Optimizing the resource’s mobility, transportation, and networking in the project construction industry, using a  fractal method
Organizations
 My Ph.D. University:
Science and Research Branch, Azad University, Tehran, Iran.
 My Organization:
Department of New Technologies, Center for European Studies, Kharazmi
University, Tehran, Iran.
 My current position:
Faculty of Manufacturing Technologies, Technical University of Kosice,
Slovakia.
Research title:
Optimizing the resource’s mobility, transportation, and
networking in the project construction industry, using a
fractal method
The impact of the construction industry on the economic
efficiency:
In 2012, in the United Kingdom, the construction industry contributed
83 billion Euros to economic output with around 2 million jobs.
In 2014, in the United States, this sector contributed 716 billion dollars
to the gross domestic product, with around 6 million jobs.
Introduction and research problem
The U.S. Bureau of Economic Analysis: http://www.bea.gov/industry/gdpbyind_data.htm
The U.S. Bureau of Labour Statistics: http://www.bls.gov/emp/ep_table_201.htm
 The construction project management problem comes from
practice
 The project schedules are not always optimal
 Using optimization methods (i.e. Project resource planning)
Introduction and research problem
Introduction and research problem
 In construction companies, choosing a finishing strategy to provide
resources and raw materials is very important.
 Contracting companies in the country's construction field may have
projects in different parts of the country.
 If the volume of work or the number of projects in the region increases,
it is cost-effective to participate in the preparation and supply of
materials.
Introduction
 In this study, a new mathematical model is presented.
 The purpose of this article is to introduce a fractal resource requirement planning
(FRRP) model.
 Assuming three levels of headquarters, regions, and projects as a fractal.
 This study was carried out in one of the contracting.
 The finding shows the proposed model could be used in project-oriented
construction companies.
Background of research
 Warneck (1993) used a fractal method to optimize the supply chain network to
increases the speed and reduces the cost of the entire network in manufacturing
industries.
 Liu and Wang (2007) presented a flexible model for resolving linear scheduling problems
involving different objectives and resource assignment tasks.
 Cheng et al. (2013) developed a resource management model using the information
constraint net to simulate and optimize resource allocation in the design process.
Research question
 Can the fractal model presented in this research be used and
implemented for resource management in project-oriented
construction companies?
Research
methodology
Fig. 1. First layer: the headquarters
Research methodology
Fig. 2. The second layer: the set of activity areas
Research methodology
Fig. 3. The third layer: the collection of projects of the region
Research methodology
Fig. 4. Conceptual model of the research
Research implementation
Fig. 5. Geographical location of existing projects
Research implementation
Fig. 6. Geographical location of existing projects in the southern part of Fars province
Research implementation
Fig. 7. Geographical division of existing projects into regions
Findings and results
INDEX 1 = machine Alamut Shirkooh Pataveh 1 Pataveh 2 Heart
1.alamut 40
1.shirkooh 40
1.pataveh2 30 40
1.herat 40
2.pataveh1 50 80
2.herat 80 80 80
3.alamut 100
3.shirkooh 100 20
3.pataveh1 100 20
3.pataveh2 20 100
3.herat 20 20 100
Table 1. Transferred values of type 1 manpower
Findings and results
Table 2. Transferred values of material type 1
INDEX 1 = material Alamut Shirkooh Pataveh 1 Pataveh 2 Heart
1.alamut 40
1.shirkooh 40 40
1.herat 40 40
2.shirkooh 80
2.pataveh1 80 80
2.pataveh2 80
2.herat 80
3.shirkooh 100 20 100
3.pataveh1 20 20 20
3.pataveh2 100 100
3.herat 20 100
Findings and results
Table 3. Transferred values of manpower type 1
INDEX 1 = human Alamut Shirkooh Pataveh 1 Pataveh 2 Heart
1.shirkooh 40 40
1.pataveh1 40 40
1.pataveh2 40
2.alamut 80
2.shirkooh 80 80
2.pataveh1 80
2.herat 80
3.alamut 20 20 20 100
3.shirkooh 100 20
3.pataveh1 100 100
3.pataveh2 100
3.herat 20
 In this research, the traditional concept of resource planning was changed.
