SlideShare a Scribd company logo
Building Construction Technology I
PracticalSession no. 2
02.03.2012
Who appoints who?
- The Investor, (himself)
- The Designer, (The Investor)
- The main site Engineer, (The Contractor)
- Project Manager / Manager of works, (The Investor)
- The Contractor, (The Investor)
- The main Contractor, (The Investor)
- The construction site workers, (The Contractor)
- The Inspection, (The Ministry)
- The Supervisor, (The Investor)
Who is responsible for?
- To make the buildings comply with relevant regulations, ( The ProjectManager )
- Informing investors, building inspection and other of any deficiencies or irregularities
before and during construction, ( The Supervision Eng. )
- For the completeness and harmonization of works formutual coherence of
implementation the contractors, ( The main site Eng. )
- Coordinating the implementation of regulations governing safety and health of workers
during construction works, ( The main site Eng. )
- Fencing / enclosing the construction site, ( The Contractor )
- Issuing building permits ( The Ministry )
- Issuing a solution/permit forremoving buildings, ( The inspection )
- Administrative supervision over the implementation of the Law on Spatial Planning and
the regulations issued under that act, ( The Ministry )
- the legality of the actions of authorities and persons with public authorities relating to
the Spatial Planning and building, ( The Ministry )
- Running the Construction dairy, ( Site engineer assistant )
- Ensuring the needed machinery, ( the Contractor )
- Maintaining the building during its lifetime, (The Investor)
- Maintaining the building after its lifetime, (The customer )
Define the:
- Construction: (objectcreated by constructing works, connected to ground, performed
from building products with common installations and equipment, or integrated
complex with facility or equipment as wellas technical - technological units or solo
installations connected to the ground. )
- Construction Works: (Performing constructionaland other works (preparation, land,
and structural, installation, finishing and mounting of construction products, plant or
equipment) with whichnew buildings are built, existing buildings are reconstructed,
removed or maintained. )
- Constructing: (the process of designing,
constructing, usage and removal of the construction (building), everything that is
related to the constructing of the new buildings can be applied in an appropiate way to
reconstructing, maintance and removal of the old buildings. )
- Construction site: (is a place,land or buildings (including other areas that are
temporarily occupied ) needed to execute the constructionworks or the application of
appropriate building technology and security, on which to build, reconstruct, remove or
perform maintenance workbuilding).
- Maintenance of buildings: (Performing constructional and other worksto preserve
the essential requirements of a building during its lifetime, withwhich does not change
the compliance with the conditions at the locationof the building in accordancewith
whichit is built.)
Put these actions in order:
- Working permit (7)
- Conceptual project (2)
- Execution project (6)
- Urban permit (3)
- Use permit (9)
- Appointing the main construction site engineer (8)
- Appointing the designer (1)
- Appointing the contractor (5)
- Main project (4)
Construction site shall be marked with: (name 4 things or more)
- Name of investors, the designer, contractorsand persons carrying out construction
supervision
- Name and type of buildings that is being built
- The name of the authority issuing the document upon whichto build
- Classification code, register number, date of issue and validity of the act upon which to
build
- An indication that it is a cultural property that is the national monument
Contractor on construction site must have: (name 8 things or more)
- The decision on registration in courtregister, or craftslicense.
- Approval for performing the constructionand performance of and the contracton the
association contractorsunder special legislation.
- Act on appointment of chief site engineer, site engineer and works manager.
- Act on appointment of supervisor or principal supervisor.
- A decision on building conditions, confirmation of the main project, or construction
permit from the conceptual or main project.
- Performing projects with the opinion of chief designer of the project and certified by the
reviser that Requested it in a report on the controlof the main projects requested , for
the previously constructed part of the building , constructionand other works that are
in progress with all amendments.
- Reviser's report on completed inspection of the execution project if required.
Construction Diary.
- Evidenceof compliance forconstruction products installed.
- Evidenceof compliance by a special law for the installed equipment.
- Identifications of Compliance for certain parts of certain constructionessential.
- Special requirements according to law and quality evidence that is requested by the law,
special regulation or project to collectduring the execution of constructionwork and
other commitments and implementation of control procedures forthe previously
constructed part of the building and construction and other worksin progress.
- Survey projectof the buildings.
- Other documents, licenses and permits for whichspecial regulations stipulates that the
contractorafter the start of constructionof the building must have at the site.

