Writing Proposals
with a logical
framework
Welcome
This is a course on writing effective
project proposals.
You should have already learnt about
pre-planning and logical frameworks.
What is a proposal?
• Your proposal is an important document
• Donors will decide to finance your project or
not from what they read.
• Any proposal should show thoughtful planning
Identify the project idea
• Do your Pre-Planning and Stakeholders
Analysis
• Look at possible funding and local resources
• What you learn from this will point you in the
direction of the best way to help - the ‘project
approach’ and ‘project logic’
Identify the project idea
• Your pre-planning should have pointed to an
approach that fits into this model:
Available resources
Community demand
Needs identified by experts
Project
Good ideas
1. Make sure there is a genuine problem and that you
can face it.
2. Two-step approach:
o First define your project thoroughly and using a
participatory approach,
o Then adapt your project proposal according to
the targeted donor.
3. Use the logical framework - a tool to design a
project in a systematic and logical way .
Writing A
Project Proposal
Find the right funding source
• Which donor has a target compatible with your
project ?
e.g. Humanitarian aid or development - ECHO, EuropeAid
Refugees - Austcare
HIV, Malaria - Global Fund
• What are your potential donors preferences?
e.g. Mines victims - Irish Aid
Institutional strengthening - AusAID
• How does each donor evaluate project proposals?
Are you likely to be selected?
‒ Is there an evaluation grid ?
– Do they require a partnership? Gender equity? What?
Remember
o Your Proposal is often the only way for the
donor to choose or reject your project
o Write a proposal only when your project idea
is already well thought out
o Fit to the donor’s guidelines
Package your project into an
attractive proposal (1)
• Follow a logical thread:
Background
 Problem
 Solution
 Sustainability
• Ensure match-up between:
Problem – Outcomes – Means
(this is called internal coherence)
• Many donors want the Logical Framework Approach
Package your project into an
attractive proposal (2)
Logic checklist
• Don’t leave a problem unsolved
• Don’t identify outcomes that do not
correspond to a problem
• Don’t identify outcomes for which you don’t
have a solution
• Don’t propose activities that are not related to
problems and outcomes
• Don’t list human resources that don’t match
the outcomes you aim to achieve
Package your project into an
attractive proposal (3)
Editing and layout
 Pay attention to the language:
- Use simple language
- Use future tenses
- Be concise and logical
- Avoid spelling mistakes
- Find a catchy title
 Pay attention to the layout / presentation:
- Use your organization’s logo on the first page
- Use headers and footers
- Use clear titles and paragraphs
- Break the monotony
- Add table of contents
- Print on standard format paper
Proposal structure
1. Executive Summary
2. Organisation description
3. Project background
4. Problem statement
5. Goal and objectives
6. Beneficiaries
7. Proposed methodology:
8. Budget
9. Monitoring and Evaluation
10. Sustainability
11. Annexes
Partners
Project implementation
Activities
Risks and assumptions
Means
14
Why is it important:
 It is the first part that is read
 Sometimes the only part that is
read…
 It can be used by the donor to
communicate to others about
your project
1. Executive Summary
1. Executive
summary
2. Presentation of
the organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
15
1. Executive Summary
Summary
 What do you propose to do?
 Where?
 Why?
 For whom?
 With whom?
 For how long?
1. Executive
summary
2. Presentation of
the organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
16
1. Executive Summary
DO :
 Write it last
 Do it carefully
 Keep it short
DON’T :
 Cut and paste
1. Executive
summary
2. Presentation of
the organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
17
2. Presentation of the organisation
Why is it important?
 Purpose: to establish credibility
and image of a well-managed
organization that meets critical
needs in its area of work
Tips
 Should not be too long
 If you are approaching a new
donor, attach in appendix an
organisation brochure and the
last annual report
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
18
2. Presentation of the organisation
Contents
 Who are you?
 Philosophy / mandate?
 History and significant
interventions / track record
 Expertise in addressing the
problem or need
 Organisational structure
 Major sources of support
 Affiliations / accreditations /
linkages
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
19
3. Project Background
Contents
 Who took the initiative?
 Does the project fit into an existing
development plan or programme?
 Is this the first phase of the project, or
continues an activity already started?
 If continuing, what have been the
main results of the previous phase?
 What studies have been done to
prepare the project?
 Who else operates in this field?
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
20
3. Project Background
Tips
You need to demonstrate that :
 The project arises from the
beneficiaries and/or the local
partners
 You know the local context very
well
 You have the experience needed
to run the project successfully
 You have been successful before
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
21
4. Problem Statement
Why is it important?
Unless donors are convinced that
there is a real problem, they will
not agree to pay for our project!
Tips
A “good” problem should:
 concern people
 be concrete and demonstrated
 be solvable
 come from a demand
 be an emergency or priority
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
22
4. Problem Statement
Contents
 Describe the scope and size of
the problem
 What are the immediate causes?
 What are the underlying causes?
 What are the effects?
 How does it affect people?
 Why does it have to be
addressed?
 Why now and not later?
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
23
5. Goal and Objectives
Goals (or overall objectives):
Describes the long-term goals your
project will contribute to.
Project Purpose or Specific Objective:
Describes the objective of your project
in response to the core problem.
Expected Results:
Describes the outputs (or outcomes) -
the concrete results of your project.
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
24
Objectives should be SMART:
 Specific = they must meet the needs
(problems) identified
 Measurable = they should be
measured by concrete indicators
which should reflect the extent to
which they have been attained
 Acceptable = by all involved partners
 Relevant = they must be adequate to
the project socio-cultural environment
 Timely = must be reached by the end
of the project
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
5. Goal and Objectives
25
6. Beneficiaries
Contents
 Clearly identify direct and
indirect beneficiaries:
• Direct support to target group
• Indirect benefits to others
• How many?
• Where?
• Characteristics?
 Specify how and at what stage
they will be involved in the
project
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
26
7. Proposed Methodology
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Contents
 Partners
 Project implementation
 Activities
 Risks and assumptions
 Means
Why is it important?
 Shows how objectives will be
achieved
27
Partners:
 Clearly divide main partners and
other partners
 Provide background information:
 Goals/philosophy?
 Area of intervention?
 Relationship with beneficiaries?
 Cooperation track-record?
 Type of partnership you set up
 Specify each partner’s role
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
7. Proposed Methodology
28
Project implementation:
 Rationale for selecting this
methodology
 Project implementation structure:
roles and responsibilities of all the
project stakeholders
Tip
Use a chart to show the project
implementation structure
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
7. Proposed Methodology
29
7. Proposed Methodology
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Activities:
 What will be done?
 How?
 By whom?
 Where?
 By when?
Tips
 Be as precise as possible
 Cluster activities by expected
result
 Use a work plan to summarise
30
7. Proposed Methodology
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Example:
Training:
 How many persons?
 For how long? Starting when?
 Which methodology will be used
(seminars, in-house training, ad hoc
courses, etc.)
 Why is the training necessary?
 Which new skills will the trainees
acquire?
Year Year 1
Month 1 2 3 4 5 6 7
Activity 1
Activity 2
Activity 3
Activity 4
31
7. Proposed Methodology
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Risks/Assumptions:
 Risks are external factors that could
potentially jeopardise your project and
are beyond your control
 Assumptions are things you are
expecting to be a certain way
Why is it important?
 It helps assess the factors which could
jeopardise your project
 It helps examining the project for
completeness and consistency
32
7. Proposed methodology
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Means:
 Human resources:
 Explain the responsibilities and
tasks of each key person in the
