SlideShare a Scribd company logo
H a s a n S i d d i q u i a n d J u l i u s M o n i
GLNG Upstream Operations – Engineering & Planning, Santos Ltd, Brisbane, QLD 4000, Australia
W E L L U N L O A D I N G S O L U T I O N
Fairview is located in the Comet Ridge Project Area.
Sales gas production commenced in 1997, and today
production is around 130 TJ/day, with the average
well productivity at 1 TJ/day. Almost 200 wells have
been drilled to date, and these wells are in various
stages of development. Longer term, more than 4,000
wells will be required to feed gas to the LNG trains at
Gladstone.
The coal seam gas field comprises of free-flow and
pumped wells. A well consists of a separator, with
water and gas gathering lines. The gas flows to
plants where it is compressed and dehydrated, while
the water flows to treatment plants where it is treated
and recycled.
During early stages of the well production life cycle,
gas rates increase and water rates decrease. Water
production is the primary focus initially in the
dewatering phase, as it allows the gas to flow later.
Wells that are able to flow gas above a “critical
velocity” are able to lift water without intervention.
Critical velocity is defined as the minimum gas
velocity in the tubing required to move liquid droplets
up to the surface.
However some wells lose their ability to flow gas
above this “critical velocity”, for various reasons. In
these wells, water builds up in the well bore (i.e. they
load-up). As wells load-up, it causes gas flow to
decrease or cease, resulting in lost gas production.
A tell tale sign of liquid loading is a significant
differential pressure across the casing and tubing
pressures on a free flow well. This is more typical in
wells that are moving between the dewatering and
stable phases of the production lifecycle.
IntroductionIntroduction Increasing bottom hole pressure is more expensive,
as compared to decreasing the surface pressure. For
this reason, decreasing the surface pressure is the
more attractive option, and it is used in the design of
the new well unloading solution.
Additionally, by lowering the surface pressure (i.e. the
backpressure on the well) to atmospheric conditions,
the maximum gas velocity is reached through the
tubing, which creates the best conditions for lifting
water from the well bore.
The skid assembly that we are constructing is mobile
and will feature a separator that operates at
atmospheric pressure.
It is connected directly to the well head tubing
minimizing backpressure. The separator will allow all
gas to flow to the existing flare on the lease. Water
will flow into unloading tank by gravity, minimizing
environmental impact.
Upon completion of unloading a tanker will remove
the water and the equipment will be rigged down and
moved to the next candidate well.
Unloading Tank
• 220 bbls capacity with access step and platform
• Fully self contained in a single load, no crane
required for set up
• Locally built in Roma, transport dimensions are
within restrictions of length, width, height, and
weight
Design DetailsDesign Details
• Suits relatively simple needs of CSG wells
• One truck for transport within road limits
• All components are mounted on a single skid base
• All components are easily handled and assembled
by a two-person work party
• No automation is required
• Designed to eliminate working at heights issue
• Separator connection points to well and flare are
located on both sides of the skid
• Gravity flow of water from separator to tank
• Cost just under 200K, which can be recovered by
the production of one well in a year
• Will be used to do simple well tests to determine
well completion requirements, which could save
more than 200K just for one well
AdvantagesAdvantages
Project UpdateProject Update
• Concept design completed
• Process design completed
• Purchase order issued
• Separator and tank design completed
• 3D- Model completed and under review
• Drafting in progress
• Expected delivery date: End of year 2012
AcknowledgementsAcknowledgements
James Jonutis – GLNG Upstream Operations
Jessica McClintock – GLNG Upstream Operations
ReferencesReferences
James F. Lea, Henry V. Nickens, and Mike R. Wells,
Gas Well Deliquification
Separator Vessel
• 2.2 MMscf/d and 400 bwpd capacity with manway,
internal ladder, and magnetic-type level gauge
• Code & Class: AS 1210 & Class 2A
• No PSV requirement, globe valve provides
pressure control at tie-in point
Connection
to well
Connection
to well Connections
to flare
AimAim
ConceptConcept
The aim of the project is to develop a low cost
method to unload a well that provides predictable and
repeatable results in an environmentally friendly and
commercially viable way. Ideally, the new unloading
method should reduce well pressure to atmospheric,
capture water and flare dry gas, all while eliminating
the need for excavation, lining, fencing and
remediation.
In order to restore water loaded wells to gas
production, built up liquid is lifted from the well bore
by increasing the gas flow velocity in the tubing. This
can be achieved by either:
1. Increasing the bottom hole pressure by:
• Using an “air pack”; this uses a large compressor
to pump a high volume of air down the annulus
and unload the tubing against gathering system
pressure
2. Decreasing the surface pressure to atmospheric
conditions by:
• bypassing the separator to the flare stack
(banned)
• bypassing the separator to a flare pit
All the methods in the bullet points above have fewer
advantages as compared to the disadvantages.
Some of the disadvantages are: uncontrolled release
of water to grade; expensive civil work; high potential
for cold venting; expensive and unpredictable results.
When gas flow velocity from a well is not sufficient to
lift the liquids to the surface against gathering system
pressure, external intervention is needed to unload
the well. At present in Fairview 10-20% of the existing
wells require some form of treatment to unload the
well bore and reach maximum gas flow rates.
Time
R
a
t
e
Rate falling off decline
curve, indication of
loading
Declining water production curve analysis
time
dewatering stable decline
rates
Candidate CSG Wells

