Project Value Network
Shareholder
Value
Outcome
Value
Stakeholder
Value
Effort
Value
AHP
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 3
Topics and Objectives
• Strategic Thinking: Focusing on what creates
most value for the stakeholders
• Prioritize Customer Needs with AHP
• Deploy Prioritized Customer Needs
• Analyze [only] important relationships in detail
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 4
Session Agenda
Stakeholder Perspective:
Identifying Needs for Requirement Definition
1. Perceptions of value lead to expectations
2. Compatibility of expectations as segmentation basis
3. Stable needs but dynamic expectations
4. Describing expectation as a tolerance
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 5
3. Project Blitz QFD: The 7 Steps of Blitz QFD
0. Identify the Customers (Previous lecture)
1. Go to Gemba (Previous lecture)
2. Discover Customer Needs (Previous lecture)
3. Structure Customer Needs (Previous lecture)
4. Analyze Customer Needs Structure (Previous lecture)
5. Prioritize Customer Needs (AHP)
6. Deploy Prioritized Customer Needs (MVT)
7. Analyze Essential Tasks in Detail (WBS, FMEA)
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 6
Project Blitz QFD: Step 5-7
Analytic
Hierarchy
Process
What needs are
most important?


 Hierarchy
diagram Maximum Value
table
How to meet
their needs?
items
tasks
needsneeds
high-value
customer
needs
7MP
tools
high-value
tasks
tasks
Project Task
table
How will we
do it?
FMEA
table
risks
What could
go wrong?
What needs
weren't stated?

