SlideShare a Scribd company logo
Copyright 2013 GPAllied
Presented by: Ricky Smith, CMRP
Why Use Repeatable Procedures
Copyright 2013 GPAllied
Why Repeatable Job Procedures?
Description Probability
General rate for errors involving very high stress levels - Maintenance 30%
Complicated non-routine task, with stress 30%
Supervisor does not recognize the operator’s error 10%
Non-routine operation, with other duties at the same time 10%
Operator fails to act correctly in the first 30 minutes of stressful emergency situations 10%
Errors in simple arithmetic with self-checking 3%
General error rate for oral communication 3%
Failure to return the manually operated test valve to the correct configuration after maintenance 1%
Operator fails to act correctly after the first few hours in a high stress scenario 1%
General error of omission 1%
General error rate for an act performed incorrectly 0.3%
Error in simple routine operation 0.1%
Selection of the wrong switch (dissimilar in shape) 0.1%
Selection of a key-operated switch rather that a non-key-operated switch (EOC) 0.01%
Human performance limit: single operator 0.01%
Human performance limit: team of mechanics performing a well-designed task 0.001%
Copyright 2013 GPAllied
Why Repeatable Procedures?
“not using repeatable, effective procedures results in monetary losses”
Copyright 2013 GPAllied
How good are you at performing work to standard?
Copyright 2013 GPAllied
Do you sometime miss what is important?
Copyright 2013 GPAllied
It isn’t what you know that will kill you, it
what you don’t know that will
Copyright 2013 GPAllied
Could everyone perform a task the same way?
Copyright 2013 GPAllied
Does your team experience Human Induced Failures
Time
Infant Mortality
Pattern F = 68%
Copyright 2013 GPAllied
Reactive Maintenance Attributes
• Ineffective or No Planning and Scheduling
• PM Compliance has a wide variance
• Performing PM on Equipment that continues to
breakdown
• Overnight deliveries sit for weeks, months
• Everyone works as hard as they can with little if any
movement seen toward proactive
• Storeroom is Chaos (people standing in line at
7:00am waiting on parts)
Copyright 2013 GPAllied
What percent of your failures are human induced?
• 10%
• 20%
• 50%
• 70%
• Studies say 70-80%
• What percentage can we stop or reduce?
• How can you reduced them?
• Do you have the discipline?
• Can you change the way every thinks – top to
bottom in the organization?
Copyright 2013 GPAllied
Maintenance Issues
• Most maintenance staff actually work 2-4 hours a day
- Effective Direct work is low
– Lack of effective Planning
– Lack of effective Scheduling
• 70-80 % of equipment failures are Human-INDUCED
– Not using a Torque Wrench
– Not knowing specifications
– Not having the right part at the right time
– Improperly handling and installing bearings
– No Repeatable PM, Corrective, Lube Procedures
Is this problem serious? It cannot be that bad!
Copyright 2013 GPAllied
“Your system is perfectly designed to give you
the results you get”
– W. Deming PhD
Copyright 2013 GPAllied
“We have learned to live in a world of mistakes and defective
products as if they were necessary to life”
– Dr. W. Edward Deming
Copyright 2013 GPAllied
“A Proactive Reliability Process is a supply
chain. If a step in the process is skipped, or
performed at a substandard level, the process
creates defects known as failures. The output of
a healthy reliability process is optimal asset
reliability at optimal cost.”
― Ron Thomas, Retired
Reliability Director, Dofasco Steel
Copyright 2013 GPAllied
Effects of Improper Installation or Maintenance
Copyright 2013 GPAllied
Early Identification of a Defect
Copyright 2013 GPAllied
How do we resolve this Problem?
Copyright 2013 GPAllied
Developing and Executing Work Procedures?
• Quantitative Preventive Maintenance
• Corrective Maintenance
• Operator Care
• Lubrication
Copyright 2013 GPAllied
Why are Work Procedures Important?
• Repeatable process
• Capture knowledge
• Train new employees
• Reduce self induced failures
Copyright 2013 GPAllied
Implement a Repeatable Process
• What is required to ensure you have a repeatable
process?
– Step by Step Procedures
– Specifications / Standards
– Required Parts
– Potential Parts
– Special Tools (Core Drill)
– Special Equipment (60 JLG Lift)
– Craft and Number of Each Craft
– Special Permits
Copyright 2013 GPAllied
We want to Capture Knowledge
• Knowledge from Experience maintenance personnel
• Knowledge gained from RCA
• Knowledge gained from similar work
• All RCM and FMEA results
Copyright 2013 GPAllied
Train “New” Employees
(What about current employees?)
• Use work procedures as training tool
• Ensuring everyone is trained to same standard
• Ensure everyone is trained and qualified to use
special tools
• If new information presents itself, change the
procedure
• Use for qualification and certification
– Critical Procedures
• Rebuild a large worm drive gearbox
• Clean hydraulic reservoir
Copyright 2013 GPAllied
Reduce (eliminate) Self Induced Failures
(70-80%?)
• What are your current self induced failures
– Use Failure Codes, Cause Codes, and Action
Codes
– Measure Rework
– Measure Mean Time Between Failure
• Ensure everyone employs the same standards,
specifications
• Ensure all work is repeatable
• Ensure the right tool is applied in the proper manner
– Torque Wrench, Bearing Heater, etc.
Copyright 2013 GPAllied
At What level should procedures be written?
• Lowest level conceivable
• Simple – Apply KISS Method
• Complexity if acceptable as well if required
Copyright 2013 GPAllied
1st Step Begin the conversation
Tool Box Talk - https://app.box.com/s/7ncbvjr9ndsbpzdyvqii
Copyright 2013 GPAllied
Introduction to Human Factors
Engineering
Do you see the problem?
Are you going to solve the problem
•HFE - 26
Copyright 2013 GPAllied
Steps to success
• Awareness
• Begin the conversation – Tool Box Talk
• Action
• Train a couple maintenance personnel as
procedure specialist
• Develop new procedures on critical assets first
• Measure the results and post for all to see
(good or bad)
• Adjust as needed
• Continue the journey
Copyright 2013 GPAllied
Questions?
Contact Ricky Smith CMRP
rsmith@gpallied.com