More Related Content

PPSX
Water coning in oil wells and DWS technology
PPTX
Production methods for Petroleum
PDF
Oil & Gas Production
PPTX
Nsulangi_Drives Mechanism_CUG
PPT
Oil and Gas process and SAP PRA overview
PDF
Reservoir
PPT
Desin of penstock pipe ppt
PPTX
Storage works
Water coning in oil wells and DWS technology
Production methods for Petroleum
Oil & Gas Production
Nsulangi_Drives Mechanism_CUG
Oil and Gas process and SAP PRA overview
Reservoir
Desin of penstock pipe ppt
Storage works

What's hot (20)

PPT
introduction to completions and workovers (2)
PPTX
Intake structures
PPTX
Water shut off ppt
PDF
Shale gas presentation
PPTX
M.i tank
PPTX
Regulating structure for canal flow
PPTX
Final Presentation (2)
PPT
design of hydraulic controls and structures
PPTX
Hydraulic Fracturing 101
PPTX
Artificial Lift Selection Criterion
PPTX
Unit 3 Diversion and Impounding Structures
PPTX
02 Types of Intake Structures
PPTX
Hydropower
PPTX
Spillways
PPT
hydro power energy water conveyance system
PDF
Impacts from groundwater comtrol in urban areas
PPT
Intake structures in wwwe
PPTX
City Council January 3, 2012 Hickory update
PPTX
Subsea completion and control system
introduction to completions and workovers (2)
Intake structures
Water shut off ppt
Shale gas presentation
M.i tank
Regulating structure for canal flow
Final Presentation (2)
design of hydraulic controls and structures
Hydraulic Fracturing 101
Artificial Lift Selection Criterion
Unit 3 Diversion and Impounding Structures
02 Types of Intake Structures
Hydropower
Spillways
hydro power energy water conveyance system
Impacts from groundwater comtrol in urban areas
Intake structures in wwwe
City Council January 3, 2012 Hickory update
Subsea completion and control system
Ad

Similar to Well Unloading Solution - Winning Poster (20)

PDF
Gas Lift Design SLB gggffyh hhnbxddser.pdf
DOCX
report on aqua silencer
PDF
An Introduction to Well Completion Design.pdf
DOCX
Key Process Considerations for Pipeline Design Basis
PDF
Defining Well completion
PDF
Gas lift design
PDF
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (C...
PPTX
Innovative stimulation am ar_10.10
PPTX
Innovative stimulation am ar_10.10
PPTX
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
PPTX
Oil and gas field development
PDF
Well_Completions.pdf
PPTX
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
PDF
Well control 1)
PDF
BHR PI Conference Paper by Glenn Harbold
PPT
Basics of Hydro power plant
PDF
IRJET- Roughness Coefficient of Alkali Activated Mineral based Concrete C...
PPTX
Hydel Generation and Types Of Turbines
PDF
Completion and work over well control .pdf
PPTX
Penstocks, powerhouse and tailrace
Gas Lift Design SLB gggffyh hhnbxddser.pdf
report on aqua silencer
An Introduction to Well Completion Design.pdf
Key Process Considerations for Pipeline Design Basis
Defining Well completion
Gas lift design
Gas Lift Design: Comparative Study of Continuous and Intermittent Gas Lift (C...
Innovative stimulation am ar_10.10
Innovative stimulation am ar_10.10
PLANNING & DESIGN OF LIFT IRRIGATION.pptx
Oil and gas field development
Well_Completions.pdf
Analyzing Multi-zone completion using multilayer by IPR (PROSPER)
Well control 1)
BHR PI Conference Paper by Glenn Harbold
Basics of Hydro power plant
IRJET- Roughness Coefficient of Alkali Activated Mineral based Concrete C...
Hydel Generation and Types Of Turbines
Completion and work over well control .pdf
Penstocks, powerhouse and tailrace
Ad

