Project Management 1. What is Project Management
Week 1
Turn your phones off Picture by Mike Licht, NotionsCapital.com  http://www.flickr.com/photos/notionscapital/869847216/
Welcome 2 parts Intro – who am I, what we’ll be doing this semester, assessments About projects – The Project Management Framework
First Form into 12 Groups 1st
Revision Groups
Second Your motivation 2nd
Who wants to  be  a project manager?
Why?
Who wants to  work with  a project manager?
When? Where? How?
A walk through the course outline Photo by Tricky at flickr http://www.flickr.com/photos/sovietuk/1432861455/sizes/o/
The textbook Gray, C., & Larson, E. (2006). Project management – The managerial process (3rd ed.). NY:  McGraw-Hill. 658.404 G791p3      
Revision Week 13 Global IT Project Management Current Issues in Project Management Weeks 10 – 12 Managing Project Teams Project Conflict Management Performance Management  Weeks 7 – 9 Managing Project Change Project Marketing Project Leadership Weeks 4 – 6 Project Management Framework Project Selection and Portfolio Management  Project Management Plans Weeks 1 – 3
B 50% End of semester Final Examination A 15% Week 11, Wednesday 1 st  October 4pm Week 7 Team Report A 15% Week 8, Wednesday 10 th  September 4pm Week 2 Team Project Proposal (Stage-2) A 10% Week 5, Wednesday 20 th  August 4pm Week 2 Team Project Proposal (Stage-1) A 10% Weeks 1-11 Weekly Tutorial Participation Task Type Weighting Due Date Release Date Assessment Task
View > Notes Page
Week 1 The Project Management Framework
8 things you want to know What is a Project? Process Groups The Triple Constraint What is Project Management? The Project Manager Importance of Project Management Project Management Framework Integrated Approach
1. What is a Project? All projects have a beginning, a middle and an end. Beginning Middle End
A definition: “ A temporary endeavor undertaken to accomplish a unique purpose” Beginning Middle End
Source: CHAOS Report 1995 by the Standish Group Access it here: h ttp://net.educause.edu/ir/library/pdf/NCP08083B.pdf Not even completed Typically 189% over budget OTOBOS 53% Challenged 16% Success 31%   Critical Failures 1994 1 2 3 4 5 6 7 8
More & more IT projects are starting each year 500K 300K 200K 1998 2001 2002 ?? 2007
Projects have a common set of characteristics  which can also be defined by what they are not A target outcome A defined life span Cross organisational participation New or unique Time, Cost and performance requirements
Projects have a common set of characteristics   which can also be defined by what they are  not A target outcome A defined life span Cross organisational participation New or unique Time, Cost and performance requirements
Explorations Go on indefinitely One team or one person working alone Creating the same thing multiple times No constraints on time, cost or performance What a project isn’t
Projects v Not Projects
Process Groups All projects typically go through these five processes Close Initiate Plan Monitor & Control Implement
A process is a series of actions directed towards a particular result. Step 1 Step 2 Step 3 Result activity inputs outputs
Figure 1.1  Project Life Cycle  (Gray & Larson, 2006, p6)
 
PMI and the PMBOK www.pmi.org PMP certification Google  PMBOK.pdf
There are alternatives to PMI Numbers from Craig Brown (Sept 2007) 7,100 Australia AIPM 15,000 UK APM 30,000 Europe IPMA 240,000 USA PMI Number of members Head office Project Management Organisation
3. The Triple Constraint Also known as the IRON TRIANGLE Time Scope Cost
Figure 1.1  Triple Constraint of Project Management (Schwalbe, 2006, p8)
The  Quadruple   Constraint Warning: Quality has many definitions Quality Time Scope Cost
4. What is Project Management? Advantages of Project Management Better control of financial, physical, and human resources Improved customer relations Shorter development times Lower costs Higher quality and increased reliability Higher profit margins Improved productivity Better internal coordination
 