More Related Content

PDF
Results from Optimized Asset Reliability
PDF
Precision Maintenance Presentation
PDF
Failure Reporting, Analysis, Corrective Action System
PDF
World Class Maintenance WebEx Slides
PDF
Developing Effective Work Procedures Training - 3 days
PDF
Preventive Maintenance Maturity Matrix 2013 version
PDF
Preventive Maintenance Best Practices workshop Brochure
PDF
PdM Maturity Matrix Poster
Results from Optimized Asset Reliability
Precision Maintenance Presentation
Failure Reporting, Analysis, Corrective Action System
World Class Maintenance WebEx Slides
Developing Effective Work Procedures Training - 3 days
Preventive Maintenance Maturity Matrix 2013 version
Preventive Maintenance Best Practices workshop Brochure
PdM Maturity Matrix Poster

What's hot (20)

PDF
Precision Maintenance
PDF
7 Steps to a Working Failure Reporting System - FRACAS
PDF
Lubrication Maturity Matrix
PDF
Tool Box Talk - CMRP exam recommendations
PDF
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
PDF
KPI Users Group - Failure Reports
PDF
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
PDF
5 Things You Can Do Now To Calm Down Reactivity
PDF
Maintenance and Reliability Case Studies and Bench-marking Data
PDF
Maintenance Metrics
PDF
Why Your Pm Program is Not Working
PDF
Skills of a Proactive Maintenance Technician
DOCX
The Basics Of Failures
PDF
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
PDF
Why RCM Doesn't Work?
PDF
FMEA Final Project
PPT
Reliability centered maintenance
PDF
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
PDF
Procedure Based Maintenance White Paper
PPT
KPI SMRP Presentation
Precision Maintenance
7 Steps to a Working Failure Reporting System - FRACAS
Lubrication Maturity Matrix
Tool Box Talk - CMRP exam recommendations
SMRP (1997) Proactive Maintenance Slides by John Day - 1997
KPI Users Group - Failure Reports
SMRP World Class Maintenance Slides John Day - Alcoa Mt Holly
5 Things You Can Do Now To Calm Down Reactivity
Maintenance and Reliability Case Studies and Bench-marking Data
Maintenance Metrics
Why Your Pm Program is Not Working
Skills of a Proactive Maintenance Technician
The Basics Of Failures
Reliability and Maintenance Conference - 7-9 April 2014, Al Khobar, Kingdom o...
Why RCM Doesn't Work?
FMEA Final Project
Reliability centered maintenance
Maintenance Planning and Scheduling Maturity Matrix #2 of 2
Procedure Based Maintenance White Paper
KPI SMRP Presentation
Ad

Viewers also liked (19)

