Module Topics and Objectives
The role of project plans and changes
– Importance of quality of project planning.
– Recognize that plan changes and goal changes are
different.
– Analyze the impact of plan and goal changes on
project value.
– Analyze the impact of contextual factors on plan and
goal changes.
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Value PM: Core Conflict in Maximization Paradigm
Maximize
Project
Value
PrerequisiteRequirementObjective
The management core problem:
– Management of change: Opportunity discovery and
exploitation.
Exploit
Opportunities
Not Exploit
Opportunities
Initial
Requirements
Met
Stakeholder
Expectations
Met
PM’s
Value
Mindset
3
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Plans are Nothing, Changing Plans is
Everything
The Impact of Changes on Project
Success
For academic use only. 4
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 5
Conceptual Framework of Project Planning and Changing
Efficiency Customer
Satisfct.
Goal
Changes
Plan
Changes
Quality of
Planning
Context
+
+
+
+
+
+
-
-
-
-
-
-
+
Hypothesized Relations between the Planning Variables and Success
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 6
Conceptual Framework – Variable Definitions
– Plan changes: frequency
– Goal changes: importance and frequency
– Planning quality: work breakdown, resource
allocation, scheduling, budget
– Success: efficiency, customer satisfaction
– Context
• Technical Risks: demanding
• Importance: usefulness, importance for
organization
• Experience: similar project
• Manpower: personnel losses or transfer
• Parallel Projects: undertaken at the same time
• Breakthrough: technological
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 7
Conceptual Framework – Variable Measurements
Scale Measures
Efficiency
(Alpha:0.86)
1. The project had come in on schedule
2. The project had come in on budget
Customer
satisfaction
(Alpha:0.81)
1. The clients were satisfied with the process by which this project
was completed
2. The clients are satisfied with the results of the project
Plan changes The project plans (schedule, personnel, budget) were often changed
Goal changes
(Alpha:0.83)
1. Project goals were often changed
2. At least one major project goal was changed considerably
Planning quality
(Alpha:0.85)
1. The entire project task (scope) was structured in work packages.
2. Every work package was allocated with a specific time allowance.
3. We knew which activities contained slack time or slack resources.
4. All work packages had a predecessor and a successor work
package (except the first and the last).
5. There was a detailed budget plan for the project.
6. The precise demand for key personnel (who, when) was specified
in the project plan
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Conceptual Framework – Variable Measurements
For academic use only. 8
Scale Measures
Technical risks
(Alpha:0.79)
1. The task was technically demanding.
2. The completion of the business goals included high risks.
Importance
(Alpha:0.78)
1. It was important that the results of the project could be used as
soon as possible
2. The implementation of the project was important for the
organization’s policy
3. The implementation of the project was important for the success of
the organization
Experience The projecting company had experience with the solution of similar
problems
Manpower The project team did not experience any significant personnel losses
or transfer during the project’s development
Parallel projects The completion of the project depended on other projects,
undertaken at the same time.
Break through The project was not subject to any recent technological
breakthrough, which could have rendered it obsolete.
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 9
Empirical Findings - Sample Description
Kind of Project Absolute frequency Relative frequency
Machine tool manufacturing 25 5.6%
Plant construction 61 13.6
Building construction 30 6.7
Product development 116 25.9
Reorganization 52 11.6
Software 109 24.3
Others 55 12.3
Total 448 100.0%
Returned Questionnaires: 43%, N= 448 (257 successful, 191 unsuccessful)
Respondents: Project Leader 46%, Team 27%, Others 27%
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 10
Empirical Findings – Correlations between Contextual and
Planning Variables
Quality of
Planning
Goal
Changes
Plan
Changes
Personnel Constraints n.s. .226** .226**
Parallel Projects n.s. .202** .174**
Occurrence of Breakthrough n.s. .247** .127**
Technical Risks n.s. .175** .165**
Importance .204** n.s. n.s.
Experience .170** n.s. n.s.
**p<=0.01, n.s. – not significant
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 11
Empirical Findings – Path Model
Efficiency Customer
Satisfct.
Goal
Changes
Plan
Changes
Quality of
Planning
-.27 -.21
+.50
+.61
+.14+.27
-.16
-.23
n.s.
n.s.
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 12
Empirical Findings – Path Model (total)
Efficiency
-.20
R2= 26%
Cust. Sati.
R2= 55%
+.61
Technical
Risk
Goal
Changes
Plan
Changes
Quality of
Planning
Personnel
Constr.
Parallel
Projects
Break
through
Import.
Experie.
+.16 +.15 +.14 +.18
+.11
-.16
-.21
-.23
+.50
+.14
+.16
+.20
-.27
+.27
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 13
Empirical Findings – Effects of Success Factors
Planning Variables/ Impact on
Efficiency
Direct
Effect
Indirect
Effect
Total
Effect
Quality of Planning +.27 +.08 +.35
Goal Changes -.21 -.10 -.31
Plan Changes -.23 - -.23
Planning Variables/ Impact on
Customer Satisfaction
Direct
Effect
Indirect
Effect
Total
Effect
Quality of Planning +.14 +.25 +.39
Goal Changes -.15 -.19 -.34
Plan Changes - -.14 -.14
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 14
Goal
Changes
Empirical Findings – Calculation of Effects (Ex.)
• Indirect Effects of Goal Changes
• (+.50 * -. 23) = -.10
• = Indirect Effect -.10 ( )
• + Direct Effect -.21 ( )
• = Total Effect -.31
Efficiency
+.50
-.23
-.21
Plan
Changes
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 15
Summary of Empirical Findings
• The influences of planning and changes on project success
– The positive total effect of the variable quality of planning (+.35
and +.39) is completely overridden by the negative combined
effect of plan and goal changes (-.54 and -.48)
• The interactions between the planning variables
– The quality of planning reduces the level of goal changes (−0.27),
it does NOT affect plan changes
– Changing project goals leads to changes of project plans (0.50)
• The influences of context on the project planning activities
– Strategic importance and the level of experience of the project
team affecting only the quality of planning
– The others influence goal changes and plan changes
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013For academic use only. 16
Summary of Empirical Findings
• Plan changes and goal changes are different!
• Goal changes will lead to plan changes
• The influence of frequent changes on project value is
significantly negative
• The quality of project planning can reduce goal changes
• The causes for changing project plans are contextual-
related
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Definitions of Project Risk and Uncertainty
• Project Risk
– Project risks also known as the Known-Unknowns are
basically events, circumstances, situations or
conditions that have a potential negative impact on
meeting predefined project objectives.
• Project Uncertainty
– Unexpected and unforeseen project situations with
potential significant impact on the value of a project.
For academic use only. 17
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
Exploratory case based interview study
• 42 case studies
• 90-minute interviews with semi-structured questionnaire
• Creation of case study protocol and database
Research Method
Project Category Frequencies
Information Systems Projects 20
Product and Service Development Projects 9
Construction Projects 4
Business & Organization Change Projects 3
Research & Development Projects 2
Project-like tasks 4
Total 42
For academic use only. 18
Mgt 610 Strategic Perspectives on Project Management
© Thomas Lechler 2013
• Stakeholder capabilities and dynamics are the most frequent source of
uncertainties!
• Mergers and acquisitions and politics lead to uncertainty.
Categories of Uncertainties
Uncertainty Categories Uncertainty Sources Frequencies
Stakeholder uncertainty Inexperience, change, contracts 18
Organizational uncertainty M&A, politics, unknown legacy system 9
Technological uncertainty Tech. issues, tight specs 8
Contextual turbulences Legal, market 6
Project characteristics Unknown complexity 3
Malpractice Self induced uncertainty 2
For academic use only. 19