high-risk
items
high-value itemspriorities
a
b
c
?
[House of
Quality]
What details
should we know?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 7
AHP: Priorities - Filtering / Selecting / Sorting
Should we focus on all identified customer needs?
We need a method for
– deciding which customer needs to focus on
by using a set of decision criteria
– deciding which to do now (priorities), and
which to do later (posteriorities)
But what are we looking for in a “priority”?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 8
AHP: Different Types of Measurement Scales
scale
empirical
observations example
mathematical
structure
nominal determination of
equality
numbers on
football players
mayinterchange
values
ordinal determination of
rank order
team standings maysquare or
cube values
interval equalityofintervals
or differences
temperature in ° F
or ° C
mayadd a
constantto values
ratio equalityofratios temperature in
° Kelvin
maymultiplyvalues
bya constant
source: S.S. Stevens, Science 103:678
For accurate selection, and for weights you can
multiply by, you must have ratio scale priorities
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 9
AHP: Direction to a Solution
What is the simplest way to get ratio scale
priorities?
Even though we don’t have ratio scale
judgments?
inputs AHP outputs
ratio
scale
results
judgments
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 10
AHP: The Analytical Hierarchy Process
Developed by Dr. Thomas L. Saaty
– well-tested, with excellent track record
• does not require consensus from participants
– works with quantitative and qualitative data
• produces ratio scale results in all cases
– psychologically “user friendly”
• uses relative judgment (pairwise evaluation)
– forces a detailed understanding of issues
• leads to a common understanding of the decision, and the
rationale for it
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 11
AHP: Inputs
How do we get our inputs?
– Pairwise evaluation
“Which one is more?
– Using a relative
judgment scale
“How much more?”
A pairwise evaluation on a
single dimension is the most
accurate judgment you make
Scale
– 9 extreme
– 8
– 7 very strong
– 6
– 5 strong
– 4
– 3 moderate
– 2
– 1 equal
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 12
AHP: Basic Template
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 13
AHP: Example: Apples with Oranges
Comparing apples and oranges, and other fruit, on
one characteristic: juiciness
– Additional characteristics can be handled the
same way…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 14
AHP: Example: Apples with Oranges - Step1
For a single criteria (at a time)
Compare each pair
1 2 3 4
juiciness rmelon orange pear apple
1 watermelon 1
2 orange 1
3 pear 1
4 apple 1
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 15
AHP: Example: Apples with Oranges – Step1
After our first step the matrix looks like the following,
but with different numbers.
1 2 3 4
juiciness rmelon orange pear apple
watermelon 1 2 4 6
orange 1 2 4
pear 1 2
apple 1
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 16
AHP: Example: Apples with Oranges – Step2
The second step completes the matrix.
After the second step the matrix looks like the
following, just with different numbers.
1 2 3 4
juiciness rmelon orange pear apple
1 watermelon 1 2 4 6
2 orange 1/2 1 2 4
3 pear 1/4 1/2 1 2
4 apple 1/6 1/4 1/2 1
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 17
AHP: Example: Apples with Oranges – Step3
1 2 3 4
juiciness rmelon orange pear apple
1 watermelon 1 2 4 6
2 orange 1/2 1 2 4
3 pear 1/4 1/2 1 2
4 apple 1/6 1/4 1/2 1
1.92 3.75 7.50 13.0
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 18
AHP: Example: Apples with Oranges – Step4
1 2 3 4 1 2 3 4 row row
juiciness rmelon orange pear apple normalized columns total avg.
1 watermelon 1 2.0 4 6 0.52 0.53 0.53 0.46
2 orange 1/2 1 2 4 0.26 0.27 0.27 0.31
3 pear 1/4 1/2 1 2 0.13 0.13 0.13 0.15
4 apple 1/6 1/4 1/2 1 0.09 0.07 0.07 0.08
1.92 3.75 7.50 13.00 1.00 1.00 1.00 1.00 4.00 1.000
relative judgment scale:
extreme 9.0 1/9 0.111
8.0 1/8 0.125
very strong 7.0 1/7 0.143
6.0 1/6 0.167
strong 5.0 1/5 0.200
4.0 1/4 0.250
moderate 3.0 1/3 0.333
2.0 1/2 0.500
equal 1.0 1/1 1.000
the
Row
Average of
Normalized
Columns
approximation
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 19
AHP: Example: Apples with Oranges – Step5 and
6
1 2 3 4 1 2 3 4 row row
juiciness rmelon orange pear apple normalized columns total avg.
1 watermelon 1 2.0 4 6 0.52 0.53 0.53 0.46 2.049 0.512
2 orange 1/2 1 2 4 0.26 0.27 0.27 0.31 1.101 0.275
3 pear 1/4 1/2 1 2 0.13 0.13 0.13 0.15 0.551 0.138
4 apple 1/6 1/4 1/2 1 0.09 0.07 0.07 0.08 0.299 0.075
1.92 3.75 7.50 13.00 1.00 1.00 1.00 1.00 4.00 1.000
relative judgment scale:
extreme 9.0 1/9 0.111
8.0 1/8 0.125
very strong 7.0 1/7 0.143
6.0 1/6 0.167
strong 5.0 1/5 0.200
4.0 1/4 0.250
moderate 3.0 1/3 0.333
2.0 1/2 0.500
equal 1.0 1/1 1.000
the
Row
Average of
Normalized
Columns
approximation
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 20
AHP: Example: Apples with Oranges – Output
• The results:
– accurate
– ratio-scale
– Priorities
– This can be proven
mathematically to be a
ratio scale
ratio-scale
juiciness priorities
1 watermelon 0.512
2 orange 0.275
3 pear 0.138
4 apple 0.075
1.000
What are your fruit ratios?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 21
AHP: Example: Apples with Oranges – Checking
•How do we know it’s right?
– Sensitivity analysis
• visible process
• “what-if” scenarios
– Judgment consistency
• the inconsistency ratio
(.10 < IR)
• revisit the most
inconsistent judgments
Expert
Choice
ratio-scale exact
priorities calc.
0.512 0.542
0.275 0.303
0.138 0.110
0.075 0.045
1.000 1.000
IR=
0.06
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 22
AHP: Types of Evaluation Criteria
1. Relative judgments (Nominal Scale)
– the most generally applicable
– the most accurate judgment
2. Absolute judgments (Ordinal Scale)
– ranking against a standard scale
– requires experience and expertise
3. Quantitative judgments (Interval Scale)
Measurements or Estimates (numeric quantities)
– bigger is better
– smaller is better
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 23
AHP: Case 1: Selecting Projects
Many projects, and a few criteria
– Define the evaluation criteria
• And the values they may take on
– Prioritize the values
– For each criteria, assign values
• And plug in the priority of that value
– Add the priorities, normalize, and rank
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 24
AHP: Case 1: Rating projects
Criteria
Risk Reward
Uncertainty
Complexity
Pace
Success
Projects S % rank
Project 1
Project 2
Project 3
Project 4
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 25
AHP: Case 1: Criteria Uncertainty
Technological Uncertainty
Uncertainty
low
medium
high
super-high
normalized columns S %
low 1 2 3 5 0.49 0.46 0.55 0.45 1.95 0.49
medium 1/2 1 1 3 0.25 0.23 0.18 0.27 0.93 0.23
high 1/3 1/1 1 2 0.16 0.23 0.18 0.18 0.76 0.19
super-high 1/5 1/3 1/2 1 0.10 0.08 0.09 0.09 0.36 0.09
2.03 4.33 5.50 11.00 1.00 1.00 1.00 1.00 4.00 1.00
 Take each criteria,
 Define the values it can take on
 Prioritize those values, with pairwise evaluation
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 26
AHP: Case 1: Criteria Complexity
System Complexity (scope)
Complexity
assembly
system
array
normalized columns S %
assembly 1 4 6 0.71 0.75 0.60 2.06 0.69
system 1/4 1 3 0.18 0.19 0.30 0.66 0.22
array 1/6 1/3 1 0.12 0.06 0.10 0.28 0.09
1.42 5.33 10.00 1.00 1.00 1.00 3.00 1.00
Continue for each criteria, and all values
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 27
AHP: Case 1: Criteria Pace
And additional criteria would be handled the
same way…
Time frame available for completion
Pace
regular
fast
blitz
normalized columns S %
regular 1 2 4 0.57 0.60 0.50 1.67 0.56
fast 1/2 1 3 0.29 0.30 0.38 0.96 0.32
blitz 1/4 1/3 1 0.14 0.10 0.13 0.37 0.12
1.75 3.33 8.00 1.00 1.00 1.00 3.00 1.00
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 28
AHP: Case 1: Criteria Success
Primary success dimension impact (expected)
Success
efficiency
customer
business
future
normalized columns S %
efficiency 1 3 5 7 0.60 0.58 0.68 0.44 2.29 0.57
customer 1/3 1 1 5 0.20 0.19 0.14 0.31 0.84 0.21
business 1/5 1/1 1 3 0.12 0.19 0.14 0.19 0.64 0.16
future 1/7 1/5 1/3 1 0.09 0.04 0.05 0.06 0.23 0.06
1.68 5.20 7.33 16.00 1.00 1.00 1.00 1.00 4.00 1.00
After the “risk” or “cost” criteria,
Here is a “reward” or “benefit” criteria…
Now fill the the appropriate values in the table
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 29
AHP: Case 1: Rating projects
Criteria
Risk Reward
Uncertainty
Complexity
Pace
Success
Projects S % rank
medium system blitz customer
Project 1
low array fast business
Project 2
super assembly regular future
Project 3
high system blitz efficiency
Project 4
0.00
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 30
AHP: Case 1: Project Priorities
Criteria
Risk Reward
Uncertainty
Complexity
Pace
Success
Projects S % rank
medium system blitz customer
Project 1 0.23 0.22 0.12 0.21 0.79 0.18 4
low array fast business
Project 2 0.49 0.09 0.32 0.16 1.06 0.24 3
super assembly regular future
Project 3 0.09 0.69 0.56 0.06 1.39 0.32 1
high system blitz efficiency
Project 4 0.19 0.22 0.12 0.57 1.11 0.25 2
4.34 1.00
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 31
AHP: Case 1: Many ways to apply …
Criteria
Risk Reward
Uncertainty
Complexity
Pace
Success
Projects S % rank S % rank
medium system blitz customer
Project 1 0.23 0.22 0.12 0.58 0.17 3 0.21 0.21 0.21 2
low array fast business
Project 2 0.49 0.09 0.32 0.90 0.27 2 0.16 0.16 0.16 3
super assembly regular future
Project 3 0.09 0.69 0.56 1.33 0.40 1 0.06 0.06 0.06 4
high system blitz efficiency
Project 4 0.19 0.22 0.12 0.53 0.16 4 0.57 0.57 0.57 1
3.34 1.00 1.00 1.00
Risk Reward
May separate risk and reward… and add more
criteria
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 32
Case 2: Prioritizing in a Hierarchy
• Many criteria, and few alternatives
– Define the criteria
• Organize into a hierarchy
– Prioritize the criteria hierarchy top-down
• By what method?
– Apply the most important criteria first
• No need to continue once an alternative
dominates the rest
– Check the analysis for sensitivity
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 33
Case 2: Prioritizing in a Hierarchy
alternatives
businessasusual
shutofftheiroxygen
embraceandextend
radicalreengineering
criteria % wt.
SA1
SA2
SA3
SA4
revenue
cost
risk
fun
%
¶
·
¸
¹Î
What project strategy
is to prefer?
What are the criteria?
Here we have an
example of each type
of criteria
(mathematically)
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 34
Case 2: Step 1 Prioritizing the Decision Criteria
Are the decision criteria equal in importance? No!
So prioritize the criteria… by the same method:
Pair wise Evaluation
(importance of criteria to strategy selection) row row
criteria revenu cost risk fun normalized columns total avg.
revenue 1 3 5 7 0.597 0.662 0.536 0.438 2.232 0.558
cost 1/3 1 3 5 0.199 0.221 0.321 0.313 1.053 0.263
risk 1/5 1/3 1 3 0.119 0.074 0.107 0.188 0.487 0.122
fun 1/7 1/5 1/3 1 0.085 0.044 0.036 0.063 0.228 0.057
1.676 4.533 9.333 16.000 1 1 1 1 4 1
Î
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 35
Case 2: Step 2 Prioritizing the Alternatives
revenue (projected revenue for alternative) totals
estimated value 100 60 120 80 360
normalized 0.278 0.167 0.333 0.222 1.000
¶
cost (relative cost of alternative) totals
estimated value $100 $120 $110 $140 470
the inverse 0.010 0.008 0.009 0.007 0.035
normalized 0.289 0.241 0.263 0.207 1.000
·
Bigger is Better!
Smaller is Better! => Inverse!
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 36
Case 2: Step 2 Prioritizing the Alternatives
risk (the degreeof strategic risk)
absolute judgment 2 5 3 4 no. of arrows
