SlideShare a Scribd company logo
2
Most read
17
Most read
20
Most read
AUTOMATED
TRAFFIC
CONTROL
SYSTEM
o Likithe
o Sajivi
o Assam
o Washif
Contents
• Introduction
– Problem Statement
– Objectives
• Feasibility Study
– Tools and Technologies
– Risk Identification
• Planning
– Project Activity Sequencing
– Time and Cost Analysis
Contents (continued)
• Organizing
– Requirement Gathering
– Project Team Handling
– Task Delivery
• What’s Next
– Implementation
– Final Deliverable
• Conclusion
Introduction
Problem Statement
• Difficult to reduce traffic in 4-point road crossings
• Inefficiency in signal switching
• The lanes with more traffic tolerate more waiting time
• The lanes with less traffic often gets the green signal
• Hence, petrol is heavily consumed within waiting cars
• Conflict arises for pedestrians while crossing lanes
Introduction (continued)
Aim
• Implement methods to manage traffic in appropriate lanes
Objectives
• Reduce waiting time for lanes with more traffic
• Maintain proper signal switching with balanced timing
• Prevent traffic collisions
• Allocate timings exclusively for pedestrians to cross lanes
Feasibility Study
Tools
• ROSE/RSA/WebSphere Modeler
• Eclipse/RAD/Lotus Forms Designer/Portlet Factory
• WebSphere Portal/WAS/WAS CE/WPS
• DB2 Express – ‘C’ or DB2 UDB
• Tivoli CDP/TSM/Tivoli Directory Server
• Center OS (Red Hat Linux 6.5)
Feasibility Study (continued)
Users
• UML
• J2EE
• XML
• E-Forms
• AJAX
• Web 2.0
• Web-services
• SOA
Technologies
• City Traffic Management Authority
• Traffic Police
• Car Owners
• Pedestrians
Feasibility Study (continued)
Risk Identification
• Some drivers and pedestrians don’t hesitate to violate traffic laws
• Traffic signal posts might loose functionality due to power failure
• Traffic signals posts might loose functionality as it encounters heavy rains
• Traffic control data could be either mishandled or stolen
Planning
Project Activity Sequencing
• Design/Assemble traffic signal posts
• Install Database Server
• Install Linux system
• Install Tivoli Directory Server
• Connect traffic signal posts to the servers
• Configure the servers via Linux
• Configure traffic signal posts via Linux
Planning (continued)
Time Analysis
Planning (continued)
Cost Analysis
Tool Price ($)
WebSphere Modeler Version 6.2.0 120.96
Lotus Form Designer 120.96
WebSphere Portal (D596YLL) 4,200.00
DB2 - C Express 0.00
Tivoli Directory Server 133.00
Center OS (Red Hat Linux) 11.40
Total Price ($) 4,586.32
Organizing
Functional Requirements
• Normal signal control based on historical date and time of the day
• Peak time traffic control based on sensors/satellite information to get data on flow of traffic and
dynamically change timings
• VIP/Emergency traffic clearance for vehicles such as ambulance/fire brigade
• Co-ordination with neighbouring traffic control points
• Provision of traffic diversion
• Switching to guided manual control
• Alert system for signal violation
• Timer Control
Organizing (continued)
Non-Functional Requirements
• Secure access of confidential data (user’s details) with SSL
• 24x7 availability
• Better component design to get better performance at peak time
• Flexible service based architecture for future extension
• VIP Route Mapping
• Advance Traffic Alerts
• Monitoring lane disciplines
• Data analysis of different size and category of vehicles
Optional Requirements
Organizing (continued)
ProjectTeam
• The project team consists of five members, while one of them is elected to be the Project Manager.
Project Manager
Hardware
Manager
Software
Manager
Risk Manager Quality Manager
Organizing (continued)
Task Delivery
Hardware Manager
• Design/Assemble traffic signal posts
• Install Tivoli Directory Server
• Connect traffic signal posts to the servers
Software Manager
• Install Database Server and Linux System
• Configure the servers via Linux
• Configure traffic signal posts via Linux
Quality Manager
• Review Project Scope and Objectives
• Review Project Progress
• Identify and report customer satisfaction
• Maintain a Quality Manual for the project
Risk Manager
• Identify and analyze risks
• Assess and execute alternatives to respond risks
• Monitor outcomes to project quality
• Report all events in a Risk Logbook
What’s Next
Implementation
• Tools and techniques must be used to control the project flow
• All project events must be documented in status reports
• Project must be frequently reviewed to realize if it maintains schedule and cost
• Project scope and schedule should be changed to maintain the triple constraint
• Daily traffic movements
• Analytical data
• Average time taken to move from one traffic point to other
• Increase/Decrease tend in traffic flows
Information to be gathered
What’s Next (continued)
• The items that must include with the final outcome of the project are,
– Online/Offline help to system users
– Application Archive (.war/.ear) with source code
– Database backup and DDL script
– Complete system source code
Final Deliverable
Conclusion
• The use of 5 phase project management by Weiss and Wysocki is certain to contribute towards
project success.
• Since steps to plan, manage and review the project are included in this methodology, the triple
constraint shall be managed.
• As quality and risk management are ensured by the project team, the objectives and benefits are
likely to be achieved.
• Hence, we can conclude that the 5 phase project management is a structured method to sustain all
project activities and resources.
Additional Information
• Gemini Systems LLC, 2013, WebSphere Portal Server, Available at: http://estore.gemini-
systems.com/ibm/software-license/lotus-collaboration-software/websphere-portal/websphere-portal-
server/D59FLLL.html
• DB2 Express-C Team Blog, 2010, DB2 Express FTL gets more features, lower price, Available at:
http://www.db2teamblog.com/2010/10/db2-express-ftl-gets-more-features.html
• Gemini Systems LLC, 2013, Tivoli Directory Server, Available at: http://estore.gemini-
systems.com/ibm/software-license/tivoli-management-software/ibm-tivoli-directory-server/tivoli-
directory-server/D56L1LL-J.html
• Amazon, 2016, The Complete Linux Operating System 6.5 (Red Hat Linux 6.1 with
enhancements), Available at: http://www.amazon.com/Complete-Linux-Operating-System-
enhacements/dp/B00001SHO3
Additional Information (continued)
• Gemini Systems LLC, 2013, Forms Designer, Available at: http://estore.gemini-
systems.com/ibm/software-license/lotus-collaboration-software/forms/forms-designer/
• Gemini Systems LLC, 2013, WebSphere Business Modeler Advanced, Available at:
http://estore.gemini-systems.com/ibm/software-license/websphere-server-software/websphere-
business-integration/websphere-business-modeler-advanced/
ANY QUESTIONS?