 To evaluate the proposed model, it was coded and run by GAMS software and the
project information has been used as the input of this mathematical model.
 Due to the research question, after analyzing and results, it is specified that the
proposed model could be used and implemented for resource management in
project-oriented construction companies.
 For future research
Discussion & conclusion
References
Bider, I., Perjons, E., Elias, M., & Johannesson, P. (2017). A fractal enterprise model and its application for business development. Software & Systems
Modeling, 16(3), 663-689. https://doi.org/10.1007/s10270-016-0554-9
Canavesio, M. M., & Martinez, E. (2007). Enterprise modeling of a project-oriented fractal company for SMEs networking. Computers in
industry, 58(8-9), 794-813. https://doi.org/10.1016/j.compind.2007.02.005
Canavesio, M. M., Quaglia, C., & Martinez, E. (2016). Agent-based simulation of a project fractal company. In XXII Congreso Argentino de Ciencias de
la Computación (CACIC 2016).
Chen, S. M., Chen, P. H., & Chang, L. M. (2012). Simulation and analytical techniques for construction resource planning and scheduling. Automation
in construction, 21, 99-113. https://doi.org/10.1016/j.autcon.2011.05.018
Cheng, F., Li, H., Wang, Y. W., Skitmore, M., & Forsythe, P. (2013). Modeling resource management in the building design process by information
constraint Petri nets. Automation in Construction, 29, 92-99. https://doi.org/10.1016/j.autcon.2012.08.005
Cheraghi, E., Zohrehvandi, S., Vanhoucke, M., & Tosarkani, B. M. (2022). A multiproject scheduling and resource management model in projects
construction. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-02-2021-0177
Karaa, F. A., & Nasr, A. Y. (1986). Resource management in construction. Journal of construction engineering and management, 112(3), 346-357.
Karaulova, T., Poljantshikov, I., Shevtshenko, E., & Kramarenko, S. (2014). Fractal approach for manufacturing project management. Mechanics, 20(3),
352-359. https://doi.org/10.5755/j01.mech.20.3.6755
References
Peralta, M. E., & Soltero, V. M. (2020). Analysis of fractal manufacturing systems framework towards industry 4.0. Journal of manufacturing
systems, 57, 46-60. https://doi.org/10.1016/j.jmsy.2020.08.004
Rahmanniyay, F., & Yu, A. J. (2019). A multi-objective stochastic programming model for project-oriented human-resource management
optimization. International Journal of Management Science and Engineering Management, 14(4), 231-239.
https://doi.org/10.1080/17509653.2018.1534220
Sun, H., Liu, H., Tian, J., Guo, R., Xu, Q., Yao, L., ... & Zhu, C. (2022). Modelling and Optimizing Resource Management and Environmental Benefit of
Construction and Demolition Waste: A Case Study in China. Buildings, 12(9), 1361. https://doi.org/10.3390/buildings12091361
Warnecke, H. J. (1993). “The Fractal Company: a Revolution in Corporate Culture, Springer-Verlag. Berlin.
Zohrehvandi, S. (2022). A Project-Scheduling and Resource Management Heuristic Algorithm in the Construction of Combined Cycle Power Plant
Projects. Computers, 11(2), 23. https://doi.org/10.3390/computers11020023
Zohrehvandi, S., Vanhoucke, M., & Khalilzadeh, M. (2020). A project buffer and resource management model in energy sector; a case study in
construction of a wind farm project. International Journal of Energy Sector Management, 14(6), 1123-1142. https://doi.org/10.1108/IJESM-10-2019-
0025
Thank you for
your attention

More Related Content

PDF
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
PDF
Project Scheduling: Survey and Research Potentials
PDF
Resource Optimization in Construction of a Residential Apartment using Primav...
PPTX
Resource scheduling in Construction Projects Using MSP
PDF
Resourceconstrained Project Scheduling Models Algorithms Extensions And Appli...
PDF
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
PPTX
Novel tool to optimize complext industrial projects
PPTX
Novel Tool to Optimize Complex Industrial Projects
IRJET- Fuzzy Logic in Construction Project Scheduling: A Review
Project Scheduling: Survey and Research Potentials
Resource Optimization in Construction of a Residential Apartment using Primav...