5. The Project Manager Week 6 – Leading Teams Week 7 – Managing Teams
(Schwalbe, 2006, p17)
(Schwalbe, 2006, p22)
6. Importance of Project Management Increased use of Project Management Compressed product life cycle Global competition Knowledge explosion Corporate downsizing Increased customer focus Development of Third World and closed economies
7. Project Management Framework The PMBOK’s 9 Knowledge areas Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Figure 1.2  Project Management Framework (Schwalbe, 2006, p9)
8. Integrated Approach Why would a team member be a stakeholder? Stakeholders  are people involved in or affected by project activities Stakeholders include: Project sponsor Project manager Project team Support staff Customers Suppliers Opponents to the project
Project Team Suppliers Customers Opponents Sponsor & Supporters
The PMBOK’s 9 Knowledge areas Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Time Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Cost management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Scope Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Quality Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Remember this? The first four knowledge areas are  Core Functions
The next four knowledge areas are  Facilitating Processes Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
HR Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Risk Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Communications Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Procurement Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
What knowledge area do  contract labourers fall into? Contract staff ? HR Management Procurement Management
Integration Management – pulling it all together Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
What if it’s not  Integrated? Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
Figure 1.2  Integrated Management of Projects  (Gray & Larson, 2006, p13)
Which ones are most important for projects? Technical skills People Skills Budgeting, Scheduling, Documenting Leading, Motivating, Listening, Empathising
Figure 1.3  Technical and Sociocultural Dimensions of Project Management (Gray & Larson, 2006, p13)
BetterProjects.net Title page pic care of dbking & CC @ Flickr http://flickr.com/photos/bootbearwdc/20109566/

More Related Content

PPT
The Business Value Of Project Management powerpoint presentation
PPTX
Project Management Process and Its Phases
PPT
Project Management 101 Briefing
PPTX
Project Management
PPT
Key Concepts for Project Mgmt
PPT
Introduce Project Management
PPT
3 Project Cycle and Planning (4-6 hours)
PPTX
Program or project management process report
The Business Value Of Project Management powerpoint presentation
Project Management Process and Its Phases
Project Management 101 Briefing
Project Management
Key Concepts for Project Mgmt
Introduce Project Management
3 Project Cycle and Planning (4-6 hours)
Program or project management process report

What's hot (20)

PPT
Introduction to-project-management
PDF
Fundamentals of Project Management
PPTX
Project management
PPTX
Project Management 101 Primer
PPT
Introduction To Project Management Megat
PPTX
Project management
PDF
Project Management 101: Communication is 90% of the Job
PPTX
Practical Project Management - full course
PPTX
Project management fundamentals
PPT
Project management concepts_basic
PPT
Advanced project management ppts
PPT
Top Five Ideas for Project Management
PPTX
Project Management Foundations Course 101 - Project Management Concepts
PPT
Presentation project management
PPTX
Project Management Chapter 1 and chapter 2 Rosetti
PDF
The six step guide to practical project management
PPTX
Programs and Portfolios - Multi-project Management
PPT
Evansville Project Management Presentation
PPT
project management essentials
PPTX
Introduction to Project Management (workshop) - v.1
Introduction to-project-management
Fundamentals of Project Management
Project management
Project Management 101 Primer
Introduction To Project Management Megat
Project management
Project Management 101: Communication is 90% of the Job
Practical Project Management - full course
Project management fundamentals
Project management concepts_basic
Advanced project management ppts
Top Five Ideas for Project Management
Project Management Foundations Course 101 - Project Management Concepts
Presentation project management
Project Management Chapter 1 and chapter 2 Rosetti
The six step guide to practical project management
Programs and Portfolios - Multi-project Management
Evansville Project Management Presentation
project management essentials
Introduction to Project Management (workshop) - v.1
Ad

Viewers also liked (20)