More Related Content

PPTX
Traffic control system
PPTX
Biology project on cells
PPTX
Traffic light controller
PPTX
Introduction to computer network
PPTX
Computer Network
PDF
Atmosphere (hindi)
Traffic control system
Biology project on cells
Traffic light controller
Introduction to computer network
Computer Network
Atmosphere (hindi)

What's hot (20)

PPTX
Intelligent traffic information and control system
PPTX
Traffic sign recognition
PPTX
Automated traffic control by using image processing
DOCX
seminar report on Li-Fi Technology
PPTX
Application of traffic light
ODP
Computer Vision for Traffic Sign Recognition
PPTX
HSI MODEL IN COLOR IMAGE PROCESSING
PPTX
Artificial intelligence in transportation system
PPTX
Autonomous car
PPTX
Using prior knowledge to initialize the hypothesis,kbann
PPTX
Density based-traffic-light-control-system project-2 (3)
PPTX
SMART TRAFFIC CONTROL
PPTX
Density based traffic signal control using microcontroller
PPTX
Point processing
DOC
Speed detection-of-moving-vehicle-using-speed-cameras
PPT
WSN IN IOT
PPTX
Image Representation & Descriptors
PPT
Digital Image Processing
PPTX
Automatic traffic density monitoring and control system
PPTX
Traffic Violation System
Intelligent traffic information and control system
Traffic sign recognition
Automated traffic control by using image processing
seminar report on Li-Fi Technology
Application of traffic light
Computer Vision for Traffic Sign Recognition
HSI MODEL IN COLOR IMAGE PROCESSING
Artificial intelligence in transportation system
Autonomous car
Using prior knowledge to initialize the hypothesis,kbann
Density based-traffic-light-control-system project-2 (3)
SMART TRAFFIC CONTROL
Density based traffic signal control using microcontroller
Point processing
Speed detection-of-moving-vehicle-using-speed-cameras
WSN IN IOT
Image Representation & Descriptors
Digital Image Processing
Automatic traffic density monitoring and control system
Traffic Violation System
Ad