project.
 Justify the need for expatriate
personnel
 Material resources:
 Give an explanation of the most
important budget lines
 Justify vehicles
33
8. Budget
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Contents
 Budget spreadsheet
 Budget explanations and
justifications
Tips
 Prepare it using your action plan
 Don’t inflate the budget
 Carefully follow donor’s
requirements
 Divide your budget into years
34
9. Monitoring & Evaluation
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring
and
evaluation
10. Sustainability
11. Annexes
Why is it important?
 Monitoring: to assess whether
your project activities are on track
 Evaluation: to assess whether
your project is effective, efficient,
has an impact, is relevant and
sustainable
Contents
 What will be monitored and why?
 By whom?
 How often?
 Using which tools and methods?
35
10. Sustainability
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
Contents
 Institutional sustainability
 Technical sustainability
 Socio-cultural sustainability
 Financial sustainability
Why is it important?
Because donors want to be sure
that their investment will not be
lost at the end of the project and
that you are already planning the
phasing out of the project.
36
Contents
 Glossary
 Maps
 Statistics/ policy documents
 Proof of registration and tax benefits for
donors
 Financial statement
 Composition of Board of Directors
 List of major donors
 Annual report, brochures & publications
 Specific studies or evaluation reports
 Memorandum of agreement with
partners
 Letters of support
 Pictures, case studies
 Other...
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
11. Annexes / Appendices
37
11. Appendices / Annexes
Tips
 Refer to the appendices in the
proposal (see appendix a), but....
 If something is crucially
important, write it in the proposal!
 Add a table of contents for the
appendices
 Put the appendix number on the
top of each page “appendix no xy”
 Separate each appendix by a
coloured page
1. Executive
summary
2. Presentation
of the
organisation
3. Project
background
4. Problem
statement
5. Goal and
objectives
6. Beneficiaries
7. Proposed
methodology
8. Budget
9. Monitoring and
evaluation
10. Sustainability
11. Annexes
BREAK
Back in 60 minutes
Proposal package
1. Cover letter
Use letterhead, mention project title, purpose, amount
requested, contact person and list of attached documents
2. Project proposal:
• Title page with logo
• Table of contents
• Executive summary
• Detailed proposal
• Annexes
3. Requested attachments
Include all documents requested by the donor (which are not
already included) in the annexes
Final check
Ask someone outside the project team to read
the proposal before sending to a donor.
41
CASE STUDY
Handicap
International
42
Case study: Laos project
• Targeted donor: ECHO (European Community
Humanitarian Office)
– ECHO mandate: humanitarian and emergency
actions
• Context: Need of gap funding between two
contracts with EuropeAid (budget line B7-661 « mines »)
– EuropeAid mandate: long-term development
oriented
• Project rationale: training of deminers in Laos,
Savannakhet Province
43
Version I:
what would you change/improve ?
1. GENERAL INFORMATION
Title of operation: Technical support for the
maintenance of Lao National Unexploded Ordnance
(UXO LAO) activities in Savannakhet. Province of
Lao PDR while preparing the consolidation of a 24
month final phase of the project.
Start-up date: March 2002.
44
VERSION II:
What was written in the final version
• VERSION 2
1. GENERAL INFORMATION
Title of operation: Maintenance of Handicap
International Technical Assistance to UXO Clearance
Operations in Savannakhet Province, Lao PDR
Start-up date: 1st March 2002
45
Version I:
what would you change/improve ?
4.1. Overall objective(s)
Phase 4 – Transfer of knowledge, skills and capacities to UXO
LAO Savannakhet in respect of the application of comprehensive
national procedure across all aspects of the programme leading to
the complete withdrawal of HI technical assistance.
4.2. Project purpose/ Specific objective
To provide reduced technical support to UXO LAO Savannakhet for
UXO area clearance and disposal in order to allow UXO LAO to
maintain limited activities to national standards.
This is an interim arrangement of six months that will allow limited
continuity of operations for UXO LAO in Savannakhet until
implementing partner funding becomes available. This will allow
UXO LAO Savannakhet to conduct its full range activities
(community awareness, survey, roving and area clearance) to
national standards under the technical supervision of Handicap
International technical advisor as described in the phase four
financing proposal.
46
VERSION II:
What was written in the final version
• 4.1. Overall objectives:
The populations of Phine, Xepon, Vilabuly, Nong,
Atsaphanthong, Phalan Xai and Atsaphone of Savannakhet
Province, Lao PDR live in a safer environment.
• 4.2. Project purpose/ Specific objective:
The negative impacts of UXOs in the districts of Phine, Xepon,
Vilabuly, Nong, Atsaphanthong, Phalan Xai and Atsaphone of
Savannakhet Province, Lao PDR are reduced.
47
Version I:
what would you change/improve ?
• VERSION 1 :Number of direct beneficiaries:
UXO Lao staff in Savannakhet Province. Currently UXO Lao assisted by HI
have 160 deminers, surveyors, community awareness (CA) members and
supporting staff in the province.
The general population on the four most UXO affected districts of
Savannakhet Province will also directly benefit of the clearance operations
undertaken by UXO Lao.
The quantitative outputs of UXO LAO Savannakhet in the key activities
since the HI project started are:
Area Clearance: Agriculture land cleared: 2,534,935m2 ( 58% of the total
land cleared)
Roving Tasks: Villages visited: 939
Community Awareness: Villages visited: 561 out of more than 625
48
VERSION II:
What was written in the final version
Number of direct beneficiaries:
The general population on the seven most UXO affected districts of
Savannakhet Province will directly benefit of the clearance operations and
awareness activities undertaken by UXO Lao. The direct beneficiaries are
more specifically, the populations of the districts of Phine, Xepon, Vilabuly,
Nong, Atsaphanthong, Phalan Xai and Atsaphone. The number of direct
beneficiaries is estimated at over 22,000 people. The vast majority of the
beneficiaries are subsistence farmers from ethnic minority groups in remote
areas. Through activities undertaken in this programme, the local
population will benefit from improved land accessibility, improved land
availability, a safer working and living environment and an improved ability
to avoid accidents caused by unexploded ordnance.
Equally, UXO LAO staff in Savannakhet Province are direct beneficiaries of
this programme. Currently UXO Lao staff assisted by HI includes de-miners,
surveyors, community awareness (CA) workers and support staff in the
province. The number of beneficiaries equals 160 employees of UXO LAO.
Through activities undertaken in this programme, UXO LAO employees will
benefit from training aimed at safer, more efficient and more diverse
unexploded ordinance identification, removal and destruction.
49
VERSION III:
Keep it short…
Number of direct beneficiaries:
The general population of the seven most UXO affected districts of
Savannakhet Province, estimated at over 22,000 people, will directly
benefit from the clearance and awareness activities of UXO Lao.
Most beneficiaries are subsistence farmers from ethnic minorities in
remote areas who will benefit from improved land accessibility and
availability and a safer living and working environment.
UXO Lao staff in Savannakhet Province who are also direct
beneficiaries include de-miners, surveyors, community awareness (CA)
workers and support staff, totalling 160 employees.
Staff will benefit from training aimed at safer, more efficient and more
diverse unexploded ordinance identification, removal and destruction.
50
Checklist: all the good questions to bear in mind when
drafting a project proposal
1. Before writing the proposal:
• Is the stakeholder analysis done and complete?
• Have I established a coherent problem tree and a concrete
problem ?
• Have objectives, results and activities been discussed with
all partners and accepted ?
• Do I know the donor to whom I will send my proposal (e.g.
mandate, criteria, specific format, etc.)?
• Is there an internal organisation that has been set up
within your organisation around this proposal ? Does
each person know her tasks ?
51
Checklist: all the good questions to bear in mind when
drafting a project proposal
2. When drafting the proposal:
• Is my proposal coherent:- identified problem  suggested
activities  proposed outcome?
• Is my proposal precise enough (e.g. explanation of
expected results and intended activities, definition of
SMART indicators)?
• Is my proposal understandable by everybody (not too
many technical terms, theories explained, etc.)?
• Have I really respected the donor’s criteria ?
• Have I put the information in the correct place ?
• Have I corrected all the spelling mistakes ?
52
Thankyou
Adapted for Health Poverty Action by Tony Hobbs
from original material and case study by Handicap International