PDF
Introduction to Project Management
PPTX
Ginnie Mae Project Management Day 2015
PPTX
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
PDF
Leadership
PDF
Project Management 01
PDF
Negotiations
PPT
Week 05 - Marketing and Project Management
PPT
Project management
PPT
ITIL version 2: Foundation Training
PPTX
Agile & SCRUM
PDF
RESTful web service with JBoss Fuse
PPTX
PMP Training - 12 project procurement management
PPTX
PMP Training - 08 project quality management
PPTX
PMP Training - 04 project integration management
PPTX
PMP Training - 06 project time management2
PPTX
PMP Training - 10 project communication management
PPTX
PMP Training - 05 project scope management
PPTX
PMP Training - 09 project human resource management
PPTX
PMP Training - 11 project risk management
PPTX
PMP Training - 01 introduction to framework
Introduction to Project Management
Ginnie Mae Project Management Day 2015
Incident, Problem, Change, Knowledge…and Service Catalog? A Powerful Circle.
Leadership
Project Management 01
Negotiations
Week 05 - Marketing and Project Management
Project management
ITIL version 2: Foundation Training
Agile & SCRUM
RESTful web service with JBoss Fuse
PMP Training - 12 project procurement management
PMP Training - 08 project quality management
PMP Training - 04 project integration management
PMP Training - 06 project time management2
PMP Training - 10 project communication management
PMP Training - 05 project scope management
PMP Training - 09 project human resource management
PMP Training - 11 project risk management
PMP Training - 01 introduction to framework
Ad

Similar to Week 01 - What is Project Management (20)

PPT
Is5540 course review
PPT
Basic del Project Management - 6. importanza e componenti
PPT
L01 introduction to pm
PPTX
PM 01 - Introduction to Project Management
PPTX
Project Management @ Ektoo
PPTX
Strategies for successful_engineering_management
PPT
How Project Management Can Be Used in Your Nonprofit
PDF
Projectmanagement 141108102434-conversion-gate01
PPTX
Chapter 3 Lecture Slides
PPTX
Project Management Framework
PPTX
CAPM Exam Prep Course Preview
PPT
The Project Management Process - Week 2
PPT
Week 02 - Portfolio Management
PPTX
Section 1: introduction
PPTX
Section 1: introduction
PPTX
projectmanagement-141108102434-conversion-gate01-converted.pptx
PDF
Oleksandr Osypenko: Вступ до PMP та огляд курсу (UA)
PPT
Ch01
PDF
Project management fundamentals
PDF
Introduction to Project Management
Is5540 course review
Basic del Project Management - 6. importanza e componenti
L01 introduction to pm
PM 01 - Introduction to Project Management
Project Management @ Ektoo
Strategies for successful_engineering_management
How Project Management Can Be Used in Your Nonprofit
Projectmanagement 141108102434-conversion-gate01
Chapter 3 Lecture Slides
Project Management Framework
CAPM Exam Prep Course Preview
The Project Management Process - Week 2
Week 02 - Portfolio Management
Section 1: introduction
Section 1: introduction
projectmanagement-141108102434-conversion-gate01-converted.pptx
Oleksandr Osypenko: Вступ до PMP та огляд курсу (UA)
Ch01
Project management fundamentals
Introduction to Project Management

Recently uploaded (20)

PPTX
Cell Structure & Organelles in detailed.
PDF
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PDF
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
VCE English Exam - Section C Student Revision Booklet
PDF
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
PPTX
Week 4 Term 3 Study Techniques revisited.pptx
PDF
Basic Mud Logging Guide for educational purpose
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PPTX
Pharma ospi slides which help in ospi learning
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
Institutional Correction lecture only . . .
PDF
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
Pre independence Education in Inndia.pdf
PDF
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf
Cell Structure & Organelles in detailed.
Physiotherapy_for_Respiratory_and_Cardiac_Problems WEBBER.pdf
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
ANTIBIOTICS.pptx.pdf………………… xxxxxxxxxxxxx
102 student loan defaulters named and shamed – Is someone you know on the list?
VCE English Exam - Section C Student Revision Booklet
The Lost Whites of Pakistan by Jahanzaib Mughal.pdf
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Week 4 Term 3 Study Techniques revisited.pptx
Basic Mud Logging Guide for educational purpose
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Pharma ospi slides which help in ospi learning
2.FourierTransform-ShortQuestionswithAnswers.pdf
Institutional Correction lecture only . . .
Mark Klimek Lecture Notes_240423 revision books _173037.pdf
Pharmacology of Heart Failure /Pharmacotherapy of CHF
Pre independence Education in Inndia.pdf
Saundersa Comprehensive Review for the NCLEX-RN Examination.pdf