weight 0.260 0.035 0.134 0.068 0.4969
normalized 0.523 0.070 0.270 0.136 1.000
¸
risk (the degree of risk for alternative) row row
absolute judgment scale: safe some risk bold fool normalized columns total avg.
ô 1 safe 1 3 5 7 9 0.560 0.642 0.524 0.429 0.360 2.514 0.503
ôô 2 some risk 1/3 1 3 5 7 0.187 0.214 0.315 0.306 0.280 1.301 0.260
ôôô 3 risky 1/5 1/3 1 3 5 0.112 0.071 0.105 0.184 0.200 0.672 0.134
ôôôô 4 bold 1/7 1/5 1/3 1 3 0.080 0.043 0.035 0.061 0.120 0.339 0.068
ôôôôô 5 foolhardy 1/9 1/7 1/5 1/3 1 0.062 0.031 0.021 0.020 0.040 0.174 0.035
1.79 4.68 9.53 16.33 25.00 1.000 1.000 1.000 1.000 1.000 5.000 1.000
The absolute judgment requires expertise
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 37
Case 2: Step 2 Prioritizing the Alternatives
(amount of enjoyment in doing alternative) row row
fun busine shut o embrac radica normalized columns total avg.
business as usual 1 1/3 1/5 5 0.109 0.074 0.122 0.227 0.532 0.133
shut off their oxygen 3/1 1 1/3 7 0.326 0.223 0.203 0.318 1.070 0.268
embrace and extend 5/1 3/1 1 9 0.543 0.670 0.608 0.409 2.231 0.558
radical reengineering 1/5 1/7 1/9 1 0.022 0.032 0.068 0.045 0.167 0.042
9.200 4.476 1.644 22.000 1 1 1 1 4 1
¹
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 38
Case 2: Step 3 Final Alternatives Evaluated
businessasusual
shutofftheiroxygen
embraceandextend
radicalreengineering
criteria % wt
SA1
SA2
SA3
SA4
100 60 120 80
0.278 0.167 0.333 0.222
revenue 0.558 0.155 0.093 0.186 0.124
cost
risk
fun
% priorities
count or estimate
local priorities
global priorities
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 39
Case 2: Step 3 Final Alternatives Evaluated
businessasusual
shutofftheiroxygen
embraceandextend
radicalreengineering
criteria % wt
SA1
SA2
SA3
SA4
100 60 120 80
0.278 0.167 0.333 0.222
revenue 0.558 0.155 0.093 0.186 0.124
100 120 110 140
0.289 0.241 0.263 0.207
cost 0.263 0.076 0.063 0.069 0.054
2 5 3 4
0.523 0.07 0.27 0.136
risk 0.122 0.064 0.009 0.033 0.017
0.133 0.268 0.558 0.042
fun 0.057 0.008 0.015 0.032 0.002
% 0.303 0.18 0.32 0.197 priorities
count or estimate
local priorities
global priorities
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 40
AHP: More criteria?
important
criteria
applied first
hierarchyof
criteria
alternatives
priorities
priorities
For a large number of
criteria…
We must organize the
Criteria
• Pairwise evaluation
would be too time
consuming…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 41
AHP: Complex criteria REQUIRE A HIERARCHY
primary secondary tertiary
Secondary 1.1
1.2.1
1.2.2
Secondary 1.2 1.2.3
1.2.4
PRIMARY 2 Secondary 2.1 1.2.4
2.1.1
2.1.2
2.1.3
Secondary 2.2
– Several goals?
– Several
objectives for
each goal?
– Several sub-
objectives for
each objective?
•Three levels is all you
need…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 42
AHP: Work top down
• First, compare
the primaries
• Then, compare
the secondaries
for the most
important
primary…
primary secondary tertiary
Secondary 1.1
local global
0.09 0.04 1.2.1
1.2.2
Secondary 1.2 1.2.3
local global 1.2.4
0.54 0.27
PRIMARY 2 Secondary 2.1 1.2.4
0.50 local global 2.1.1
0.32 0.16 2.1.2
2.1.3
Secondary 2.2
local global
0.06 0.03
1.00 0.50
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 43
AHP: Branch by branch
primary secondary tertiary local global
Secondary 1.1
local global
0.09 0.04 1.2.1 0.47 0.13
1.2.2 0.32 0.09
Secondary 1.2 1.2.3 0.17 0.05
local global 1.2.4 0.04 0.01
0.54 0.27 1.00
PRIMARY 2 Secondary 2.1 1.2.4
0.50 local global 2.1.1
0.32 0.16 2.1.2
2.1.3
Secondary 2.2
local global
0.06 0.03
1.00 0.50
Then compare the tertiaries for the most
important secondary…
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 44
AHP: Most important criteria
primary secondary tertiary local global rank ?
Secondary 1.1 0.04 5
local global
0.09 0.04 1.2.1 0.47 0.13 1 
1.2.2 0.32 0.09 3 
Secondary 1.2 1.2.3 0.17 0.05 4 
local global 1.2.4 0.04 0.01 9
0.54 0.27 1.00
PRIMARY 2 Secondary 2.1 1.2.4 0.64 0.10 2 
0.50 local global 2.1.1 0.21 0.03 6
0.32 0.16 2.1.2 0.10 0.02 8
2.1.3 0.05 0.01 10
Secondary 2.2 1.00
local global
0.06 0.03 0.03 7
1.00 0.50 0.50
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 45
AHP: Results
•We can identify and prioritize the most important criteria
first
– Before all the criteria are prioritized,
or even identified
– Efficient prioritization!
•Apply those most important criteria to the alternatives
– And stop if one alternative is dominant
– Efficient selection!
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 46
AHP: Focusing on Few Criteria
• Exhaustive evaluation is unnecessary
Requirements Priority
0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
Requirements
Priority
High value
Requirements
BEST EFFORTS
Low value
Requirements
USUAL EFFORTS
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 47
AHP: Don’t make this mistake
– Criteria not at same
level of detail?
– Priorities on ordinal
or interval scale?
– All criteria applied,
inconsistently, with
an ordinal scale?
• Ordinal x
ordinal = “error:
invalid
operation”
– Add table entries
– Result = garbage
all criteria
applied
alternatives
ordinalpriorities
big list
of
criteria
garbage
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 48
AHP: Summary
• The Analytic Hierarchy Process (AHP)
– How are priority/selection decisions made in
your organization?
– Is the process well-defined and visible?
• is it checked? improved? taught?
– Is it done efficiently?
• Is the math legitimate?
• Is it important, and useful, to be good at rapid,
accurate priorities?
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 49
AHP: Software
• There are several packages available to do the
calculations (including Excel).
– Expert Choice 2000 (www.expertchoice.com)
• Trial version available for free download
• Limited to three levels (you don’t need more for
most analyses)
• Excellent inconsistency and sensitivity analysis
• Good manual and tutorial in full version
• Many decision analysis tools include AHP
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 50
Step 6: Deploy Prioritized Customer Needs
• Now that you know the most important customer needs, you
know:
– What you must do to deliver them?
– How to find the most important contributors
in the other columns on the CVT
• or add them...
• Define the Maximum Value Table
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 51
Step 6: Maximum Value Table
customer voice table customer voice table customer voice table
c us t om er c onc er ns t ec hnic al c onc er ns des ign c onc er ns
customer customer customer technical
segments problems needs requirements functions technology reliability safety
home owner "slips out of my can hold easily dimensions illuminate objectspower saving works in cold no sparks
hand and breaks" switch weather (gas leak)
driver "always dead charges quickly weight protect adjustable focus switch doesn't bright color,
when I need it" components stick glow-in-the-dark
camper "don't bring can carry easily stability transform energyadjustable lens doesn't crackstill works
when I need it" headband when dropped when dropped
On the MVT,
those items that contribute most to satisfying the most
important customer needs, are the maximum value items
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 52
Step 7. Analyze Essential Tasks in Detail
•Analyze Important Relationships in Detail and only to the extent
that is warranted!
– keep the focus on high-value items
– explore [only] to the depth necessary,
• the details of one column, or
• the interactions between two columns
•Redefine the WBS if necessary
•Modify the project risk analysis with FMEA
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 53
Doing Project Blitz QFD
• Don’t stagnate!
– continually improve at QFD, and product development
• get better at the tools & techniques
• refine your process
• become more sophisticated, more comprehensive
– graduate from Blitz QFD, to Comprehensive QFD
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 54
Doing Project Blitz QFD
• Any negative effects?
– Is there any downside to
doing Blitz QFD?
– Will anything else be
worse because you are
doing Blitz?
• Plan how to deal with
negative effects and
anticipated obstacles!
Any anticipated obstacles?
– If you can’t do Blitz QFD,
you can’t do QFD…
• easier, faster, cheaper
– Management may need a
professional overview of
QFD
• benefits
• who’s doing it
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 55
Doing Project Blitz QFD
• Preparation (offline)
– one day: sort out our inputs; clarify what we have; what
we are doing; goals
• Workshop (with full team)
– one day: do Blitz
• Follow up (with selected team members)
– one day: how to fill in the holes we found
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 56
Doing Project Blitz QFD
• Blitz QFD:
– emphasizes on all the basic themes of QFD
– develops good QFD habits,
and avoids bad QFD habits
– demonstrates the power of QFD quickly
– fully upwards compatible with high-powered comprehensive
QFD
– encourages development to a more sophisticated QFD
process
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 57
AHP Homework example: Where to go on
vacation?
• Alternatives?
– Bora Bora
– Orlando
– Paris
– New York
• Criteria?
– Relaxation
– Things to Do
– Cost
– Memories
• Take four alternatives, and apply four weighted
• criteria to them (as a minimum)
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 58
AHP: Example
Vacation Destinations
BoraBora
Orlando
Paris
NewYork
Critieria priority
0.62 0.12 0.20 0.06 local priorities
Relaxation 0.16 0.10 0.02 0.03 0.01 global priorities
0.05 0.21 0.32 0.42 local priorities
Things to Do 0.09 0.00 0.02 0.03 0.04 global priorities
0.06 0.24 0.13 0.57 local priorities
Cost 0.34 0.02 0.08 0.04 0.20 global priorities
0.57 0.10 0.29 0.04 local priorities
Memories 0.41 0.23 0.04 0.12 0.02 global priorities
1.00 0.36 0.16 0.22 0.26 priority 1.000
1 4 3 2 rank
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 59
AHP: Example
Criteria Weight
Relaxation
ThingstoDo
Cost
Memories
normalized columns S
priority
rank
Relaxation 1 3 1/2 1/5 0.120 0.273 0.182 0.079 0.653 0.163 3
Things to Do 1/3 1 1/4 1/3 0.040 0.091 0.091 0.132 0.353 0.088 4
Cost 2 4 1 1 0.240 0.364 0.364 0.395 1.362 0.341 2
Memories 5 3 1/1 1 0.600 0.273 0.364 0.395 1.631 0.408 1
8.333 11.000 2.750 2.533 1.000 1.000 1.000 1.000 4.000 1.000
Relaxation
BoraBora
Orlando
Paris
NewYork
normalized columns S
priority
rank
Bora Bora 1 6 4 8 0.649 0.643 0.696 0.500 2.487 0.622 1
Orlando 1/6 1 1/2 3 0.108 0.107 0.087 0.188 0.490 0.122 3
Paris 1/4 2 1 4 0.162 0.214 0.174 0.250 0.800 0.200 2
New York 1/8 1/3 1/4 1 0.081 0.036 0.043 0.063 0.223 0.056 4
1.542 9.333 5.750 16.000 1.000 1.000 1.000 1.000 4.000 1.000
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 60
AHP: Example
Things to Do
BoraBora
Orlando
Paris
NewYork
totals
estimated number 10 40 60 80 190
normalized 0.053 0.211 0.316 0.421 1.000
4 3 2 1 rank
Cost
BoraBora
Orlando
Paris
NewYork
totals
estimated cost $5,000 $1,200 $2,200 $500 $8,900
the inverse 0.000 0.001 0.000 0.002 0.003
normalized 0.057 0.239 0.130 0.573 1.000
4 2 3 1 rank
Mgt 610 Strategic Perspectives on Project Management
(c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 61
AHP: Example
Now go and construct your own AHP example
using Excel (or download Expert Choice 2000)
Memories
weeks
months
years
lifetime
normalized columns S
priority
values weeks 1 1/4 1/7 1/9 0.048 0.019 0.033 0.070 0.169 0.042
months 4 1 1/5 1/7 0.190 0.075 0.046 0.090 0.402 0.101
years 7 5 1 1/3 0.333 0.377 0.230 0.210 1.151 0.288
lifetime 9 7 3 1 0.429 0.528 0.691 0.630 2.278 0.569
21.000 13.250 4.343 1.587 1.000 1.000 1.000 1.000 4.000 1.000
values applied
BoraBora
Orlando
Paris
NewYork
value lifetime months years weeks
priority 0.569 0.101 0.288 0.042
1 3 2 4 rank