More Related Content

PPTX
Boundary spanning leadership slideshare
PPTX
Benefits of volunteerism
PPT
PPT
Understanding financing challenges in NGOs
PPTX
Leaders as change agents
PDF
Stakeholder engagement and management
PPTX
Stakeholder management _1
Boundary spanning leadership slideshare
Benefits of volunteerism
Understanding financing challenges in NGOs
Leaders as change agents
Stakeholder engagement and management
Stakeholder management _1

What's hot (20)

PPTX
Teamwork
PPTX
Leading People and Teams
PDF
How To Build A Successful Team
PDF
The 5 Dysfunctions of a Team
PPTX
Leadership and management Skills
PPTX
A Survival Guide for Leaders
PPTX
Stakeholder Engagement vs Stakeholder Management
PPT
Leadership
PPTX
Positive approaches to Conflict Management
PPT
Managing Conflicts And Difficult People
PDF
Behavioral Theories Of Leadership Powerpoint Presentation Slides
PPT
Volunteering
PPTX
Management training how to use behavioural competencies
PDF
Collaborative leadership
PPT
Change Management Framework
PPT
Effective Strategic Planning Workshop
PPTX
SERVANT LEADERSHIP
PDF
Module 4 - Networking and Alliances
PDF
Leadership Training | Leadership Skills | Effective Leadership
PPTX
Team Building
Teamwork
Leading People and Teams
How To Build A Successful Team
The 5 Dysfunctions of a Team
Leadership and management Skills
A Survival Guide for Leaders
Stakeholder Engagement vs Stakeholder Management
Leadership
Positive approaches to Conflict Management
Managing Conflicts And Difficult People
Behavioral Theories Of Leadership Powerpoint Presentation Slides
Volunteering
Management training how to use behavioural competencies
Collaborative leadership
Change Management Framework
Effective Strategic Planning Workshop
SERVANT LEADERSHIP
Module 4 - Networking and Alliances
Leadership Training | Leadership Skills | Effective Leadership
Team Building
Ad

Viewers also liked (20)

PDF
How To Write A Business Proposal - The Ultimate Guide
PPT
Writing paper workshopwritingacademicpaper-telkomuniv-15102015
PPTX
Admission essay
PPT
Clinical use of_music_therapy dr shashikant
PPT
Complete wellness program ABHYASA TRUST and IM WELL Pvt Ltd
PPT
Gunam multispeciality hospital's workplace wellness program
PPT
Wellness Fitness Program
PDF
Us Wellness Chamber Of Commerce Wellness Program Proposal 2009 1
PPTX
India women empowered
DOCX
Target Wellness Proposal
PDF
Planning tips chapman 2013
PPTX
yoga for college students
PPT
Proposal for Wellness Program
 
PPSX
Stress adrenal cortex
PPTX
FRACTALS - How to write a proposal for FRACTALS
PPT
Biology of mind dr shashikant
PPSX
Geriatric medicine
PDF
EU funding for startups and SMEs - How to write a proposal that doesn't suck?
PPTX
How to write a project proposal
PPT
Wellness Powerpoint
 