Resource scheduling in Construction Projects Using MSP
Resourceconstrained Project Scheduling Models Algorithms Extensions And Appli...
Primavera EPPM case study - Oracle Primavera P6 Collaborate 14
Novel tool to optimize complext industrial projects
Novel Tool to Optimize Complex Industrial Projects

Similar to Optimizing the resource’s mobility, transportation, and networking in the project construction industry, using a fractal method (20)

PPTX
Development of machine allocation & Route Recommendation).pptx
PDF
Operational Research And Networks Finke G Ed
PPTX
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
PDF
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
PDF
A885115 030
PDF
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
PPTX
Techniques of OR.pptx
PDF
Efficient Planning Scheduling and Delay Analysis of Residential Project
PDF
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
PDF
Project Management The Managerial Process 6th Edition Larson Solutions Manual
PDF
Lecture notes on_construction_project_ma
PDF
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
PDF
H03302058066
PDF
IRJET - Optimum Utilization of Construction Resources: A Review
PPTX
Network problems
PDF
Managing over allocation of resource in steel industries using project manage...
PPTX
CE427-Chp6-Resource-Allocation-24Apr2019.pptx
PDF
Project Management The Managerial Process 6th Edition Larson Solutions Manual
PDF
Project Management The Managerial Process 6th Edition Larson Solutions Manual
PDF
Managing over allocation of resource in steel
Development of machine allocation & Route Recommendation).pptx
Operational Research And Networks Finke G Ed
TIME & RESOURCE PLANNING,MANAGEMENT SOFTWARE
A Study on Project Planning Using the Deterministic and Probabilistic Models ...
A885115 030
IRJET- Application of Microsoft Project for Planning and Scheduling of a Resi...
Techniques of OR.pptx
Efficient Planning Scheduling and Delay Analysis of Residential Project
“OPTIMIZATION OF COST BY ALLOCATION OF RESOURCES USING PRIMAVERA P6”
Project Management The Managerial Process 6th Edition Larson Solutions Manual
Lecture notes on_construction_project_ma
Planning, Scheduling and Allocation of Resources for Multi – storiedStructure...
H03302058066
IRJET - Optimum Utilization of Construction Resources: A Review
Network problems
Managing over allocation of resource in steel industries using project manage...
CE427-Chp6-Resource-Allocation-24Apr2019.pptx
Project Management The Managerial Process 6th Edition Larson Solutions Manual
Project Management The Managerial Process 6th Edition Larson Solutions Manual
Managing over allocation of resource in steel
Ad

Recently uploaded (20)

PDF
Categorization of Factors Affecting Classification Algorithms Selection
PPTX
Fundamentals of safety and accident prevention -final (1).pptx
PDF
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
PPTX
Management Information system : MIS-e-Business Systems.pptx
PPTX
introduction to high performance computing
PDF
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
PDF
August 2025 - Top 10 Read Articles in Network Security & Its Applications
PPTX
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
PDF
Exploratory_Data_Analysis_Fundamentals.pdf
PPTX
Fundamentals of Mechanical Engineering.pptx
PPTX
Feature types and data preprocessing steps
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
Automation-in-Manufacturing-Chapter-Introduction.pdf
PPTX
Module 8- Technological and Communication Skills.pptx
PPTX
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
PDF
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
PPTX
Information Storage and Retrieval Techniques Unit III
PDF
Design Guidelines and solutions for Plastics parts
Categorization of Factors Affecting Classification Algorithms Selection
Fundamentals of safety and accident prevention -final (1).pptx
A SYSTEMATIC REVIEW OF APPLICATIONS IN FRAUD DETECTION
Management Information system : MIS-e-Business Systems.pptx
introduction to high performance computing
Artificial Superintelligence (ASI) Alliance Vision Paper.pdf
August 2025 - Top 10 Read Articles in Network Security & Its Applications
CURRICULAM DESIGN engineering FOR CSE 2025.pptx
Exploratory_Data_Analysis_Fundamentals.pdf
Fundamentals of Mechanical Engineering.pptx
Feature types and data preprocessing steps
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
Automation-in-Manufacturing-Chapter-Introduction.pdf
Module 8- Technological and Communication Skills.pptx
Graph Data Structures with Types, Traversals, Connectivity, and Real-Life App...