More Related Content

PDF
New approach for solving software project scheduling problem using differenti...
PPT
PPT
Project control
PDF
Improving Project Performance in the DOE
PPTX
Slides 2015 for contact 1
PPT
Software Project Management Spm1176
PPTX
Project Monitoring and Control
PPT
Project Management
New approach for solving software project scheduling problem using differenti...
Project control
Improving Project Performance in the DOE
Slides 2015 for contact 1
Software Project Management Spm1176
Project Monitoring and Control
Project Management

What's hot (20)

PPT
Chapter 7 managing risk
PPTX
Getting To Done - A Master Class Workshop
PDF
76 s201905
PPSX
Project Control System
PPT
Chap001 (1)
PPTX
Project management.pptx
PDF
Most Popular 20 Evergreen Project Management Terms
PPT
PDF
DCMA 14-Point Schedule Quality Check
PPT
Project performance tracking analysis and reporting
PPTX
Project Time Management
PDF
My 5 Learnings of Waterfall Project Management
PPTX
Showing how to Increase the Probability of Project Success by applying the ...
PPT
06 pert cpm
PDF
Monitor and control process group part two
PPTX
Integrating risk with earned value
PDF
Strategic portfolio management
PDF
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
PPTX
Project planning and control
Chapter 7 managing risk
Getting To Done - A Master Class Workshop
76 s201905
Project Control System
Chap001 (1)
Project management.pptx
Most Popular 20 Evergreen Project Management Terms
DCMA 14-Point Schedule Quality Check
Project performance tracking analysis and reporting
Project Time Management
My 5 Learnings of Waterfall Project Management
Showing how to Increase the Probability of Project Success by applying the ...
06 pert cpm
Monitor and control process group part two
Integrating risk with earned value
Strategic portfolio management
Lect-1: Software Project Management - Project Dimensions, Players, SDLC and P...
Project planning and control
Ad