How To Write A Business Proposal - The Ultimate Guide
Writing paper workshopwritingacademicpaper-telkomuniv-15102015
Admission essay
Clinical use of_music_therapy dr shashikant
Complete wellness program ABHYASA TRUST and IM WELL Pvt Ltd
Gunam multispeciality hospital's workplace wellness program
Wellness Fitness Program
Us Wellness Chamber Of Commerce Wellness Program Proposal 2009 1
India women empowered
Target Wellness Proposal
Planning tips chapman 2013
yoga for college students
Proposal for Wellness Program
 
Stress adrenal cortex
FRACTALS - How to write a proposal for FRACTALS
Biology of mind dr shashikant
Geriatric medicine
EU funding for startups and SMEs - How to write a proposal that doesn't suck?
How to write a project proposal
Wellness Powerpoint
 
Ad

Similar to How to write Proposal for a Project by Ahmadshah Pashaye (20)

PPTX
10 Project Proposal Writing
PPTX
Project proposal writing civil engg
PDF
Training material on proposal writing & resource mobilization for focus pak...
PPTX
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
PPT
Preparing a project proposal
PPTX
Proposal Writing with Sher Shah Rahim
PPTX
IS068_Lecture2.pptxnsnnsnsnsnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn
PDF
Grant Writing: The Major Components of a Grant Proposal
PDF
SAESC fundraising presentation: writing effective proposals 4 feb 2013
PDF
Proposal Writing for individuals and NGO Presentation
PPT
Grant Writing 101
PPTX
Project Proposal Writing.pptx
DOC
Mothod of proposal
PPT
Grant writing basics creating a fundable proposal
PPT
jta_how_to_write_a_project_proposal.ppt
PDF
Fundraising for the small nonprofit Presentation
PPTX
fundsforNGOs Doc. training materials for NGOs
PPTX
Implementation project proposal writing (1).pptx
PPTX
Implementation project proposal writing (1).pptx
PPTX
Project proposal
10 Project Proposal Writing
Project proposal writing civil engg
Training material on proposal writing & resource mobilization for focus pak...
Final Class Presentation on Direct Problem-solving Intervention Projects.pptx
Preparing a project proposal
Proposal Writing with Sher Shah Rahim
IS068_Lecture2.pptxnsnnsnsnsnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnnn
Grant Writing: The Major Components of a Grant Proposal
SAESC fundraising presentation: writing effective proposals 4 feb 2013
Proposal Writing for individuals and NGO Presentation
Grant Writing 101
Project Proposal Writing.pptx
Mothod of proposal
Grant writing basics creating a fundable proposal
jta_how_to_write_a_project_proposal.ppt
Fundraising for the small nonprofit Presentation
fundsforNGOs Doc. training materials for NGOs
Implementation project proposal writing (1).pptx
Implementation project proposal writing (1).pptx
Project proposal

Recently uploaded (20)

PDF
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
PDF
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
PPT
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
PPTX
introduction to high performance computing
PDF
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
PPT
Occupational Health and Safety Management System
PPTX
UNIT - 3 Total quality Management .pptx
PPTX
Current and future trends in Computer Vision.pptx
PPT
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PDF
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
PDF
86236642-Electric-Loco-Shed.pdf jfkduklg
PPTX
Nature of X-rays, X- Ray Equipment, Fluoroscopy
PDF
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
PDF
Visual Aids for Exploratory Data Analysis.pdf
PPTX
UNIT 4 Total Quality Management .pptx
PPTX
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
PDF
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
PPTX
Fundamentals of Mechanical Engineering.pptx
PDF
737-MAX_SRG.pdf student reference guides
PDF
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems
COURSE DESCRIPTOR OF SURVEYING R24 SYLLABUS
BIO-INSPIRED ARCHITECTURE FOR PARSIMONIOUS CONVERSATIONAL INTELLIGENCE : THE ...
Introduction, IoT Design Methodology, Case Study on IoT System for Weather Mo...
introduction to high performance computing
Mitigating Risks through Effective Management for Enhancing Organizational Pe...
Occupational Health and Safety Management System
UNIT - 3 Total quality Management .pptx
Current and future trends in Computer Vision.pptx
A5_DistSysCh1.ppt_INTRODUCTION TO DISTRIBUTED SYSTEMS
PREDICTION OF DIABETES FROM ELECTRONIC HEALTH RECORDS
86236642-Electric-Loco-Shed.pdf jfkduklg
Nature of X-rays, X- Ray Equipment, Fluoroscopy
SMART SIGNAL TIMING FOR URBAN INTERSECTIONS USING REAL-TIME VEHICLE DETECTI...
Visual Aids for Exploratory Data Analysis.pdf
UNIT 4 Total Quality Management .pptx
6ME3A-Unit-II-Sensors and Actuators_Handouts.pptx
Enhancing Cyber Defense Against Zero-Day Attacks using Ensemble Neural Networks
Fundamentals of Mechanical Engineering.pptx
737-MAX_SRG.pdf student reference guides
Human-AI Collaboration: Balancing Agentic AI and Autonomy in Hybrid Systems