More Related Content

PDF
Statistical Discovery for Consumer and Marketing Research
PDF
A Primer in Statistical Discovery
PPT
Crystal ball
PDF
Risk Management in Data Analysis
PPTX
JMP for Ethanol Producers
PDF
THE 5 DIMENSIONS OF PROBLEM SOLVING USING DINNA: CASE STUDY IN THE ELECTRONIC...
PPTX
Understanding data dfm_1_yogi_schulz_2017_05
PPTX
Hypothesis Testing: Relationships (Compare 2+ Factors)
Statistical Discovery for Consumer and Marketing Research
A Primer in Statistical Discovery
Crystal ball
Risk Management in Data Analysis
JMP for Ethanol Producers
THE 5 DIMENSIONS OF PROBLEM SOLVING USING DINNA: CASE STUDY IN THE ELECTRONIC...
Understanding data dfm_1_yogi_schulz_2017_05
Hypothesis Testing: Relationships (Compare 2+ Factors)

What's hot (19)

PDF
50120140507010
PPTX
Hypothesis Testing: Central Tendency – Normal (Compare 2+ Factors)
PPTX
Hypothesis Testing: Proportions (Compare 2+ Factors)
PPTX
Hypothesis Testing: Formal and Informal Sub-Processes
PPTX
Hypothesis Testing: Spread (Compare 1:1)
PPTX
Hypothesis Testing: Relationships (Overview)
PPTX
Hypothesis Testing: Central Tendency – Normal (Compare 1:1)
PPTX
Kepner-Tregoe Problem-Solving Method
PDF
Building Engaging Games for Learning AND Assessment
PPTX
Hypothesis Testing: Central Tendency – Non-Normal (Compare 1:1)
DOCX
Chaplin school of hospitality and tourism management inter
PPTX
Hypothesis Testing: Relationships (Compare 1:1)
PPTX
Hypothesis Testing: Proportions (Compare 1:1)
PDF
Top Brainnovation to boost Workplace Productivity and Resilience
PDF
Biostatistics Workshop: Regression
PPTX
Hypothesis Testing: Statistical Laws and Confidence Intervals
PPTX
Hypothesis Testing: Central Tendency – Non-Normal (Compare 2+ Factors)
PPTX
Hypothesis Testing: Proportions (Compare 1:Standard)
PPTX
Hypothesis Testing: Spread (Compare 2+ Factors)
50120140507010
Hypothesis Testing: Central Tendency – Normal (Compare 2+ Factors)
Hypothesis Testing: Proportions (Compare 2+ Factors)
Hypothesis Testing: Formal and Informal Sub-Processes
Hypothesis Testing: Spread (Compare 1:1)
Hypothesis Testing: Relationships (Overview)
Hypothesis Testing: Central Tendency – Normal (Compare 1:1)
Kepner-Tregoe Problem-Solving Method
Building Engaging Games for Learning AND Assessment
Hypothesis Testing: Central Tendency – Non-Normal (Compare 1:1)
Chaplin school of hospitality and tourism management inter
Hypothesis Testing: Relationships (Compare 1:1)
Hypothesis Testing: Proportions (Compare 1:1)
Top Brainnovation to boost Workplace Productivity and Resilience
Biostatistics Workshop: Regression
Hypothesis Testing: Statistical Laws and Confidence Intervals
Hypothesis Testing: Central Tendency – Non-Normal (Compare 2+ Factors)
Hypothesis Testing: Proportions (Compare 1:Standard)
Hypothesis Testing: Spread (Compare 2+ Factors)
Ad

Viewers also liked (10)

PDF
Week11 slides
PDF
Lecture04 slides
PDF
Week09 cc single_project_slides_v1
DOCX
Yiheng deng hw3
DOC
Yiheng deng hw2
DOC
Yiheng deng hw1
PDF
Week10 slides
PDF
Week12 slides
PDF
Reading week08 saaty_ahp_prediction
PPT
Examples of smart_objective_attributes
Week11 slides
Lecture04 slides
Week09 cc single_project_slides_v1
Yiheng deng hw3
Yiheng deng hw2
Yiheng deng hw1
Week10 slides
Week12 slides
Reading week08 saaty_ahp_prediction
Examples of smart_objective_attributes
Ad