More Related Content

PPTX
Building Construction Class 2. definitions
DOCX
Building Construction 3. responsibilities of participants
PPTX
Building Construction and Tech. 3. Responsibilities of participants
PPTX
Building Construction 7. construction site
PPTX
4. offer tendering - site
PPTX
Site organization and networking techniques
PPTX
Diploma(civil) sem i boce_unit 3_building construction a
PPTX
Unit 3.building construction
Building Construction Class 2. definitions
Building Construction 3. responsibilities of participants
Building Construction and Tech. 3. Responsibilities of participants
Building Construction 7. construction site
4. offer tendering - site
Site organization and networking techniques
Diploma(civil) sem i boce_unit 3_building construction a
Unit 3.building construction

What's hot (18)

DOCX
Yenimi CV Version 2
PPTX
9. introduction to site preparation
PDF
Building construction-report (1)
PPTX
4 storied building superstructure construction proposal
PDF
Site layout cpm module4
ODT
cv2015march
PDF
Bcon Report
DOCX
re mohammed bataiha cv 20082015
ODT
Birhanu
PDF
Ici individual
DOCX
majdi C.V
DOCX
Industrial trainning project report for Civil Engineering
PPTX
Building Construction: Experiencing Construction
DOCX
Building Industrial Training report for CIVIL ENGINEERING
PDF
Building Construction 1 Project 1 2016
DOC
Project on construction of 3 block house report
PPTX
Building project presentation
Yenimi CV Version 2
9. introduction to site preparation
Building construction-report (1)
4 storied building superstructure construction proposal
Site layout cpm module4
cv2015march
Bcon Report
re mohammed bataiha cv 20082015
Birhanu
Ici individual
majdi C.V
Industrial trainning project report for Civil Engineering
Building Construction: Experiencing Construction
Building Industrial Training report for CIVIL ENGINEERING
Building Construction 1 Project 1 2016
Project on construction of 3 block house report
Building project presentation
Ad

Viewers also liked (10)

PPTX
Innovations in Construction
PDF
Building contruction and housing sector in myanmar 2014
PPTX
101 Level 1 Principles of building construction, information and communication
PDF
12 construction safety
PPTX
Space frame
PPTX
Folded plate structure
PPT
Principles Of Marketing 1
PPT
Stages in Construction
PPTX
Space frames
PPTX
Building Construction
Innovations in Construction
Building contruction and housing sector in myanmar 2014
101 Level 1 Principles of building construction, information and communication
12 construction safety
Space frame
Folded plate structure
Principles Of Marketing 1
Stages in Construction
Space frames
Building Construction
Ad

Similar to Building Construction 2. rules and definition in construction (20)

DOCX
Building Construction 2. rules and definition in construction
PPTX
md zaid internship ppt.pptx.mini project o
DOCX
Building Construction and Technology
PPTX
Unit 7-Project management(Edexel)-Lesson 1
PPTX
Construction site supervision aalecture one.
PPTX
Construction phases
DOC
Rishabh kumar
PPTX
National building code
PDF
BUILDING CONSTRUCTION REPORT
PPTX
Industrial Training On Construction At Simplex Infrastructures Ltd
DOCX
UNIT 3 - Building Trades.docx
PDF
Richard castro_CV
PPTX
Sem 2 Building Construction Project 1
PPTX
One Storey Building Construction (Pre-Construction Process)
DOC
Josefino Waje cv 2
PDF
Site civil engineer fiazuddin
PDF
Eng.ahmed
DOC
Ms compiled report
PDF
Constructionmethodologyandprojectmanagementreport
DOCX
Construction Management Jump StartChapter 5Project Sta.docx
Building Construction 2. rules and definition in construction
md zaid internship ppt.pptx.mini project o
Building Construction and Technology
Unit 7-Project management(Edexel)-Lesson 1
Construction site supervision aalecture one.
Construction phases
Rishabh kumar
National building code
BUILDING CONSTRUCTION REPORT
Industrial Training On Construction At Simplex Infrastructures Ltd
UNIT 3 - Building Trades.docx
Richard castro_CV
Sem 2 Building Construction Project 1
One Storey Building Construction (Pre-Construction Process)
Josefino Waje cv 2
Site civil engineer fiazuddin
Eng.ahmed
Ms compiled report
Constructionmethodologyandprojectmanagementreport
Construction Management Jump StartChapter 5Project Sta.docx