How to write Proposal for a Project by Ahmadshah Pashaye

  • 1. Writing Proposals with a logical framework
  • 2. Welcome This is a course on writing effective project proposals. You should have already learnt about pre-planning and logical frameworks.
  • 3. What is a proposal? • Your proposal is an important document • Donors will decide to finance your project or not from what they read. • Any proposal should show thoughtful planning
  • 4. Identify the project idea • Do your Pre-Planning and Stakeholders Analysis • Look at possible funding and local resources • What you learn from this will point you in the direction of the best way to help - the ‘project approach’ and ‘project logic’
  • 5. Identify the project idea • Your pre-planning should have pointed to an approach that fits into this model: Available resources Community demand Needs identified by experts Project
  • 6. Good ideas 1. Make sure there is a genuine problem and that you can face it. 2. Two-step approach: o First define your project thoroughly and using a participatory approach, o Then adapt your project proposal according to the targeted donor. 3. Use the logical framework - a tool to design a project in a systematic and logical way .
  • 8. Find the right funding source • Which donor has a target compatible with your project ? e.g. Humanitarian aid or development - ECHO, EuropeAid Refugees - Austcare HIV, Malaria - Global Fund • What are your potential donors preferences? e.g. Mines victims - Irish Aid Institutional strengthening - AusAID • How does each donor evaluate project proposals? Are you likely to be selected? ‒ Is there an evaluation grid ? – Do they require a partnership? Gender equity? What?
  • 9. Remember o Your Proposal is often the only way for the donor to choose or reject your project o Write a proposal only when your project idea is already well thought out o Fit to the donor’s guidelines
  • 10. Package your project into an attractive proposal (1) • Follow a logical thread: Background  Problem  Solution  Sustainability • Ensure match-up between: Problem – Outcomes – Means (this is called internal coherence) • Many donors want the Logical Framework Approach
  • 11. Package your project into an attractive proposal (2) Logic checklist • Don’t leave a problem unsolved • Don’t identify outcomes that do not correspond to a problem • Don’t identify outcomes for which you don’t have a solution • Don’t propose activities that are not related to problems and outcomes • Don’t list human resources that don’t match the outcomes you aim to achieve
  • 12. Package your project into an attractive proposal (3) Editing and layout  Pay attention to the language: - Use simple language - Use future tenses - Be concise and logical - Avoid spelling mistakes - Find a catchy title  Pay attention to the layout / presentation: - Use your organization’s logo on the first page - Use headers and footers - Use clear titles and paragraphs - Break the monotony - Add table of contents - Print on standard format paper
  • 13. Proposal structure 1. Executive Summary 2. Organisation description 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology: 8. Budget 9. Monitoring and Evaluation 10. Sustainability 11. Annexes Partners Project implementation Activities Risks and assumptions Means
  • 14. 14 Why is it important:  It is the first part that is read  Sometimes the only part that is read…  It can be used by the donor to communicate to others about your project 1. Executive Summary 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 15. 15 1. Executive Summary Summary  What do you propose to do?  Where?  Why?  For whom?  With whom?  For how long? 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 16. 16 1. Executive Summary DO :  Write it last  Do it carefully  Keep it short DON’T :  Cut and paste 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 17. 17 2. Presentation of the organisation Why is it important?  Purpose: to establish credibility and image of a well-managed organization that meets critical needs in its area of work Tips  Should not be too long  If you are approaching a new donor, attach in appendix an organisation brochure and the last annual report 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 18. 18 2. Presentation of the organisation Contents  Who are you?  Philosophy / mandate?  History and significant interventions / track record  Expertise in addressing the problem or need  Organisational structure  Major sources of support  Affiliations / accreditations / linkages 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 19. 19 3. Project Background Contents  Who took the initiative?  Does the project fit into an existing development plan or programme?  Is this the first phase of the project, or continues an activity already started?  If continuing, what have been the main results of the previous phase?  What studies have been done to prepare the project?  Who else operates in this field? 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 20. 20 3. Project Background Tips You need to demonstrate that :  The project arises from the beneficiaries and/or the local partners  You know the local context very well  You have the experience needed to run the project successfully  You have been successful before 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 21. 21 4. Problem Statement Why is it important? Unless donors are convinced that there is a real problem, they will not agree to pay for our project! Tips A “good” problem should:  concern people  be concrete and demonstrated  be solvable  come from a demand  be an emergency or priority 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 22. 22 4. Problem Statement Contents  Describe the scope and size of the problem  What are the immediate causes?  What are the underlying causes?  What are the effects?  How does it affect people?  Why does it have to be addressed?  Why now and not later? 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 23. 23 5. Goal and Objectives Goals (or overall objectives): Describes the long-term goals your project will contribute to. Project Purpose or Specific Objective: Describes the objective of your project in response to the core problem. Expected Results: Describes the outputs (or outcomes) - the concrete results of your project. 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 24. 24 Objectives should be SMART:  Specific = they must meet the needs (problems) identified  Measurable = they should be measured by concrete indicators which should reflect the extent to which they have been attained  Acceptable = by all involved partners  Relevant = they must be adequate to the project socio-cultural environment  Timely = must be reached by the end of the project 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 5. Goal and Objectives
  • 25. 25 6. Beneficiaries Contents  Clearly identify direct and indirect beneficiaries: • Direct support to target group • Indirect benefits to others • How many? • Where? • Characteristics?  Specify how and at what stage they will be involved in the project 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 26. 26 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Contents  Partners  Project implementation  Activities  Risks and assumptions  Means Why is it important?  Shows how objectives will be achieved
  • 27. 27 Partners:  Clearly divide main partners and other partners  Provide background information:  Goals/philosophy?  Area of intervention?  Relationship with beneficiaries?  Cooperation track-record?  Type of partnership you set up  Specify each partner’s role 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 7. Proposed Methodology
  • 28. 28 Project implementation:  Rationale for selecting this methodology  Project implementation structure: roles and responsibilities of all the project stakeholders Tip Use a chart to show the project implementation structure 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 7. Proposed Methodology
  • 29. 29 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Activities:  What will be done?  How?  By whom?  Where?  By when? Tips  Be as precise as possible  Cluster activities by expected result  Use a work plan to summarise
  • 30. 30 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Example: Training:  How many persons?  For how long? Starting when?  Which methodology will be used (seminars, in-house training, ad hoc courses, etc.)  Why is the training necessary?  Which new skills will the trainees acquire? Year Year 1 Month 1 2 3 4 5 6 7 Activity 1 Activity 2 Activity 3 Activity 4
  • 31. 31 7. Proposed Methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Risks/Assumptions:  Risks are external factors that could potentially jeopardise your project and are beyond your control  Assumptions are things you are expecting to be a certain way Why is it important?  It helps assess the factors which could jeopardise your project  It helps examining the project for completeness and consistency
  • 32. 32 7. Proposed methodology 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Means:  Human resources:  Explain the responsibilities and tasks of each key person in the project.  Justify the need for expatriate personnel  Material resources:  Give an explanation of the most important budget lines  Justify vehicles