Similar to Week08 slides (20)

PDF
Lecture07 vo customer
PDF
Week07 slides 2013_s
PDF
UsingAHP_02
PDF
PDF
Using the Analytic Hierarchy Process (AHP) to Select and Prioritize Project...
PPT
Lecture 1b AHP - Copy.pptwjsjw ww s d dd
PPTX
Intelligent decision support systems-SCT
PPT
AHP Method
PDF
Apply AHP in decision making
PDF
How to prioritize criteria - process overview
PPT
AHP_Report_EM-206.ppt
PPTX
Multiple Criteria for Decision
PPTX
Analytic Hierarchy Process Presentation.pptx
DOCX
With the consideration of the recurring theme and ideas of .docx
PPT
PPT-UEU-Sistem-Pendukung-Keputusan-Pertemuan-9.ppt
PDF
Poonam 20ahluwalia-131008015758-phpapp02
PDF
Poonam ahluwalia
PDF
Application of the analytic hierarchy process (AHP) for selection of forecast...
PDF
Week05 slides
PPSX
Requirement Management
Lecture07 vo customer
Week07 slides 2013_s
UsingAHP_02
Using the Analytic Hierarchy Process (AHP) to Select and Prioritize Project...
Lecture 1b AHP - Copy.pptwjsjw ww s d dd
Intelligent decision support systems-SCT
AHP Method
Apply AHP in decision making
How to prioritize criteria - process overview
AHP_Report_EM-206.ppt
Multiple Criteria for Decision
Analytic Hierarchy Process Presentation.pptx
With the consideration of the recurring theme and ideas of .docx
PPT-UEU-Sistem-Pendukung-Keputusan-Pertemuan-9.ppt
Poonam 20ahluwalia-131008015758-phpapp02
Poonam ahluwalia
Application of the analytic hierarchy process (AHP) for selection of forecast...
Week05 slides
Requirement Management

More from henry KKK (19)

PDF
Week10 slides
PDF
Week10 slides
PDF
Week09 cc single_project_slides_v1
PDF
Week06 slides
PDF
Week05 spc single_case
PDF
Week05 reading
PDF
Week05 exercise
PDF
Week03 slides spring_2013
PDF
Week03 reading lechler_pm_mindset
PDF
Week02 slides spring_2013
PDF
Week02 reading lechler_plan_and_changing
PDF
Week01 slides spring_2013
PDF
Toc evaporating cloud
PDF
Toc evaporating cloud
PDF
Syllabus mgt610 2013_s
PDF
Reading week09 lechler_cc
PDF
Reading week08 shah_ahp_case
PDF
Reading week08 shah_ahp_case
PDF
Reading week08 saaty_sevenpillars_ahp
Week10 slides
Week10 slides
Week09 cc single_project_slides_v1
Week06 slides
Week05 spc single_case
Week05 reading
Week05 exercise
Week03 slides spring_2013
Week03 reading lechler_pm_mindset
Week02 slides spring_2013
Week02 reading lechler_plan_and_changing
Week01 slides spring_2013
Toc evaporating cloud
Toc evaporating cloud
Syllabus mgt610 2013_s
Reading week09 lechler_cc
Reading week08 shah_ahp_case
Reading week08 shah_ahp_case
Reading week08 saaty_sevenpillars_ahp

Recently uploaded (20)

PPTX
5 Stages of group development guide.pptx
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PDF
Unit 1 Cost Accounting - Cost sheet
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
DOCX
Euro SEO Services 1st 3 General Updates.docx
PDF
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
PDF
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PDF
IFRS Notes in your pocket for study all the time
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
DOCX
Business Management - unit 1 and 2
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
A Brief Introduction About Julia Allison
PDF
Chapter 5_Foreign Exchange Market in .pdf
PPTX
Amazon (Business Studies) management studies
5 Stages of group development guide.pptx
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
Unit 1 Cost Accounting - Cost sheet
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
Euro SEO Services 1st 3 General Updates.docx
20250805_A. Stotz All Weather Strategy - Performance review July 2025.pdf
Belch_12e_PPT_Ch18_Accessible_university.pptx
Stem Cell Market Report | Trends, Growth & Forecast 2025-2034
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
BsN 7th Sem Course GridNNNNNNNN CCN.pdf
Probability Distribution, binomial distribution, poisson distribution
ICG2025_ICG 6th steering committee 30-8-24.pptx
IFRS Notes in your pocket for study all the time
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
Business Management - unit 1 and 2
COST SHEET- Tender and Quotation unit 2.pdf
A Brief Introduction About Julia Allison
Chapter 5_Foreign Exchange Market in .pdf
Amazon (Business Studies) management studies