PDF
Why is your current PM Program not Effective?
PDF
Maintenance of Hydraulic Systems
PDF
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
PDF
Oil Pan Plug Defect - Cause: No One Used a Torque Wrench
PDF
Elements Of Root Cause Analysis
PDF
TAT ACE SBS Failure Root Cause Analysis
PDF
Mean Time Between Failure Vs Cost
PDF
Hydraulic Maintenance and Troubleshooting
PDF
Gates Belts PM Manual
PDF
SMRP - Maintenance Cost as a Percent of RAV
PDF
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
PDF
Maintenance Craft Skill Maturity Matrix
PPTX
Lean A3 Report for Planning Downtime Elimination
PDF
Maintenance Planning and Scheduling Maturity Matrix - #1 of 2
PDF
8 Steps To Success In Maintenance Planning And Scheduling
PDF
Maintenance KPI
PDF
2015 Upload Campaigns Calendar - SlideShare
PPTX
What to Upload to SlideShare
PDF
Getting Started With SlideShare
Why is your current PM Program not Effective?
Maintenance of Hydraulic Systems
Maximo KPI Maintenance & Asset Reliability Support Workshop IMC 2013 presenta...
Oil Pan Plug Defect - Cause: No One Used a Torque Wrench
Elements Of Root Cause Analysis
TAT ACE SBS Failure Root Cause Analysis
Mean Time Between Failure Vs Cost
Hydraulic Maintenance and Troubleshooting
Gates Belts PM Manual
SMRP - Maintenance Cost as a Percent of RAV
Condition Monitoring (PdM) Maturity Matrix - Know Best Practices
Maintenance Craft Skill Maturity Matrix
Lean A3 Report for Planning Downtime Elimination
Maintenance Planning and Scheduling Maturity Matrix - #1 of 2
8 Steps To Success In Maintenance Planning And Scheduling
Maintenance KPI
2015 Upload Campaigns Calendar - SlideShare
What to Upload to SlideShare
Getting Started With SlideShare
Ad

Similar to Why should you use repeatable maintenance procedures? (20)

PPTX
PPTX
Principles of Lean Maintenance
PDF
Automated testing san francisco oct 2013
PDF
Procedure Based Maintenance
PPTX
Top 10 Agile Metrics
PDF
Best Practices in Maintenance and Reliability
PDF
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
PPTX
Simple Steps to Improve Your Maintenance Program
PPTX
9-6-23 jkasghdkjfhasvjdsddffJH step 1.pptx
PPTX
Ask the Expert: Lean Leadership - Can We Talk About OEE?
PPTX
20 Tools of Six Sigma.pptx
PPTX
Effective quality improvement paths for manufacturing
PPTX
TPM Activity
PPTX
Lean Management Basics
PPTX
Fundamentals of testing
PPTX
1603960041059_20 Six Sigma Good Tools.pptx
PDF
PAC 2019 virtual Joerek Van Gaalen
PPTX
Understanding Root Cause Analysis
PPSX
Mistake proofing for web
PPTX
Mistake proofing for web1
Principles of Lean Maintenance
Automated testing san francisco oct 2013
Procedure Based Maintenance
Top 10 Agile Metrics
Best Practices in Maintenance and Reliability
Poet ( PROCESS OPERATIONAL EXCELLENCE TECHNIQUE)
Simple Steps to Improve Your Maintenance Program
9-6-23 jkasghdkjfhasvjdsddffJH step 1.pptx
Ask the Expert: Lean Leadership - Can We Talk About OEE?
20 Tools of Six Sigma.pptx
Effective quality improvement paths for manufacturing
TPM Activity
Lean Management Basics
Fundamentals of testing
1603960041059_20 Six Sigma Good Tools.pptx
PAC 2019 virtual Joerek Van Gaalen
Understanding Root Cause Analysis
Mistake proofing for web
Mistake proofing for web1

More from Ricky Smith CMRP, CMRT (20)