Week 01 - What is Project Management

  • 1. Project Management 1. What is Project Management
  • 3. Turn your phones off Picture by Mike Licht, NotionsCapital.com http://www.flickr.com/photos/notionscapital/869847216/
  • 4. Welcome 2 parts Intro – who am I, what we’ll be doing this semester, assessments About projects – The Project Management Framework
  • 5. First Form into 12 Groups 1st
  • 8. Who wants to be a project manager?
  • 10. Who wants to work with a project manager?
  • 12. A walk through the course outline Photo by Tricky at flickr http://www.flickr.com/photos/sovietuk/1432861455/sizes/o/
  • 13. The textbook Gray, C., & Larson, E. (2006). Project management – The managerial process (3rd ed.). NY: McGraw-Hill. 658.404 G791p3      
  • 14. Revision Week 13 Global IT Project Management Current Issues in Project Management Weeks 10 – 12 Managing Project Teams Project Conflict Management Performance Management Weeks 7 – 9 Managing Project Change Project Marketing Project Leadership Weeks 4 – 6 Project Management Framework Project Selection and Portfolio Management Project Management Plans Weeks 1 – 3
  • 15. B 50% End of semester Final Examination A 15% Week 11, Wednesday 1 st October 4pm Week 7 Team Report A 15% Week 8, Wednesday 10 th September 4pm Week 2 Team Project Proposal (Stage-2) A 10% Week 5, Wednesday 20 th August 4pm Week 2 Team Project Proposal (Stage-1) A 10% Weeks 1-11 Weekly Tutorial Participation Task Type Weighting Due Date Release Date Assessment Task
  • 16. View > Notes Page
  • 17. Week 1 The Project Management Framework
  • 18. 8 things you want to know What is a Project? Process Groups The Triple Constraint What is Project Management? The Project Manager Importance of Project Management Project Management Framework Integrated Approach
  • 19. 1. What is a Project? All projects have a beginning, a middle and an end. Beginning Middle End
  • 20. A definition: “ A temporary endeavor undertaken to accomplish a unique purpose” Beginning Middle End
  • 21. Source: CHAOS Report 1995 by the Standish Group Access it here: h ttp://net.educause.edu/ir/library/pdf/NCP08083B.pdf Not even completed Typically 189% over budget OTOBOS 53% Challenged 16% Success 31% Critical Failures 1994 1 2 3 4 5 6 7 8
  • 22. More & more IT projects are starting each year 500K 300K 200K 1998 2001 2002 ?? 2007
  • 23. Projects have a common set of characteristics which can also be defined by what they are not A target outcome A defined life span Cross organisational participation New or unique Time, Cost and performance requirements
  • 24. Projects have a common set of characteristics which can also be defined by what they are not A target outcome A defined life span Cross organisational participation New or unique Time, Cost and performance requirements
  • 25. Explorations Go on indefinitely One team or one person working alone Creating the same thing multiple times No constraints on time, cost or performance What a project isn’t
  • 26. Projects v Not Projects
  • 27. Process Groups All projects typically go through these five processes Close Initiate Plan Monitor & Control Implement
  • 28. A process is a series of actions directed towards a particular result. Step 1 Step 2 Step 3 Result activity inputs outputs
  • 29. Figure 1.1 Project Life Cycle (Gray & Larson, 2006, p6)
  • 30.  
  • 31. PMI and the PMBOK www.pmi.org PMP certification Google PMBOK.pdf
  • 32. There are alternatives to PMI Numbers from Craig Brown (Sept 2007) 7,100 Australia AIPM 15,000 UK APM 30,000 Europe IPMA 240,000 USA PMI Number of members Head office Project Management Organisation
  • 33. 3. The Triple Constraint Also known as the IRON TRIANGLE Time Scope Cost
  • 34. Figure 1.1 Triple Constraint of Project Management (Schwalbe, 2006, p8)
  • 35. The Quadruple Constraint Warning: Quality has many definitions Quality Time Scope Cost
  • 36. 4. What is Project Management? Advantages of Project Management Better control of financial, physical, and human resources Improved customer relations Shorter development times Lower costs Higher quality and increased reliability Higher profit margins Improved productivity Better internal coordination
  • 37.  
  • 38. 5. The Project Manager Week 6 – Leading Teams Week 7 – Managing Teams
  • 41. 6. Importance of Project Management Increased use of Project Management Compressed product life cycle Global competition Knowledge explosion Corporate downsizing Increased customer focus Development of Third World and closed economies
  • 42. 7. Project Management Framework The PMBOK’s 9 Knowledge areas Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 43. Figure 1.2 Project Management Framework (Schwalbe, 2006, p9)
  • 44. 8. Integrated Approach Why would a team member be a stakeholder? Stakeholders are people involved in or affected by project activities Stakeholders include: Project sponsor Project manager Project team Support staff Customers Suppliers Opponents to the project
  • 45. Project Team Suppliers Customers Opponents Sponsor & Supporters
  • 46. The PMBOK’s 9 Knowledge areas Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 47. Time Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 48. Cost management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 49. Scope Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 50. Quality Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 51. Remember this? The first four knowledge areas are Core Functions
  • 52. The next four knowledge areas are Facilitating Processes Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 53. HR Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 54. Risk Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 55. Communications Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 56. Procurement Management Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 57. What knowledge area do contract labourers fall into? Contract staff ? HR Management Procurement Management
  • 58. Integration Management – pulling it all together Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 59. What if it’s not Integrated? Integration Management Time Management Cost Management Scope Management Quality Management HR Management Risk Management Communication Management Procurement Management
  • 60. Figure 1.2 Integrated Management of Projects (Gray & Larson, 2006, p13)
  • 61. Which ones are most important for projects? Technical skills People Skills Budgeting, Scheduling, Documenting Leading, Motivating, Listening, Empathising
  • 62. Figure 1.3 Technical and Sociocultural Dimensions of Project Management (Gray & Larson, 2006, p13)
  • 63. BetterProjects.net Title page pic care of dbking & CC @ Flickr http://flickr.com/photos/bootbearwdc/20109566/