More from Hamdija Velagic (20)

PDF
Introduction to Arch Week 14
PDF
Introduction to Arch Week 13
PDF
Introduction to Arch Week 11
PDF
Introduction to Arch List of potential questions
PDF
Architecture form space order
DOCX
8. formwork and scaffolding
PPT
8. formworks and scaffoldings
PPT
Building Construction 8. formworks and scaffoldings
DOCX
Building Construction 6. intro to building materials
PPTX
6. intro to building materials
DOCX
5. construction equipment Building Construction
PPTX
5. construction equipment Building Construction
PPTX
5. construction equipment Building Construction
PDF
Intro to Architecture Week 5 [compatibility mode]
PDF
New Intro to Architecture Week 4
DOCX
Building Construction 4. tender offer
PDF
Intro to Arch Week 4 [compatibility mode]
PPTX
Building Construction 4. offer tendering - site
PDF
Into. to Arch Week 3
PDF
Into. to Arch Week 2
Introduction to Arch Week 14
Introduction to Arch Week 13
Introduction to Arch Week 11
Introduction to Arch List of potential questions
Architecture form space order
8. formwork and scaffolding
8. formworks and scaffoldings
Building Construction 8. formworks and scaffoldings
Building Construction 6. intro to building materials
6. intro to building materials
5. construction equipment Building Construction
5. construction equipment Building Construction
5. construction equipment Building Construction
Intro to Architecture Week 5 [compatibility mode]
New Intro to Architecture Week 4
Building Construction 4. tender offer
Intro to Arch Week 4 [compatibility mode]
Building Construction 4. offer tendering - site
Into. to Arch Week 3
Into. to Arch Week 2

Recently uploaded (20)

PPT
340036916-American-Literature-Literary-Period-Overview.ppt
PDF
COST SHEET- Tender and Quotation unit 2.pdf
PDF
Chapter 5_Foreign Exchange Market in .pdf
PDF
Roadmap Map-digital Banking feature MB,IB,AB
PPT
Data mining for business intelligence ch04 sharda
PPTX
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
PPTX
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
PDF
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
PPTX
ICG2025_ICG 6th steering committee 30-8-24.pptx
PPTX
Probability Distribution, binomial distribution, poisson distribution
PPTX
Amazon (Business Studies) management studies
PPTX
HR Introduction Slide (1).pptx on hr intro
PPTX
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
PDF
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
DOCX
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
PDF
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
PDF
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
PPTX
Belch_12e_PPT_Ch18_Accessible_university.pptx
DOCX
unit 1 COST ACCOUNTING AND COST SHEET
PDF
Ôn tập tiếng anh trong kinh doanh nâng cao
340036916-American-Literature-Literary-Period-Overview.ppt
COST SHEET- Tender and Quotation unit 2.pdf
Chapter 5_Foreign Exchange Market in .pdf
Roadmap Map-digital Banking feature MB,IB,AB
Data mining for business intelligence ch04 sharda
AI-assistance in Knowledge Collection and Curation supporting Safe and Sustai...
CkgxkgxydkydyldylydlydyldlyddolydyoyyU2.pptx
kom-180-proposal-for-a-directive-amending-directive-2014-45-eu-and-directive-...
ICG2025_ICG 6th steering committee 30-8-24.pptx
Probability Distribution, binomial distribution, poisson distribution
Amazon (Business Studies) management studies
HR Introduction Slide (1).pptx on hr intro
Board-Reporting-Package-by-Umbrex-5-23-23.pptx
Katrina Stoneking: Shaking Up the Alcohol Beverage Industry
unit 2 cost accounting- Tender and Quotation & Reconciliation Statement
Elevate Cleaning Efficiency Using Tallfly Hair Remover Roller Factory Expertise
pdfcoffee.com-opt-b1plus-sb-answers.pdfvi
Belch_12e_PPT_Ch18_Accessible_university.pptx
unit 1 COST ACCOUNTING AND COST SHEET
Ôn tập tiếng anh trong kinh doanh nâng cao

