Workcenter Scheduling
Presented By:
Shivangi Singh
Shivani Gautam
Shivangi Arora
INTRODUCTION
 A schedule is a timetable for performing activities, utilizing resources, or
allocating facilities.
 Manufacturing Execution Systems (MES): Is an information system that
schedules, dispatches, tracks, monitors, and controls production on the
factory floor.
 A WorkCentre is an area in a business in which productive resources are
organized and work is completed.
 Objectives of Work center scheduling
I. Meet due dates.
II. Minimize lead time.
III. Minimize setup time.
IV. Minimize work in process inventory.
V. Maximize machine or labor utilization
Related study
Title: Comprehensive Review of the Dispatching, Scheduling and Routing of
AGVs.
Abstract:
Automated Guided Vehicle System (AGVS) has become an important strategic
tool for automated warehouses.
AGVs are widely used to transport materials between workstations in flexible
manufacturing systems and perform a variety of tasks that involve automation
in industrial environments. If all the requirements are carried out as per the
needs of the productive system, the control system is a viable option for the
increase in enterprise competitiveness.
Job sequencing
 Sequencing: the process of determining the job order on machines or work
centers. Also known as priority sequencing.
 Priority rules: the rules used in obtaining a job sequence
1. FCFS : orders are run in the order they arrive.
2. SOT : Run the job with the shortest completion time first, next shortest
second and so on. Also referred as SPT.
3. EDD : Run the job with the earliest due date first.
4. STR : Time remaining before due date — remaining processing time.
5. LCFS : As orders arrives, they are placed on the top of the stack; the operator
usually picks up the order on top to run first.
6. Random: In this the supervisor usually select whichever job they feel like
running.
Example for scheduling n job on 1 machines:
Scheduling n job on 2 machines:
 In this we use Johnson’s rule.
 Steps to Johnson’s Rule
I. List the operation time for each job.
II. Select the shortest operation time.
III. If the shortest time is on the first machine, do first.
• If the shortest time is on the second machine, do the job last.
• For ties, do first.
 Repeat steps 2-3 for each remaining job.
Scheduling n job on m machines:
 Assignment method: a special case of the transportation method of linear
programming.
 Steps for Assignment method:
1. Subtract the smallest number in each row or column from itself and all other
numbers in that row or column.
2. Now, determine the minimum number of lines required to cover each zero.
3. Subtract minimum number i.e. uncovered from all the uncovered values and
add the minimum number to the numbers that lie at the intersection.
4. Now make job assignments.
Personnel scheduling in services
 Scheduling daily work times: It’s basically about deriving a staffing plan
1. Requires the fewest workers to accomplish the daily workload.
2. Minimizes the variance between actual and planned output.
 Scheduling hourly work times: This kind of personnel scheduling situation
can be approached by applying a simple rule, the “first-hour” principle. The
first hour rule implies that for the first hour, we assign a number of workers
equal to the requirement in that period.

More Related Content

PPTX
Process selection
PPTX
transportation, warehousing and inventory decisions
PPTX
Pricing & Revenue Management In A Supply Chain
PPTX
Aggregate planning
PPT
CAPACITY PLANNING
PPTX
Global supply chain management
PPTX
Types of loading, production & operations management
PPTX
Capacity planning ppt
Process selection
transportation, warehousing and inventory decisions
Pricing & Revenue Management In A Supply Chain
Aggregate planning
CAPACITY PLANNING
Global supply chain management
Types of loading, production & operations management
Capacity planning ppt

What's hot (20)

PPTX
Strategic control & its types
PPT
Retailing
PPTX
Types of strategy
PPT
Make or buy decision
PPTX
Global logistics
PDF
Operation Process
PPT
Store design
PPT
Facility location
PPT
Master Scheduling
PPTX
WAREHOUSING AND STORAGE IN SUPPLY CHAIN MANAGEMENT
PPTX
Differentiation strategy
PPT
Ch17 scheduling
PPTX
Role of transportation in supply chain mgmt
PPTX
Core competencies
PPTX
Business process re engineering
PPT
Production & operations management
PDF
SUPPLY CHAIN STRATEGIES
PPTX
Legal & ethical issues in retailing
PPTX
Operations strategy
Strategic control & its types
Retailing
Types of strategy
Make or buy decision
Global logistics
Operation Process
Store design
Facility location
Master Scheduling
WAREHOUSING AND STORAGE IN SUPPLY CHAIN MANAGEMENT
Differentiation strategy
Ch17 scheduling
Role of transportation in supply chain mgmt
Core competencies
Business process re engineering
Production & operations management
SUPPLY CHAIN STRATEGIES
Legal & ethical issues in retailing
Operations strategy
Ad