Editor's Notes

  • #17: This is the notes
  • #20: Def : A temporary endeavor undertaken to accomplish a unique purpose needs Major Characteristics of a Project: Established objectives Defined life span with a beginning and end Across-organizational participation New or unique Specific time, cost, and performance requirements
  • #22: Source: CHAOS Report 1995 by the Standish Group Access it here: http://net.educause.edu/ir/library/pdf/NCP08083B.pdf Since 1995 several subsequent versions have been published. Project performance has improved… incrementally.. Over the subsequent decade. There is still significant improvement opportunities for the IT projects industry. What do you think is going wrong at your workplace? What can be done to improve things? The 1995 Standish (CHAOS) report found the following factors common to successful projects1. User Involvement 15.9% 2. Executive Management Support 13.9% 3. Clear Statement of Requirements 13.0% 4. Proper Planning 9.6% 5. Realistic Expectations 8.2% 6. Smaller Project Milestones 7.7% 7. Competent Staff 7.2% 8. Ownership 5.3% 9. Clear Vision & Objectives 2.9% 10. Hard-Working, Focused Staff 2.4% Other 13.9%
  • #27: Routine, Repetitive Work Taking class notes Daily entering sales receipts into the accounting ledger Responding to a supply-chain request Practicing scales on the piano Routine manufacture of an Apple iPod Attaching tags on a manufactured product Projects Writing a term paper Setting up a sales kiosk for a professional accounting meeting Developing a supply-chain information system Writing a new piano piece Designing an iPod that is approximately 2 X 4 inches, interfaces with PC, and stores 10,000 songs Wire-tag projects for GE and Wal-Mart
  • #29: Def : A process is a series of actions directed toward a particular result Project management can be viewed as a number of interlinked processes Process groups include: Initiating processes Planning processes Executing processes Monitoring and controlling processes Closing processes
  • #34: Every project is constrained by: Scope What work will be done as part of the project? What unique product, service, or result does the customer or sponsor expect from the project? Time How long should it take to complete the project? What is the project’s schedule? Cost What should it cost to complete the project? What is the project’s budget?
  • #35: Project manager’s duty to balance the three often competing goals May be good enough to hit the target, or range of triple constraint goals Important to determine which aspects of the triple constraint are most important “Quadruple constraint” includes quality as well as scope, time, and cost
  • #36: Every project is constrained by: Scope What work will be done as part of the project? What unique product, service, or result does the customer or sponsor expect from the project? Time How long should it take to complete the project? What is the project’s schedule? Cost What should it cost to complete the project? What is the project’s budget?
  • #37: Def : Project Management is … “ the application of knowledge, skills, tools and techniques to project activities to meet project requirements” (PMI, 2004, p8). Challenge of Project Management: Managing temporary, non-repetitive activities and often acting independent of the organization Getting right people, right time to address the right issues and make the right decisions Duties of Project Managers: Gather resources for the project Linked to the customer interface Provides direction, coordination, and integration to the project team Responsible for performance and success of the project
  • #40: Suggested Skills: Communication skills: listening, persuading Organizational skills: planning, goal-setting, analyzing Team Building skills: understanding, motivation, Leadership skills: sets example, energetic, vision, delegates, positive Coping skills: flexibility, creativity, patience, persistence Technological skills: experience, knowledge
  • #43: Describe key competencies that project managers must develop: Core function areas lead to specific project objectives (scope, time, cost, and quality) Facilitating function areas are the means for achieving project objectives (human resources, communication, risk, and procurement management) Knowledge function (project integration management) influences and is influenced by all other areas