Building Construction 2. rules and definition in construction

  • 1. Building Construction Technology I PracticalSession no. 2 02.03.2012 Who appoints who? - The Investor, (himself) - The Designer, (The Investor) - The main site Engineer, (The Contractor) - Project Manager / Manager of works, (The Investor) - The Contractor, (The Investor) - The main Contractor, (The Investor) - The construction site workers, (The Contractor) - The Inspection, (The Ministry) - The Supervisor, (The Investor) Who is responsible for? - To make the buildings comply with relevant regulations, ( The ProjectManager ) - Informing investors, building inspection and other of any deficiencies or irregularities before and during construction, ( The Supervision Eng. ) - For the completeness and harmonization of works formutual coherence of implementation the contractors, ( The main site Eng. ) - Coordinating the implementation of regulations governing safety and health of workers during construction works, ( The main site Eng. ) - Fencing / enclosing the construction site, ( The Contractor ) - Issuing building permits ( The Ministry ) - Issuing a solution/permit forremoving buildings, ( The inspection ) - Administrative supervision over the implementation of the Law on Spatial Planning and the regulations issued under that act, ( The Ministry ) - the legality of the actions of authorities and persons with public authorities relating to the Spatial Planning and building, ( The Ministry ) - Running the Construction dairy, ( Site engineer assistant ) - Ensuring the needed machinery, ( the Contractor ) - Maintaining the building during its lifetime, (The Investor) - Maintaining the building after its lifetime, (The customer )
  • 2. Define the: - Construction: (objectcreated by constructing works, connected to ground, performed from building products with common installations and equipment, or integrated complex with facility or equipment as wellas technical - technological units or solo installations connected to the ground. ) - Construction Works: (Performing constructionaland other works (preparation, land, and structural, installation, finishing and mounting of construction products, plant or equipment) with whichnew buildings are built, existing buildings are reconstructed, removed or maintained. ) - Constructing: (the process of designing, constructing, usage and removal of the construction (building), everything that is related to the constructing of the new buildings can be applied in an appropiate way to reconstructing, maintance and removal of the old buildings. ) - Construction site: (is a place,land or buildings (including other areas that are temporarily occupied ) needed to execute the constructionworks or the application of appropriate building technology and security, on which to build, reconstruct, remove or perform maintenance workbuilding). - Maintenance of buildings: (Performing constructional and other worksto preserve the essential requirements of a building during its lifetime, withwhich does not change the compliance with the conditions at the locationof the building in accordancewith whichit is built.) Put these actions in order: - Working permit (7) - Conceptual project (2) - Execution project (6) - Urban permit (3) - Use permit (9) - Appointing the main construction site engineer (8) - Appointing the designer (1) - Appointing the contractor (5) - Main project (4) Construction site shall be marked with: (name 4 things or more) - Name of investors, the designer, contractorsand persons carrying out construction supervision - Name and type of buildings that is being built - The name of the authority issuing the document upon whichto build
  • 3. - Classification code, register number, date of issue and validity of the act upon which to build - An indication that it is a cultural property that is the national monument Contractor on construction site must have: (name 8 things or more) - The decision on registration in courtregister, or craftslicense. - Approval for performing the constructionand performance of and the contracton the association contractorsunder special legislation. - Act on appointment of chief site engineer, site engineer and works manager. - Act on appointment of supervisor or principal supervisor. - A decision on building conditions, confirmation of the main project, or construction permit from the conceptual or main project. - Performing projects with the opinion of chief designer of the project and certified by the reviser that Requested it in a report on the controlof the main projects requested , for the previously constructed part of the building , constructionand other works that are in progress with all amendments. - Reviser's report on completed inspection of the execution project if required. Construction Diary. - Evidenceof compliance forconstruction products installed. - Evidenceof compliance by a special law for the installed equipment. - Identifications of Compliance for certain parts of certain constructionessential. - Special requirements according to law and quality evidence that is requested by the law, special regulation or project to collectduring the execution of constructionwork and other commitments and implementation of control procedures forthe previously constructed part of the building and construction and other worksin progress. - Survey projectof the buildings. - Other documents, licenses and permits for whichspecial regulations stipulates that the contractorafter the start of constructionof the building must have at the site.