Week08 slides

  • 1. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 1 MGT610 Lecture 8 Stakeholder Perspective: Prioritizing Needs
  • 2. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 2 Project Value Network Shareholder Value Outcome Value Stakeholder Value Effort Value AHP
  • 3. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 3 Topics and Objectives • Strategic Thinking: Focusing on what creates most value for the stakeholders • Prioritize Customer Needs with AHP • Deploy Prioritized Customer Needs • Analyze [only] important relationships in detail
  • 4. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 4 Session Agenda Stakeholder Perspective: Identifying Needs for Requirement Definition 1. Perceptions of value lead to expectations 2. Compatibility of expectations as segmentation basis 3. Stable needs but dynamic expectations 4. Describing expectation as a tolerance
  • 5. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 5 3. Project Blitz QFD: The 7 Steps of Blitz QFD 0. Identify the Customers (Previous lecture) 1. Go to Gemba (Previous lecture) 2. Discover Customer Needs (Previous lecture) 3. Structure Customer Needs (Previous lecture) 4. Analyze Customer Needs Structure (Previous lecture) 5. Prioritize Customer Needs (AHP) 6. Deploy Prioritized Customer Needs (MVT) 7. Analyze Essential Tasks in Detail (WBS, FMEA)
  • 6. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 6 Project Blitz QFD: Step 5-7 Analytic Hierarchy Process What needs are most important?    Hierarchy diagram Maximum Value table How to meet their needs? items tasks needsneeds high-value customer needs 7MP tools high-value tasks tasks Project Task table How will we do it? FMEA table risks What could go wrong? What needs weren't stated?  high-risk items high-value itemspriorities a b c ? [House of Quality] What details should we know?
  • 7. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 7 AHP: Priorities - Filtering / Selecting / Sorting Should we focus on all identified customer needs? We need a method for – deciding which customer needs to focus on by using a set of decision criteria – deciding which to do now (priorities), and which to do later (posteriorities) But what are we looking for in a “priority”?
  • 8. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 8 AHP: Different Types of Measurement Scales scale empirical observations example mathematical structure nominal determination of equality numbers on football players mayinterchange values ordinal determination of rank order team standings maysquare or cube values interval equalityofintervals or differences temperature in ° F or ° C mayadd a constantto values ratio equalityofratios temperature in ° Kelvin maymultiplyvalues bya constant source: S.S. Stevens, Science 103:678 For accurate selection, and for weights you can multiply by, you must have ratio scale priorities
  • 9. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 9 AHP: Direction to a Solution What is the simplest way to get ratio scale priorities? Even though we don’t have ratio scale judgments? inputs AHP outputs ratio scale results judgments
  • 10. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 10 AHP: The Analytical Hierarchy Process Developed by Dr. Thomas L. Saaty – well-tested, with excellent track record • does not require consensus from participants – works with quantitative and qualitative data • produces ratio scale results in all cases – psychologically “user friendly” • uses relative judgment (pairwise evaluation) – forces a detailed understanding of issues • leads to a common understanding of the decision, and the rationale for it
  • 11. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 11 AHP: Inputs How do we get our inputs? – Pairwise evaluation “Which one is more? – Using a relative judgment scale “How much more?” A pairwise evaluation on a single dimension is the most accurate judgment you make Scale – 9 extreme – 8 – 7 very strong – 6 – 5 strong – 4 – 3 moderate – 2 – 1 equal
  • 12. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 12 AHP: Basic Template
  • 13. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 13 AHP: Example: Apples with Oranges Comparing apples and oranges, and other fruit, on one characteristic: juiciness – Additional characteristics can be handled the same way…
  • 14. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 14 AHP: Example: Apples with Oranges - Step1 For a single criteria (at a time) Compare each pair 1 2 3 4 juiciness rmelon orange pear apple 1 watermelon 1 2 orange 1 3 pear 1 4 apple 1
  • 15. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 15 AHP: Example: Apples with Oranges – Step1 After our first step the matrix looks like the following, but with different numbers. 1 2 3 4 juiciness rmelon orange pear apple watermelon 1 2 4 6 orange 1 2 4 pear 1 2 apple 1
  • 16. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 16 AHP: Example: Apples with Oranges – Step2 The second step completes the matrix. After the second step the matrix looks like the following, just with different numbers. 1 2 3 4 juiciness rmelon orange pear apple 1 watermelon 1 2 4 6 2 orange 1/2 1 2 4 3 pear 1/4 1/2 1 2 4 apple 1/6 1/4 1/2 1
  • 17. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 17 AHP: Example: Apples with Oranges – Step3 1 2 3 4 juiciness rmelon orange pear apple 1 watermelon 1 2 4 6 2 orange 1/2 1 2 4 3 pear 1/4 1/2 1 2 4 apple 1/6 1/4 1/2 1 1.92 3.75 7.50 13.0
  • 18. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 18 AHP: Example: Apples with Oranges – Step4 1 2 3 4 1 2 3 4 row row juiciness rmelon orange pear apple normalized columns total avg. 1 watermelon 1 2.0 4 6 0.52 0.53 0.53 0.46 2 orange 1/2 1 2 4 0.26 0.27 0.27 0.31 3 pear 1/4 1/2 1 2 0.13 0.13 0.13 0.15 4 apple 1/6 1/4 1/2 1 0.09 0.07 0.07 0.08 1.92 3.75 7.50 13.00 1.00 1.00 1.00 1.00 4.00 1.000 relative judgment scale: extreme 9.0 1/9 0.111 8.0 1/8 0.125 very strong 7.0 1/7 0.143 6.0 1/6 0.167 strong 5.0 1/5 0.200 4.0 1/4 0.250 moderate 3.0 1/3 0.333 2.0 1/2 0.500 equal 1.0 1/1 1.000 the Row Average of Normalized Columns approximation
  • 19. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 19 AHP: Example: Apples with Oranges – Step5 and 6 1 2 3 4 1 2 3 4 row row juiciness rmelon orange pear apple normalized columns total avg. 1 watermelon 1 2.0 4 6 0.52 0.53 0.53 0.46 2.049 0.512 2 orange 1/2 1 2 4 0.26 0.27 0.27 0.31 1.101 0.275 3 pear 1/4 1/2 1 2 0.13 0.13 0.13 0.15 0.551 0.138 4 apple 1/6 1/4 1/2 1 0.09 0.07 0.07 0.08 0.299 0.075 1.92 3.75 7.50 13.00 1.00 1.00 1.00 1.00 4.00 1.000 relative judgment scale: extreme 9.0 1/9 0.111 8.0 1/8 0.125 very strong 7.0 1/7 0.143 6.0 1/6 0.167 strong 5.0 1/5 0.200 4.0 1/4 0.250 moderate 3.0 1/3 0.333 2.0 1/2 0.500 equal 1.0 1/1 1.000 the Row Average of Normalized Columns approximation
  • 20. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 20 AHP: Example: Apples with Oranges – Output • The results: – accurate – ratio-scale – Priorities – This can be proven mathematically to be a ratio scale ratio-scale juiciness priorities 1 watermelon 0.512 2 orange 0.275 3 pear 0.138 4 apple 0.075 1.000 What are your fruit ratios?
  • 21. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 21 AHP: Example: Apples with Oranges – Checking •How do we know it’s right? – Sensitivity analysis • visible process • “what-if” scenarios – Judgment consistency • the inconsistency ratio (.10 < IR) • revisit the most inconsistent judgments Expert Choice ratio-scale exact priorities calc. 0.512 0.542 0.275 0.303 0.138 0.110 0.075 0.045 1.000 1.000 IR= 0.06
  • 22. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 22 AHP: Types of Evaluation Criteria 1. Relative judgments (Nominal Scale) – the most generally applicable – the most accurate judgment 2. Absolute judgments (Ordinal Scale) – ranking against a standard scale – requires experience and expertise 3. Quantitative judgments (Interval Scale) Measurements or Estimates (numeric quantities) – bigger is better – smaller is better
  • 23. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 23 AHP: Case 1: Selecting Projects Many projects, and a few criteria – Define the evaluation criteria • And the values they may take on – Prioritize the values – For each criteria, assign values • And plug in the priority of that value – Add the priorities, normalize, and rank
  • 24. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 24 AHP: Case 1: Rating projects Criteria Risk Reward Uncertainty Complexity Pace Success Projects S % rank Project 1 Project 2 Project 3 Project 4