Viewers also liked (20)

PPTX
Modeling Design and Analysis of Intelligent Traffic Control System Based on S...
DOCX
Traffic light controller
DOCX
Traffic signal-project-
PPTX
Smart Control of Traffic Signal System using Image Processing
DOCX
Density based traffic light control
PDF
Final Project Report on Image processing based intelligent traffic control sy...
PPTX
Intelligent Traffic Light control using Embedded Systems
PPTX
Ee 323 project
PDF
Automated Traffic Control System
PDF
Boltay Haath
PDF
An open traffic light control model for reducing vehicles’ co2 emissions base...
PDF
Abstracts of image processing
DOC
BIOMEDICAL PROJECT ABSTRACT-Digital pulmonary function test spirometry
DOCX
Abstract of master's thesis on traffic congestion in Ghana
PPT
339_311 PPT
DOCX
Abstract
PDF
Smart traffic management system
PPTX
TRAFFIC LIGHT CONTROL USING RF TECH
DOCX
Embedded system for traffic light control
Modeling Design and Analysis of Intelligent Traffic Control System Based on S...
Traffic light controller
Traffic signal-project-
Smart Control of Traffic Signal System using Image Processing
Density based traffic light control
Final Project Report on Image processing based intelligent traffic control sy...
Intelligent Traffic Light control using Embedded Systems
Ee 323 project
Automated Traffic Control System
Boltay Haath
An open traffic light control model for reducing vehicles’ co2 emissions base...
Abstracts of image processing
BIOMEDICAL PROJECT ABSTRACT-Digital pulmonary function test spirometry
Abstract of master's thesis on traffic congestion in Ghana
339_311 PPT
Abstract
Smart traffic management system
TRAFFIC LIGHT CONTROL USING RF TECH
Embedded system for traffic light control
Ad

Similar to Automated traffic control system (20)

PPT
April 20 Briefing With Team
PPTX
Inspirage OTM in the Cloud
PPTX
Comparing Cloud platforms and tools
PPTX
Comparing Cloud Providers, Platforms and Tools
PPTX
Cloud Strategy
PPTX
Cloud Workload Suitability
PPTX
Azure AWS real time-interview questions part 9
PPTX
Fibre & Transport Network Services - Future Factory Approach & Model.pptx
PPTX
Creating a Centralized Consumer Profile Management Service with WebSphere Dat...
PPTX
Oracle Field Service - Driving CX with More Revenue & Insights | SoftClouds W...
PDF
[Cello Plus_PT] Cello Introduction_Eng
PPSX
Eurotunnel ISIS/ICIS 1994 - 2015 Reflection - Final
PDF
Cloud Ready Apps
PDF
TIA sdn transport_2_shukla_final
PDF
Accelerating the Deployment of Practical, Programmable Transport Networks
PPTX
Where Should You Deliver Database Services From?
 
PPTX
Partner webinar featuring CatDV
PDF
DEVNET-1153 Enterprise Application to Infrastructure Integration – SDN Apps
PDF
Enterprise Application to Infrastructure Integration - SDN Apps
April 20 Briefing With Team
Inspirage OTM in the Cloud
Comparing Cloud platforms and tools
Comparing Cloud Providers, Platforms and Tools
Cloud Strategy
Cloud Workload Suitability
Azure AWS real time-interview questions part 9
Fibre & Transport Network Services - Future Factory Approach & Model.pptx
Creating a Centralized Consumer Profile Management Service with WebSphere Dat...
Oracle Field Service - Driving CX with More Revenue & Insights | SoftClouds W...
[Cello Plus_PT] Cello Introduction_Eng
Eurotunnel ISIS/ICIS 1994 - 2015 Reflection - Final
Cloud Ready Apps
TIA sdn transport_2_shukla_final
Accelerating the Deployment of Practical, Programmable Transport Networks
Where Should You Deliver Database Services From?
 