  • 33. 33 8. Budget 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Contents  Budget spreadsheet  Budget explanations and justifications Tips  Prepare it using your action plan  Don’t inflate the budget  Carefully follow donor’s requirements  Divide your budget into years
  • 34. 34 9. Monitoring & Evaluation 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Why is it important?  Monitoring: to assess whether your project activities are on track  Evaluation: to assess whether your project is effective, efficient, has an impact, is relevant and sustainable Contents  What will be monitored and why?  By whom?  How often?  Using which tools and methods?
  • 35. 35 10. Sustainability 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes Contents  Institutional sustainability  Technical sustainability  Socio-cultural sustainability  Financial sustainability Why is it important? Because donors want to be sure that their investment will not be lost at the end of the project and that you are already planning the phasing out of the project.
  • 36. 36 Contents  Glossary  Maps  Statistics/ policy documents  Proof of registration and tax benefits for donors  Financial statement  Composition of Board of Directors  List of major donors  Annual report, brochures & publications  Specific studies or evaluation reports  Memorandum of agreement with partners  Letters of support  Pictures, case studies  Other... 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes 11. Annexes / Appendices
  • 37. 37 11. Appendices / Annexes Tips  Refer to the appendices in the proposal (see appendix a), but....  If something is crucially important, write it in the proposal!  Add a table of contents for the appendices  Put the appendix number on the top of each page “appendix no xy”  Separate each appendix by a coloured page 1. Executive summary 2. Presentation of the organisation 3. Project background 4. Problem statement 5. Goal and objectives 6. Beneficiaries 7. Proposed methodology 8. Budget 9. Monitoring and evaluation 10. Sustainability 11. Annexes
  • 38. BREAK Back in 60 minutes
  • 39. Proposal package 1. Cover letter Use letterhead, mention project title, purpose, amount requested, contact person and list of attached documents 2. Project proposal: • Title page with logo • Table of contents • Executive summary • Detailed proposal • Annexes 3. Requested attachments Include all documents requested by the donor (which are not already included) in the annexes
  • 40. Final check Ask someone outside the project team to read the proposal before sending to a donor.
  • 42. 42 Case study: Laos project • Targeted donor: ECHO (European Community Humanitarian Office) – ECHO mandate: humanitarian and emergency actions • Context: Need of gap funding between two contracts with EuropeAid (budget line B7-661 « mines ») – EuropeAid mandate: long-term development oriented • Project rationale: training of deminers in Laos, Savannakhet Province
  • 43. 43 Version I: what would you change/improve ? 1. GENERAL INFORMATION Title of operation: Technical support for the maintenance of Lao National Unexploded Ordnance (UXO LAO) activities in Savannakhet. Province of Lao PDR while preparing the consolidation of a 24 month final phase of the project. Start-up date: March 2002.
  • 44. 44 VERSION II: What was written in the final version • VERSION 2 1. GENERAL INFORMATION Title of operation: Maintenance of Handicap International Technical Assistance to UXO Clearance Operations in Savannakhet Province, Lao PDR Start-up date: 1st March 2002
  • 45. 45 Version I: what would you change/improve ? 4.1. Overall objective(s) Phase 4 – Transfer of knowledge, skills and capacities to UXO LAO Savannakhet in respect of the application of comprehensive national procedure across all aspects of the programme leading to the complete withdrawal of HI technical assistance. 4.2. Project purpose/ Specific objective To provide reduced technical support to UXO LAO Savannakhet for UXO area clearance and disposal in order to allow UXO LAO to maintain limited activities to national standards. This is an interim arrangement of six months that will allow limited continuity of operations for UXO LAO in Savannakhet until implementing partner funding becomes available. This will allow UXO LAO Savannakhet to conduct its full range activities (community awareness, survey, roving and area clearance) to national standards under the technical supervision of Handicap International technical advisor as described in the phase four financing proposal.
  • 46. 46 VERSION II: What was written in the final version • 4.1. Overall objectives: The populations of Phine, Xepon, Vilabuly, Nong, Atsaphanthong, Phalan Xai and Atsaphone of Savannakhet Province, Lao PDR live in a safer environment. • 4.2. Project purpose/ Specific objective: The negative impacts of UXOs in the districts of Phine, Xepon, Vilabuly, Nong, Atsaphanthong, Phalan Xai and Atsaphone of Savannakhet Province, Lao PDR are reduced.
  • 47. 47 Version I: what would you change/improve ? • VERSION 1 :Number of direct beneficiaries: UXO Lao staff in Savannakhet Province. Currently UXO Lao assisted by HI have 160 deminers, surveyors, community awareness (CA) members and supporting staff in the province. The general population on the four most UXO affected districts of Savannakhet Province will also directly benefit of the clearance operations undertaken by UXO Lao. The quantitative outputs of UXO LAO Savannakhet in the key activities since the HI project started are: Area Clearance: Agriculture land cleared: 2,534,935m2 ( 58% of the total land cleared) Roving Tasks: Villages visited: 939 Community Awareness: Villages visited: 561 out of more than 625
  • 48. 48 VERSION II: What was written in the final version Number of direct beneficiaries: The general population on the seven most UXO affected districts of Savannakhet Province will directly benefit of the clearance operations and awareness activities undertaken by UXO Lao. The direct beneficiaries are more specifically, the populations of the districts of Phine, Xepon, Vilabuly, Nong, Atsaphanthong, Phalan Xai and Atsaphone. The number of direct beneficiaries is estimated at over 22,000 people. The vast majority of the beneficiaries are subsistence farmers from ethnic minority groups in remote areas. Through activities undertaken in this programme, the local population will benefit from improved land accessibility, improved land availability, a safer working and living environment and an improved ability to avoid accidents caused by unexploded ordnance. Equally, UXO LAO staff in Savannakhet Province are direct beneficiaries of this programme. Currently UXO Lao staff assisted by HI includes de-miners, surveyors, community awareness (CA) workers and support staff in the province. The number of beneficiaries equals 160 employees of UXO LAO. Through activities undertaken in this programme, UXO LAO employees will benefit from training aimed at safer, more efficient and more diverse unexploded ordinance identification, removal and destruction.
  • 49. 49 VERSION III: Keep it short… Number of direct beneficiaries: The general population of the seven most UXO affected districts of Savannakhet Province, estimated at over 22,000 people, will directly benefit from the clearance and awareness activities of UXO Lao. Most beneficiaries are subsistence farmers from ethnic minorities in remote areas who will benefit from improved land accessibility and availability and a safer living and working environment. UXO Lao staff in Savannakhet Province who are also direct beneficiaries include de-miners, surveyors, community awareness (CA) workers and support staff, totalling 160 employees. Staff will benefit from training aimed at safer, more efficient and more diverse unexploded ordinance identification, removal and destruction.
  • 50. 50 Checklist: all the good questions to bear in mind when drafting a project proposal 1. Before writing the proposal: • Is the stakeholder analysis done and complete? • Have I established a coherent problem tree and a concrete problem ? • Have objectives, results and activities been discussed with all partners and accepted ? • Do I know the donor to whom I will send my proposal (e.g. mandate, criteria, specific format, etc.)? • Is there an internal organisation that has been set up within your organisation around this proposal ? Does each person know her tasks ?
  • 51. 51 Checklist: all the good questions to bear in mind when drafting a project proposal 2. When drafting the proposal: • Is my proposal coherent:- identified problem  suggested activities  proposed outcome? • Is my proposal precise enough (e.g. explanation of expected results and intended activities, definition of SMART indicators)? • Is my proposal understandable by everybody (not too many technical terms, theories explained, etc.)? • Have I really respected the donor’s criteria ? • Have I put the information in the correct place ? • Have I corrected all the spelling mistakes ?
  • 52. 52 Thankyou Adapted for Health Poverty Action by Tony Hobbs from original material and case study by Handicap International