Viewers also liked (7)

PDF
Reading week09 lechler_cc
PDF
Week10 slides
PDF
Week10 slides
PDF
Reading week08 saaty_ahp_prediction
PDF
Week05 slides
PDF
Reading week08 shah_ahp_case
PDF
Week12 slides
Reading week09 lechler_cc
Week10 slides
Week10 slides
Reading week08 saaty_ahp_prediction
Week05 slides
Reading week08 shah_ahp_case
Week12 slides
Ad

Similar to Week02 slides spring_2013 (20)

PDF
Week01 slides spring_2013
PDF
Lecture07 vo customer
PDF
Week07 slides 2013_s
PDF
Week03 slides spring_2013
PDF
Lecture04 slides
PDF
Lecture04 p vscorecard
PDF
Week11 slides
PDF
Week06 slides
PDF
Project Management in Practice 4th Edition Samuel J. Mantel
PPTX
Managing the Unknown v2
PDF
Project Management In Practice 4th Edition Samuel J Mantel Jack R Meredith
PDF
Planning can we do with out it?
PDF
Mic productivity project-management-foment-20121022-succesinpmv1
PDF
Project Management in Practice 4th Edition Samuel J. Mantel
PDF
Project Management in Practice 4th Edition Samuel J. Mantel
PPT
Pm presentation v2
PPTX
Project Selection
PDF
Dynamic Project Management Model
DOCX
MGT 6302, Project Management Strategy and Tactics 1 .docx
PPT
Ben Mkt 347 Week 4
Week01 slides spring_2013
Lecture07 vo customer
Week07 slides 2013_s
Week03 slides spring_2013
Lecture04 slides
Lecture04 p vscorecard
Week11 slides
Week06 slides
Project Management in Practice 4th Edition Samuel J. Mantel
Managing the Unknown v2
Project Management In Practice 4th Edition Samuel J Mantel Jack R Meredith
Planning can we do with out it?
Mic productivity project-management-foment-20121022-succesinpmv1
Project Management in Practice 4th Edition Samuel J. Mantel
Project Management in Practice 4th Edition Samuel J. Mantel
Pm presentation v2
Project Selection
Dynamic Project Management Model
MGT 6302, Project Management Strategy and Tactics 1 .docx
Ben Mkt 347 Week 4

More from henry KKK (18)

DOCX
Yiheng deng hw3
DOC
Yiheng deng hw2
DOC
Yiheng deng hw1
PPT
Examples of smart_objective_attributes
PDF
Week10 slides
PDF
Week09 cc single_project_slides_v1
PDF
Week09 cc single_project_slides_v1
PDF
Week08 slides
PDF
Week05 spc single_case
PDF
Week05 reading
PDF
Week05 exercise
PDF
Week03 reading lechler_pm_mindset
PDF
Week02 reading lechler_plan_and_changing
PDF
Toc evaporating cloud
PDF
Toc evaporating cloud
PDF
Syllabus mgt610 2013_s
PDF
Reading week08 shah_ahp_case
PDF
Reading week08 saaty_sevenpillars_ahp
Yiheng deng hw3
Yiheng deng hw2
Yiheng deng hw1
Examples of smart_objective_attributes
Week10 slides
Week09 cc single_project_slides_v1
Week09 cc single_project_slides_v1
Week08 slides
Week05 spc single_case
Week05 reading
Week05 exercise
Week03 reading lechler_pm_mindset
Week02 reading lechler_plan_and_changing
Toc evaporating cloud
Toc evaporating cloud
Syllabus mgt610 2013_s
Reading week08 shah_ahp_case
Reading week08 saaty_sevenpillars_ahp

Recently uploaded (20)

