate in the development of this product.

More Related Content

PDF
Undestand PMBok 5th, Section 4
PDF
Undestand PMBok 5th, Section 1&2
PPTX
Lecture 05:Advanced Project Management PM Processes and Framework
PPTX
1.3 project management process groups & knowledge areas 1
PDF
PMP PMBOK 6th
PDF
Pmp Exam Prep PDF-1
PPT
PMI Project Management Framework
PPTX
Project Management Professional PMI-PMP Based on PMBOK 6th Edition
Undestand PMBok 5th, Section 4
Undestand PMBok 5th, Section 1&2
Lecture 05:Advanced Project Management PM Processes and Framework
1.3 project management process groups & knowledge areas 1
PMP PMBOK 6th
Pmp Exam Prep PDF-1
PMI Project Management Framework
Project Management Professional PMI-PMP Based on PMBOK 6th Edition

What's hot (19)

PDF
PMP Lecture 3: Project Management Processes
PPTX
Online PMP Prep Material for PMP Exam - Project management process groups
PDF
PMP PMBOK5 project management processes
PPTX
7.0 Project Cost Management Overview
PPTX
Project Management Framework
PDF
1. project integration management
PPTX
Project Management
PPTX
11.7 Monitor Risks
PPT
Chap04 project integration management
PDF
Project Integration Management
PDF
The Project Management Plan in 20 steps
PPTX
Project Manager Interview Questions And Answers | PMP Certification Training ...
PDF
Pmp in summary
PPTX
Project Management Framework
PPTX
Different project management methodologies
PDF
PMP Lecture 1: Introduction to Project Management
PPTX
PMP Prep 3 - Project Integration Management
PPT
Project management professional (pmi) study guide
PMP Lecture 3: Project Management Processes
Online PMP Prep Material for PMP Exam - Project management process groups
PMP PMBOK5 project management processes
7.0 Project Cost Management Overview
Project Management Framework
1. project integration management
Project Management
11.7 Monitor Risks
Chap04 project integration management
Project Integration Management
The Project Management Plan in 20 steps
Project Manager Interview Questions And Answers | PMP Certification Training ...
Pmp in summary
Project Management Framework
Different project management methodologies
PMP Lecture 1: Introduction to Project Management
PMP Prep 3 - Project Integration Management
Project management professional (pmi) study guide
Ad

Viewers also liked (17)

PDF
Understand PMBoK 5th edition
PDF
PMP Knowledge Areas Summary
PPT
Project Management PPT
PPSX
Project management
PPTX
Integration Management Presentation
PPTX
Project Management: Initiating Process Group - Lesson 1
PDF
Create your first_website_now
PDF
Code of Ethics and Professional Conduct
PDF
Understand PMBoK 4th
PDF
Time management
PDF
PMP Exam Prep-ITTOs and KP
PPTX
Project risk management
PDF
Step by step guide on project risk management
PDF
Mapping PMBOK® to Agile
PDF
Project Management Summary 2012
PPTX
Mapping GSD and PMBOK Guide
PDF
PMBOK 5th Edition Project Management Processes and Knowledge Areas
Understand PMBoK 5th edition
PMP Knowledge Areas Summary
Project Management PPT
Project management
Integration Management Presentation
Project Management: Initiating Process Group - Lesson 1
Create your first_website_now
Code of Ethics and Professional Conduct
Understand PMBoK 4th
Time management
PMP Exam Prep-ITTOs and KP
Project risk management
Step by step guide on project risk management
Mapping PMBOK® to Agile
Project Management Summary 2012
Mapping GSD and PMBOK Guide
PMBOK 5th Edition Project Management Processes and Knowledge Areas
Ad

Similar to Undestand PMBok 5th, Section 3 (20)