  • 25. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 25 AHP: Case 1: Criteria Uncertainty Technological Uncertainty Uncertainty low medium high super-high normalized columns S % low 1 2 3 5 0.49 0.46 0.55 0.45 1.95 0.49 medium 1/2 1 1 3 0.25 0.23 0.18 0.27 0.93 0.23 high 1/3 1/1 1 2 0.16 0.23 0.18 0.18 0.76 0.19 super-high 1/5 1/3 1/2 1 0.10 0.08 0.09 0.09 0.36 0.09 2.03 4.33 5.50 11.00 1.00 1.00 1.00 1.00 4.00 1.00  Take each criteria,  Define the values it can take on  Prioritize those values, with pairwise evaluation
  • 26. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 26 AHP: Case 1: Criteria Complexity System Complexity (scope) Complexity assembly system array normalized columns S % assembly 1 4 6 0.71 0.75 0.60 2.06 0.69 system 1/4 1 3 0.18 0.19 0.30 0.66 0.22 array 1/6 1/3 1 0.12 0.06 0.10 0.28 0.09 1.42 5.33 10.00 1.00 1.00 1.00 3.00 1.00 Continue for each criteria, and all values
  • 27. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 27 AHP: Case 1: Criteria Pace And additional criteria would be handled the same way… Time frame available for completion Pace regular fast blitz normalized columns S % regular 1 2 4 0.57 0.60 0.50 1.67 0.56 fast 1/2 1 3 0.29 0.30 0.38 0.96 0.32 blitz 1/4 1/3 1 0.14 0.10 0.13 0.37 0.12 1.75 3.33 8.00 1.00 1.00 1.00 3.00 1.00
  • 28. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 28 AHP: Case 1: Criteria Success Primary success dimension impact (expected) Success efficiency customer business future normalized columns S % efficiency 1 3 5 7 0.60 0.58 0.68 0.44 2.29 0.57 customer 1/3 1 1 5 0.20 0.19 0.14 0.31 0.84 0.21 business 1/5 1/1 1 3 0.12 0.19 0.14 0.19 0.64 0.16 future 1/7 1/5 1/3 1 0.09 0.04 0.05 0.06 0.23 0.06 1.68 5.20 7.33 16.00 1.00 1.00 1.00 1.00 4.00 1.00 After the “risk” or “cost” criteria, Here is a “reward” or “benefit” criteria… Now fill the the appropriate values in the table
  • 29. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 29 AHP: Case 1: Rating projects Criteria Risk Reward Uncertainty Complexity Pace Success Projects S % rank medium system blitz customer Project 1 low array fast business Project 2 super assembly regular future Project 3 high system blitz efficiency Project 4 0.00
  • 30. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 30 AHP: Case 1: Project Priorities Criteria Risk Reward Uncertainty Complexity Pace Success Projects S % rank medium system blitz customer Project 1 0.23 0.22 0.12 0.21 0.79 0.18 4 low array fast business Project 2 0.49 0.09 0.32 0.16 1.06 0.24 3 super assembly regular future Project 3 0.09 0.69 0.56 0.06 1.39 0.32 1 high system blitz efficiency Project 4 0.19 0.22 0.12 0.57 1.11 0.25 2 4.34 1.00
  • 31. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 31 AHP: Case 1: Many ways to apply … Criteria Risk Reward Uncertainty Complexity Pace Success Projects S % rank S % rank medium system blitz customer Project 1 0.23 0.22 0.12 0.58 0.17 3 0.21 0.21 0.21 2 low array fast business Project 2 0.49 0.09 0.32 0.90 0.27 2 0.16 0.16 0.16 3 super assembly regular future Project 3 0.09 0.69 0.56 1.33 0.40 1 0.06 0.06 0.06 4 high system blitz efficiency Project 4 0.19 0.22 0.12 0.53 0.16 4 0.57 0.57 0.57 1 3.34 1.00 1.00 1.00 Risk Reward May separate risk and reward… and add more criteria
  • 32. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 32 Case 2: Prioritizing in a Hierarchy • Many criteria, and few alternatives – Define the criteria • Organize into a hierarchy – Prioritize the criteria hierarchy top-down • By what method? – Apply the most important criteria first • No need to continue once an alternative dominates the rest – Check the analysis for sensitivity
  • 33. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 33 Case 2: Prioritizing in a Hierarchy alternatives businessasusual shutofftheiroxygen embraceandextend radicalreengineering criteria % wt. SA1 SA2 SA3 SA4 revenue cost risk fun % ¶ · ¸ ¹Î What project strategy is to prefer? What are the criteria? Here we have an example of each type of criteria (mathematically)
  • 34. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 34 Case 2: Step 1 Prioritizing the Decision Criteria Are the decision criteria equal in importance? No! So prioritize the criteria… by the same method: Pair wise Evaluation (importance of criteria to strategy selection) row row criteria revenu cost risk fun normalized columns total avg. revenue 1 3 5 7 0.597 0.662 0.536 0.438 2.232 0.558 cost 1/3 1 3 5 0.199 0.221 0.321 0.313 1.053 0.263 risk 1/5 1/3 1 3 0.119 0.074 0.107 0.188 0.487 0.122 fun 1/7 1/5 1/3 1 0.085 0.044 0.036 0.063 0.228 0.057 1.676 4.533 9.333 16.000 1 1 1 1 4 1 Î
  • 35. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 35 Case 2: Step 2 Prioritizing the Alternatives revenue (projected revenue for alternative) totals estimated value 100 60 120 80 360 normalized 0.278 0.167 0.333 0.222 1.000 ¶ cost (relative cost of alternative) totals estimated value $100 $120 $110 $140 470 the inverse 0.010 0.008 0.009 0.007 0.035 normalized 0.289 0.241 0.263 0.207 1.000 · Bigger is Better! Smaller is Better! => Inverse!
  • 36. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 36 Case 2: Step 2 Prioritizing the Alternatives risk (the degreeof strategic risk) absolute judgment 2 5 3 4 no. of arrows weight 0.260 0.035 0.134 0.068 0.4969 normalized 0.523 0.070 0.270 0.136 1.000 ¸ risk (the degree of risk for alternative) row row absolute judgment scale: safe some risk bold fool normalized columns total avg. ô 1 safe 1 3 5 7 9 0.560 0.642 0.524 0.429 0.360 2.514 0.503 ôô 2 some risk 1/3 1 3 5 7 0.187 0.214 0.315 0.306 0.280 1.301 0.260 ôôô 3 risky 1/5 1/3 1 3 5 0.112 0.071 0.105 0.184 0.200 0.672 0.134 ôôôô 4 bold 1/7 1/5 1/3 1 3 0.080 0.043 0.035 0.061 0.120 0.339 0.068 ôôôôô 5 foolhardy 1/9 1/7 1/5 1/3 1 0.062 0.031 0.021 0.020 0.040 0.174 0.035 1.79 4.68 9.53 16.33 25.00 1.000 1.000 1.000 1.000 1.000 5.000 1.000 The absolute judgment requires expertise
  • 37. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 37 Case 2: Step 2 Prioritizing the Alternatives (amount of enjoyment in doing alternative) row row fun busine shut o embrac radica normalized columns total avg. business as usual 1 1/3 1/5 5 0.109 0.074 0.122 0.227 0.532 0.133 shut off their oxygen 3/1 1 1/3 7 0.326 0.223 0.203 0.318 1.070 0.268 embrace and extend 5/1 3/1 1 9 0.543 0.670 0.608 0.409 2.231 0.558 radical reengineering 1/5 1/7 1/9 1 0.022 0.032 0.068 0.045 0.167 0.042 9.200 4.476 1.644 22.000 1 1 1 1 4 1 ¹
  • 38. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 38 Case 2: Step 3 Final Alternatives Evaluated businessasusual shutofftheiroxygen embraceandextend radicalreengineering criteria % wt SA1 SA2 SA3 SA4 100 60 120 80 0.278 0.167 0.333 0.222 revenue 0.558 0.155 0.093 0.186 0.124 cost risk fun % priorities count or estimate local priorities global priorities
  • 39. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 39 Case 2: Step 3 Final Alternatives Evaluated businessasusual shutofftheiroxygen embraceandextend radicalreengineering criteria % wt SA1 SA2 SA3 SA4 100 60 120 80 0.278 0.167 0.333 0.222 revenue 0.558 0.155 0.093 0.186 0.124 100 120 110 140 0.289 0.241 0.263 0.207 cost 0.263 0.076 0.063 0.069 0.054 2 5 3 4 0.523 0.07 0.27 0.136 risk 0.122 0.064 0.009 0.033 0.017 0.133 0.268 0.558 0.042 fun 0.057 0.008 0.015 0.032 0.002 % 0.303 0.18 0.32 0.197 priorities count or estimate local priorities global priorities
  • 40. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 40 AHP: More criteria? important criteria applied first hierarchyof criteria alternatives priorities priorities For a large number of criteria… We must organize the Criteria • Pairwise evaluation would be too time consuming…
  • 41. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 41 AHP: Complex criteria REQUIRE A HIERARCHY primary secondary tertiary Secondary 1.1 1.2.1 1.2.2 Secondary 1.2 1.2.3 1.2.4 PRIMARY 2 Secondary 2.1 1.2.4 2.1.1 2.1.2 2.1.3 Secondary 2.2 – Several goals? – Several objectives for each goal? – Several sub- objectives for each objective? •Three levels is all you need…
  • 42. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 42 AHP: Work top down • First, compare the primaries • Then, compare the secondaries for the most important primary… primary secondary tertiary Secondary 1.1 local global 0.09 0.04 1.2.1 1.2.2 Secondary 1.2 1.2.3 local global 1.2.4 0.54 0.27 PRIMARY 2 Secondary 2.1 1.2.4 0.50 local global 2.1.1 0.32 0.16 2.1.2 2.1.3 Secondary 2.2 local global 0.06 0.03 1.00 0.50