PPT
Chapter four Project-Preparation material
PPT
Data mining for business intelligence ch04 sharda
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
IFRS Notes in your pocket for study all the time
PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
PDF
DOC-20250806-WA0002._20250806_112011_0000.pdf
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
PDF
MSPs in 10 Words - Created by US MSP Network
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
PPTX
Amazon (Business Studies) management studies
PDF
A Brief Introduction About Julia Allison
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
Tata consultancy services case study shri Sharda college, basrur
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PDF
Digital Marketing & E-commerce Certificate Glossary.pdf.................
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
COST SHEET- Tender and Quotation unit 2.pdf
Chapter four Project-Preparation material
Data mining for business intelligence ch04 sharda
Unit 1 Cost Accounting - Cost sheet
IFRS Notes in your pocket for study all the time
340036916-American-Literature-Literary-Period-Overview.ppt
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
NISM Series V-A MFD Workbook v December 2024.khhhjtgvwevoypdnew one must use ...
DOC-20250806-WA0002._20250806_112011_0000.pdf
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Ôn tập tiếng anh trong kinh doanh nâng cao
MSPs in 10 Words - Created by US MSP Network
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Amazon (Business Studies) management studies
A Brief Introduction About Julia Allison
Belch_12e_PPT_Ch18_Accessible_university.pptx
Tata consultancy services case study shri Sharda college, basrur
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Digital Marketing & E-commerce Certificate Glossary.pdf.................
Euro SEO Services 1st 3 General Updates.docx
COST SHEET- Tender and Quotation unit 2.pdf