EXPLORING LEARNING ENGAGEMENT FACTORS INFLUENCING BEHAVIORAL, COGNITIVE, AND ...
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
Level 2 – IBM Data and AI Fundamentals (1)_v1.1.PDF
Information Storage and Retrieval Techniques Unit III
Design Guidelines and solutions for Plastics parts
Ad

Optimizing the resource’s mobility, transportation, and networking in the project construction industry, using a fractal method

  • 2. Organizations  My Ph.D. University: Science and Research Branch, Azad University, Tehran, Iran.  My Organization: Department of New Technologies, Center for European Studies, Kharazmi University, Tehran, Iran.  My current position: Faculty of Manufacturing Technologies, Technical University of Kosice, Slovakia.
  • 3. Research title: Optimizing the resource’s mobility, transportation, and networking in the project construction industry, using a fractal method
  • 4. The impact of the construction industry on the economic efficiency: In 2012, in the United Kingdom, the construction industry contributed 83 billion Euros to economic output with around 2 million jobs. In 2014, in the United States, this sector contributed 716 billion dollars to the gross domestic product, with around 6 million jobs. Introduction and research problem The U.S. Bureau of Economic Analysis: http://www.bea.gov/industry/gdpbyind_data.htm The U.S. Bureau of Labour Statistics: http://www.bls.gov/emp/ep_table_201.htm
  • 5.  The construction project management problem comes from practice  The project schedules are not always optimal  Using optimization methods (i.e. Project resource planning) Introduction and research problem
  • 6. Introduction and research problem  In construction companies, choosing a finishing strategy to provide resources and raw materials is very important.  Contracting companies in the country's construction field may have projects in different parts of the country.  If the volume of work or the number of projects in the region increases, it is cost-effective to participate in the preparation and supply of materials.
  • 7. Introduction  In this study, a new mathematical model is presented.  The purpose of this article is to introduce a fractal resource requirement planning (FRRP) model.  Assuming three levels of headquarters, regions, and projects as a fractal.  This study was carried out in one of the contracting.  The finding shows the proposed model could be used in project-oriented construction companies.
  • 8. Background of research  Warneck (1993) used a fractal method to optimize the supply chain network to increases the speed and reduces the cost of the entire network in manufacturing industries.  Liu and Wang (2007) presented a flexible model for resolving linear scheduling problems involving different objectives and resource assignment tasks.  Cheng et al. (2013) developed a resource management model using the information constraint net to simulate and optimize resource allocation in the design process.
  • 9. Research question  Can the fractal model presented in this research be used and implemented for resource management in project-oriented construction companies?
  • 10. Research methodology Fig. 1. First layer: the headquarters
  • 11. Research methodology Fig. 2. The second layer: the set of activity areas
  • 12. Research methodology Fig. 3. The third layer: the collection of projects of the region
  • 13. Research methodology Fig. 4. Conceptual model of the research
  • 14. Research implementation Fig. 5. Geographical location of existing projects
  • 15. Research implementation Fig. 6. Geographical location of existing projects in the southern part of Fars province
  • 16. Research implementation Fig. 7. Geographical division of existing projects into regions
  • 17. Findings and results INDEX 1 = machine Alamut Shirkooh Pataveh 1 Pataveh 2 Heart 1.alamut 40 1.shirkooh 40 1.pataveh2 30 40 1.herat 40 2.pataveh1 50 80 2.herat 80 80 80 3.alamut 100 3.shirkooh 100 20 3.pataveh1 100 20 3.pataveh2 20 100 3.herat 20 20 100 Table 1. Transferred values of type 1 manpower