PDF
Day in the Life (DILO) of a Proactive Maintenance Manager
PDF
Day in the Life of a Proactive Maintenance Planner
PDF
Day in the life of a Proactive Maintenance Supervisor
PDF
How to know if your maintenance planning and scheduling is not effective
PDF
Day in the life of a Proactive Maintenance Supervisor
PDF
Day in the Life of a Proactive Maintenance Technician Article
PDF
Best Maintenance Repair Practices Article
PDF
Tool Box Talk - Maintenance Parts Checkout
PDF
Tool Box Talk - Lubrication of Bearings
PDF
Tool Box Talk - Maintenance Planning and Scheduling
PDF
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
PDF
Tool Box Talk - How to Stop Hydraulic Leaks and Why
PDF
Maintenance of Hydraulic Systems
PDF
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PDF
How to Develop an Effective Maintenance Skills Training Program
PDF
What is Lean Maintenance
PDF
Best Maintenance Repair Practices
PDF
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
PDF
Day in the Life of (DILO) of a Proactive Maintenance Technician
PDF
How to Optimize your CMMS viewer copy
Day in the Life (DILO) of a Proactive Maintenance Manager
Day in the Life of a Proactive Maintenance Planner
Day in the life of a Proactive Maintenance Supervisor
How to know if your maintenance planning and scheduling is not effective
Day in the life of a Proactive Maintenance Supervisor
Day in the Life of a Proactive Maintenance Technician Article
Best Maintenance Repair Practices Article
Tool Box Talk - Maintenance Parts Checkout
Tool Box Talk - Lubrication of Bearings
Tool Box Talk - Maintenance Planning and Scheduling
Top 7 Reasons why Maintenance Work Orders are Closed Out Accurately
Tool Box Talk - How to Stop Hydraulic Leaks and Why
Maintenance of Hydraulic Systems
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
How to Develop an Effective Maintenance Skills Training Program
What is Lean Maintenance
Best Maintenance Repair Practices
PM Tool Box Talk 101 - Fundamentals of Preventive Maintenance
Day in the Life of (DILO) of a Proactive Maintenance Technician
How to Optimize your CMMS viewer copy

Recently uploaded (20)

PPTX
Pharma ospi slides which help in ospi learning
PDF
O7-L3 Supply Chain Operations - ICLT Program
PDF
Pre independence Education in Inndia.pdf
PPTX
Institutional Correction lecture only . . .
PPTX
master seminar digital applications in india
PPTX
Cell Types and Its function , kingdom of life
PDF
Business Ethics Teaching Materials for college
PPTX
Week 4 Term 3 Study Techniques revisited.pptx
PDF
Complications of Minimal Access Surgery at WLH
PPTX
Pharmacology of Heart Failure /Pharmacotherapy of CHF
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PPTX
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PPTX
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
PDF
Supply Chain Operations Speaking Notes -ICLT Program
PPTX
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
PDF
Insiders guide to clinical Medicine.pdf
Pharma ospi slides which help in ospi learning
O7-L3 Supply Chain Operations - ICLT Program
Pre independence Education in Inndia.pdf
Institutional Correction lecture only . . .
master seminar digital applications in india
Cell Types and Its function , kingdom of life
Business Ethics Teaching Materials for college
Week 4 Term 3 Study Techniques revisited.pptx
Complications of Minimal Access Surgery at WLH
Pharmacology of Heart Failure /Pharmacotherapy of CHF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
BOWEL ELIMINATION FACTORS AFFECTING AND TYPES
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
school management -TNTEU- B.Ed., Semester II Unit 1.pptx
Supply Chain Operations Speaking Notes -ICLT Program
IMMUNITY IMMUNITY refers to protection against infection, and the immune syst...
O5-L3 Freight Transport Ops (International) V1.pdf
102 student loan defaulters named and shamed – Is someone you know on the list?
3rd Neelam Sanjeevareddy Memorial Lecture.pdf
Insiders guide to clinical Medicine.pdf

Why should you use repeatable maintenance procedures?