Week02 slides spring_2013

  • 1. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 1 MGT610 Lecture 2 The Impact of Project Risks and Uncertainties
  • 2. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 2 Module Topics and Objectives The role of project plans and changes – Importance of quality of project planning. – Recognize that plan changes and goal changes are different. – Analyze the impact of plan and goal changes on project value. – Analyze the impact of contextual factors on plan and goal changes.
  • 3. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Value PM: Core Conflict in Maximization Paradigm Maximize Project Value PrerequisiteRequirementObjective The management core problem: – Management of change: Opportunity discovery and exploitation. Exploit Opportunities Not Exploit Opportunities Initial Requirements Met Stakeholder Expectations Met PM’s Value Mindset 3
  • 4. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Plans are Nothing, Changing Plans is Everything The Impact of Changes on Project Success For academic use only. 4
  • 5. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 5 Conceptual Framework of Project Planning and Changing Efficiency Customer Satisfct. Goal Changes Plan Changes Quality of Planning Context + + + + + + - - - - - - + Hypothesized Relations between the Planning Variables and Success
  • 6. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 6 Conceptual Framework – Variable Definitions – Plan changes: frequency – Goal changes: importance and frequency – Planning quality: work breakdown, resource allocation, scheduling, budget – Success: efficiency, customer satisfaction – Context • Technical Risks: demanding • Importance: usefulness, importance for organization • Experience: similar project • Manpower: personnel losses or transfer • Parallel Projects: undertaken at the same time • Breakthrough: technological
  • 7. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 7 Conceptual Framework – Variable Measurements Scale Measures Efficiency (Alpha:0.86) 1. The project had come in on schedule 2. The project had come in on budget Customer satisfaction (Alpha:0.81) 1. The clients were satisfied with the process by which this project was completed 2. The clients are satisfied with the results of the project Plan changes The project plans (schedule, personnel, budget) were often changed Goal changes (Alpha:0.83) 1. Project goals were often changed 2. At least one major project goal was changed considerably Planning quality (Alpha:0.85) 1. The entire project task (scope) was structured in work packages. 2. Every work package was allocated with a specific time allowance. 3. We knew which activities contained slack time or slack resources. 4. All work packages had a predecessor and a successor work package (except the first and the last). 5. There was a detailed budget plan for the project. 6. The precise demand for key personnel (who, when) was specified in the project plan
  • 8. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Conceptual Framework – Variable Measurements For academic use only. 8 Scale Measures Technical risks (Alpha:0.79) 1. The task was technically demanding. 2. The completion of the business goals included high risks. Importance (Alpha:0.78) 1. It was important that the results of the project could be used as soon as possible 2. The implementation of the project was important for the organization’s policy 3. The implementation of the project was important for the success of the organization Experience The projecting company had experience with the solution of similar problems Manpower The project team did not experience any significant personnel losses or transfer during the project’s development Parallel projects The completion of the project depended on other projects, undertaken at the same time. Break through The project was not subject to any recent technological breakthrough, which could have rendered it obsolete.
  • 9. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 9 Empirical Findings - Sample Description Kind of Project Absolute frequency Relative frequency Machine tool manufacturing 25 5.6% Plant construction 61 13.6 Building construction 30 6.7 Product development 116 25.9 Reorganization 52 11.6 Software 109 24.3 Others 55 12.3 Total 448 100.0% Returned Questionnaires: 43%, N= 448 (257 successful, 191 unsuccessful) Respondents: Project Leader 46%, Team 27%, Others 27%
  • 10. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 10 Empirical Findings – Correlations between Contextual and Planning Variables Quality of Planning Goal Changes Plan Changes Personnel Constraints n.s. .226** .226** Parallel Projects n.s. .202** .174** Occurrence of Breakthrough n.s. .247** .127** Technical Risks n.s. .175** .165** Importance .204** n.s. n.s. Experience .170** n.s. n.s. **p<=0.01, n.s. – not significant
  • 11. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 11 Empirical Findings – Path Model Efficiency Customer Satisfct. Goal Changes Plan Changes Quality of Planning -.27 -.21 +.50 +.61 +.14+.27 -.16 -.23 n.s. n.s.
  • 12. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 12 Empirical Findings – Path Model (total) Efficiency -.20 R2= 26% Cust. Sati. R2= 55% +.61 Technical Risk Goal Changes Plan Changes Quality of Planning Personnel Constr. Parallel Projects Break through Import. Experie. +.16 +.15 +.14 +.18 +.11 -.16 -.21 -.23 +.50 +.14 +.16 +.20 -.27 +.27
  • 13. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 13 Empirical Findings – Effects of Success Factors Planning Variables/ Impact on Efficiency Direct Effect Indirect Effect Total Effect Quality of Planning +.27 +.08 +.35 Goal Changes -.21 -.10 -.31 Plan Changes -.23 - -.23 Planning Variables/ Impact on Customer Satisfaction Direct Effect Indirect Effect Total Effect Quality of Planning +.14 +.25 +.39 Goal Changes -.15 -.19 -.34 Plan Changes - -.14 -.14
  • 14. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 14 Goal Changes Empirical Findings – Calculation of Effects (Ex.) • Indirect Effects of Goal Changes • (+.50 * -. 23) = -.10 • = Indirect Effect -.10 ( ) • + Direct Effect -.21 ( ) • = Total Effect -.31 Efficiency +.50 -.23 -.21 Plan Changes
  • 15. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 15 Summary of Empirical Findings • The influences of planning and changes on project success – The positive total effect of the variable quality of planning (+.35 and +.39) is completely overridden by the negative combined effect of plan and goal changes (-.54 and -.48) • The interactions between the planning variables – The quality of planning reduces the level of goal changes (−0.27), it does NOT affect plan changes – Changing project goals leads to changes of project plans (0.50) • The influences of context on the project planning activities – Strategic importance and the level of experience of the project team affecting only the quality of planning – The others influence goal changes and plan changes
  • 16. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013For academic use only. 16 Summary of Empirical Findings • Plan changes and goal changes are different! • Goal changes will lead to plan changes • The influence of frequent changes on project value is significantly negative • The quality of project planning can reduce goal changes • The causes for changing project plans are contextual- related
  • 17. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Definitions of Project Risk and Uncertainty • Project Risk – Project risks also known as the Known-Unknowns are basically events, circumstances, situations or conditions that have a potential negative impact on meeting predefined project objectives. • Project Uncertainty – Unexpected and unforeseen project situations with potential significant impact on the value of a project. For academic use only. 17
  • 18. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 Exploratory case based interview study • 42 case studies • 90-minute interviews with semi-structured questionnaire • Creation of case study protocol and database Research Method Project Category Frequencies Information Systems Projects 20 Product and Service Development Projects 9 Construction Projects 4 Business & Organization Change Projects 3 Research & Development Projects 2 Project-like tasks 4 Total 42 For academic use only. 18
  • 19. Mgt 610 Strategic Perspectives on Project Management © Thomas Lechler 2013 • Stakeholder capabilities and dynamics are the most frequent source of uncertainties! • Mergers and acquisitions and politics lead to uncertainty. Categories of Uncertainties Uncertainty Categories Uncertainty Sources Frequencies Stakeholder uncertainty Inexperience, change, contracts 18 Organizational uncertainty M&A, politics, unknown legacy system 9 Technological uncertainty Tech. issues, tight specs 8 Contextual turbulences Legal, market 6 Project characteristics Unknown complexity 3 Malpractice Self induced uncertainty 2 For academic use only. 19