Editor's Notes

  • #2: A course for mid level NGO workers. Add a presentation on planning and one on the logframe to make a one day course (5-8 hours) Present it alone as a half day module of a longer course - part eight of eight in a short course on Project Cycle management, or part 10 in a course of 10 units on project cycle and general management. This module alone 3-4 hours. Sample Schedule for a stand-alone one day course: 9.30 - 9.40 Introduction of participants and facilitators 9.40 - 9.50: Expectations from the participants (If you use a flipchart it can stay up all day) 9.50 - 9.55: Introduction to the whole session: General recommendations/ LFA-Group exercise/ Contents of a project proposal-group exercise 9.55 - 10.05: Brainstorming: what does it take to write a winning proposal? 10.05 - 10.35: Presentation on Project Planning 10.35 - 11.15: Presentation on the LFA 12.15 - 13.15: Lunch Break 13.15 - 13.45: Group exercise LFA (15 min for actual work, 5 min for presentations by each group) 13.45 - 14.15: This Presentation on the contents of a project proposal 14.15 - 14.25: Introduction to the group exercise 14.25 - 14.55: Group exercise 14.55-15.20: tea/coffee break 15.20-15.50: presentation and discussion 15.50-16.00: Evaluation of the session
  • #3: Do your housekeeping here if you haven’t already – rules, times, exercises, contributing to discussion and exercises. If you did pre-planning and logical frameworks on a previous day you could recap here.
  • #4: This is how you first share an idea for consideration It is a crucial document: donors will decide whether or not to finance your project based on what you have written. It should reflect thoughtful planning, it is therefore the last stage of project planning
  • #5: Covered in earlier modules
  • #6: Demand from the community + Needs as defined by project staff and specialists = identification of the problem to be tackled. What are the resources available that can be mobilised: human/material/financial (within your organisation, your community and outside)? Do you have the capacity to tackle this problem? If you do, your project idea is likely to be relevant. Once the project idea is identified, it needs to be carefully planned.
  • #7: Write a proposal only when your project idea is already well defined, you have selected an approach and your target group. Get your thoughts clear before you write the project proposal. Make sure that your project answers a need and a demand and that you have the resources to address it. Be logical and coherent - there are some tools which can be used for that (see second part of the presentation) Make sure to stick to the donor’s mandate, values and criteria for appraising proposals (without compromising your own values and identity). To put it in a nutshell: what you need is COMMON SENSE!
  • #9: Which donor/funder has a mandate which is compatible with your project idea? ex. Refugees => UNHCR What are your potential donors’ preferences? Look for their country strategy papers or existing areas of intervention: geographical area? Sector (health, education, environment, etc.)? Target groups? Project size (big/small)? Type of project (e.g. infrastructure vs. capacity-building or advocacy, emergency vs. development)? What are their selection criteria and are you likely to be selected? Get their grant application form and guidelines and look for their evaluation grid (ex. Local partnership, involvement of beneficiaries, gender dimension, etc.)
  • #10: Stay within the donor’s criteria and values – if you can’t, find another funder
  • #11: The reader should discover your project following a logical thread: Background - Problem - Solution – Sustainability Do not assume that funders know the problem you are dealing with, give them enough information to understand the situation and appreciate the need for your project Ensure internal coherence between: Problem - Objectives- Means Many donors follow the Logical Framework Approach (DFID, GTZ, EC, AusAid), it helps to ensure internal logic and coherence of a project (and therefore of the project proposal). It should be used as a planning tool and not filled in mechanically.
  • #13: Simple unemotive language. If you want to add emotion append a case study
  • #15: Why it is important: Is the first thing that is read (good impression or bad impression on the proposal) Sometimes, is the only thing that is read… It can be used by the donor to communicate about the project
  • #16: Contents: What do you propose to do? Where? Why? For whom? With whom? For how long?
  • #17: DO : Write it only when you have finished writing the rest of the proposal Do it carefully Be concise (2 pages maximum) DON’T : Use the “cut and paste” technique.
  • #18: Why it is important? To establish credibility and image of a well-managed organization that meets critical needs in its area of work Tips Should not be too long If you are approaching a new donor, attach in appendix a presentation brochure and/or the last annual or activity report
  • #19: Who are you? What is your organisations’ philosophy and mandate? What is your history and significant interventions/ track record? What is your expertise in addressing the problem stated in the proposal? Organisational structure Major sources of support Affiliations/accreditations/ linkages (if any) Uniqueness (if any)
  • #20: Especially relevant for projects linked to a previous project (second phase) or a bigger programme Contents: Who took the initiative? Does the project fit into an existing development plan or programme? Is the project part of a more complex programme? Is this the first phase of the project, or the continuation of an activity already undergoing? If this is the case, which have been the main result of the previous phase? What studies have been done to prepare the project? Who else operates in this field?
  • #21: Tips Reading the project background must clearly show that : The project arises from the beneficiaries and/or the local partners You know very well the local context You have the experience needed to run the project successfully, you have been successful before
  • #22: Why it is important? Unless donors are convinced that there is a real problem, they will not agree to disburse money for our project ! The problem statement is the reason why you are writing a proposal! Tips A “good” problem is expressed as follows: it should concern people it should be concrete it should be solvable (you have the resources to solve it or you can easily mobilise them) and measurable in a meaningful and timely way it should arise from a demand made by the beneficiaries it should be an emergency or priority: why tackle this problem now and not later? Why this particular problem and not another? The implications should be clear: what will happen if the problem is not solved?
  • #23: Description of the condition or situation you wish to change: scope and magnitude (with as many facts and figures as possible), what is the current situation? Don’t assume that your donor knows everything, give him as much information as possible but in a logical sequence: What are the immediate causes of the problem? What are the underlying causes of the problem? What are the effects of the problem? How does it affect people? Why does it have to be addressed? (what will happen if the problem is not solved?) Why now and not later? Editing Tip: the issues can come alive through the use of concrete stories as an example, it is sometimes more appealing than an enumeration of statistics and data