Viewers also liked (18)

DOCX
Ops 571 free final exam sg 2014
PPTX
Team c powerpoint presentation w6
PPT
yellow belt training
DOCX
Ops 571 final exam questions and correct answers 100% guaranteed#
PPTX
Linear programming
PPTX
Lesson slides understanding customer needs
PDF
Six Sigma for Beginners- Yellow and Green Belt
PDF
Lean management applied by nike
PPT
Scheduling
DOCX
(New) final exam for ops 571 all correct answers 100%
PPTX
Six Sigma Yellow Belt
PPTX
TQM concept use by McDonald
PPTX
Understanding Customer Needs
PPT
Scheduling and sequencing
PPT
Lean presentation ppt
PPTX
Six Sigma the best ppt
PPT
Poka yoke
PPT
Scheduling
Ops 571 free final exam sg 2014
Team c powerpoint presentation w6
yellow belt training
Ops 571 final exam questions and correct answers 100% guaranteed#
Linear programming
Lesson slides understanding customer needs
Six Sigma for Beginners- Yellow and Green Belt
Lean management applied by nike
Scheduling
(New) final exam for ops 571 all correct answers 100%
Six Sigma Yellow Belt
TQM concept use by McDonald
Understanding Customer Needs
Scheduling and sequencing
Lean presentation ppt
Six Sigma the best ppt
Poka yoke
Scheduling
Ad

Similar to Work Center Scheduling (20)

PPT
Production And Operation Materials
PPT
Production And Operation Materials
PDF
Programación de operaciones (GTO) Ingeniería civil industrial
PPT
production scheduling
PDF
C0362015022
PPT
unit-4-4Operations Planning and Control-Scheduling.ppt
PDF
Work Study, Method Study
PPTX
Unit 3 iem part 2
DOC
Which of the following approaches to service design
PPT
Chapter5-Facility Layout_POM.ppt
PPT
Operation scheduling
PDF
From an operational perspective, yield management is most effective under whi...
DOC
A p chart to monitor process quality
DOC
Which of the following is not a problem definition tool
DOC
Which of the following is a total measure of productivity
PPTX
PRODUCTION PLANNING AND CONTROL-WORK STUDY
DOC
Which of the following basic types of production layout
PDF
APPAREL PRODUCTION MANAGEMNET
PPTX
REDUCTION OF WASTAGES THROUGH PPC TECHNIQUES
PPT
Project Management Scheduling methods Slides
Production And Operation Materials
Production And Operation Materials
Programación de operaciones (GTO) Ingeniería civil industrial
production scheduling
C0362015022
unit-4-4Operations Planning and Control-Scheduling.ppt
Work Study, Method Study
Unit 3 iem part 2
Which of the following approaches to service design
Chapter5-Facility Layout_POM.ppt
Operation scheduling
From an operational perspective, yield management is most effective under whi...
A p chart to monitor process quality
Which of the following is not a problem definition tool
Which of the following is a total measure of productivity
PRODUCTION PLANNING AND CONTROL-WORK STUDY
Which of the following basic types of production layout
APPAREL PRODUCTION MANAGEMNET
REDUCTION OF WASTAGES THROUGH PPC TECHNIQUES
Project Management Scheduling methods Slides

More from Shivangi Singh (6)

PPTX
Exporting american culture
PPTX
E-Bulletin
PPTX
Research Design
PPTX
Web based tourism system
PDF
Full doc. copy
Exporting american culture
E-Bulletin
Research Design
Web based tourism system
Full doc. copy

Recently uploaded (20)