  • 1. Copyright 2013 GPAllied Presented by: Ricky Smith, CMRP Why Use Repeatable Procedures
  • 2. Copyright 2013 GPAllied Why Repeatable Job Procedures? Description Probability General rate for errors involving very high stress levels - Maintenance 30% Complicated non-routine task, with stress 30% Supervisor does not recognize the operator’s error 10% Non-routine operation, with other duties at the same time 10% Operator fails to act correctly in the first 30 minutes of stressful emergency situations 10% Errors in simple arithmetic with self-checking 3% General error rate for oral communication 3% Failure to return the manually operated test valve to the correct configuration after maintenance 1% Operator fails to act correctly after the first few hours in a high stress scenario 1% General error of omission 1% General error rate for an act performed incorrectly 0.3% Error in simple routine operation 0.1% Selection of the wrong switch (dissimilar in shape) 0.1% Selection of a key-operated switch rather that a non-key-operated switch (EOC) 0.01% Human performance limit: single operator 0.01% Human performance limit: team of mechanics performing a well-designed task 0.001%
  • 3. Copyright 2013 GPAllied Why Repeatable Procedures? “not using repeatable, effective procedures results in monetary losses”
  • 4. Copyright 2013 GPAllied How good are you at performing work to standard?
  • 5. Copyright 2013 GPAllied Do you sometime miss what is important?
  • 6. Copyright 2013 GPAllied It isn’t what you know that will kill you, it what you don’t know that will
  • 7. Copyright 2013 GPAllied Could everyone perform a task the same way?
  • 8. Copyright 2013 GPAllied Does your team experience Human Induced Failures Time Infant Mortality Pattern F = 68%
  • 9. Copyright 2013 GPAllied Reactive Maintenance Attributes • Ineffective or No Planning and Scheduling • PM Compliance has a wide variance • Performing PM on Equipment that continues to breakdown • Overnight deliveries sit for weeks, months • Everyone works as hard as they can with little if any movement seen toward proactive • Storeroom is Chaos (people standing in line at 7:00am waiting on parts)
  • 10. Copyright 2013 GPAllied What percent of your failures are human induced? • 10% • 20% • 50% • 70% • Studies say 70-80% • What percentage can we stop or reduce? • How can you reduced them? • Do you have the discipline? • Can you change the way every thinks – top to bottom in the organization?
  • 11. Copyright 2013 GPAllied Maintenance Issues • Most maintenance staff actually work 2-4 hours a day - Effective Direct work is low – Lack of effective Planning – Lack of effective Scheduling • 70-80 % of equipment failures are Human-INDUCED – Not using a Torque Wrench – Not knowing specifications – Not having the right part at the right time – Improperly handling and installing bearings – No Repeatable PM, Corrective, Lube Procedures Is this problem serious? It cannot be that bad!
  • 12. Copyright 2013 GPAllied “Your system is perfectly designed to give you the results you get” – W. Deming PhD
  • 13. Copyright 2013 GPAllied “We have learned to live in a world of mistakes and defective products as if they were necessary to life” – Dr. W. Edward Deming
  • 14. Copyright 2013 GPAllied “A Proactive Reliability Process is a supply chain. If a step in the process is skipped, or performed at a substandard level, the process creates defects known as failures. The output of a healthy reliability process is optimal asset reliability at optimal cost.” ― Ron Thomas, Retired Reliability Director, Dofasco Steel
  • 15. Copyright 2013 GPAllied Effects of Improper Installation or Maintenance
  • 16. Copyright 2013 GPAllied Early Identification of a Defect
  • 17. Copyright 2013 GPAllied How do we resolve this Problem?
  • 18. Copyright 2013 GPAllied Developing and Executing Work Procedures? • Quantitative Preventive Maintenance • Corrective Maintenance • Operator Care • Lubrication
  • 19. Copyright 2013 GPAllied Why are Work Procedures Important? • Repeatable process • Capture knowledge • Train new employees • Reduce self induced failures
  • 20. Copyright 2013 GPAllied Implement a Repeatable Process • What is required to ensure you have a repeatable process? – Step by Step Procedures – Specifications / Standards – Required Parts – Potential Parts – Special Tools (Core Drill) – Special Equipment (60 JLG Lift) – Craft and Number of Each Craft – Special Permits
  • 21. Copyright 2013 GPAllied We want to Capture Knowledge • Knowledge from Experience maintenance personnel • Knowledge gained from RCA • Knowledge gained from similar work • All RCM and FMEA results
  • 22. Copyright 2013 GPAllied Train “New” Employees (What about current employees?) • Use work procedures as training tool • Ensuring everyone is trained to same standard • Ensure everyone is trained and qualified to use special tools • If new information presents itself, change the procedure • Use for qualification and certification – Critical Procedures • Rebuild a large worm drive gearbox • Clean hydraulic reservoir
  • 23. Copyright 2013 GPAllied Reduce (eliminate) Self Induced Failures (70-80%?) • What are your current self induced failures – Use Failure Codes, Cause Codes, and Action Codes – Measure Rework – Measure Mean Time Between Failure • Ensure everyone employs the same standards, specifications • Ensure all work is repeatable • Ensure the right tool is applied in the proper manner – Torque Wrench, Bearing Heater, etc.
  • 24. Copyright 2013 GPAllied At What level should procedures be written? • Lowest level conceivable • Simple – Apply KISS Method • Complexity if acceptable as well if required
  • 25. Copyright 2013 GPAllied 1st Step Begin the conversation Tool Box Talk - https://app.box.com/s/7ncbvjr9ndsbpzdyvqii
  • 26. Copyright 2013 GPAllied Introduction to Human Factors Engineering Do you see the problem? Are you going to solve the problem •HFE - 26
  • 27. Copyright 2013 GPAllied Steps to success • Awareness • Begin the conversation – Tool Box Talk • Action • Train a couple maintenance personnel as procedure specialist • Develop new procedures on critical assets first • Measure the results and post for all to see (good or bad) • Adjust as needed • Continue the journey
  • 28. Copyright 2013 GPAllied Questions? Contact Ricky Smith CMRP rsmith@gpallied.com