  • #47: Describe key competencies that project managers must develop: Core function areas lead to specific project objectives (scope, time, cost, and quality) Facilitating function areas are the means for achieving project objectives (human resources, communication, risk, and procurement management) Knowledge function (project integration management) influences and is influenced by all other areas
  • #48: Project Cost Management Consists of preparing and managing the budget for the project Processes include: cost estimating cost budgeting cost control Outputs include: cost estimates, baseline budget, earned value calculations
  • #49: Project Time Management Estimating work completion time, developing project schedule, and ensuring timely completion of the project Processes include: activity definition activity sequencing activity resource estimating activity duration estimating schedule development schedule control Outputs include: network diagram, Gantt chart, critical path etc…
  • #50: Project Scope Management Involves defining and managing all the work required to complete the project successfully Processes include: scope planning scope definition creating the WBS scope verification scope control Outputs include: project charter, scope statement, WBS etc…
  • #51: Project Quality Management Ensures that the project will satisfy the stated or implied needs for which it was undertaken Processes include: quality planning quality assurance quality control Outputs include: quality assurance plan, standards etc…
  • #54: Project Human Resource Management Concerned with making effective use of the people involved with the project Processes include: human resource planning acquiring the project team developing the project team managing the project team Outputs include: project organization charts, staffing management plan, resource histogram etc…
  • #55: Project Risk Management Identifying, analyzing, and responding to risks related to the project Processes include: risk management planning risk identification qualitative risk analysis quantitative risk analysis risk response planning risk monitoring and control Outputs include: risk management plan, contingency plans etc…
  • #56: Project Communications Management Involves generating, collecting and storing project information Processes include: communications planning information distribution performance reporting managing stakeholders Outputs include: communications management plan, status reports, performance reports etc…
  • #57: Project Procurement Management Involves acquiring goods and services for a project from outside the organization Processes include: planning purchases and acquisitions planning contracting requesting seller responses selecting sellers administering the contract closing the contract Outputs include: contract, statement of work etc…
  • #59: Project Integration Management Involves coordinating all the other knowledge areas throughout a project’s life cycle. Processes include: develop project charter develop the preliminary project scope statement develop the project management plan direct and manage project execution monitor and control the project work perform integrated change control close the project Outputs include: project plan, change control system etc…
  • #60: Problems resulting from the use of piecemeal Project Management Systems Do not tie together the overall strategies of the firm Fail to prioritize selection of projects by their importance of their contribution to the firm Not integrated throughout project life cycle Do not match project planning and controls with organizational culture to make appropriate adjustments in support of project
  • #61: In Integrated process management systems all the parts are inter-related, a change in one of the parts will influence the whole. Mission, objectives and strategies are set to meet the needs of the customer. External environmental factors: political, social, economic and technological Internal environmental factors: strengths and weaknesses such as management, facilities, financial conditions etc.