PDF
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
PDF
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
PDF
Business Ethics Teaching Materials for college
PPTX
human mycosis Human fungal infections are called human mycosis..pptx
PPTX
Week 4 Term 3 Study Techniques revisited.pptx
PDF
O7-L3 Supply Chain Operations - ICLT Program
PPTX
PPH.pptx obstetrics and gynecology in nursing
PDF
O5-L3 Freight Transport Ops (International) V1.pdf
PPTX
Microbial diseases, their pathogenesis and prophylaxis
PDF
Classroom Observation Tools for Teachers
PDF
Module 4: Burden of Disease Tutorial Slides S2 2025
PPTX
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
PDF
TR - Agricultural Crops Production NC III.pdf
PPTX
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
PDF
2.FourierTransform-ShortQuestionswithAnswers.pdf
PPTX
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
PDF
Abdominal Access Techniques with Prof. Dr. R K Mishra
PDF
Pre independence Education in Inndia.pdf
PDF
102 student loan defaulters named and shamed – Is someone you know on the list?
PDF
Chapter 2 Heredity, Prenatal Development, and Birth.pdf
Origin of periodic table-Mendeleev’s Periodic-Modern Periodic table
BÀI TẬP BỔ TRỢ 4 KỸ NĂNG TIẾNG ANH 9 GLOBAL SUCCESS - CẢ NĂM - BÁM SÁT FORM Đ...
Business Ethics Teaching Materials for college
human mycosis Human fungal infections are called human mycosis..pptx
Week 4 Term 3 Study Techniques revisited.pptx
O7-L3 Supply Chain Operations - ICLT Program
PPH.pptx obstetrics and gynecology in nursing
O5-L3 Freight Transport Ops (International) V1.pdf
Microbial diseases, their pathogenesis and prophylaxis
Classroom Observation Tools for Teachers
Module 4: Burden of Disease Tutorial Slides S2 2025
Introduction to Child Health Nursing – Unit I | Child Health Nursing I | B.Sc...
TR - Agricultural Crops Production NC III.pdf
Introduction_to_Human_Anatomy_and_Physiology_for_B.Pharm.pptx
2.FourierTransform-ShortQuestionswithAnswers.pdf
The Healthy Child – Unit II | Child Health Nursing I | B.Sc Nursing 5th Semester
Abdominal Access Techniques with Prof. Dr. R K Mishra
Pre independence Education in Inndia.pdf
102 student loan defaulters named and shamed – Is someone you know on the list?
Chapter 2 Heredity, Prenatal Development, and Birth.pdf

Work Center Scheduling

  • 1. Workcenter Scheduling Presented By: Shivangi Singh Shivani Gautam Shivangi Arora
  • 2. INTRODUCTION  A schedule is a timetable for performing activities, utilizing resources, or allocating facilities.  Manufacturing Execution Systems (MES): Is an information system that schedules, dispatches, tracks, monitors, and controls production on the factory floor.  A WorkCentre is an area in a business in which productive resources are organized and work is completed.  Objectives of Work center scheduling I. Meet due dates. II. Minimize lead time. III. Minimize setup time. IV. Minimize work in process inventory. V. Maximize machine or labor utilization
  • 3. Related study Title: Comprehensive Review of the Dispatching, Scheduling and Routing of AGVs. Abstract: Automated Guided Vehicle System (AGVS) has become an important strategic tool for automated warehouses. AGVs are widely used to transport materials between workstations in flexible manufacturing systems and perform a variety of tasks that involve automation in industrial environments. If all the requirements are carried out as per the needs of the productive system, the control system is a viable option for the increase in enterprise competitiveness.
  • 4. Job sequencing  Sequencing: the process of determining the job order on machines or work centers. Also known as priority sequencing.  Priority rules: the rules used in obtaining a job sequence 1. FCFS : orders are run in the order they arrive. 2. SOT : Run the job with the shortest completion time first, next shortest second and so on. Also referred as SPT. 3. EDD : Run the job with the earliest due date first. 4. STR : Time remaining before due date — remaining processing time. 5. LCFS : As orders arrives, they are placed on the top of the stack; the operator usually picks up the order on top to run first. 6. Random: In this the supervisor usually select whichever job they feel like running.
  • 5. Example for scheduling n job on 1 machines:
  • 6. Scheduling n job on 2 machines:  In this we use Johnson’s rule.  Steps to Johnson’s Rule I. List the operation time for each job. II. Select the shortest operation time. III. If the shortest time is on the first machine, do first. • If the shortest time is on the second machine, do the job last. • For ties, do first.  Repeat steps 2-3 for each remaining job.
  • 7. Scheduling n job on m machines:  Assignment method: a special case of the transportation method of linear programming.  Steps for Assignment method: 1. Subtract the smallest number in each row or column from itself and all other numbers in that row or column. 2. Now, determine the minimum number of lines required to cover each zero. 3. Subtract minimum number i.e. uncovered from all the uncovered values and add the minimum number to the numbers that lie at the intersection. 4. Now make job assignments.
  • 8. Personnel scheduling in services  Scheduling daily work times: It’s basically about deriving a staffing plan 1. Requires the fewest workers to accomplish the daily workload. 2. Minimizes the variance between actual and planned output.  Scheduling hourly work times: This kind of personnel scheduling situation can be approached by applying a simple rule, the “first-hour” principle. The first hour rule implies that for the first hour, we assign a number of workers equal to the requirement in that period.