  • #24: GOAL(S): Describes what your project (together with other development actors) will contribute to. Refers to the impact(s) of the problem your project is tackling. Specific Objective(s) or Project Purpose Describes what your particular project will do (positive formulation of the problem). Expected Results Describes the outputs or concrete results of your project (through its activities and resources) which link to desired outcomes Expected results are important: A donor will finance results and not objectives. Reading the project, he/she should be able to visualise the project results!
  • #25: Objectives should be measured against SMART indicators: Specific = they must reflect the problem identified and the impact (outcome or overall goal) and link to activities (specific objectives/expected results) Measurable = they should be measured by concrete indicators which show the extent of change with data that is available in good time at reasonable cost and is attributable to the project activities Attainable = targets are set realistically and are achievable within the project timeframe Relevant = they must fit with the project socio-cultural environment Timely = progress must be visible by the end of the project
  • #26: Clearly identify direct and indirect beneficiaries: Directly receiving support Indirectly benefiting How many beneficiaries? Where? Characteristics? Gender? Age group (if relevant)? Socio-economic status etc. Specify how and at what stage they will be involved in the project: design, implementation, management, evaluation
  • #27: Contents Partners Project implementation Activities Risks and assumptions Means Why it is important? Indicates how objectives will be achieved
  • #28: Clearly distinguish between main partners and other partners Provide background information on your partner: Goals/philosophy? Area of intervention? Relationship with the beneficiaries? Cooperation track-record? Describe the type of partnership you set up Specify each partner’s role in the project (both in the project identification and in project management)
  • #29: Rationale for selecting a particular or unique methodology (has it been tested or will it be pioneered in this project? Project implementation structure: roles and responsibilities of all the project stakeholders, special bodies (project steering committee etc.), orgainigram, chart.
  • #30: Activities: What will be done? How? By whom? Where? By when? Tips Be as precise as possible and give enough details to reassure the donor Cluster activities by expected result and number them accordingly Use a work plan to summarise:
  • #31: Example: training How many persons? For how long? Which methodology will be used (seminars, in-house training, ad hoc courses, etc.) Why is the training necessary? Which new skills will the trainees acquire?
  • #32: Risks/Assumptions: A risk is an external factor that could potentially jeopardise your project and is beyond the control of the project management Assumptions describe those external factors which are important for achieving your objectives Why it is important? It helps assess the factors which could jeopardise your project It helps examine the project for completeness and consistency: if a risk has been identified that is likely to happen and affect your project, then you should include activities that will reduce it, adapt to it, or change your strategy altogether You have to avoid the “killer assumption” that could destroy the project
  • #33: Means: Human resources: Explain the responsibilities and tasks of each key person in the project. Justify the need for expatriate personnel, why not local hire Material resources: Give an explanation of the most important budget lines Justify vehicles, how they will be used and not misused Take care with assets – what happens to them after the project, can they be shared Tips Includes credentials of key staff, special qualifications or job description Be realistic and honest in your assessment
  • #34: Contents Budget itself Budget explanations and justifications: you need to justify the main budget lines. You can also analyse your budget in the narrative Tips Prepare your budget using your Plan of Action: Activities/Timeframe-> Means required-> how much it costs-> add for each budget line, year by year Don’t inflate the budget: enquire about unit costs, enter only those costs which correspond to project activities Follow carefully donor’s requirements (e.g. eligible costs, administrative costs) Disaggregate your budget for each year and pay attention to cash flow (are there large upfront expenses in the first year, or increasing activity costs as the project develops?)
  • #35: Why it is important? Monitoring: to see whether your project is on track Evaluation: to assess whether your project is effective, efficient, has an impact, is relevant, sustainable… Remember: You need to provide guarantees that you will provide timely and accurate reports and that you will build on the lessons you learn throughout the project. Where do you get the information from : indicators column in the logframe/ means of verification => M&E plan Contents What is monitored? Why? By whom? How often? Using which tools and methods? baseline survey, regular reports, specific studies, research
  • #36: Institutional Sustainability : Who will own the property acquired under the project? Who will be responsible for the project after completion? How will the project be managed, maintained and run once the financing comes to an end? Technical Sustainability: has the staff the capacity to manage the project or continue the activities (skills, knowledge, equipment)? Socio-cultural Sustainability : how do you ensure that the project is accepted by the communities and by the beneficiaries? (involvement of beneficiaries). How will the project significantly affect their lives after it is completed? Can the project be replicated elsewhere? Financial Sustainability : How will any project operating expenses be met? (cost recovery, grants from the government, etc.) Most funders like to see organisations develop the capacity to raise their own funds over the long run (through membership development, major donors, programme services fees, benefit events etc.) Why is it important? This is a very important section of the proposal because... Donors want to be sure that their investment will not be lost at the end of the project and that we are already planning the phasing out of the project, including the impact on the beneficiaries of the removal of support. A project is unlikely to be funded if donors perceive that after the project the situation will return to as it was before.
  • #37: Contents Glossary Maps (sometimes better at the beginning of the proposal, sometimes better two maps: now and after) Statistics/ policy documents Proof of registration and tax benefits for donors Financial statement Composition of Board of Directors List of major donors to your organisation Annual report, brochures & publications Specific studies or evaluation reports Memorandum of agreement with partners Letters of support Pictures Others...
  • #39: Lunch Break Please be punctual!
  • #40: This is the package you put together to send to the donor
  • #42: Group exercise II: Design a mini project proposal