Partner webinar featuring CatDV
DEVNET-1153 Enterprise Application to Infrastructure Integration – SDN Apps
Enterprise Application to Infrastructure Integration - SDN Apps

Recently uploaded (20)

PDF
The Rise and Fall of 3GPP – Time for a Sabbatical?
DOCX
The AUB Centre for AI in Media Proposal.docx
PPTX
20250228 LYD VKU AI Blended-Learning.pptx
PPTX
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
PDF
Electronic commerce courselecture one. Pdf
PDF
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
PPTX
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
PDF
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
PDF
Empathic Computing: Creating Shared Understanding
PDF
Encapsulation_ Review paper, used for researhc scholars
PDF
Review of recent advances in non-invasive hemoglobin estimation
PDF
Approach and Philosophy of On baking technology
PDF
NewMind AI Weekly Chronicles - August'25 Week I
PPT
“AI and Expert System Decision Support & Business Intelligence Systems”
PDF
cuic standard and advanced reporting.pdf
PPTX
sap open course for s4hana steps from ECC to s4
PDF
Per capita expenditure prediction using model stacking based on satellite ima...
PDF
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
PPTX
Understanding_Digital_Forensics_Presentation.pptx
PPT
Teaching material agriculture food technology
The Rise and Fall of 3GPP – Time for a Sabbatical?
The AUB Centre for AI in Media Proposal.docx
20250228 LYD VKU AI Blended-Learning.pptx
VMware vSphere Foundation How to Sell Presentation-Ver1.4-2-14-2024.pptx
Electronic commerce courselecture one. Pdf
Blue Purple Modern Animated Computer Science Presentation.pdf.pdf
Effective Security Operations Center (SOC) A Modern, Strategic, and Threat-In...
Profit Center Accounting in SAP S/4HANA, S4F28 Col11
Empathic Computing: Creating Shared Understanding
Encapsulation_ Review paper, used for researhc scholars
Review of recent advances in non-invasive hemoglobin estimation
Approach and Philosophy of On baking technology
NewMind AI Weekly Chronicles - August'25 Week I
“AI and Expert System Decision Support & Business Intelligence Systems”
cuic standard and advanced reporting.pdf
sap open course for s4hana steps from ECC to s4
Per capita expenditure prediction using model stacking based on satellite ima...
TokAI - TikTok AI Agent : The First AI Application That Analyzes 10,000+ Vira...
Understanding_Digital_Forensics_Presentation.pptx
Teaching material agriculture food technology