  • 18. Findings and results Table 2. Transferred values of material type 1 INDEX 1 = material Alamut Shirkooh Pataveh 1 Pataveh 2 Heart 1.alamut 40 1.shirkooh 40 40 1.herat 40 40 2.shirkooh 80 2.pataveh1 80 80 2.pataveh2 80 2.herat 80 3.shirkooh 100 20 100 3.pataveh1 20 20 20 3.pataveh2 100 100 3.herat 20 100
  • 19. Findings and results Table 3. Transferred values of manpower type 1 INDEX 1 = human Alamut Shirkooh Pataveh 1 Pataveh 2 Heart 1.shirkooh 40 40 1.pataveh1 40 40 1.pataveh2 40 2.alamut 80 2.shirkooh 80 80 2.pataveh1 80 2.herat 80 3.alamut 20 20 20 100 3.shirkooh 100 20 3.pataveh1 100 100 3.pataveh2 100 3.herat 20
  • 20.  In this research, the traditional concept of resource planning was changed.  To evaluate the proposed model, it was coded and run by GAMS software and the project information has been used as the input of this mathematical model.  Due to the research question, after analyzing and results, it is specified that the proposed model could be used and implemented for resource management in project-oriented construction companies.  For future research Discussion & conclusion
  • 21. References Bider, I., Perjons, E., Elias, M., & Johannesson, P. (2017). A fractal enterprise model and its application for business development. Software & Systems Modeling, 16(3), 663-689. https://doi.org/10.1007/s10270-016-0554-9 Canavesio, M. M., & Martinez, E. (2007). Enterprise modeling of a project-oriented fractal company for SMEs networking. Computers in industry, 58(8-9), 794-813. https://doi.org/10.1016/j.compind.2007.02.005 Canavesio, M. M., Quaglia, C., & Martinez, E. (2016). Agent-based simulation of a project fractal company. In XXII Congreso Argentino de Ciencias de la Computación (CACIC 2016). Chen, S. M., Chen, P. H., & Chang, L. M. (2012). Simulation and analytical techniques for construction resource planning and scheduling. Automation in construction, 21, 99-113. https://doi.org/10.1016/j.autcon.2011.05.018 Cheng, F., Li, H., Wang, Y. W., Skitmore, M., & Forsythe, P. (2013). Modeling resource management in the building design process by information constraint Petri nets. Automation in Construction, 29, 92-99. https://doi.org/10.1016/j.autcon.2012.08.005 Cheraghi, E., Zohrehvandi, S., Vanhoucke, M., & Tosarkani, B. M. (2022). A multiproject scheduling and resource management model in projects construction. Engineering, Construction and Architectural Management. https://doi.org/10.1108/ECAM-02-2021-0177 Karaa, F. A., & Nasr, A. Y. (1986). Resource management in construction. Journal of construction engineering and management, 112(3), 346-357. Karaulova, T., Poljantshikov, I., Shevtshenko, E., & Kramarenko, S. (2014). Fractal approach for manufacturing project management. Mechanics, 20(3), 352-359. https://doi.org/10.5755/j01.mech.20.3.6755
  • 22. References Peralta, M. E., & Soltero, V. M. (2020). Analysis of fractal manufacturing systems framework towards industry 4.0. Journal of manufacturing systems, 57, 46-60. https://doi.org/10.1016/j.jmsy.2020.08.004 Rahmanniyay, F., & Yu, A. J. (2019). A multi-objective stochastic programming model for project-oriented human-resource management optimization. International Journal of Management Science and Engineering Management, 14(4), 231-239. https://doi.org/10.1080/17509653.2018.1534220 Sun, H., Liu, H., Tian, J., Guo, R., Xu, Q., Yao, L., ... & Zhu, C. (2022). Modelling and Optimizing Resource Management and Environmental Benefit of Construction and Demolition Waste: A Case Study in China. Buildings, 12(9), 1361. https://doi.org/10.3390/buildings12091361 Warnecke, H. J. (1993). “The Fractal Company: a Revolution in Corporate Culture, Springer-Verlag. Berlin. Zohrehvandi, S. (2022). A Project-Scheduling and Resource Management Heuristic Algorithm in the Construction of Combined Cycle Power Plant Projects. Computers, 11(2), 23. https://doi.org/10.3390/computers11020023 Zohrehvandi, S., Vanhoucke, M., & Khalilzadeh, M. (2020). A project buffer and resource management model in energy sector; a case study in construction of a wind farm project. International Journal of Energy Sector Management, 14(6), 1123-1142. https://doi.org/10.1108/IJESM-10-2019- 0025
  • 23. Thank you for your attention