PPTX
Project Management Process and Its Phases
PPTX
Project Management Life Cycle
PPTX
2) PMT & PIM.pptx
PPT
Project Management V1
PPTX
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
PPT
Project managemenet knowledge areas
PPTX
PMBOK(Project Management Body of Knowledge)
PDF
PPTX
Project management professional
DOCX
life cycle of project team
DOCX
project Management(simpleexplanation).docx
ODP
ProjectManagementforNGOs
PPTX
PMP Training - 04 project integration management
PPTX
Chapter 3 PROJECT MANAGEMENT PROCESSES - StudentsCopy.pptx
PPTX
PPT1-PROJECT-_-Project-Management.pptx
PPT
Introduction To Project Management
PPTX
Project Management Processes
PPTX
Project Management basics PMBOK 6 (1).pptx
PPTX
2.1 integration management
PPT
Introduction to-project-management
Project Management Process and Its Phases
Project Management Life Cycle
2) PMT & PIM.pptx
Project Management V1
Project Management Cycle and MS Project 2013 By Subodh Kumar PMP
Project managemenet knowledge areas
PMBOK(Project Management Body of Knowledge)
Project management professional
life cycle of project team
project Management(simpleexplanation).docx
ProjectManagementforNGOs
PMP Training - 04 project integration management
Chapter 3 PROJECT MANAGEMENT PROCESSES - StudentsCopy.pptx
PPT1-PROJECT-_-Project-Management.pptx
Introduction To Project Management
Project Management Processes
Project Management basics PMBOK 6 (1).pptx
2.1 integration management
Introduction to-project-management

More from Amr Miqdadi (8)

PDF
PMBOK GUIDE 7th Summary
PDF
PMBOK 6th edition Guide Summary
PDF
Understand PMBOK 6TH GUIDE
PDF
PMBok 4th Processes Summary Sheet
PDF
Pmp exam prep Pdf- 2
PDF
PMP Exam Formulas
PDF
Master MSProject 2010
PPSX
Pmp flash cards
PMBOK GUIDE 7th Summary
PMBOK 6th edition Guide Summary
Understand PMBOK 6TH GUIDE
PMBok 4th Processes Summary Sheet
Pmp exam prep Pdf- 2
PMP Exam Formulas
Master MSProject 2010
Pmp flash cards

Recently uploaded (20)

PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PPTX
Final Presentation General Medicine 03-08-2024.pptx
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
PDF
Insiders guide to clinical Medicine.pdf
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
PDF
RMMM.pdf make it easy to upload and study
PPTX
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
Classroom Observation Tools for Teachers
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PPTX
Renaissance Architecture: A Journey from Faith to Humanism
PDF
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
PDF
Business Ethics Teaching Materials for college
PDF
Basic Mud Logging Guide for educational purpose
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
FourierSeries-QuestionsWithAnswers(Part-A).pdf
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
Final Presentation General Medicine 03-08-2024.pptx
102 student loan defaulters named and shamed – Is someone you know on the list?
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Insiders guide to clinical Medicine.pdf
PPH.pptx obstetrics and gynecology in nursing
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
grade 11-chemistry_fetena_net_5883.pdf teacher guide for all student
RMMM.pdf make it easy to upload and study
PPT- ENG7_QUARTER1_LESSON1_WEEK1. IMAGERY -DESCRIPTIONS pptx.pptx
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Classroom Observation Tools for Teachers
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Renaissance Architecture: A Journey from Faith to Humanism
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
Business Ethics Teaching Materials for college
Basic Mud Logging Guide for educational purpose
Abdominal Access Techniques with Prof. Dr. R K Mishra
FourierSeries-QuestionsWithAnswers(Part-A).pdf
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...