Automated traffic control system

  • 2. Contents • Introduction – Problem Statement – Objectives • Feasibility Study – Tools and Technologies – Risk Identification • Planning – Project Activity Sequencing – Time and Cost Analysis
  • 3. Contents (continued) • Organizing – Requirement Gathering – Project Team Handling – Task Delivery • What’s Next – Implementation – Final Deliverable • Conclusion
  • 4. Introduction Problem Statement • Difficult to reduce traffic in 4-point road crossings • Inefficiency in signal switching • The lanes with more traffic tolerate more waiting time • The lanes with less traffic often gets the green signal • Hence, petrol is heavily consumed within waiting cars • Conflict arises for pedestrians while crossing lanes
  • 5. Introduction (continued) Aim • Implement methods to manage traffic in appropriate lanes Objectives • Reduce waiting time for lanes with more traffic • Maintain proper signal switching with balanced timing • Prevent traffic collisions • Allocate timings exclusively for pedestrians to cross lanes
  • 6. Feasibility Study Tools • ROSE/RSA/WebSphere Modeler • Eclipse/RAD/Lotus Forms Designer/Portlet Factory • WebSphere Portal/WAS/WAS CE/WPS • DB2 Express – ‘C’ or DB2 UDB • Tivoli CDP/TSM/Tivoli Directory Server • Center OS (Red Hat Linux 6.5)
  • 7. Feasibility Study (continued) Users • UML • J2EE • XML • E-Forms • AJAX • Web 2.0 • Web-services • SOA Technologies • City Traffic Management Authority • Traffic Police • Car Owners • Pedestrians
  • 8. Feasibility Study (continued) Risk Identification • Some drivers and pedestrians don’t hesitate to violate traffic laws • Traffic signal posts might loose functionality due to power failure • Traffic signals posts might loose functionality as it encounters heavy rains • Traffic control data could be either mishandled or stolen
  • 9. Planning Project Activity Sequencing • Design/Assemble traffic signal posts • Install Database Server • Install Linux system • Install Tivoli Directory Server • Connect traffic signal posts to the servers • Configure the servers via Linux • Configure traffic signal posts via Linux
  • 11. Planning (continued) Cost Analysis Tool Price ($) WebSphere Modeler Version 6.2.0 120.96 Lotus Form Designer 120.96 WebSphere Portal (D596YLL) 4,200.00 DB2 - C Express 0.00 Tivoli Directory Server 133.00 Center OS (Red Hat Linux) 11.40 Total Price ($) 4,586.32
  • 12. Organizing Functional Requirements • Normal signal control based on historical date and time of the day • Peak time traffic control based on sensors/satellite information to get data on flow of traffic and dynamically change timings • VIP/Emergency traffic clearance for vehicles such as ambulance/fire brigade • Co-ordination with neighbouring traffic control points • Provision of traffic diversion • Switching to guided manual control • Alert system for signal violation • Timer Control
  • 13. Organizing (continued) Non-Functional Requirements • Secure access of confidential data (user’s details) with SSL • 24x7 availability • Better component design to get better performance at peak time • Flexible service based architecture for future extension • VIP Route Mapping • Advance Traffic Alerts • Monitoring lane disciplines • Data analysis of different size and category of vehicles Optional Requirements
  • 14. Organizing (continued) ProjectTeam • The project team consists of five members, while one of them is elected to be the Project Manager. Project Manager Hardware Manager Software Manager Risk Manager Quality Manager
  • 15. Organizing (continued) Task Delivery Hardware Manager • Design/Assemble traffic signal posts • Install Tivoli Directory Server • Connect traffic signal posts to the servers Software Manager • Install Database Server and Linux System • Configure the servers via Linux • Configure traffic signal posts via Linux Quality Manager • Review Project Scope and Objectives • Review Project Progress • Identify and report customer satisfaction • Maintain a Quality Manual for the project Risk Manager • Identify and analyze risks • Assess and execute alternatives to respond risks • Monitor outcomes to project quality • Report all events in a Risk Logbook
  • 16. What’s Next Implementation • Tools and techniques must be used to control the project flow • All project events must be documented in status reports • Project must be frequently reviewed to realize if it maintains schedule and cost • Project scope and schedule should be changed to maintain the triple constraint • Daily traffic movements • Analytical data • Average time taken to move from one traffic point to other • Increase/Decrease tend in traffic flows Information to be gathered
  • 17. What’s Next (continued) • The items that must include with the final outcome of the project are, – Online/Offline help to system users – Application Archive (.war/.ear) with source code – Database backup and DDL script – Complete system source code Final Deliverable
  • 18. Conclusion • The use of 5 phase project management by Weiss and Wysocki is certain to contribute towards project success. • Since steps to plan, manage and review the project are included in this methodology, the triple constraint shall be managed. • As quality and risk management are ensured by the project team, the objectives and benefits are likely to be achieved. • Hence, we can conclude that the 5 phase project management is a structured method to sustain all project activities and resources.
  • 19. Additional Information • Gemini Systems LLC, 2013, WebSphere Portal Server, Available at: http://estore.gemini- systems.com/ibm/software-license/lotus-collaboration-software/websphere-portal/websphere-portal- server/D59FLLL.html • DB2 Express-C Team Blog, 2010, DB2 Express FTL gets more features, lower price, Available at: http://www.db2teamblog.com/2010/10/db2-express-ftl-gets-more-features.html • Gemini Systems LLC, 2013, Tivoli Directory Server, Available at: http://estore.gemini- systems.com/ibm/software-license/tivoli-management-software/ibm-tivoli-directory-server/tivoli- directory-server/D56L1LL-J.html • Amazon, 2016, The Complete Linux Operating System 6.5 (Red Hat Linux 6.1 with enhancements), Available at: http://www.amazon.com/Complete-Linux-Operating-System- enhacements/dp/B00001SHO3
  • 20. Additional Information (continued) • Gemini Systems LLC, 2013, Forms Designer, Available at: http://estore.gemini- systems.com/ibm/software-license/lotus-collaboration-software/forms/forms-designer/ • Gemini Systems LLC, 2013, WebSphere Business Modeler Advanced, Available at: http://estore.gemini-systems.com/ibm/software-license/websphere-server-software/websphere- business-integration/websphere-business-modeler-advanced/