Well Unloading Solution - Winning Poster

  • 1. H a s a n S i d d i q u i a n d J u l i u s M o n i GLNG Upstream Operations – Engineering & Planning, Santos Ltd, Brisbane, QLD 4000, Australia W E L L U N L O A D I N G S O L U T I O N Fairview is located in the Comet Ridge Project Area. Sales gas production commenced in 1997, and today production is around 130 TJ/day, with the average well productivity at 1 TJ/day. Almost 200 wells have been drilled to date, and these wells are in various stages of development. Longer term, more than 4,000 wells will be required to feed gas to the LNG trains at Gladstone. The coal seam gas field comprises of free-flow and pumped wells. A well consists of a separator, with water and gas gathering lines. The gas flows to plants where it is compressed and dehydrated, while the water flows to treatment plants where it is treated and recycled. During early stages of the well production life cycle, gas rates increase and water rates decrease. Water production is the primary focus initially in the dewatering phase, as it allows the gas to flow later. Wells that are able to flow gas above a “critical velocity” are able to lift water without intervention. Critical velocity is defined as the minimum gas velocity in the tubing required to move liquid droplets up to the surface. However some wells lose their ability to flow gas above this “critical velocity”, for various reasons. In these wells, water builds up in the well bore (i.e. they load-up). As wells load-up, it causes gas flow to decrease or cease, resulting in lost gas production. A tell tale sign of liquid loading is a significant differential pressure across the casing and tubing pressures on a free flow well. This is more typical in wells that are moving between the dewatering and stable phases of the production lifecycle. IntroductionIntroduction Increasing bottom hole pressure is more expensive, as compared to decreasing the surface pressure. For this reason, decreasing the surface pressure is the more attractive option, and it is used in the design of the new well unloading solution. Additionally, by lowering the surface pressure (i.e. the backpressure on the well) to atmospheric conditions, the maximum gas velocity is reached through the tubing, which creates the best conditions for lifting water from the well bore. The skid assembly that we are constructing is mobile and will feature a separator that operates at atmospheric pressure. It is connected directly to the well head tubing minimizing backpressure. The separator will allow all gas to flow to the existing flare on the lease. Water will flow into unloading tank by gravity, minimizing environmental impact. Upon completion of unloading a tanker will remove the water and the equipment will be rigged down and moved to the next candidate well. Unloading Tank • 220 bbls capacity with access step and platform • Fully self contained in a single load, no crane required for set up • Locally built in Roma, transport dimensions are within restrictions of length, width, height, and weight Design DetailsDesign Details • Suits relatively simple needs of CSG wells • One truck for transport within road limits • All components are mounted on a single skid base • All components are easily handled and assembled by a two-person work party • No automation is required • Designed to eliminate working at heights issue • Separator connection points to well and flare are located on both sides of the skid • Gravity flow of water from separator to tank • Cost just under 200K, which can be recovered by the production of one well in a year • Will be used to do simple well tests to determine well completion requirements, which could save more than 200K just for one well AdvantagesAdvantages Project UpdateProject Update • Concept design completed • Process design completed • Purchase order issued • Separator and tank design completed • 3D- Model completed and under review • Drafting in progress • Expected delivery date: End of year 2012 AcknowledgementsAcknowledgements James Jonutis – GLNG Upstream Operations Jessica McClintock – GLNG Upstream Operations ReferencesReferences James F. Lea, Henry V. Nickens, and Mike R. Wells, Gas Well Deliquification Separator Vessel • 2.2 MMscf/d and 400 bwpd capacity with manway, internal ladder, and magnetic-type level gauge • Code & Class: AS 1210 & Class 2A • No PSV requirement, globe valve provides pressure control at tie-in point Connection to well Connection to well Connections to flare AimAim ConceptConcept The aim of the project is to develop a low cost method to unload a well that provides predictable and repeatable results in an environmentally friendly and commercially viable way. Ideally, the new unloading method should reduce well pressure to atmospheric, capture water and flare dry gas, all while eliminating the need for excavation, lining, fencing and remediation. In order to restore water loaded wells to gas production, built up liquid is lifted from the well bore by increasing the gas flow velocity in the tubing. This can be achieved by either: 1. Increasing the bottom hole pressure by: • Using an “air pack”; this uses a large compressor to pump a high volume of air down the annulus and unload the tubing against gathering system pressure 2. Decreasing the surface pressure to atmospheric conditions by: • bypassing the separator to the flare stack (banned) • bypassing the separator to a flare pit All the methods in the bullet points above have fewer advantages as compared to the disadvantages. Some of the disadvantages are: uncontrolled release of water to grade; expensive civil work; high potential for cold venting; expensive and unpredictable results. When gas flow velocity from a well is not sufficient to lift the liquids to the surface against gathering system pressure, external intervention is needed to unload the well. At present in Fairview 10-20% of the existing wells require some form of treatment to unload the well bore and reach maximum gas flow rates. Time R a t e Rate falling off decline curve, indication of loading Declining water production curve analysis time dewatering stable decline rates Candidate CSG Wells