Undestand PMBok 5th, Section 3

  • 1. This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading the book. Project Management Processes Based on PMBOK® Guide 5th Edition Amr Miqdadi, PMP info@pmlead.net
  • 2.
  • 3. Project Life Cycle  A process is a set of interrelated actions and activities performed to achieve a pre-specified product, result, or service  Each process is characterized by its inputs, the tools and techniques that can be applied, and the resulting outputs  In order for a project to be successful, the project team must: o Select appropriate processes required to meet the project objectives; o Use a defined approach that can be adopted to meet requirements; o Comply with requirements to meet stakeholder needs and expectations; o Establish and maintain appropriate communication & engagement with stockholders; o Balance the competing constraints.
  • 4.  The project processes are performed by the project team and generally fall into one of two major categories: o Project management processes ensure the effective flow of the project throughout its existence. o Product-oriented processes specify and create the project’s product. Process Groups  Initiating process group: recognizing a project or phase should begin (authorizing the project or phase)  Planning process group: devising and maintaining a workable plan  Executing process group: coordinating resources to execute the plan  Monitoring & Controlling process group: ensuring project objectives are met; monitoring, correcting and measuring progress  Closing process group: formalized acceptance
  • 5.  Common Project Management Processes Interactions: o Monitoring & Controlling Process Group interacts with the other Process Groups o Project Management Process Groups are linked by the outputs that are produced o The Process groups are overlapping activities that occur throughout the project o The output of one process generally becomes an input to another process or is a deliverable of the project, subproject or phase o Deliverables of subproject or project level may be called incremental deliverables o The Planning Process Group provides the Executing Process Group with project management plan and project documents o Project management plan and project documents always revisited and updated
  • 6. o If the project is divided into phases, the process groups interact with each phase o The Process Groups are not Project Life Cycle Phases
  • 7. Initiating Process Group  Defines and authorizes the project.  Are often done external to the project’s scope of control.  Facilitate formal authorization to start a new project.  Project manager assigned  Funding and approval happens external to project boundaries  Many large or complex projects are divided into phases, and repeating it for each subsequent phases. Initiating Process Group Develop Project Charter Identify Stakeholders
  • 8. Planning Process Group  Defines and refines the objectives, and plan the course of action required to attain the objective and scope that the project was undertaken to address.  Develops project management plan and also refines project scope, project cost and schedule.  It is updated and refined throughout execution process group by rolling wave planning.  All necessary stakeholders are involved in this process.
  • 9. Planning Process Group Develop Project Management Plan Plan Scope Management, Collect Requirments, Define Scope, Create WBS Plan Schedula Management, Define Activities, Sequance Activities, Estimate Activity Resources, Estimate Activty Durations, Develop Schedule Plan Cost Management, Estimate Costs, Determine Budget Plan Quality Management Plan Human Resource Management Plan Communications Management Plan Risk Management, Identify Risks, Perform Qualititative Risk Analysis, Perform Quantitative Risk Analysis, Plan Risk Responses Plan Procurment Management Plan Stakeholder Management
  • 10. Execution Process Group  Majority of the project budget will be spent in performing Executing Process Group.  Integrates people and other resources to carry out the project management plan.  During the project execution, results may require planning updates and rebaselining.
  • 11. Execution Process Group Direct and Manage Project Work Perform Quality Assurance Acquire project team, Develop Project team, Manage Project team Manage Communications Conduct Procurments Manage Stakeholders Engagement
  • 12. Monitoring & Controlling Process Group  The main benefit of M&E Process Groups is that the project performance is measured and analyzed at regular intervals.  Monitoring the ongoing project activities against the project management plan and the project performance measurement baseline  Influencing the factors that could circumvent change control or configuration management so only approved changes are implemented.  Controlling changes and recommending corrective or preventing action in anticipation of possible problems.  M&E Process Group not only monitors and controls the work being done within a Process Group, but also monitors and controls the entire project effort.
  • 13. Monitoring & Controlling Process Group Monitor & Control Project Work, Perform Integrated Change Control Validate Scope, Control Scope Control Schedule Control Costs Control Quality Control Communications Plan Communications Management Control Risks Control Procurments Control Stakeholders Engagement
  • 14. Closing Process Group  Formalizes acceptance of the project or phase deliverable.  Obtain acceptance by the customer or sponsor to formally close the project or the phase  Conduct post-project or phase-end review  Record impacts of tailoring to any process  Document lessons learned  Apply appropriate updates to organizational process assets.  Achieve all relevant project documents in the PMIS to be used as historical data  Close out all procurement activities  Perform team members’ assessments  Release project resources Closing Process Group Close Project or Phase Close Procurment
  • 15. Project Information The project data are continuously collected and analyzed during the dynamic context of the project execution. The project team should use appropriate terminologies. Such as:  Work performance data: the row observations and measurements identified during activities performed to carry out the project work. (Ex: reported present of work physically completed, quality and technical performance measures, start and finish date of scheduled activities, number of defects, actual cost, actual duration, etc..)  Work performance information: the performance data collected from various controlling processes, analyzed in context and integrated based on relationships across areas.(ex: status of deliverables, implementation status for change requests, and furcated estimates to complete).  Work performance reports: the physical or electronic representation of work performance information is compiled in project documents, intended to raise issues or generate decisions (ex: status reports, memos, justifications, information notes, etc…)
  • 16. You need to understand the terms and the logic relationships between the inputs, outputs and tools& techniques. Memorizing them is not enough and will lead you nowhere. Refer to the PMBoK 5h Edition for more details. & Please do not hesitate to contact me anytime if you have any questions, comments, and feedbacks. Success is yours, Prepared By: Amr Miqdadi, PMP info@pmlead.net http://www.pmlead.net PMI®, PMP®, CAPM® and PMBOK® Guide are trademarks of the Project Management Institute, Inc.
  • 17. PMI® has not endorsed and did not participate in the development of this product.