  • 43. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 43 AHP: Branch by branch primary secondary tertiary local global Secondary 1.1 local global 0.09 0.04 1.2.1 0.47 0.13 1.2.2 0.32 0.09 Secondary 1.2 1.2.3 0.17 0.05 local global 1.2.4 0.04 0.01 0.54 0.27 1.00 PRIMARY 2 Secondary 2.1 1.2.4 0.50 local global 2.1.1 0.32 0.16 2.1.2 2.1.3 Secondary 2.2 local global 0.06 0.03 1.00 0.50 Then compare the tertiaries for the most important secondary…
  • 44. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 44 AHP: Most important criteria primary secondary tertiary local global rank ? Secondary 1.1 0.04 5 local global 0.09 0.04 1.2.1 0.47 0.13 1  1.2.2 0.32 0.09 3  Secondary 1.2 1.2.3 0.17 0.05 4  local global 1.2.4 0.04 0.01 9 0.54 0.27 1.00 PRIMARY 2 Secondary 2.1 1.2.4 0.64 0.10 2  0.50 local global 2.1.1 0.21 0.03 6 0.32 0.16 2.1.2 0.10 0.02 8 2.1.3 0.05 0.01 10 Secondary 2.2 1.00 local global 0.06 0.03 0.03 7 1.00 0.50 0.50
  • 45. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 45 AHP: Results •We can identify and prioritize the most important criteria first – Before all the criteria are prioritized, or even identified – Efficient prioritization! •Apply those most important criteria to the alternatives – And stop if one alternative is dominant – Efficient selection!
  • 46. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 46 AHP: Focusing on Few Criteria • Exhaustive evaluation is unnecessary Requirements Priority 0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 Requirements Priority High value Requirements BEST EFFORTS Low value Requirements USUAL EFFORTS
  • 47. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 47 AHP: Don’t make this mistake – Criteria not at same level of detail? – Priorities on ordinal or interval scale? – All criteria applied, inconsistently, with an ordinal scale? • Ordinal x ordinal = “error: invalid operation” – Add table entries – Result = garbage all criteria applied alternatives ordinalpriorities big list of criteria garbage
  • 48. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 48 AHP: Summary • The Analytic Hierarchy Process (AHP) – How are priority/selection decisions made in your organization? – Is the process well-defined and visible? • is it checked? improved? taught? – Is it done efficiently? • Is the math legitimate? • Is it important, and useful, to be good at rapid, accurate priorities?
  • 49. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 49 AHP: Software • There are several packages available to do the calculations (including Excel). – Expert Choice 2000 (www.expertchoice.com) • Trial version available for free download • Limited to three levels (you don’t need more for most analyses) • Excellent inconsistency and sensitivity analysis • Good manual and tutorial in full version • Many decision analysis tools include AHP
  • 50. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 50 Step 6: Deploy Prioritized Customer Needs • Now that you know the most important customer needs, you know: – What you must do to deliver them? – How to find the most important contributors in the other columns on the CVT • or add them... • Define the Maximum Value Table
  • 51. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 51 Step 6: Maximum Value Table customer voice table customer voice table customer voice table c us t om er c onc er ns t ec hnic al c onc er ns des ign c onc er ns customer customer customer technical segments problems needs requirements functions technology reliability safety home owner "slips out of my can hold easily dimensions illuminate objectspower saving works in cold no sparks hand and breaks" switch weather (gas leak) driver "always dead charges quickly weight protect adjustable focus switch doesn't bright color, when I need it" components stick glow-in-the-dark camper "don't bring can carry easily stability transform energyadjustable lens doesn't crackstill works when I need it" headband when dropped when dropped On the MVT, those items that contribute most to satisfying the most important customer needs, are the maximum value items
  • 52. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 52 Step 7. Analyze Essential Tasks in Detail •Analyze Important Relationships in Detail and only to the extent that is warranted! – keep the focus on high-value items – explore [only] to the depth necessary, • the details of one column, or • the interactions between two columns •Redefine the WBS if necessary •Modify the project risk analysis with FMEA
  • 53. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 53 Doing Project Blitz QFD • Don’t stagnate! – continually improve at QFD, and product development • get better at the tools & techniques • refine your process • become more sophisticated, more comprehensive – graduate from Blitz QFD, to Comprehensive QFD
  • 54. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 54 Doing Project Blitz QFD • Any negative effects? – Is there any downside to doing Blitz QFD? – Will anything else be worse because you are doing Blitz? • Plan how to deal with negative effects and anticipated obstacles! Any anticipated obstacles? – If you can’t do Blitz QFD, you can’t do QFD… • easier, faster, cheaper – Management may need a professional overview of QFD • benefits • who’s doing it
  • 55. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 55 Doing Project Blitz QFD • Preparation (offline) – one day: sort out our inputs; clarify what we have; what we are doing; goals • Workshop (with full team) – one day: do Blitz • Follow up (with selected team members) – one day: how to fill in the holes we found
  • 56. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 56 Doing Project Blitz QFD • Blitz QFD: – emphasizes on all the basic themes of QFD – develops good QFD habits, and avoids bad QFD habits – demonstrates the power of QFD quickly – fully upwards compatible with high-powered comprehensive QFD – encourages development to a more sophisticated QFD process
  • 57. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 57 AHP Homework example: Where to go on vacation? • Alternatives? – Bora Bora – Orlando – Paris – New York • Criteria? – Relaxation – Things to Do – Cost – Memories • Take four alternatives, and apply four weighted • criteria to them (as a minimum)
  • 58. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 58 AHP: Example Vacation Destinations BoraBora Orlando Paris NewYork Critieria priority 0.62 0.12 0.20 0.06 local priorities Relaxation 0.16 0.10 0.02 0.03 0.01 global priorities 0.05 0.21 0.32 0.42 local priorities Things to Do 0.09 0.00 0.02 0.03 0.04 global priorities 0.06 0.24 0.13 0.57 local priorities Cost 0.34 0.02 0.08 0.04 0.20 global priorities 0.57 0.10 0.29 0.04 local priorities Memories 0.41 0.23 0.04 0.12 0.02 global priorities 1.00 0.36 0.16 0.22 0.26 priority 1.000 1 4 3 2 rank
  • 59. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 59 AHP: Example Criteria Weight Relaxation ThingstoDo Cost Memories normalized columns S priority rank Relaxation 1 3 1/2 1/5 0.120 0.273 0.182 0.079 0.653 0.163 3 Things to Do 1/3 1 1/4 1/3 0.040 0.091 0.091 0.132 0.353 0.088 4 Cost 2 4 1 1 0.240 0.364 0.364 0.395 1.362 0.341 2 Memories 5 3 1/1 1 0.600 0.273 0.364 0.395 1.631 0.408 1 8.333 11.000 2.750 2.533 1.000 1.000 1.000 1.000 4.000 1.000 Relaxation BoraBora Orlando Paris NewYork normalized columns S priority rank Bora Bora 1 6 4 8 0.649 0.643 0.696 0.500 2.487 0.622 1 Orlando 1/6 1 1/2 3 0.108 0.107 0.087 0.188 0.490 0.122 3 Paris 1/4 2 1 4 0.162 0.214 0.174 0.250 0.800 0.200 2 New York 1/8 1/3 1/4 1 0.081 0.036 0.043 0.063 0.223 0.056 4 1.542 9.333 5.750 16.000 1.000 1.000 1.000 1.000 4.000 1.000
  • 60. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 60 AHP: Example Things to Do BoraBora Orlando Paris NewYork totals estimated number 10 40 60 80 190 normalized 0.053 0.211 0.316 0.421 1.000 4 3 2 1 rank Cost BoraBora Orlando Paris NewYork totals estimated cost $5,000 $1,200 $2,200 $500 $8,900 the inverse 0.000 0.001 0.000 0.002 0.003 normalized 0.057 0.239 0.130 0.573 1.000 4 2 3 1 rank
  • 61. Mgt 610 Strategic Perspectives on Project Management (c) 2013, Thomas Lechler and David Keeney. All rights reserved.For academic use only. 61 AHP: Example Now go and construct your own AHP example using Excel (or download Expert Choice 2000) Memories weeks months years lifetime normalized columns S priority values weeks 1 1/4 1/7 1/9 0.048 0.019 0.033 0.070 0.169 0.042 months 4 1 1/5 1/7 0.190 0.075 0.046 0.090 0.402 0.101 years 7 5 1 1/3 0.333 0.377 0.230 0.210 1.151 0.288 lifetime 9 7 3 1 0.429 0.528 0.691 0.630 2.278 0.569 21.000 13.250 4.343 1.587 1.000 1.000 1.000 1.000 4.000 1.000 values applied BoraBora Orlando Paris NewYork value lifetime months years weeks priority 0.569 0.101 0.288 0.042 1 3 2 4 rank